Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 616.8, EPG 616.27)
m (EPG 236.5.16)
Line 27: Line 27:
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 +
|-
 +
|[[image:Main Page Apr 2, 2018.jpg|center|400px|thumb|''' <center>  MoDOT is repairing [http://www.modot.org/kansascity/major_projects/I_470_Bridges.htm 15 bridges along I-470 from Blue Ridge Blvd. to I-70].  Crews are progressing well on the Cedar Cr. Bridge in Lee’s Summit.      </center>''']]
 
|-
 
|-
 
|[[image:Main Page Mar 27, 2018.jpg|center|400px|thumb|''' <center>  (L to R) Sr. Traffic Studies Specialist Jeff Baird, a private citizen, Area Engr. Karen Yeomans and Proj. Manager Jenn Becker talk at a public hearing in Brentwood, MO about [http://l.facebook.com/l.php?u=http%3A%2F%2Fwww.modot.org%2Fstlouis%2Fnews_and_information%2FDistrict6Release.shtml%3Faction%3DdisplaySSI%26newsId%3D214955&h=ATOG4rzxJ4soZGAJRbM4OVu2ySBzAcOH4IXD9vJ7ArYnqUuts53-TSSRXponQihxWQx_hpEyrgMzBuMQ3KxuQJbwMf4X6QOUfiWogCwFq4dcoefabtJFF6UQHcrEGomThd3X construction along Manchester Rd. between Lindbergh and Big Bend] scheduled for 2020.      </center>''']]
 
|[[image:Main Page Mar 27, 2018.jpg|center|400px|thumb|''' <center>  (L to R) Sr. Traffic Studies Specialist Jeff Baird, a private citizen, Area Engr. Karen Yeomans and Proj. Manager Jenn Becker talk at a public hearing in Brentwood, MO about [http://l.facebook.com/l.php?u=http%3A%2F%2Fwww.modot.org%2Fstlouis%2Fnews_and_information%2FDistrict6Release.shtml%3Faction%3DdisplaySSI%26newsId%3D214955&h=ATOG4rzxJ4soZGAJRbM4OVu2ySBzAcOH4IXD9vJ7ArYnqUuts53-TSSRXponQihxWQx_hpEyrgMzBuMQ3KxuQJbwMf4X6QOUfiWogCwFq4dcoefabtJFF6UQHcrEGomThd3X construction along Manchester Rd. between Lindbergh and Big Bend] scheduled for 2020.      </center>''']]
|-
 
|[[image:Main Page Feb 27, 2018.jpg|center|400px|thumb|''' <center>  To construct the Perry County Rte. AC Connector Rd., much consideration went into preserving the grotto sculpin’s habitat.  On almost 5 acres, MoDOT will use appropriately sized, rock-lined, flat-bottomed ditches, grass swales, sediment basins and silt fences for extra treatment of highway runoff. MoDOT also protected a sinkhole from future development. These water quality improvements are expected to enhance the habitat of this endangered species.      </center>''']]
 
 
|}
 
|}
  
Line 68: Line 68:
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[[236.5 Property Management#236.5.16 Legal Opinion of Title|EPG 236.5.16.1 Fee Simple vs. Less Than Fee Simple Interest]]'''
 +
 +
4/2/18: Clarified guidance about the legal title of opinion for excess property appraised for $25,000 or less that includes any references to right of way in the acquisition deed.
 +
 
'''Light Bar Guidance'''
 
'''Light Bar Guidance'''
  
Line 163: Line 167:
  
 
2/1/18: In [[:Category:128 Conceptual Studies#128.2 Preventive Maintenance Projects (1R and 2R)|EPG 128.2 Preventive Maintenance Projects (1R and 2R)]] and [[231.2 Clear Zones#231.2.1 Introduction|EPG 231.2 Clear Zones]], the guidance regarding clear zones and roadside hardware for 1R and 2R projects was condensed and clarified.
 
2/1/18: In [[:Category:128 Conceptual Studies#128.2 Preventive Maintenance Projects (1R and 2R)|EPG 128.2 Preventive Maintenance Projects (1R and 2R)]] and [[231.2 Clear Zones#231.2.1 Introduction|EPG 231.2 Clear Zones]], the guidance regarding clear zones and roadside hardware for 1R and 2R projects was condensed and clarified.
 
'''[[131.1 Design Exception Process#131.1.4 The Design Exception Process|EPG 131.1.4 The Design Exception Process]]'''
 
 
1/26/18: Design Exceptions are to be stored electronically in eProjects after Central Office Design and/or Bridge divisions have reviewed and approved.
 

Revision as of 12:08, 2 April 2018

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
MoDOT is repairing 15 bridges along I-470 from Blue Ridge Blvd. to I-70. Crews are progressing well on the Cedar Cr. Bridge in Lee’s Summit.
(L to R) Sr. Traffic Studies Specialist Jeff Baird, a private citizen, Area Engr. Karen Yeomans and Proj. Manager Jenn Becker talk at a public hearing in Brentwood, MO about construction along Manchester Rd. between Lindbergh and Big Bend scheduled for 2020.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 40 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.


Perhaps you've wondered how many hits the most popular EPG articles have. As of early April, the numbers of hits are:
20. EPG 136 169099  10. EPG 751.5 237670
19. EPG 134 177018  9. EPG 616.23 273447
18. EPG 751.40 179275  8. EPG 600 275202
17. EPG 136.4 179447  7. EPG 100 325407
16. EPG 620.2 188951  6. EPG 700 341340
15. EPG 903 197327  5. EPG 900 360302
14. EPG 200 204179  4. EPG 101 385447
13. EPG 751.50 206387  3. EPG 136.12 389381
12. EPG 136.9 216787  2. EPG 751 455260
11. EPG 616 222280  1. EPG Main Page 3094425

EPG 236.5.16.1 Fee Simple vs. Less Than Fee Simple Interest

4/2/18: Clarified guidance about the legal title of opinion for excess property appraised for $25,000 or less that includes any references to right of way in the acquisition deed.

Light Bar Guidance

4/2/18: In EPG 616.8 Typical Applications, light bar policy in TA-35 and TAs 35a-d was clarified by highlighting in a note that the light bar is optional. Also, Light Bar guidance in EPG 616.27 Fleet Lighting was updated.

Obtaining DBE Concurrence Electronically in eAgreements

3/28/18: DBE Concurrence may now be electronically obtained in eAgreements. MOU execution process, consultant contract and supplemental agreement guidance was updated.

EPG 751.2.2 Transient Loads

3/27/18: Wind pressure on vehicles, braking force and centrifugal force are assumed to act horizontally at the roadway surface, per AASHTO agenda.

Contract Leveling Course (CLC) and Seal Coat

3/27/18: The Contract Leveling Course and Seal Coat guidelines, pdf files, as well as their respective JSP packages were updated.

EPG 103.1.6.6.1.2 File Naming Convention for Plan Sheet Changes

3/20/18: Guidance was updated for ProjectWise.

EPG 237.14 Electronic Design Data Delivery

3/16/18: EPG 237.14 has been completely rewritten and updated. Please carefully read and note the changes.

EPG 751.1.2.21 Substructure Type

3/9/18: Guidance for minimum galvanized penetration (elevation) was added for piles for retaining walls supported on piles and bridge end bents on piles with embankments supported by MSE walls.

TMA Light Bar

3/8/18: In EPG 612.1.3 MoDOT Protective Vehicle/TMA Guidelines, the TMA Light Bar is now temporarily optional and not required to be purchased for use. In EPG 616.8 Typical Applications, TA-35 MT and TAs 35a-35d MT were also updated with this information.

Tack Coat Estimate Factors

2/27/18: The tack coat estimate factors were updated in EPG 450 Bituminous Pavement Design.

EPG 146.2 DBE Subcontract

2/22/18: Clarified guidance regarding overruns and underruns as they relate to DBE participation.

DBE Concurrence and Executing Consultant Contracts

2/16/18: Guidance in EPG 134.2.4 MoDOT MOU Execution Process, EPG 134.4 Contract Approval, Execution and Distribution, EPG 134.5.2 Supplemental Agreements and EPG 153.8 Design now directs that DBE Concurrence must be requested prior to executing consultant contracts.

D-15 Material List

2/9/18: In 237.7 Equipment and Materials List, designers are now required to include the D-15 in the Electronic Deliverables.

EPG 616.6.89 Radar Speed Advisory Assembly

2/9/18: Expanded and updated guidance on the placement of the Radar Speed Advisory Assembly.

Revised Galvanized Pile Requirements

2/9/18: In EPG 702 Load-Bearing Piles, EPG 751.1.2 Bridges/Boxes, EPG 751.36 Driven Piles, EPG 751.50 E2, EPG 751.50 G, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) and replace it with AASHTO M 270, Gr 50 (ASTM A709, Gr 50). 

Pipe Culverts

2/9/18: Guidance has been clarified and completely rewritten to be in accordance with pipe specifications. This includes the new articles EPG 724 Pipe Culverts and EPG 1041 Polypropylene Culvert Pipe and the re-titled EPG 730 Thermoplastic Pipe Culverts. EPG 732 Flared End Sections, EPG 750.7.2 Types, EPG 1028 Corrugated Polyvinyl Chloride Culvert Pipe and EPG 1047 Corrugated Polyethylene Culvert Pipe were also updated. EPG 728 Corrugated Polyvinyl Chloride Culvert Pipe was deleted since there is no longer a Sec 728.

Drainage relative to MSE Walls

2/9/18: Revised guidance in EPG 747.2.6.2 Mechanically Stabilized Earth (MSE) Wall Systems, EPG 751.1.2.18 Preliminary Cost Estimate, EPG 751.1.2.31 Design Exceptions, EPG 751.1.4.3 MSE Walls, EPG 751.10.3.1 Type, Alignment and Spacing , EPG 751.10.3.3 General Requirements for Location of Slab Drains, EPG 751.24.1.1 Wall Type Selection, EPG 751.24.2 Mechanically Stabilized Earth (MSE) Walls and EPG J1. General better defines where drainage/water can or cannot be discharged relative to the location of MSE walls and provides ways to divert the drainage/water in the design process.

Collars on Precast Concrete Box Culverts

2/9/18: Revisions in EPG 751.8.1.5 Precast Culvert, EPG 751.8.3.2 Steel Reinforcement and EPG 751.50 A2.8 address collars on precast concrete box culverts when cast-in-place box culverts are called for on the project. The revision also revises when/how geotextile fabric is used on precast joints. 

LED Luminaires

2/9/18: Guidance is now provided to allow the use of LED luminaires for roadway lighting in EPG 901.7 Light Source and Intensity, EPG 901.8 System Voltage, EPG 901.9 Layout, EPG 901.11, EPG 901.12 Electrical Components, EPG 901.13, EPG 901.14 Dusk-to-Dawn Lighting Policy, EPG 901.16 Construction Inspection Guidelines for Sec 901.

Request to Subcontract Work (Form C-220)

2/6/18: Guidance for a contractor to fill out Form C-220 was clarified in EPG 108.1.3 Disadvantaged Business Enterprises Subcontracting.

EPG 153.1.3.3 Agreements Written By Other Entities

2/5/18: This new guidance addresses Agreements initiated by other entities that are not initiated in eAgreements. The agreement template is initiated by the other entity, executed by the Commission and then uploaded into eAgreements Record center.

EPG 129.12 Presentation for Location or Design Approval to the Commission

2/2/18: Clarified the requirements for location and design approval, which is required even if an LPA is administering and paying for the improvement.

EPG Other Aspects of Pavement Design, Minor Roads

2/2/18: Clarification about pavement thicknesses/types sometimes not included on typical sections.

EPG 616.6.89 Radar Speed Advisory Assembly

2/2/18: Expanded and updated guidance on the placement of the Radar Speed Advisory Assembly. Also slightly updated Work Zone Questions for the Core Team in EPG 616.14 Work Zone Safety and Mobility Policy.

Clear Zones for 1R and 2R Projects

2/1/18: In EPG 128.2 Preventive Maintenance Projects (1R and 2R) and EPG 231.2 Clear Zones, the guidance regarding clear zones and roadside hardware for 1R and 2R projects was condensed and clarified.