User contributions for Smithk
Jump to navigation
Jump to search
26 May 2010
- 11:0111:01, 26 May 2010 diff hist 0 m Category:754 Bridge Engineering Assistance Program (BEAP) per Bridge, the list of current BEAP consulants was updated
- 09:3909:39, 26 May 2010 diff hist −156 m 616.23 Construction Inspection Guidelines for Sec 616 Updated guidance that workers shall, not should, wear Class 2 and 3 safety apparel to bring it into compliance with Sec 616.3.1.
25 May 2010
- 14:3114:31, 25 May 2010 diff hist +78 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) minor cosmetic revision
- 12:1012:10, 25 May 2010 diff hist 0 N File:236.6 Statewide Fee Appraiser List May 25 2010.pdf No edit summary
- 12:0912:09, 25 May 2010 diff hist +3 m 236.6 Appraisal and Appraisal Review Per RW, Roster of Approved Contract Appraisers updated
- 12:0512:05, 25 May 2010 diff hist 0 N File:236.7 Roster of Approved Contract Negotiators (Form 7-8.2) May 25.pdf No edit summary
- 12:0412:04, 25 May 2010 diff hist 0 m 236.7 Negotiation Per RW, Roster of Approved Contract Negotiators updated
- 09:4709:47, 25 May 2010 diff hist −8 m Category:1190 Graffiti Removers minor clarification
24 May 2010
- 14:0014:00, 24 May 2010 diff hist −1 m Category:702 Load-Bearing Piles →702.1.4.1 Pile Formulas: Minor correction, per Bridge
- 11:1211:12, 24 May 2010 diff hist 0 N File:101 Trainee Notification.doc No edit summary current
- 11:1211:12, 24 May 2010 diff hist 0 N File:101 Contractor Monthly Trainee Report.doc No edit summary current
- 11:1211:12, 24 May 2010 diff hist −72 m Category:101 Standard Forms →Construction and Contractor Related: per ECR, two forms updated
21 May 2010
- 14:3714:37, 21 May 2010 diff hist +5,153 m Category:138 Project Development Chronology Old road maps added
20 May 2010
- 08:1808:18, 20 May 2010 diff hist +131 m Category:1020 Corrugated Metallic-Coated Steel Culvert Pipe, Pipe-Arches and End Sections →1020.2.1.2 Sheet Manufacturer's Certified Analysis and Guarantee: Per CM, minor clarifications and link updates
19 May 2010
- 08:0108:01, 19 May 2010 diff hist +93 m Category:130 Value Engineering added VE contact link
- 06:3906:39, 19 May 2010 diff hist −1,936 m 236.8 Relocation Assistance Program →236.8.5 Relocation Assistance Program - Pre-Acquisition Requirements: Per RW, "planning" removed since it is a part of NEPA and does not need to be in EPG 236.8
18 May 2010
- 12:4412:44, 18 May 2010 diff hist −4 m 236.8 Relocation Assistance Program →236.8.15.2 Notice to Vacate: minor clarification
- 12:2712:27, 18 May 2010 diff hist −25 m Category:1047 Corrugated Polyethylene Culvert Pipe →1047.3 Sample Record: Per Physical Lab, updated GS-17 Form 1 link.
- 12:2512:25, 18 May 2010 diff hist −25 m Category:1028 Corrugated Polyvinyl Chloride Culvert Pipe →1028.3 Sample Record: Per Physical Lab, updated GS-17 Forms 1 link.
- 12:2412:24, 18 May 2010 diff hist −47 m Category:1024 Corrugated Aluminum Alloy Culvert Pipe and Corrugated Aluminum Alloy Structural Plate →1024.3 Sample Record: Per Physical Lab, updated GS-17 Forms 1 and 2 links.
- 12:2112:21, 18 May 2010 diff hist 0 N File:GS-17 Form 1.pdf No edit summary
- 12:2112:21, 18 May 2010 diff hist 0 N File:GS-17 Form 2.pdf No edit summary
- 12:2012:20, 18 May 2010 diff hist −47 m Category:1020 Corrugated Metallic-Coated Steel Culvert Pipe, Pipe-Arches and End Sections →1020.3 Sample Record: Per Physical Lab, updated GS-17 Forms 1 and 2 links.
- 11:5811:58, 18 May 2010 diff hist −34 m 643.3 Reserved for Future Use →643.3.16.3 Methods of Attachment: Clarification, per Bridge, Traffic and the Incident Response Priority Team
- 09:5609:56, 18 May 2010 diff hist +16 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) minor cosmetic adjustment
- 09:4109:41, 18 May 2010 diff hist 0 N File:806.8 SWPPP May 10.doc No edit summary current
- 09:4009:40, 18 May 2010 diff hist +146 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Environmental, removed Type 4 Preq'd Turf Reinfcmt Mats to bring article into compliance with industry standards. Also added an easily-printable pdf of EPG 806.8.
17 May 2010
- 12:4312:43, 17 May 2010 diff hist +33 m 751.6 General Quantities addition of a photo
- 12:4212:42, 17 May 2010 diff hist 0 N File:751.6.jpg No edit summary current
- 11:0911:09, 17 May 2010 diff hist +247 m Category:1001 General Requirements for Material Numerous minor corrections, per CM
14 May 2010
- 10:5310:53, 14 May 2010 diff hist 0 m Category:501 Concrete →501.1.9.3 Required Information: minor correction
- 08:2108:21, 14 May 2010 diff hist +22 m 616.27 Traffic Control for Field Operations Clarification, per Traffic and the Incident Response Priority Team
- 08:1908:19, 14 May 2010 diff hist −18 m 616.27 Traffic Control for Field Operations →616.23.2.1 Fundamental Principles: Clarification, per Traffic and the Incident Response Priority Team
- 08:1508:15, 14 May 2010 diff hist −8 m 643.3 Reserved for Future Use →643.3.1 Application for Permits: Clarification, per Traffic and the Incident Response Priority Team
- 08:1108:11, 14 May 2010 diff hist −251 m 616.26 Work Zone Level 3 Training Clarification, per Traffic and the Incident Response Priority Team
- 08:1108:11, 14 May 2010 diff hist −18 m 616.20 Work Zone Safety and Mobility Policy →616.14.2 Fundamental Principles: Clarification, per Traffic and the Incident Response Priority Team
- 08:1008:10, 14 May 2010 diff hist −20 m 616.20 Work Zone Safety and Mobility Policy →616.14.13 Roadway Capacity Considerations: Clarification, per Traffic and the Incident Response Priority Team
13 May 2010
- 10:5910:59, 13 May 2010 diff hist +71 m 751.9 Bridge Seismic Design →751.9.2.2 Checklist for Seismic Computations: minor cosmetic adjustment
- 08:5908:59, 13 May 2010 diff hist 0 m 748.5 Matching Existing Structures Updated link to EPG 131.1, formerly EPG 131.4
- 08:5608:56, 13 May 2010 diff hist 0 m 232.3 Two - Way Left - Turn Lanes Updated link to EPG 131.1, formerly EPG 131.4
- 08:5608:56, 13 May 2010 diff hist 0 m 607.1 Applications Updated link to EPG 131.1, formerly EPG 131.4
- 08:5308:53, 13 May 2010 diff hist 0 m 233.3 Roundabouts →233.3.3.1 Justification for Use:: Updated link to EPG 131.1, formerly EPG 131.4
- 08:5208:52, 13 May 2010 diff hist 0 m 230.2 Vertical Alignment →230.2.10 Bridge Considerations: Updated link to EPG 131.1, formerly EPG 131.4
- 08:5108:51, 13 May 2010 diff hist 0 m Alternate Pavement Updated link to EPG 131.1, formerly EPG 131.4
- 08:5108:51, 13 May 2010 diff hist 0 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.19 Median Acceleration Lanes: Updated link to EPG 131.1, formerly EPG 131.4
- 08:4808:48, 13 May 2010 diff hist 0 m 606.1 Guardrail Updated link to EPG 131.1, formerly EPG 131.4
- 08:4608:46, 13 May 2010 diff hist 0 m 751.1 Preliminary Design Updated link to EPG 131.1, formerly EPG 131.4
- 08:4308:43, 13 May 2010 diff hist 0 m Category:126 Location Study and Alternatives Analysis →126.3.1 Project Description: Updated link to EPG 131.1, formerly EPG 131.5
- 08:4108:41, 13 May 2010 diff hist 0 m Category:128 Conceptual Studies Updated link to EPG 131.1, formerly EPG 131.5
- 08:3608:36, 13 May 2010 diff hist 0 m Category:235 Preliminary Plans Updated link to EPG 131.1, formerly EPG 131.5