User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:25, 30 May 2014 diff hist +107 m 236.16 Outdoor Advertising
- 11:07, 30 May 2014 diff hist 0 N File:236.16 Amended Permit Cover 2014.pdf
- 10:55, 30 May 2014 diff hist +44,204 m 236.16 Outdoor Advertising Per RW, this article has been generally re-written and updated to reflect legislative changes.
- 10:40, 30 May 2014 diff hist 0 N File:236.7.2.6.docx
- 10:40, 30 May 2014 diff hist +5,030 m 236.7 Negotiation Per RW, clarification of OA Structures Considered Real Estate. New guidance for Sign Agreement Reset Program - Partial Waiver & Reset Agreement. New Form 236.7.2.6 Written Notice of the Intended Acq.
- 10:27, 30 May 2014 diff hist +122 m 236.6 Appraisal and Appraisal Review inserted links
- 10:18, 30 May 2014 diff hist -1 m 236.6 Appraisal and Appraisal Review →236.6.3.1 Standard Appraisal Format
- 10:17, 30 May 2014 diff hist +30 m 236.6 Appraisal and Appraisal Review →236.6.3.1 Standard Appraisal Format: inserted link
- 09:26, 30 May 2014 diff hist 0 N File:236.6.4.3.docx
- 09:25, 30 May 2014 diff hist -551 m 236.6 Appraisal and Appraisal Review Per RW, updated Appraisal Review and Approval of Just Compensation (Form 236.6.4.3)
- 09:12, 30 May 2014 diff hist +707 m 236.6 Appraisal and Appraisal Review Per RW, definitions are now available for "Conforming Out of Standard" structure status and the "Reset Option".
- 08:36, 30 May 2014 diff hist +4 m 236.6 Appraisal and Appraisal Review →236.6.7.2 Appraisal Format for Billboards and Sites
- 07:52, 30 May 2014 diff hist +114 m Category:101 Standard Forms Per Traffic, added WZ Inspection Form to both CM and Maintenance listings
- 07:33, 30 May 2014 diff hist 0 m Category:350 Design for Bases and Aggregate Surfaces minor correction
- 14:54, 29 May 2014 diff hist -53 m Main Page EPG 130.1.5.2
- 14:51, 29 May 2014 diff hist +780 m Category:130 Value Engineering →130.1.5.2 Non-Traditional Studies: Per EPG, new guidance is available for an additional use of the Risk Assessment as a value analysis effort.
- 10:39, 29 May 2014 diff hist -257 m Main Page EPG 606.1.3.3
- 10:17, 29 May 2014 diff hist 0 m 606.1 Guardrail →606.1.3.3 Bullnose Guardrail System: Per EPG, bullnose guidance clarification
- 07:11, 29 May 2014 diff hist +113 m LPA:136.13 LPA Policy Changes Form 136.8.25
- 07:09, 29 May 2014 diff hist -5 m LPA:136.12 Figures, Glossary and Other Useful Links Form 136.8.25
- 07:09, 29 May 2014 diff hist 0 N File:136.8.25 2014.doc current
- 07:08, 29 May 2014 diff hist -2 m LPA:136.8 Local Public Agency Land Acquisition
- 07:07, 29 May 2014 diff hist -10 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated Form 136.8.25, Sample Donation Letter and Waiver of Appraisal
- 14:25, 28 May 2014 diff hist 0 m Main Page
- 09:23, 28 May 2014 diff hist 0 N File:231.3.jpg current
- 09:23, 28 May 2014 diff hist +3 m 231.3 Lane Width added photo current
- 12:29, 27 May 2014 diff hist +288 m Main Page EPG 616.13.7
- 12:12, 27 May 2014 diff hist 0 N File:616.13.7.3.pdf current
- 12:12, 27 May 2014 diff hist 0 N File:616.13.7.2.pdf current
- 12:11, 27 May 2014 diff hist -2 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.7 Traffic Pacing
- 12:11, 27 May 2014 diff hist 0 N File:616.13.7.1.xlsx current
- 12:11, 27 May 2014 diff hist +2,479 m 616.13 Work Zone Capacity, Queue and Travel Delay Per Bridge, traffic pacing facilitates short duration overhead work operations by pacing traffic at a slow speed for predetermined distance upstream of work area rather than being completely stopped
- 13:25, 23 May 2014 diff hist 0 m Main Page
- 12:14, 23 May 2014 diff hist +89 m Category:239 Construction Inspection Guidelines for Final Plans →239.5 2A Sheets: Per CADD, updated a MicroStation procedure
- 08:07, 23 May 2014 diff hist +32 m 903.1 Highway Signing General Information added photo
- 08:06, 23 May 2014 diff hist 0 N File:903.1.jpg current
- 11:10, 22 May 2014 diff hist 0 m 751.2 Loads →751.2.4.3 Live Load Shear Distribution: minor clarification
- 11:08, 22 May 2014 diff hist +4 m Category:751 LRFD Bridge Design Guidelines updated link
- 10:13, 22 May 2014 diff hist 0 N File:Main Page May 22, 2014.jpg current
- 10:13, 22 May 2014 diff hist -61 m Main Page new photo
- 08:44, 22 May 2014 diff hist +133 m LPA:136.13 LPA Policy Changes Roster of Approved Contract Negotiators
- 08:43, 22 May 2014 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Per RW, updated Roster of Approved Contract Negotiators
- 08:40, 22 May 2014 diff hist 0 N File:236.7 Roster of Approved Contract Negotiators May 2014.pdf
- 08:39, 22 May 2014 diff hist +8 m 236.7 Negotiation Per RW, updated Roster of Approved Contract Negotiators
- 15:05, 21 May 2014 diff hist -103 m 751.6 General Quantities →751.6.2.11 Structural Steel Protective Coatings (Nonweathering Steel): Per Bridge, clarification since primer is rarely used
- 12:55, 21 May 2014 diff hist -21 m Main Page Form D-12
- 12:37, 21 May 2014 diff hist -35 m 643.2 Local Utility Adjustments - Public and Private Per Design, updated Form D-12
- 12:37, 21 May 2014 diff hist -35 m Category:101 Standard Forms Per Design, updated Form D-12
- 12:36, 21 May 2014 diff hist -70 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Design, updated Form D-12
- 12:35, 21 May 2014 diff hist 0 N File:D-12.docx