User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:47, 18 June 2014 diff hist -29 m 171.1 Administration updated three CCO links in ADM(B1) and ADM(B2)
- 08:41, 18 June 2014 diff hist +13 m Help Article →Division Contacts: EPG contact for CCO
- 14:45, 17 June 2014 diff hist +78 m Category:235 Preliminary Plans updated CCO links to DE10 and DE11
- 12:49, 17 June 2014 diff hist 0 m Main Page
- 10:44, 17 June 2014 diff hist 0 N File:236.6.3.3 Waiver Valuation (Form 6.3.3).docx
- 10:44, 17 June 2014 diff hist +3 m 236.6 Appraisal and Appraisal Review Per RW, updated Waiver Valuation (Form 6.3.3)
- 10:41, 17 June 2014 diff hist +48 m 236.3 Administration →236.3.3.2 Right of Way Cost Estimates: Per RW, minor clarification
- 10:06, 17 June 2014 diff hist 0 N File:Main Page June 17, 2014.jpg current
- 10:05, 17 June 2014 diff hist +376 m Main Page EPG 110.3.1, EPG 238.3.37 and EPG 748.7.3
- 08:17, 17 June 2014 diff hist 0 N File:238.3.37.12.jpg current
- 08:16, 17 June 2014 diff hist 0 N File:236.6.3.2 Value Finding Appraisal 2014.docx
- 08:16, 17 June 2014 diff hist 0 N File:236.6.3.1 Standard Appraisal 2014.docx
- 08:16, 17 June 2014 diff hist 0 N File:236.6.3.7B.docx
- 08:15, 17 June 2014 diff hist -69 m 236.6 Appraisal and Appraisal Review Per RW, updated three forms
- 08:02, 17 June 2014 diff hist -2,576 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.1 Wage Interviews
- 08:02, 17 June 2014 diff hist +2,157 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.1 Wage Interviews: Per CM, clarified wage rate interview requirements to meet federal requirements. Main change combines all frequency rates into one (except for JOCs, which are being added)
- 07:53, 17 June 2014 diff hist -449 m 238.3 Route Surveying →238.3.37 Bridge Survey Information: Per Bridge, updated guidance to match survey needs for geo files. Clarified subarticles' organization and added a typical valley section location sketch.
- 07:31, 17 June 2014 diff hist +1,792 m 748.7 Bridge Reports and Layouts →748.7.3 Preparation of Bridge Survey Report: Per Bridge, removed the requirement for districts to calculate drainage area for bridge surveys. Also added guidance/requirements for GEO files.
- 15:07, 16 June 2014 diff hist 0 m Main Page
- 15:05, 16 June 2014 diff hist -143 m Main Page EPG 751.50 and EPG 101
- 14:48, 16 June 2014 diff hist +553 m 751.50 Standard Detailing Notes Per Bridge, additional guidance for notes A1.2 and H1.3
- 14:40, 16 June 2014 diff hist +4 m Category:108 Prosecution and Progress →108.1 Subletting of Contract (for Sec 108.1): Per CM, updated QRG Subcontracts
- 14:38, 16 June 2014 diff hist 0 N File:Subcontracts June 2014.docx
- 14:37, 16 June 2014 diff hist +5 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated QRG Subcontracts
- 11:22, 16 June 2014 diff hist +56 m Category:110 State and Federal Wage Rates and Other Requirements added link
- 10:18, 16 June 2014 diff hist 0 N File:150.1.1.pdf
- 10:17, 16 June 2014 diff hist -11 m Category:150 Quality Management folder structure figure updated
- 10:09, 16 June 2014 diff hist 0 m 751.40 LFD Widening and Repair →751.40.4.3 Replacement of Existing Rail with Thrie Beam Rail
- 10:07, 16 June 2014 diff hist +977 m 751.40 LFD Widening and Repair →751.40.4.3 Replacement of Existing Rail with Thrie Beam Rail: Per Bridge, inserted and updated links
- 08:55, 16 June 2014 diff hist 0 N File:150.1.1.jpg current
- 08:55, 16 June 2014 diff hist -3 m Category:150 Quality Management →150.1.1 Folder Structure: Per CM, updated figure of the folder structure
- 08:09, 16 June 2014 diff hist +31 m 748.4 Headwater and Backwater →748.4.1 Headwater: Per Bridge, minor clarifications
- 12:50, 13 June 2014 diff hist 0 N File:Main Page Moving Forward.jpg current
- 12:50, 13 June 2014 diff hist +504 m Main Page Moving Forward
- 12:12, 13 June 2014 diff hist 0 N File:Main Page 2 June 13, 2014.jpg current
- 12:12, 13 June 2014 diff hist 0 N File:Main Page June 13, 2014.jpg current
- 12:12, 13 June 2014 diff hist +380 m Main Page EPG 150, EPG 137.7
- 11:17, 13 June 2014 diff hist -7,104 m Category:105 Control of Work Per CM, EPG 105.23 Quality Management revised and moved to EPG 150 Quality Management.
- 11:14, 13 June 2014 diff hist +2,246 m Category:137 Construction Inspection Guidance for Records to be Maintained Per CM, EPG 137.7 is new guidance to correspond to new article EPG 150 Quality Managment that establishes file organization for Quality Management projects.
- 11:11, 13 June 2014 diff hist +53 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: added link
- 11:04, 13 June 2014 diff hist +147 m 106.20 Reporting →106.20.1 SiteManager (SM): Per CM, new guidance (EPG 150) and guidance revised to establish file organization for Quality Management projects.
- 10:40, 13 June 2014 diff hist 0 m Category:622 Pavement and Bridge Surface Removal and Texturing →622.2 Diamond Grinding Existing Portland Cement Concrete Pavement: minor correction
- 10:14, 13 June 2014 diff hist 0 N File:413.4.jpg current
- 10:14, 13 June 2014 diff hist +31 m 413.4 Bituminous Fog Sealing added photo
- 08:38, 13 June 2014 diff hist -9 m 236.6 Appraisal and Appraisal Review Per RW, per 236.6.3.7 Realty Asset Valuation, C. Valuation by Realty Asset Appraisal, 3. Assemblage Parcels, "terrain" removed as a factor that does not influence value
- 08:07, 13 June 2014 diff hist +2 m 236.7 Negotiation Per RW, updated Roster of Approved Contract Negotiators
- 08:06, 13 June 2014 diff hist +133 m LPA:136.13 LPA Policy Changes Updated Roster of Approved Contract Negotiators
- 08:05, 13 June 2014 diff hist 0 N File:236.7 Roster of Approved Contract Negotiators June 2014.pdf
- 08:05, 13 June 2014 diff hist +5 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated Roster of Approved Contract Negotiators
- 07:18, 13 June 2014 diff hist 0 N File:150.1.2.jpg current