User contributions
Jump to navigation
Jump to search
- 12:27, 12 September 2017 diff hist -23 m 751.10 General Superstructure →751.10.1.14 Girder Haunch Reinforcement: Per BR, minor grammatical revision
- 11:12, 12 September 2017 diff hist +18 m Main Page EPG 751.22.2.2
- 10:26, 12 September 2017 diff hist +347 751.22 Prestressed Concrete I Girders →751.22.2.2 Prestressing Strands: Per BR, clarified that distances to hold-down devices and between hold-down devices for prestressed girders & beams should be reported on plans to nearest inch
- 13:48, 8 September 2017 diff hist 0 N File:Main Page Sep 8, 2017.jpg current
- 13:47, 8 September 2017 diff hist -333 m Main Page
- 07:03, 8 September 2017 diff hist +4 m Main Page
- 11:32, 7 September 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator Sep 2017.xlsx
- 11:31, 7 September 2017 diff hist +8 m 606.1 Guardrail Minor general cell formatting for the Guardrail Length of Need Calculator spreadsheet.
- 10:19, 7 September 2017 diff hist +28 m Category:941 Permits and Access Requests updated title
- 10:17, 7 September 2017 diff hist 0 m Category:100 GENERAL
- 10:15, 7 September 2017 diff hist +84 m 153.23 Utility updated title
- 10:13, 7 September 2017 diff hist +32 m 236.16 Outdoor Advertising updated title
- 10:12, 7 September 2017 diff hist +27 m 236.13 Designing Right of Way Plans updated title
- 10:11, 7 September 2017 diff hist +251 m 236.12 Quality Assurance Reviews updated title
- 10:08, 7 September 2017 diff hist +28 m 236.11 Mediation updated title
- 10:06, 7 September 2017 diff hist +170 m 236.8 Relocation Assistance Program updated title
- 10:03, 7 September 2017 diff hist +312 m 236.7 Negotiation updated title
- 10:01, 7 September 2017 diff hist +140 m 236.6 Appraisal and Appraisal Review updated title
- 09:59, 7 September 2017 diff hist +448 m 236.5 Property Management updated title
- 09:54, 7 September 2017 diff hist +307 m 236.3 Administration updated title
- 09:49, 7 September 2017 diff hist +134 m 236.1 General Information updated title
- 10:52, 6 September 2017 diff hist 0 N File:101 Floodplain Development Permit Application Sept 6 2017.pdf current
- 10:52, 6 September 2017 diff hist +2 m Category:101 Standard Forms Per BR, further updated Floodplain Development Permit/Application with new SEMA personnel info
- 13:54, 5 September 2017 diff hist -368 141.1 Cost Share Program
- 13:46, 5 September 2017 diff hist 0 N File:101 Floodplain Development Permit Application Sept 2017.pdf current
- 13:46, 5 September 2017 diff hist +5 m Category:101 Standard Forms →Bridge: Per BR, updated Floodplain Development Permit/Application with new SEMA personnel info
- 13:39, 1 September 2017 diff hist -16 m 751.1 Preliminary Design →751.1.2.19.2 Content: updated link
- 11:19, 1 September 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.7 Features Crossed
- 11:18, 1 September 2017 diff hist +55 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.7 Features Crossed
- 11:17, 1 September 2017 diff hist -2 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.7 Features Crossed
- 11:15, 1 September 2017 diff hist +4 m 751.5 Structural Detailing Guidelines →751.5.2.1 Plan and General Elevation (Front Sheet)
- 11:14, 1 September 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.2.1.1 Substructure Elements
- 11:07, 1 September 2017 diff hist -188 m Main Page EPG 236.16, EPG 236.4
- 10:46, 1 September 2017 diff hist +265 m LPA:136.13 LPA Policy Changes EPG 136.8.5.2
- 10:41, 1 September 2017 diff hist +152 m LPA:136.8 Local Public Agency Land Acquisition →136.8.5.2 Title Information: Per RW, added a link to a checklist of items to determine property ownership for ADA projects.
- 10:37, 1 September 2017 diff hist -2 m 236.4 Description Writing and Titles →236.4.4.1 Purpose: Per RW, added a checklist of items to determine property ownership for ADA projects.
- 10:31, 1 September 2017 diff hist 0 N File:236.4.4.1.docx current
- 10:30, 1 September 2017 diff hist +1,310 m 236.4 Description Writing and Titles →236.4.4.1 Purpose: Per RW, added a checklist of items to determine property ownership for ADA projects.
- 10:22, 1 September 2017 diff hist +109 m 236.16 Outdoor Advertising →236.16.11 Cutout and Extension Process: Per RW, updated the cutout and extension process to reflect current statutes.
- 08:35, 31 August 2017 diff hist +598 m Main Page EPG 751
- 08:19, 31 August 2017 diff hist +91 m 751.50 Standard Detailing Notes inserted links
- 13:38, 30 August 2017 diff hist +1 m 751.50 Standard Detailing Notes →E3. Miscellaneous
- 13:35, 30 August 2017 diff hist -4 m Category:941 Permits and Access Requests →941.2.2 Evaluation Guidelines and Considerations: minor correction
- 13:33, 30 August 2017 diff hist +298 m 751.50 Standard Detailing Notes Per BR, clarified guidance for bridge clearances.
- 13:16, 30 August 2017 diff hist 0 N File:751.5.2.1.2.7 construction.jpg current
- 13:16, 30 August 2017 diff hist 0 N File:751.5.2.1.2.7 min clearance.jpg current
- 13:15, 30 August 2017 diff hist 0 N File:751.5.2.1.1.5 min vert clearance.jpg current
- 13:14, 30 August 2017 diff hist -663 m 751.5 Structural Detailing Guidelines Per BR, clarified guidance for bridge clearances.
- 11:21, 30 August 2017 diff hist 0 m 751.40 LFD Widening and Repair updated link
- 11:19, 30 August 2017 diff hist +2 m 750.7 Non-Hydraulic Considerations updated links