User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:52, 14 January 2019 diff hist -36 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.3.2 Sign Height: updated links
- 08:52, 14 January 2019 diff hist -36 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.2.3 Sign Dimension: updated link
- 08:47, 14 January 2019 diff hist -150 m 617.1 Temporary Traffic Barriers updated links
- 08:44, 14 January 2019 diff hist -234 m 617.3 Material Inspection for Sec 617 updated links
- 08:41, 14 January 2019 diff hist -72 m 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.5 Temporary Traffic Barriers: updated links
- 15:38, 11 January 2019 diff hist -15 m Main Page EPG 751.22.3.13
- 15:27, 11 January 2019 diff hist +51 m 751.22 Prestressed Concrete I Girders →751.22.3.13 Intermediate Diaphragms: Per BR, revised guidance about spacing of steel intermediate diaphragms for PSI girders to include NU girders.
- 11:10, 11 January 2019 diff hist -108 m Main Page EPG 751.50
- 11:08, 11 January 2019 diff hist +450 m 751.50 Standard Detailing Notes →A3. All Structures: Per BR, new note for uncoated steel coming in contact with galvanized piles
- 10:07, 11 January 2019 diff hist +372 m LPA:136.13 LPA Policy Changes EPG 136.6.4.8
- 10:04, 11 January 2019 diff hist +226 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.8 Stormwater and Erosion Control: Per Env'l, additional clarifying NEPA information added at the request of FHWA
- 09:21, 11 January 2019 diff hist -33 m 236.16 Outdoor Advertising Per RW, updated links
- 16:20, 10 January 2019 diff hist +2,647 N 910.6 Closed Circuit Television (CCTV) Systems Per TS, guidance added for Closed Circuit TV policies. Includes criteria for sharing camera feeds, methods for troubleshooting, and contacts for help.
- 14:39, 10 January 2019 diff hist -416 m Main Page EPG 127.25.2
- 14:31, 10 January 2019 diff hist -26 m 806.6 Proper Operation and Maintenance Per Env'l, minor updates to bring EPG guidance up to current, established practices. current
- 14:19, 10 January 2019 diff hist +167 m 127.25 Maintenance Environmental Policies →127.25.2 Hazardous Material Spills: Per Env'l, minor updates to bring EPG guidance up to current, established practices.
- 13:23, 9 January 2019 diff hist -103 m Main Page EPG 903, EPG 903.3.16
- 12:00, 9 January 2019 diff hist +1 m Category:903 Highway Signing →MoDOT 5-Year Plan for Signing – Practical Operations
- 11:38, 9 January 2019 diff hist +3,172 m Category:903 Highway Signing →MoDOT 5-Year Plan for Signing – Practical Operations: Per TS, updated to current practices. Added guidance for the use of the Sign Management System
- 11:15, 9 January 2019 diff hist -324 m 903.3 Ground-Mounted Sign Supports Per TS, updated to current practices. Eliminated outdated reference to sign production center and reclamation of old signs by the prison. Added guidance for the use of the Sign Management System.
- 09:20, 9 January 2019 diff hist +2 m 321.1 Design of Earth Slopes
- 09:17, 9 January 2019 diff hist 0 N File:203 Physical Studies of Pennsylvanian Shale in a High Filla.pdf current
- 09:16, 9 January 2019 diff hist 0 N File:203 MCHRP 76-1a.pdf current
- 09:15, 9 January 2019 diff hist +2 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →203.1 Construction Inspection Guidance for Sec 203
- 09:14, 9 January 2019 diff hist 0 File:203 MCHRP 76-1.pdf Smithk uploaded a new version of File:203 MCHRP 76-1.pdf current
- 09:10, 9 January 2019 diff hist 0 File:203 Physical Studies of Pennsylvanian Shale in a High Fill.pdf Smithk uploaded a new version of File:203 Physical Studies of Pennsylvanian Shale in a High Fill.pdf current
- 09:09, 9 January 2019 diff hist 0 File:203 MCHRP 76-1.pdf Smithk uploaded a new version of File:203 MCHRP 76-1.pdf
- 08:10, 9 January 2019 diff hist +19 m 1045.5 Policy on Color of Structural Steel Paint updated link
- 15:31, 8 January 2019 diff hist -68 m Main Page EPG 236.3.7.1
- 15:27, 8 January 2019 diff hist +1,042 m 236.3 Administration →236.3.7.1 General: Per RW, updated RW clearance process for projects programmed in the STIP with RW funding but then do not require RW to construct the project.
- 13:24, 7 January 2019 diff hist 0 N File:910.5.2.4 PICPIFMemo.docx current
- 14:38, 4 January 2019 diff hist +4,781 m 910.5 ITS Improvements Procurement Per TS, added new guidance for PIC and PIF requests as they specifically apply to ITS.
- 14:20, 4 January 2019 diff hist +259 m Main Page EPG 121
- 13:53, 4 January 2019 diff hist -29,647 m 121.5 Asset Management Per TP, updated EPG 121, 121.1, 121.2 and 121.5 to current practices.
- 13:51, 4 January 2019 diff hist 0 m 121.5 Asset Management Smithk moved page 121.5 Prioritization Factors to 121.5 Asset Management: re-titled by TP
- 13:51, 4 January 2019 diff hist +36 N 121.5 Prioritization Factors Smithk moved page 121.5 Prioritization Factors to 121.5 Asset Management: re-titled by TP current
- 13:50, 4 January 2019 diff hist 0 N File:121.2 map.jpg current
- 13:50, 4 January 2019 diff hist 0 N File:121.2 plan.jpg current
- 13:48, 4 January 2019 diff hist -11,102 m 121.2 The Planning Framework for Transportation Decision-Making Per TP, updated EPG 121, 121.1, 121.2 and 121.5 to current practices.
- 13:47, 4 January 2019 diff hist 0 m 121.2 The Planning Framework for Transportation Decision-Making Smithk moved page 121.2 121.2 The Planning Framework for Transportation Decision-Making to 121.2 The Planning Framework for Transportation Decision-Making
- 13:47, 4 January 2019 diff hist +77 N 121.2 121.2 The Planning Framework for Transportation Decision-Making Smithk moved page 121.2 121.2 The Planning Framework for Transportation Decision-Making to 121.2 The Planning Framework for Transportation Decision-Making current
- 13:47, 4 January 2019 diff hist 0 m 121.2 The Planning Framework for Transportation Decision-Making Smithk moved page 121.2 The Planning Process to 121.2 121.2 The Planning Framework for Transportation Decision-Making: re-titled by TP
- 13:47, 4 January 2019 diff hist +83 N 121.2 The Planning Process Smithk moved page 121.2 The Planning Process to 121.2 121.2 The Planning Framework for Transportation Decision-Making: re-titled by TP current
- 13:46, 4 January 2019 diff hist -694 m 121.1 Public Involvement and Decision-Making Per TP, updated EPG 121, 121.1, 121.2 and 121.5 to current practices.
- 13:45, 4 January 2019 diff hist -239 m Category:121 Project Planning, Prioritization and STIP Commitments Per TP, updated EPG 121, 121.1, 121.2 and 121.5 to current practices.
- 10:38, 4 January 2019 diff hist -710 m Category:101 Standard Forms →Construction and Materials: Per CM, temporarily removed 5 inaccurate AC Index Price Adjustment spreadsheets.
- 11:34, 3 January 2019 diff hist 0 File:606.1.3.1 Guardrail Length of Need Calculator.xlsx Smithk uploaded a new version of File:606.1.3.1 Guardrail Length of Need Calculator.xlsx
- 09:50, 3 January 2019 diff hist +49 m Main Page EPG 910.4.1.2
- 09:38, 3 January 2019 diff hist 0 N File:910.4.1.2 SEA format.docx current
- 09:37, 3 January 2019 diff hist +10 m 910.4 ITS Architecture