User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:48, 4 February 2020 diff hist +37 m Category:216 Removals for Bridge Structures →Total Surface Hydro Demolition (Sec 216.110) current
- 11:45, 4 February 2020 diff hist 0 N File:216 surface hydro.jpg current
- 11:44, 4 February 2020 diff hist +3,454 Category:216 Removals for Bridge Structures Per BR, deck rehabilitation guidance has been updated to current methods. Pay items updated for monolithic deck repair to supplementary wearing surface material. Rehabilitation design guidance was expanded
- 09:32, 4 February 2020 diff hist +6 m 236.18 Scenic Byways →236.18.9 Missouri Byway Map and Contacts: Per RW, updated link to Missouri Byway Map current
- 13:45, 3 February 2020 diff hist -78 m 771.19 Chip Seal to Entire Deck
- 13:28, 3 February 2020 diff hist -1 m Category:770 Maintenance of Bridges
- 13:24, 3 February 2020 diff hist +9 m 234.6 Diverging Diamond Interchanges updated links
- 13:20, 3 February 2020 diff hist -2 m Category:130 Value Engineering →130.1 Discussion: updated link
- 13:17, 3 February 2020 diff hist -1 m Category:1048 Pavement Marking Material →1048.2.1.3 Inspection
- 11:46, 3 February 2020 diff hist -1 m Category:1048 Pavement Marking Material →1048.2.6 Drop-on Glass Beads: updated link
- 14:46, 31 January 2020 diff hist -27 m Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14): updated link, per CM
- 14:44, 31 January 2020 diff hist +40 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs)
- 14:43, 31 January 2020 diff hist -38 m Category:101 Standard Forms →SiteManager Quick Reference Guides (QRGs) 20px
- 14:27, 31 January 2020 diff hist +278 m Category:101 Standard Forms →Construction and Materials: Per CM, DE, updated JOC links.
- 13:30, 31 January 2020 diff hist +289 m Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14)
- 12:44, 31 January 2020 diff hist +68 m Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14): Per CM, added a link for the Fuel Adjustment Calculation spreadsheet
- 12:03, 31 January 2020 diff hist -39 m Category:619 Pavement Edge Treatment
- 11:49, 30 January 2020 diff hist 0 m Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14)
- 11:47, 30 January 2020 diff hist +12 m Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14)
- 11:37, 30 January 2020 diff hist +51 m Recent Policy Changes in the EPG EPG 109.14
- 11:36, 30 January 2020 diff hist +129 m Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14): Per CM, coordinated guidance with established AWP/SM practices.
- 10:56, 30 January 2020 diff hist -14 m 102.2 Contractor Performance Rating System Per CM, minor clarification
- 10:22, 30 January 2020 diff hist +24 m Recent Policy Changes in the EPG EPG 751.6.2.17
- 10:11, 30 January 2020 diff hist +16 m 751.6 General Quantities →751.6.2.17 Excavation
- 10:09, 30 January 2020 diff hist 0 N File:751.6.2.17 stream no excavation.jpg current
- 10:09, 30 January 2020 diff hist 0 N File:751.6.2.17 stream typical.jpg current
- 10:08, 30 January 2020 diff hist 0 N File:751.6.2.17 all.jpg current
- 10:08, 30 January 2020 diff hist 0 N File:751.6.2.17 stub.jpg current
- 10:08, 30 January 2020 diff hist 0 N File:751.6.2.17 non int case 1 2.jpg current
- 10:07, 30 January 2020 diff hist 0 N File:751.6.2.17 non int case 1 1.jpg current
- 10:07, 30 January 2020 diff hist 0 N File:751.6.2.17 int case 1 2.jpg current
- 10:07, 30 January 2020 diff hist 0 N File:751.6.2.17 int case 1 1.jpg current
- 10:06, 30 January 2020 diff hist -1,176 m 751.6 General Quantities →751.6.2.17 Excavation: Per BR, updated excavation guidance to address Integral End Bents, remove Semi-Deep abutments and address effects of skew. Proposal catches guidance up to long established, current practice.
- 15:35, 29 January 2020 diff hist -440 m 147.3 Job Order Contracting (JOC) →147.3.4 Issuing Job Orders: Per EPS, updated Example Job Order table. (Originally done on 1/22/20 but was erased by wiki transfer to another server)
- 11:16, 29 January 2020 diff hist +125 m Recent Policy Changes in the EPG
- 10:20, 29 January 2020 diff hist -814 m Category:948 Incident Response Plan and Emergency Response Management Per SM, deleted archaic information; provided link to MO Emergency Routes map. (This was originally done 1/22/20 but was erased with wiki's transfer to another server.)
- 09:58, 29 January 2020 diff hist 0 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs)
- 09:55, 29 January 2020 diff hist +158 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, restored a QRG (AWP MA Retroactively Updating Materials Conversion Factor) whose link was removed by the recent wiki transfer to another server
- 15:54, 28 January 2020 diff hist -552 m 147.3 Job Order Contracting (JOC) updated JOC links
- 13:59, 28 January 2020 diff hist -78 m Recent Policy Changes in the EPG EPG 236.6.3.3
- 13:26, 28 January 2020 diff hist -1 m 236.6 Appraisal and Appraisal Review →236.6.3.3 Waiver Valuation
- 13:26, 28 January 2020 diff hist +153 m 236.6 Appraisal and Appraisal Review →236.6.3.3 Waiver Valuation: Per RW, NAP forms are now to be approved by Asst. to the State Design Engineer prior to use.
- 12:06, 28 January 2020 diff hist -38 m LPA:136.11 Local Public Agency Construction →136.11.10 On-the-job Training (OJT): updated ECR link
- 10:20, 28 January 2020 diff hist +5 m Recent Policy Changes in the EPG
- 10:11, 28 January 2020 diff hist -212 m Recent Policy Changes in the EPG EPG 121.6
- 10:05, 28 January 2020 diff hist +23 m 121.6 STIP Amendments Per TP, minor updates to links and text specific to STIP amendment process current
- 08:37, 28 January 2020 diff hist 0 N File:751.35.4.3.1 2020.jpg current
- 08:36, 28 January 2020 diff hist +5 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4.3 Wing Reinforcement: Per BR, minor correction of diagram
- 08:07, 28 January 2020 diff hist +1 m 106.3.2.86 TM-86 Preparation of Samples for Surface Sealer Wet Track Abrasion →106.3.2.86.4 Calculation current
- 08:06, 28 January 2020 diff hist +3 m Category:712 Structural Steel Construction →712.3.2.1 Chemical Tests - Bolts, Nuts, and Washers