User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:01, 15 December 2020 diff hist 0 m 153.9 Design Smithk moved page 153.8 Design to 153.9 Design: Per CCO, this article and subsequent EPG 153 articles (EPG 153.6 - EPG 153.22) were renumbered (became EPG 153.7 - 903.23) when CCO added EPG 153.6 CCO
- 12:01, 15 December 2020 diff hist +26 N 153.8 Design Smithk moved page 153.8 Design to 153.9 Design: Per CCO, this article and subsequent EPG 153 articles (EPG 153.6 - EPG 153.22) were renumbered (became EPG 153.7 - 903.23) when CCO added EPG 153.6 CCO current Tag: New redirect
- 12:01, 15 December 2020 diff hist 0 m Category:235 Preliminary Plans updated link
- 12:00, 15 December 2020 diff hist 0 m 153.8 Customer Relations Smithk moved page 153.7 Customer Relations to 153.8 Customer Relations: Per CCO, this article and subsequent EPG 153 articles (EPG 153.6 - EPG 153.22) were renumbered (became EPG 153.7 - 903.23) when CCO added EPG 153.6 CCO
- 12:00, 15 December 2020 diff hist +38 N 153.7 Customer Relations Smithk moved page 153.7 Customer Relations to 153.8 Customer Relations: Per CCO, this article and subsequent EPG 153 articles (EPG 153.6 - EPG 153.22) were renumbered (became EPG 153.7 - 903.23) when CCO added EPG 153.6 CCO current Tag: New redirect
- 11:59, 15 December 2020 diff hist 0 m 153.7 Construction and Materials Smithk moved page 153.6 Construction and Materials to 153.7 Construction and Materials: Per CCO, this article and subsequent EPG 153 articles (EPG 153.6 - EPG 153.22) were renumbered (became EPG 153.7 - 903.23) when CCO added EPG 153.6 CCO
- 11:59, 15 December 2020 diff hist +46 N 153.6 Construction and Materials Smithk moved page 153.6 Construction and Materials to 153.7 Construction and Materials: Per CCO, this article and subsequent EPG 153 articles (EPG 153.6 - EPG 153.22) were renumbered (became EPG 153.7 - 903.23) when CCO added EPG 153.6 CCO current Tag: New redirect
- 11:51, 15 December 2020 diff hist +4,246 N 153.6 Chief Counsel's Office Per CCO, new article to provide details on each step and other important information needed to properly execute agreements
- 08:27, 15 December 2020 diff hist +2 m 147.3 Job Order Contracting (JOC) Per EPS, updated JOC links
- 08:18, 15 December 2020 diff hist 0 m 147.3 Job Order Contracting (JOC) Per EPS, updated JOC links
- 08:14, 15 December 2020 diff hist -1 m 147.3 Job Order Contracting (JOC) →147.3.9 Change Order Approvals
- 08:04, 15 December 2020 diff hist +4 m 141.3 Local Funding Options →141.3.2.3.6 Step 6 - Approval of Articles, Bylaws, Finance Plan, Project and Project Plans
- 08:04, 15 December 2020 diff hist +8 m 141.3 Local Funding Options →How does a TC form?
- 08:03, 15 December 2020 diff hist +4 m 141.3 Local Funding Options →141.3.1.2.6 Step 6 - Project Approval
- 08:44, 11 December 2020 diff hist -58 m Recent Policy Changes in the EPG EPG 751.50
- 08:41, 11 December 2020 diff hist +1,071 m 751.50 Standard Detailing Notes →H1. Steel: Per BR, revised plan note to address non-standard faying surfaces in bolted splice connections.
- 13:31, 10 December 2020 diff hist 0 m 121.7 Program Estimates
- 13:30, 10 December 2020 diff hist 0 N File:104.7 EngFac SFY 18 to 20.pdf current
- 13:30, 10 December 2020 diff hist +59 m 121.7 Program Estimates Per TP, updated Engineering Factors Report to SFY 2018 - 2020
- 14:51, 9 December 2020 diff hist 0 m Category:129 Public Involvement
- 10:12, 8 December 2020 diff hist +4 m Category:609 Paved Drainage current
- 14:54, 7 December 2020 diff hist 0 File:101 Maintenance - blankinspreport.pdf Smithk reverted File:101 Maintenance - blankinspreport.pdf to an old version current
- 14:40, 7 December 2020 diff hist +328 m Category:619 Pavement Edge Treatment Per TS, minor clarification
- 13:54, 7 December 2020 diff hist 0 File:101 Maintenance - Commuter Lot Survey.pdf Smithk reverted File:101 Maintenance - Commuter Lot Survey.pdf to an old version current
- 13:50, 7 December 2020 diff hist 0 m Category:101 Standard Forms
- 11:11, 4 December 2020 diff hist +1 m 940.10 Two-Way Left-Turn Lanes ("Five-Lane" Facilities) current
- 11:11, 4 December 2020 diff hist 0 m 940.11 Three-Lane Cross-Sections current
- 11:10, 4 December 2020 diff hist +315 m 940.11 Three-Lane Cross-Sections
- 11:09, 4 December 2020 diff hist +270 m 940.10 Two-Way Left-Turn Lanes ("Five-Lane" Facilities)
- 11:07, 4 December 2020 diff hist -54 m 940.9 Auxiliary Acceleration and Turning Lanes current
- 11:04, 4 December 2020 diff hist +1 m 940.3 Clearance of Functional Areas of Interchanges current
- 10:20, 4 December 2020 diff hist -1,118 m 940.1 Analysis of Retrofit and Permit Applications Per TS, archaic information removed current
- 10:07, 4 December 2020 diff hist 0 m Category:940 Access Management
- 16:11, 3 December 2020 diff hist 0 N File:Fig. 136.9.3 Dec 2020.docx
- 14:22, 3 December 2020 diff hist +94 m Category:940 Access Management Per TS, minor clarifications
- 10:08, 2 December 2020 diff hist +30 m 751.35 Concrete Pile Cap Integral End Bents →751.35.2.4.2 Pile Design: minor clarification
- 15:53, 1 December 2020 diff hist +3 m 751.36 Driven Piles →751.36.5.7.1.2 Design Values for Individual Cast-In-Place (CIP) Pile: minor corrections
- 15:51, 1 December 2020 diff hist +3 m 751.1 Preliminary Design →751.1.2.22 Types of Piling: minor clarification
- 15:26, 1 December 2020 diff hist 0 N File:129 table 129 notice.docx current
- 15:25, 1 December 2020 diff hist -57 m Category:129 Public Involvement updated link
- 14:55, 1 December 2020 diff hist -1 m Category:129 Public Involvement →129.3 “Virtual” Public Involvement (VPI)
- 14:21, 1 December 2020 diff hist +2,189 m Category:129 Public Involvement Per Env'l, further clarified terms and slightly expanded guidance
- 14:00, 30 November 2020 diff hist +551 m Recent Policy Changes in the EPG EPG 751
- 13:40, 30 November 2020 diff hist +7,544 m 751.36 Driven Piles →751.36.5 Design Procedure: Per BR, updated to implement and clarify integral end bent simple and rigorous pile design procedure.
- 13:31, 30 November 2020 diff hist 0 N File:751.35.2.4.2.1.pdf current
- 13:31, 30 November 2020 diff hist 0 N File:751.35.2.4.2.jpg current
- 13:30, 30 November 2020 diff hist +1,208 m 751.35 Concrete Pile Cap Integral End Bents →751.35.2.4 End Bent Analysis: Per BR, updated to implement and clarify integral end bent simple and rigorous pile design procedure.
- 13:26, 30 November 2020 diff hist +914 m 751.1 Preliminary Design →751.1.2 Bridges/Boxes: Per BR, updated to implement and clarify integral end bent simple and rigorous pile design procedure.
- 08:51, 30 November 2020 diff hist -4 m 751.22 Prestressed Concrete I Girders →751.22.3.17 Shear Blocks: Minor corrections
- 10:27, 25 November 2020 diff hist +22 m LPA:136.13 LPA Policy Changes Minor clarification for 11/23/20 entry