User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:37, 10 March 2022 diff hist +242 m Category:1180 Bituminous Stockpile Patching Material
- 16:19, 9 March 2022 diff hist -241 m Category:1180 Bituminous Stockpile Patching Material
- 16:18, 9 March 2022 diff hist 0 N File:Table 805.2.4.docx current
- 16:18, 9 March 2022 diff hist +241 m Category:1180 Bituminous Stockpile Patching Material
- 15:51, 9 March 2022 diff hist +268 m LPA:136.13 LPA Policy Changes EPG 136.2
- 15:45, 9 March 2022 diff hist +10 m LPA:136.2 Certification and Training Per LPA, updated LPA training requirements to current practice current
- 15:32, 9 March 2022 diff hist +158 m LPA:136.1 Introduction →136.1.2.1.1 Requirements: Per LPA, updated LPA training requirements
- 15:30, 8 March 2022 diff hist +186 m LPA:136.13 LPA Policy Changes EPG 136.3.13
- 15:27, 8 March 2022 diff hist +97 m LPA:136.3 Federal Aid Basics →136.3.13 Agreements: Per LPA, removed archaic requirment to submit 7 copies of the program agreement
- 12:04, 8 March 2022 diff hist +13 m 905.2 Traffic Studies updated broken link
- 08:55, 8 March 2022 diff hist +11 m 901.16 Construction Inspection Guidelines for Sec 901 updated archaic link current
- 14:22, 3 March 2022 diff hist +41 m 903.3 Ground-Mounted Sign Supports clarification
- 13:40, 3 March 2022 diff hist 0 m 320.1 Preliminary Geotechnical Report (PGR) →320.1.4.2 Example for the Summary for Preliminary Geotechnical Report - Form M-41
- 13:39, 3 March 2022 diff hist 0 N File:320.1.4.2 M-41 Example.jpg current
- 13:39, 3 March 2022 diff hist 0 N File:320.1 M-41.docx current
- 13:38, 3 March 2022 diff hist +136 m 320.1 Preliminary Geotechnical Report (PGR) Per CM, provided updated Summary for Preliminary Geotechnical Report (Form M-41) and example of M-41
- 08:55, 3 March 2022 diff hist -10 m 236.8 Relocation Assistance Program updated links
- 08:36, 3 March 2022 diff hist 0 m 236.7 Negotiation updated links
- 16:25, 2 March 2022 diff hist +106 m 903.3 Ground-Mounted Sign Supports updated links
- 15:42, 1 March 2022 diff hist +17 Category:129 Public Involvement updated broken link
- 15:41, 1 March 2022 diff hist +68 m 236.7 Negotiation updated broken links
- 15:32, 1 March 2022 diff hist -12 m Category:132 Safety updated broken link
- 15:27, 1 March 2022 diff hist -70 m Category:132 Safety updated broken links
- 13:37, 1 March 2022 diff hist +13 m Category:107 Legal Relations and Responsibility to the Public updated broken link
- 13:30, 1 March 2022 diff hist +13 m 106.19 Materials Acceptance updated broken link current
- 15:30, 28 February 2022 diff hist -2 m Category:150 Quality Management Per EPS, replaced old ADA Checklist with current version
- 15:28, 28 February 2022 diff hist +5 m LPA:136.11 Local Public Agency Construction →136.11.13.5 American’s with Disabilities Act (ADA) Check List: Per EPS, replaced old ADA Checklist with current version
- 15:27, 28 February 2022 diff hist +5 m LPA:136.11 Local Public Agency Construction →136.11.4 Preconstruction Conference: Per EPS, replaced old ADA Checklist with current version
- 13:58, 28 February 2022 diff hist -869 m Category:105 Control of Work →105.9 Authority and Duties of Resident Engineer (Sec 105.9): Per CM, deleted archaic time and personnel reports guidance
- 15:53, 25 February 2022 diff hist -373 m 106.1 Source of Supply and Quality Requirements deleted archaic info
- 15:52, 25 February 2022 diff hist -2 m 106.1 Source of Supply and Quality Requirements updated broken link
- 14:55, 25 February 2022 diff hist +31 m Category:105 Control of Work updated broken link
- 14:42, 25 February 2022 diff hist +13 m 104.13 Construction Inspection Guidance for Sec 104 updated broken link current
- 14:15, 25 February 2022 diff hist -11 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) →104.12.2 Significant Scope Changes
- 14:09, 25 February 2022 diff hist 0 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) →104.12.2 Significant Scope Changes: updated link
- 14:08, 25 February 2022 diff hist +13 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) updated broken link
- 13:30, 25 February 2022 diff hist -57 m Category:134 Engineering Professional Services updated broken link
- 13:06, 25 February 2022 diff hist -165 m 238.2 Land Surveying Per CC and RW, deleted archaic RW11, Crop Damage Compensation Agreement and Release
- 11:51, 25 February 2022 diff hist +44 m 238.2 Land Surveying updated broken link
- 11:42, 25 February 2022 diff hist +11 m 238.1 Aerial Mapping and LiDAR Surveys updated broken link
- 09:41, 25 February 2022 diff hist -100 m 616.19 Quality Standards for Temporary Traffic Control Devices Per TS, deleted archaic "Work Zone Inspection Sheet"
- 13:22, 24 February 2022 diff hist 0 N File:127.14.3.5 secure 2022.pdf current
- 13:16, 24 February 2022 diff hist +5 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents →127.14.3.5 FHWA/MoDOT Environmental Partnering Agreement: Per Env'l, replaced older document with the 2022 FHWA/MoDOT Environmental Partnering Agreement
- 15:31, 23 February 2022 diff hist 0 N File:101 Bridge Hydraulics Report Feb 2022.dotx current
- 15:31, 23 February 2022 diff hist +4 m Category:101 Standard Forms →Bridge: Per BR, minor revision to Bridge Hydraulics Report
- 14:48, 23 February 2022 diff hist +100 m 616.19 Quality Standards for Temporary Traffic Control Devices Per TS, moved "Work Zone Inspection Sheet" from EPG Work Zone Safety and Mobility Policy Resources
- 13:55, 23 February 2022 diff hist +12 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per LPA, minor update for Fig. 136.4.10 LPA Consultant Services Invoice
- 08:53, 23 February 2022 diff hist -72 m 902.12 Flashing Beacons (MUTCD Chapter 4L) updated broken links current
- 08:43, 23 February 2022 diff hist -52 m 821.9 Labels and Safety Data Sheets (SDS) Per SM, deleted archaic SDS Chemicals link current
- 16:11, 22 February 2022 diff hist +16 m Category:821 Herbicides and Roadsides updated broken link current