User contributions
Jump to navigation
Jump to search
- 09:46, 19 April 2023 diff hist -1 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.16 Warning Sign Function, Design and Application (MUTCD 6F.16): updated per RR 3671
- 09:43, 19 April 2023 diff hist 0 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.2.3 Sign Dimension: updated per RR 3671
- 09:33, 19 April 2023 diff hist -3 Category:403 Asphaltic Concrete Pavement →403.1.21 Basis of Payment (Sec 403.23): updated per RR 3644 (Pay Factors (Sec 403.23.7.2) only
- 09:27, 19 April 2023 diff hist -7 Category:402 Bituminous Surface Leveling →402.1.2 Mix and Quantities: updated per RR 3644
- 09:24, 19 April 2023 diff hist -58 Category:401 Bituminous Base and Pavement →401.1.2 Plant Mix Bituminous Pavement (PMBP): updated per RR 3644 current
- 09:24, 19 April 2023 diff hist +438 Category:450 Bituminous Pavement Design updated per RR 3644 current
- 09:09, 19 April 2023 diff hist +88 Category:401 Bituminous Base and Pavement →401.2.7 Quality Control (Sec 401.8): updated per RR 3663
- 13:23, 18 April 2023 diff hist 0 File:751.5.9.2.7.2 step 7 2023.jpg Hoskir uploaded a new version of File:751.5.9.2.7.2 step 7 2023.jpg current
- 10:32, 18 April 2023 diff hist +534 Recent Policy Changes in the EPG
- 10:05, 18 April 2023 diff hist +3 751.37 Drilled Shafts →751.37.6.1 Reinforcement Design: updated per RR 3680
- 10:01, 18 April 2023 diff hist 0 751.5 Structural Detailing Guidelines →751.5.9.2.9.1 General: updated per RR 3680
- 10:00, 18 April 2023 diff hist -3 751.5 Structural Detailing Guidelines →751.5.9.2.8.4 Development of Standard Hooked Deformed Bars in Tension: updated per RR 3680
- 09:59, 18 April 2023 diff hist 0 File:751.5.9.2.7.4 steps 1-5 2023.jpg Hoskir uploaded a new version of File:751.5.9.2.7.4 steps 1-5 2023.jpg current
- 09:56, 18 April 2023 diff hist 0 N File:751.5.9.2.7.4 steps 1-5 2023.jpg
- 09:51, 18 April 2023 diff hist 0 751.5 Structural Detailing Guidelines →751.5.9.2.8.3 Development and Lap Splices of Deformed Bars in Compression: updated per RR 3680
- 09:48, 18 April 2023 diff hist +9 751.5 Structural Detailing Guidelines →751.5.9.2.8.2 Development and Lap Splices of Deformed Bars in Tension: updated per RR 3680
- 09:47, 18 April 2023 diff hist 0 N File:751.5.9.2.7.2 step 7 2023.jpg
- 09:42, 18 April 2023 diff hist 0 File:751.5.9.2.7.2 step 6 2023.jpg Hoskir uploaded a new version of File:751.5.9.2.7.2 step 6 2023.jpg current
- 09:31, 18 April 2023 diff hist 0 N File:751.5.9.2.7.2 step 6 2023.jpg
- 09:20, 18 April 2023 diff hist +12 751.5 Structural Detailing Guidelines →751.5.9.2.8.1 Development and Lap Splice General: updated per RR 3680
- 12:35, 17 April 2023 diff hist -1 m 616.23 Traffic Control for Field Operations →616.23.2.5.7 Pavement Markings: changed pavement marking link from https to http
- 15:52, 14 April 2023 diff hist 0 Category:134 Engineering Professional Services →134.5.2 Supplemental Agreements: updated link to PSC Approval to Execute Supplemental Agreement
- 15:50, 14 April 2023 diff hist 0 N File:134.5.2 2023.docx current
- 08:19, 14 April 2023 diff hist -40 m LPA:136.13 LPA Policy Changes
- 08:15, 14 April 2023 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links updated link to fig 136.3.4
- 15:54, 12 April 2023 diff hist -2 m 106.18 Technician Certification Program fixed a link current
- 15:38, 12 April 2023 diff hist +5 106.18 Technician Certification Program
- 15:38, 12 April 2023 diff hist +1 106.18 Technician Certification Program
- 15:33, 12 April 2023 diff hist -1,285 106.18 Technician Certification Program links were all out of date so this arcticle has been updated
- 15:04, 12 April 2023 diff hist 0 N File:Nhi-2023.jpg current
- 15:01, 12 April 2023 diff hist 0 N File:TCCC-2023.jpg current
- 13:20, 12 April 2023 diff hist +327 LPA:136.8 Local Public Agency Land Acquisition →136.8.5.2 Title Information: updated per RR3676
- 13:13, 12 April 2023 diff hist +329 236.7 Negotiation →236.7.1.13 Pre-Negotiation Preparation: updated per RR3676
- 13:02, 12 April 2023 diff hist -225 236.10 Right Of Way Condemnation →236.10.7.5 Appraisal, Waiver Valuation and Written Offer (RSMo 523.253): updated per RR3676
- 12:56, 12 April 2023 diff hist +230 236.3 Administration →236.3.12.2 On-call and solicitation for Consultant Services Process – Right of Way: updated per RR
- 12:31, 11 April 2023 diff hist +15 m LPA:136.6 Environmental and Cultural Requirements updated link to RER instructions
- 12:26, 11 April 2023 diff hist 0 N File:136.6.4 instructions 4-11-2023.pdf
- 09:24, 11 April 2023 diff hist +115 m LPA:136.7 Design →136.7.2.8 Proprietary Items: updated link to Proprietary Items Database
- 09:48, 6 April 2023 diff hist +844 153.19 Multimodal updated per RR 3675
- 09:16, 5 April 2023 diff hist -141 131.2 Proprietary Items and Public Interest Findings →131.2.2.2 Information Required for Approval Requests: had to reverse the change. current
- 08:19, 3 April 2023 diff hist +170 751.14 Steel Superstructure →751.14.3.1 Field Bolted Splice Design: updated per RR 3673
- 08:14, 3 April 2023 diff hist +49 903.9 General Information Signs →903.9.14 State Line Signs (I2-1, I2-2, I2-3, I2-3P): updated per RR 3674
- 11:16, 31 March 2023 diff hist 0 File:903.9.14 I2-2 I2-3 03-31-2023.png Hoskir uploaded a new version of File:903.9.14 I2-2 I2-3 03-31-2023.png current
- 11:15, 31 March 2023 diff hist 0 N File:903.9.14 I2-2 I2-3 03-31-2023.png
- 07:53, 29 March 2023 diff hist -2 m Category:409 Seal Coat fixed a couple of links in the box at the top
- 07:39, 29 March 2023 diff hist +60 Category:132 Safety updated link to MSDS
- 15:39, 28 March 2023 diff hist +3 616.8 Typical Applications (MUTCD 6H) updated 616.8.22 MP pdf
- 15:37, 28 March 2023 diff hist 0 N File:616.8.22 MT 03-2023.pdf current
- 11:01, 28 March 2023 diff hist -111 Category:132 Safety
- 10:30, 28 March 2023 diff hist -25 Category:132 Safety