Main Page

From Engineering_Policy_Guide
Revision as of 11:10, 25 February 2016 by Smithk (talk | contribs) (EPG 153)
Jump to navigation Jump to search
EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
The demolition of half of the I-64 Daniel Boone Bridge built in the 1930s. Construction for the $111 million Boone Bridge project began in January 2013 and the new eastbound bridge opened to traffic in June. The 1980s bridge was then rehabilitated and opened to westbound traffic in November.
Jody Geisendorfer (with Maintenance and Traffic) and Maint. Worker Bob Ledbetter produce sign log inspections at night. Sign inspections determine whether signs are missing, adequately reflective, obscured by vegetation, vandalized, or are visibly out of plumb to a degree the general public would notice.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 30 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.


Perhaps you've wondered how many hits the most popular EPG articles have. As of late February, the numbers of hits are:
20. EPG 136, 128860 10. EPG 616, 177128
19. EPG 134, 130050 9. EPG 600, 212297
18. EPG 751.40, 134899 8. EPG 616.23, 231823
17. EPG 751.50, 140860 7. EPG 101, 261973
16. EPG 136.4, 147572 6. EPG 100, 262172
15. EPG 620.2, 150036 5. EPG 700, 269722
14. EPG 751.5, 154837 4. EPG 900, 294963
13. EPG 903, 159796 3. EPG 136.12, 299179
12. EPG 136.9, 163622 2. EPG 751, 347915
11. EPG 200, 165810 1. EPG Main Page, 2266199

EPG 153 Agreements and Contracts

2/25/16: This new article provides details on each step and other important information needed to properly execute agreements.

Work Zone Capacity Analysis Update

2/25/16: In EPG 616.13 Work Zone Capacity, Queue and Travel Delay, the MoDOT Work Zone Impact Analysis Spreadsheet was updated.

EPG 503 Bridge Approach Slabs

2/25/16: Criteria was added for repairing bridge approach slabs or replacing new approach slabs or simply not using them on rehabilitation, redeck and widening bridge jobs.

Interim Guardrail Policy

2/23/16: This important interim policy is now available at the top of EPG 606.1 Guardrail.

END SCHOOL SPEED LIMIT Sign

2/19/16: In Table 903.19.1 School Area Sign and Plaque Sizes, the appropriate size to be used for this sign has been added.

Right of Way Duties to Provide A-Date and Clearance on Design-Build Projects

2/8/16: New guidance was provided at EPG Acquisition Authority and Project Funding for Design-Build Projects and EPG 236.3.7.8 Design-Build Right of Way Clearance.

Standard Detailing Note for Integral End Bents

2/3/16: Guidance in this note pertaining to #5-H (L shaped) approach slab anchorage bars, end of slab and fill face of end bent as well as in EPG 751.35.3.3 Prestressed Girder End Bent through EPG 751.35.4.4 Skewed Bents was clarified.

New Standard Detailing Note

1/25/16: New note, B3.34, prevents direct contact between different materials.

EPG 236.5 Property Management

1/21/16: Numerous revisions were made so that this article now reflects current practice.

Cost Estimate Guide for Rural Preliminary Design

1/14/16: In EPG 104.7 Estimates, this document has been updated with figures reflecting new Maintenance Treatment per mile costs.

Appraisal Considerations for Manufactured Homes

1/13/16: Guidance was updated to current practice pertaining to how a mobile home is determined to be real or not real property.

EPG 712.1.5.3 Rotational-Capacity Testing and Installation of A325 Type 3 High Strength Bolts

1/11/16: This new subarticle provides best practices for bolt up testing. Guidance will provide a better quality product and reduce conflicts on acceptance criteria.

EPG 771.2 Bridge Cleaning and Flushing

1/5/16: This article was revised to comply with the MDNR permit. Also, Guidance on Aquatic Invasive Species Control BMPs was added.

Deadline for Submitting Proposals to the Engineering Policy Group

1/5/16: The submittal deadlines have been moved up about a week in EPG Ballot Cycles.

EPG 643.4 Railroads

12/30/15: Much of this article was revised to reflect current practices and to clarify coordination with the Multimodal Railroad group.

Potential Storm Water Controls Table

12/30/15: This table was clarified and expanded.

TMS Maps User Guide

12/23/15: This new guide explains TMS and assists with the various tools available when mapping.

EPG 131.2 Proprietary Items and Public Interest Findings

12/17/15: Guidance was revised to align with the MoDOT/FHWA oversight and partnering agreements. Revision ensures submitted items receive appropriate approvals.

Required Notices and Posters

12/11/15: Several required posters and notices have been updated, including FHWA Form 1022, OSHA 3165, WH-1420 and the Unemployment Benefit Law.

Job Order Contracting (JOC)

12/10/15: Five of the JOC JSPs have been updated. Among the revisions, the unit costs have been fixed for 2016 and storm water compliance and new guardrail requirements have been added.

Federal Involvement

12/8/15: In a number of articles including EPG 128.10 Conceptual Study Report Approval and Submittal and EPG 131.1.3 Projects of Divisional Interest, terminology has been clarified to the current "federal involvement" (instead of "Full Oversight").

Cost Estimate Guide

12/3/15: The latest Cost Estimate Guide for rural preliminary design is available in EPG 104.7 Estimates.

Attachments by Others to MoDOT's Drainage System

11/30/15: Guidance for connections to MoDOT's drainage, as it relates to the MS4 permit, was clarified in EPG 127.25.8.3.2 System Attachments by Others.

NOTICE Plaque (W16-18P)

11/30/15: In both EPG 903.6.59 NOTICE Plaque and EPG 903.5.36 Weight Limit Signs, guidance for the NOTICE plaque has been added for use on bridge weight limit changes as well as an option for other regulatory signs. The plaque helps to emphasize bridge postings that are being lowered.

EPG 941.5 Request by a City to Construct a “WELCOME TO” Monument

11/25/15: The review and approval process was improved by revising when the categorical exclusion request will occur during the city "Welcome To" sign process.