Recent Policy Changes in the EPG
Pre-MASH 2016 Temporary Traffic Control Device Sunset Dates 4/20/22: Guidance in EPG 612 Impact Attenuators, EPG 616.6 Temporary Traffic Control Zone Devices, EPG 616.18 Construction Inspection Guidelines for Sec 616, EPG 616.19 Quality Standards for Temporary Traffic Control Devices, EPG 616.23 Traffic Control for Field Operations, EPG 617.1 Temporary Traffic Barriers, EPG 617.2 Construction Inspection Guidelines for Sec 617, EPG 1063 Temporary Traffic Control Devices and EPG 1064 Temporary Concrete Traffic Barrier now reflects that all temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant. The use of two-loop temporary Type F concrete traffic barrier shall not be allowed after January 1, 2023. EPG 403.1.19 Acceptance of Material 4/20/22: The maximum number of contractor QC sublots that can be used for one lot of superpave asphalt pavement is 28. Regardless of lot size, QA testing will always be at a frequency of one per four sublots. Any remaining quantity less than 4000 tons, that cannot be treated as a separate lot, will be combined with the previous full lot and the pay factors will be determined on the combined lot. Guidance Documents Needed for Property Closings 4/18/22: In EPG 236.7.1.13 Pre-Negotiation Preparation and EPG 236.7.4.1 Purpose, additional guidance is available for greater clarity about what is needed from property owners to close on the properties either with MoDOT or a title company. Prestressed Concrete I Girders 4/11/22: In EPG 751.22.2.5 Pretensioned Anchorage Zones, the bursting resistance guidance now allows a larger number of bonded strands for many of these girders, effectively increasing the span limits for the girders. Guidance was expanded in EPG 751.22.3.2.1 through 751.22.3.2.6 to eliminate or reduce conflict between the lowest middle two strands and the B bars. EPG 127.2.5 Approximate Timelines for Section 106 Compliance 4/5/22: Guidance about the timelines for completing the Section 106 of the National Historic Preservation Act review process has been clarified. Coil Ties in Prestressed Girder Webs 3/28/22: In several EPG 751.50 Standard Detailing Notes, references to web coil ties in bulb-tee and NU girders have been removed since these are now no longer being used. EPG 109.11 Compensation for Project Delays 3/16/22: Guidance has been expanded to produce more uniform administration of delay claims. EPG 902.4.2.1 Controller and Cabinet Replacement Program 2/16/22: The recommended replacement age for signal cabinets was updated to 25 years from 20 years. Right of Way Mediation 2/15/22: In EPG 236.7.2.19 Acquisition by Mediation and EPG 236.11.1.3 Purpose, guidance has been updated to reflect current process and procedures, including the MoDOT Impasse Letter. Bridge Barrier and Railing Guidance 2/14/22: Guidance in EPG 751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts, EPG 751.12.1.3 Type D and H (42ʺ and 32ʺ single sloped railing) and EPG 751.12.2 Two Tube Rail (Top Mounted) TL-4 (NCHRP 350) has been clarified and coordinated. EPG 616.13.2 Interstate, Freeways and Multi-lane Roadways 2/10/22: The MoDOT Work Zone Impact Analysis Spreadsheet was updated and smart work zone guidance and training videos were added. EPG 242.2 Life Cycle Cost Adjustment (LCCA) Factor 2/9/22: Guidance was clarified for the calculation of the LCCA. 2/8/22: In EPG 238.2 Land Surveying, this document was updated by replacing the term “Legal” with “Property” to comply with Code State Regulation for surveying. 1/28/22: New guidance is available for the proper steps to be made to remediate a defect in a drilled shaft. EPG 237.14 Electronic Design Data Delivery (BIM Deliverables) 1/28/22: The title of EPG 237.14 was slightly modified and its guidance updated to reflect the new CADD Package (Open Roads Designer) now in use. Bridge Blasting and Painting Packet 1/28/22: Inspectors and REs may now access this updated information in EPG 237.9.3.2 Required Information for Submittal and EPG 1081 Coating of Structural Steel. Full Depth Pavement Repairs Basis of Payment 1/26/22: EPG 613.1.1 Full Depth Pavement Repairs, Basis of Payment presents Resident Engineers with expanded guidance about compensating contractors the concrete costs for full depth repairs that significantly exceed typical section plan depths. Increased Federal Share Program 1/26/22: New EPG 104.2.1 Increased Federal Share Program and EPG 104.2.2 District Role present guidance about how and when to apply for a 5% increase of the federal cost share of innovative projects (that is, 15% state matching vs. 20% state matching). Design-Build 1/26/22: The new, expanded design-build guidance, including updated forms and checklists, brings EPG 139 Design - Build up to current practices. EPG 149's title was slightly modified and its guidance has also been brought up to current practices for project delivery method determination and initial risks. Since design-build is only one method of project delivery, EPG 149 Project Delivery Determination and Initial Risk Assessment also reflects the concurrent revisions in EPG 139. EPG 105.9.4 Documentation Records 1/21/22: Guidance has been updated to reflect current methods of documentation. Subcontractor Insurance 1/14/22: Guidance has been updated in EPG 102 Bidding Requirements and Conditions and EPG 108.1.1 Review and Approval of a Subcontract Request to reflect that, as of Jan 3, 2022, MoDOT no longer monitors subcontractor insurance. EPG 1036.2.1.1 Reinforcing Steel, Dowel Bars, Mechanical Bar Splices and Cold Drawn Wire 1/13/22: To decrease the risk of fracture in the jaws, a 30” minimum length for the #14 and #18 reinforcing steel tension test bars is now required. 1/10/22: Guidance has been expanded to align with the updated MoDOT/MDNR Memorandum of Understanding (MOU). EPG 903.9.9 City/County Limit Signs (I4, I5, I6 Series) and EPG 903.9.11 Custom City Limit and Custom County Line Signs (I4-1a, I4-2b, I6-1a) 12/30/21: Populations will no longer be included on city limit signs. City limit and county line sign designs will be modified to match the MUTCD standard layout of jurisdictional boundary signs. EPG 127.1 Request for Environmental Services 12/28/21: Guidance for the process of Request for Environmental Services (RES) submittals, especially that of the electronic process, has been clarified. Associated guidance in EPG 147.3 Job Order Contracting (JOC) was also clarified. |