User contributions
Jump to navigation
Jump to search
- 12:52, 29 June 2017 diff hist +4 m Category:900 TRAFFIC CONTROL
- 12:51, 29 June 2017 diff hist 0 m 903.19 Signing for Rail and Light Rail Transit Grade Crossings
- 12:50, 29 June 2017 diff hist +2 m 616.13 Work Zone Capacity, Queue and Travel Delay
- 12:49, 29 June 2017 diff hist 0 m 903.1 Highway Signing General Information
- 12:48, 29 June 2017 diff hist 0 m 616.16 Law Enforcement Services
- 12:48, 29 June 2017 diff hist 0 m 907.1 Safety Program Guidelines
- 12:47, 29 June 2017 diff hist +1 m 907.7 Highway Safety Manual
- 10:49, 29 June 2017 diff hist -10 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per Bidding and Est, updated link to PODI List for 2018
- 08:53, 29 June 2017 diff hist +90 m LPA:136.13 LPA Policy Changes
- 08:52, 29 June 2017 diff hist +1 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.1 Introduction
- 07:37, 29 June 2017 diff hist +373 m LPA:136.13 LPA Policy Changes EPG 136.4.1
- 07:29, 29 June 2017 diff hist 0 N File:136.4.1.ppt current
- 07:28, 29 June 2017 diff hist +269 m LPA:136.4 Consultant Selection and Consultant Contract Management Per CM, added ppt "Construction Inspection"
- 08:45, 28 June 2017 diff hist 0 m Main Page
- 07:45, 28 June 2017 diff hist -7 Category:403 Asphaltic Concrete Pavement →403.3.1.1 Trial Mixtures: Per CM,
- 07:13, 28 June 2017 diff hist 0 m Category:403 Asphaltic Concrete Pavement →403.3.1.1 Trial Mixtures
- 07:10, 28 June 2017 diff hist +7 m Category:403 Asphaltic Concrete Pavement →403.3.1.1 Trial Mixtures
- 07:09, 28 June 2017 diff hist 0 m Category:403 Asphaltic Concrete Pavement →403.3.1.1 Trial Mixtures: minor correction, per CM
- 15:00, 26 June 2017 diff hist 0 N File:Main Page June 26, 2017.jpg current
- 15:00, 26 June 2017 diff hist +96 m Main Page
- 12:41, 23 June 2017 diff hist +202 m LPA:136.13 LPA Policy Changes Fig. 136.3.1
- 12:39, 23 June 2017 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.1
- 12:38, 23 June 2017 diff hist 0 N File:136.3.1 2017.doc current
- 12:38, 23 June 2017 diff hist 0 m LPA:136.3 Federal Aid Basics Per LPA, Fig. 136.3.1 updated to show the LPA Internal Procedures Manual requires LPAs submit the FFATA form with the programming data form.
- 12:16, 23 June 2017 diff hist +363 m Main Page EPG 403
- 11:31, 23 June 2017 diff hist 0 m Category:402 Bituminous Surface Leveling →402.1.1 Plan Preparation
- 11:30, 23 June 2017 diff hist 0 m Category:402 Bituminous Surface Leveling →402.1.1 Plan Preparation
- 11:28, 23 June 2017 diff hist -133 m Category:402 Bituminous Surface Leveling Per CM, removed archaic "Asphalt Cement Price Index Example Calculations"
- 11:26, 23 June 2017 diff hist -117 m Category:401 Bituminous Base and Pavement Per CM, removed archaic "Asphalt Cement Price Index Example Calculations"
- 10:59, 23 June 2017 diff hist +322 m Category:625 Slab Stabilization →625.1.2 Construction Inspection for Sec 625.10 Slab Undersealing: Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:55, 23 June 2017 diff hist +369 m Category:409 Seal Coat Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:43, 23 June 2017 diff hist +163 m Category:402 Bituminous Surface Leveling →402.1 Design of Contract Leveling Course Projects: Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:40, 23 June 2017 diff hist +166 m Category:401 Bituminous Base and Pavement Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:38, 23 June 2017 diff hist -81 m Category:403 Asphaltic Concrete Pavement Per CM, deleted archaic "Asphalt Cement Price Adjustment (for Square Yard Items)".
- 10:36, 23 June 2017 diff hist -156 m 413.3 Ultrathin Bonded Asphalt Wearing Surface
- 10:36, 23 June 2017 diff hist -99 m 413.3 Ultrathin Bonded Asphalt Wearing Surface Per CM, deleted archaic "Asphalt Cement Price Adjustment (for Square Yard Items)".
- 08:08, 23 June 2017 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments.docx current
- 08:08, 23 June 2017 diff hist +305 m Category:403 Asphaltic Concrete Pavement Per CM, added "Guidance for Asphalt Cement Price Index Adjustments". Also moved Asphalt Cement Price Adjustment (for Square Yard Items) from EPG 413
- 15:26, 22 June 2017 diff hist -100 m Category:101 Standard Forms →Construction and Materials: Per CM, removed "UBAWS AC Membrane Adjustment" link since it was already replaced with other forms
- 10:27, 21 June 2017 diff hist -4 m Main Page
- 08:20, 21 June 2017 diff hist +176 m Main Page EPG 751.31, EPG 751.32
- 08:17, 21 June 2017 diff hist +26 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.1 Typical Pile Cap Bent
- 08:15, 21 June 2017 diff hist +29 m 751.31 Open Concrete Intermediate Bents
- 08:47, 20 June 2017 diff hist 0 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems
- 08:45, 20 June 2017 diff hist +36 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 12:08, 19 June 2017 diff hist -16 m 153.9 Design
- 15:12, 16 June 2017 diff hist +314 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.1 Typical Pile Cap Bent: Per BR, clarified and corrected foundation data
- 15:05, 16 June 2017 diff hist 0 N File:751.31.3.1 Longitudinal Beam Steps.jpg current
- 15:04, 16 June 2017 diff hist +281 m 751.31 Open Concrete Intermediate Bents →751.31.3.1 Beam Cap: BR, clarified reinforcement details for longitudinal beam step.
- 14:59, 16 June 2017 diff hist 0 N File:Main Page June 16, 2017.jpg current
- 14:58, 16 June 2017 diff hist +92 m Main Page
- 14:52, 16 June 2017 diff hist -8 m 751.6 General Quantities →751.6.2.17 Excavation
- 14:29, 16 June 2017 diff hist -3 m Main Page
- 14:27, 16 June 2017 diff hist +36 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:41, 16 June 2017 diff hist -5 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems
- 12:33, 16 June 2017 diff hist +11 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:32, 16 June 2017 diff hist -66 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:30, 16 June 2017 diff hist +57 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:03, 16 June 2017 diff hist +125 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, clarified and corrected foundation data
- 10:42, 16 June 2017 diff hist -33 m Main Page EPG 751.22.3.15
- 10:38, 16 June 2017 diff hist +222 m 751.9 LFD Seismic Per BR, clarified length requirements for dowel bars for prestressed girder bridges. Re-named "dowel rods" as "dowel bars".
- 10:32, 16 June 2017 diff hist 0 m 751.9 LFD Seismic
- 10:28, 16 June 2017 diff hist +6 m 751.22 Prestressed Concrete I Girders →751.22.3.15 Dowel Bars (Rods)
- 10:23, 16 June 2017 diff hist 0 N File:751.22.3.15.jpg current
- 10:22, 16 June 2017 diff hist -33 m 751.22 Prestressed Concrete I Girders →751.22.3.15 Dowel Bars (Rods): Per BR, clarified length requirements for dowel bars for prestressed girder bridges. Re-named "dowel rods" as "dowel bars".
- 08:58, 16 June 2017 diff hist -9 m Main Page EPG 606.1
- 08:58, 16 June 2017 diff hist +32 m 606.1 Guardrail
- 08:50, 16 June 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator.xlsx
- 08:49, 16 June 2017 diff hist +2 m 606.1 Guardrail
- 08:46, 16 June 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator.xls
- 08:46, 16 June 2017 diff hist +547 m 606.1 Guardrail Per CADD, added Guardrail Length of Need Calculator
- 14:40, 15 June 2017 diff hist +65 m 153.9 Design Per LPA, updated some contract titles and a few other items
- 14:02, 15 June 2017 diff hist 0 N File:902.5.29 Flashing Yellow Arrow brochure.pdf current
- 14:02, 15 June 2017 diff hist -11 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.29 Guidelines for Use of the Flashing Yellow Left Arrow: Updated link
- 13:44, 15 June 2017 diff hist +210 m Main Page EPG 751.6.2.17, EPG 747.1.6.2
- 13:38, 15 June 2017 diff hist +425 751.50 Standard Detailing Notes →J. MSE Wall Notes (Notes for Bridge Standard Drawings): Per BR, new J1.30 notes the revision of Bridge standard drawings for MSE wall for excavation
- 13:34, 15 June 2017 diff hist +427 751.24 LFD Retaining Walls →751.24.2.2 Details: Per BR, Cross-reference added for excavation and division responsibilities for preparing MSE wall plans, computing excavation class and quantities.
- 13:20, 15 June 2017 diff hist 0 m 751.6 General Quantities
- 13:19, 15 June 2017 diff hist 0 N File:751.6.2.17 case 7b.jpg current
- 13:19, 15 June 2017 diff hist 0 N File:751.6.2.17 case 7a.jpg current
- 13:19, 15 June 2017 diff hist 0 N File:751.6.2.17 case 6.jpg current
- 13:18, 15 June 2017 diff hist 0 N File:751.6.2.17 case 5b.jpg current
- 13:18, 15 June 2017 diff hist 0 m 751.6 General Quantities
- 13:17, 15 June 2017 diff hist 0 N File:751.6.2.17 case 5a.jpg current
- 13:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 4.jpg current
- 13:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 3.jpg current
- 13:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 2.jpg current
- 13:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 1.jpg current
- 13:15, 15 June 2017 diff hist 0 m 751.6 General Quantities
- 13:14, 15 June 2017 diff hist 0 N File:751.6.2.17.jpg current
- 13:13, 15 June 2017 diff hist 0 m 751.6 General Quantities →751.6.2.17 Excavation
- 13:12, 15 June 2017 diff hist 0 N File:751.6.2.17 earth work.jpg current
- 13:11, 15 June 2017 diff hist 0 N File:751.6.2.17 Semi Deep Case 1 Section AA.jpg current
- 13:11, 15 June 2017 diff hist +6,439 751.6 General Quantities →751.6.2.17 Excavation: Per BR, different possible cases for MSE wall excavation added
- 10:49, 15 June 2017 diff hist +175 m Main Page EPG 620, EPG 1048
- 10:40, 15 June 2017 diff hist -1,423 620.12 Construction Inspection for Sec 620 Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance
- 10:31, 15 June 2017 diff hist -310 620.1 General (MUTCD Chapter 3A) Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance.
- 10:20, 15 June 2017 diff hist +97 Category:1048 Pavement Marking Material →1048.2.1 Type 1 and Type 2 Preformed Marking Tape: Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance
- 10:11, 15 June 2017 diff hist 0 m Category:620 Pavement Marking current
- 10:10, 15 June 2017 diff hist 0 N File:620 decision 2017.jpg current
- 10:10, 15 June 2017 diff hist 0 N File:620 Durable.doc current
- 10:10, 15 June 2017 diff hist +321 Category:620 Pavement Marking Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance.
- 08:34, 15 June 2017 diff hist +3,710 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems: Per BR, division responsibilities for preparing MSE wall plans, computing excavation quantities and locations added
- 15:22, 14 June 2017 diff hist -2 m Main Page
- 13:56, 9 June 2017 diff hist -58 m Main Page EPG 402, EPG 450, EPG 751.24, EPG 760
- 12:48, 9 June 2017 diff hist 0 N File:760.4.2 FAQ 2017.docx current
- 12:48, 9 June 2017 diff hist +5 m Category:760 General Construction Inspection for Structures
- 12:47, 9 June 2017 diff hist +5 m Category:760 General Construction Inspection for Structures Per TP, also updated FAQ document
- 12:37, 9 June 2017 diff hist +1,465 Category:760 General Construction Inspection for Structures →760.4 Vertical Clearance: Per TP, expanded and clarified guidance for the measurement and reporting of vertical clearance.
- 11:36, 9 June 2017 diff hist +137 751.24 LFD Retaining Walls →751.24.2.1 Design: Per BR, the types of pipes permitted as pipe pile spacers behind MSE walls for driving piling during bridge construction were expanded.
- 11:29, 9 June 2017 diff hist -94 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, the types of pipes permitted as pipe pile spacers behind MSE walls for driving piling during bridge construction were expanded.
- 11:20, 9 June 2017 diff hist +446 Category:450 Bituminous Pavement Design →450.3 Layer Design: Per CM, guidance has been expanded to provide suggested additional quantities amounts for addressing the surface irregularities of existing pavement.
- 11:15, 9 June 2017 diff hist +1,745 Category:402 Bituminous Surface Leveling →402.1.2 Mix and Quantities: Per CM, guidance has been expanded to provide suggested additional quantities amounts for addressing the surface irregularities of existing pavement.
- 10:17, 9 June 2017 diff hist +436 m LPA:136.13 LPA Policy Changes EPG 136.6.4.9
- 10:15, 9 June 2017 diff hist 0 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.9 Borrow Sites and Other Land Disturbance Activities Outside Right of Way
- 10:12, 9 June 2017 diff hist +140 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.9 Borrow Sites and Other Land Disturbance Activities Outside Right of Way: Per Hist. Pres., guidance for env'l clearance help clarified
- 13:45, 8 June 2017 diff hist -282 m Main Page EPG 751.50
- 13:29, 8 June 2017 diff hist +89 m 751.50 Standard Detailing Notes
- 12:33, 8 June 2017 diff hist +1,386 m 751.50 Standard Detailing Notes Per BR, added Redeck Standard Notes and made minor revisions to Notes B3.32 and B3.33.
- 10:51, 8 June 2017 diff hist +101 m Main Page
- 10:48, 8 June 2017 diff hist +129 m Main Page EPG 134
- 10:42, 8 June 2017 diff hist -2 m Category:101 Standard Forms Per LPA, updated Submittal to Professional Services Committee
- 10:41, 8 June 2017 diff hist 0 N File:134.3.1 2017.doc current
- 10:41, 8 June 2017 diff hist 0 N File:134.2.4 2017.doc current
- 10:41, 8 June 2017 diff hist 0 m Category:134 Engineering Professional Services
- 10:40, 8 June 2017 diff hist 0 Category:134 Engineering Professional Services →134.1.3 Consultant Qualification
- 10:38, 8 June 2017 diff hist 0 N File:134.2.2.2 June 2017.docx current
- 10:38, 8 June 2017 diff hist 0 N File:134.2.2 2017.doc current
- 10:37, 8 June 2017 diff hist +6,789 m Category:134 Engineering Professional Services Per LPA, revised guidance for eAgreement (electronic vs wet signatures) workflow changes and to incorporate more-than-Taking Care of the System (TSCO) planning studies.
- 13:49, 7 June 2017 diff hist +13 m Main Page
- 13:31, 7 June 2017 diff hist -5 m Main Page EPG 903.15.3
- 12:13, 7 June 2017 diff hist +329 m 903.14 Memorial Signs →903.15.3 Heroes Way Interchange Program: Per TS, updated guidance to reflect current practice.
- 08:39, 7 June 2017 diff hist 0 N File:Main Page June 7, 2017.jpg current
- 08:39, 7 June 2017 diff hist -106 m Main Page
- 07:22, 7 June 2017 diff hist 0 N File:101 Workforce Pilot Program Employee Notification.pdf current
- 07:21, 7 June 2017 diff hist 0 N File:101 Sample Company Workforce Diversity Job Special Provision Action Plan.docx current
- 07:21, 7 June 2017 diff hist 0 N File:101 Contractor's Monthly New Employee Report.pdf current
- 07:21, 7 June 2017 diff hist -4 m Category:101 Standard Forms →External Civil Rights
- 07:20, 7 June 2017 diff hist +403 m Category:101 Standard Forms Three new forms from ECR
- 10:02, 6 June 2017 diff hist +296 m Category:900 TRAFFIC CONTROL
- 09:59, 6 June 2017 diff hist +300 m Category:1000 MATERIALS
- 09:57, 6 June 2017 diff hist +300 m Category:800 ROADSIDE DEVELOPMENT
- 09:54, 6 June 2017 diff hist +298 m Category:109 Measurement and Payment
- 09:53, 6 June 2017 diff hist +298 m Category:105 Control of Work
- 09:52, 6 June 2017 diff hist +301 m Category:101 Standard Forms
- 14:33, 5 June 2017 diff hist 0 m Main Page
- 09:27, 5 June 2017 diff hist -153 m Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10): Per DE, updated language to current Agreements Review Group's process for reviewing DE10 and DE11
- 09:25, 5 June 2017 diff hist -346 m 153.9 Design Per DE, updated language to EPG 153.8 DE Table and EPG 235.2.3 to current Agreements Review Group process for reviewing DE10 and DE11.
- 13:06, 2 June 2017 diff hist -5 m LPA:136.4 Consultant Selection and Consultant Contract Management updated broken 23 CFR 172.3 link
- 12:21, 2 June 2017 diff hist +8 m 103.1 Bid Opening and Award Process Per DE, the Bidding and Contract Group further clarified that Permitted Combination of Projects for lettings is no longer allowed.
- 08:25, 2 June 2017 diff hist +2 m Main Page EPG 103.1
- 08:23, 2 June 2017 diff hist -449 m 103.1 Bid Opening and Award Process Per DE, the Bidding and Contract Group no longer allows Permitted Combination of Projects for lettings.
- 07:12, 2 June 2017 diff hist -7 m Category:101 Standard Forms →Construction and Contractor Related: Per ECR, updated link to MoDOT Workforce JSP Cumulative Workforce Hours Report
- 13:42, 1 June 2017 diff hist -51 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: updated link
- 13:20, 1 June 2017 diff hist +2 m Main Page
- 10:23, 1 June 2017 diff hist +8 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 10:44, 31 May 2017 diff hist +13 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per LPA, clarified Landscape Architects as "Professional Landscape Architects".
- 09:58, 31 May 2017 diff hist +4 m Category:101 Standard Forms →Construction and Materials
- 09:53, 31 May 2017 diff hist -466 m Category:108 Prosecution and Progress
- 09:51, 31 May 2017 diff hist +466 m Category:108 Prosecution and Progress Per CM, updated link to Final Acceptance Report (C-239)
- 09:45, 31 May 2017 diff hist +498 m Category:101 Standard Forms →Construction and Materials: Per CM, updated several links
- 15:09, 30 May 2017 diff hist +96 m Category:101 Standard Forms →Construction and Materials: Per CM, added link to Final Acceptance Report (C-239)
- 15:08, 30 May 2017 diff hist +62 m Category:108 Prosecution and Progress Per CM, added link to Final Acceptance Report (C-239)
- 13:28, 30 May 2017 diff hist 0 N File:108.16.2 Sample Final Inspection Letter 2017.pdf current
- 13:28, 30 May 2017 diff hist +5 m Category:108 Prosecution and Progress Per CM, updated Fig. 108.16.2, Sample Final Inspection letter, by adding a statement to remind contractors to upload any remaining QC documents.
- 12:55, 30 May 2017 diff hist +49 m Main Page EPG 101
- 12:30, 30 May 2017 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 11:31, 30 May 2017 diff hist +7 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per Envir'l, clarified Consent Decree Initial Set-Up QRG per no. of disturbed acres when adding a project to database as well as prerequisite dates for Insp.
- 14:29, 26 May 2017 diff hist -526 m Category:240 Maintenance and Emergency Crossovers
- 14:52, 25 May 2017 diff hist 0 m Main Page
- 13:33, 25 May 2017 diff hist +10 m Main Page
- 08:29, 24 May 2017 diff hist +29 m LPA:136.13 LPA Policy Changes
- 08:28, 24 May 2017 diff hist +94 m LPA:136.13 LPA Policy Changes Fig. 136.3.20
- 08:27, 24 May 2017 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.20
- 08:27, 24 May 2017 diff hist 0 N File:Fig.136.3.20 2017.docx
- 08:26, 24 May 2017 diff hist 0 m LPA:136.3 Federal Aid Basics Per BR, updated Fig. 136.3.20, BEAP Project Tracking Form
- 14:31, 22 May 2017 diff hist 0 N File:Main Page 3 May 22, 2017.jpg current
- 14:31, 22 May 2017 diff hist 0 N File:Main Page 2 May 22, 2017.jpg current
- 14:31, 22 May 2017 diff hist 0 N File:Main Page May 22, 2017.jpg current
- 14:30, 22 May 2017 diff hist +45 m Main Page
- 10:14, 22 May 2017 diff hist +307 m 153.9 Design Per DE, revised who need to review several agreements
- 14:59, 19 May 2017 diff hist 0 N File:Main Page May 19, 2017.jpg current
- 14:59, 19 May 2017 diff hist -424 m Main Page EPG 751
- 13:45, 19 May 2017 diff hist +126 m 751.50 Standard Detailing Notes →G. Substructure Notes: Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 13:35, 19 May 2017 diff hist 0 N File:751.39 2017.jpg current
- 13:34, 19 May 2017 diff hist -144 m 751.39 Pile Footings Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 13:28, 19 May 2017 diff hist +3 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.5 Wing & Detached Wing Walls
- 13:27, 19 May 2017 diff hist 0 N File:751.35.3.5 detached wing 2017.jpg current
- 13:26, 19 May 2017 diff hist 0 N File:751.35.3.5 2017.jpg current
- 13:26, 19 May 2017 diff hist 0 N File:751.35.3.4 May 2017.jpg current
- 13:26, 19 May 2017 diff hist 0 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.3 Prestressed Girder End Bent
- 13:25, 19 May 2017 diff hist 0 N File:751.35.3.3 May 2017.jpg current
- 13:25, 19 May 2017 diff hist +136 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3 Dimensions: Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 13:09, 19 May 2017 diff hist +2 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.2 Wide Flange Beams, Plate Girders and Prestressed Girders
- 13:06, 19 May 2017 diff hist 0 N File:751.34.3.2 safety barrier.jpg current
- 13:06, 19 May 2017 diff hist 0 N File:751.34.3.2 part section.jpg current
- 13:05, 19 May 2017 diff hist 0 N File:751.34.3.2.jpg current
- 13:05, 19 May 2017 diff hist +10 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.2.2 Loads
- 13:03, 19 May 2017 diff hist 0 N File:751.34.2.2 detached wing.jpg current
- 13:02, 19 May 2017 diff hist 0 N File:751.34.2.2 elevation.jpg current
- 13:02, 19 May 2017 diff hist +55 m 751.34 Concrete Pile Cap Non-Integral End Bents Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 12:42, 19 May 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2 Typical Pile Cap Bent
- 12:34, 19 May 2017 diff hist 0 N File:751.32.3.3 part elev 2017.jpg current
- 12:34, 19 May 2017 diff hist 0 N File:751.32.3.2 2017.jpg current
- 12:33, 19 May 2017 diff hist +10 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3 Details: Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 15:04, 17 May 2017 diff hist +8 m Main Page
- 15:03, 17 May 2017 diff hist 0 N File:Main Page May 17, 2017.jpg current
- 15:03, 17 May 2017 diff hist -350 m Main Page
- 10:49, 17 May 2017 diff hist +77 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.3 Prestressed Girder End Bent: Per BR, further clarified girder chair detail & end distance from center line of bearing to end of steel & prestressed girders w/ info left out from 4/11/17
- 10:43, 17 May 2017 diff hist 0 N File:751.22.3.10 part plan skewed 2017.jpg current
- 10:43, 17 May 2017 diff hist +255 m 751.22 Prestressed Concrete I Girders →751.22.3.10 Closed Intermediate Bent Diaphragms: Per BR, girder chair detail & end distance from center line of bearing to end of steel & prestressed girders w/ info left out from 4/11/17 revision
- 10:04, 17 May 2017 diff hist 0 N File:751.11.3.6 side May 17 2017.jpg current
- 10:02, 17 May 2017 diff hist +3 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 10:00, 17 May 2017 diff hist 0 N File:751.11.3.6 side May 2017.jpg current
- 10:00, 17 May 2017 diff hist +4 m 751.11 Bearings →751.11.3 Details: Per BR, further clarified girder chair detail and end distance from center line of bearing to end of steel and prestressed girders w/ info inadvertently left out by division
- 13:37, 16 May 2017 diff hist 0 N File:134.2.2.2 May 16 2017.docx current
- 13:36, 16 May 2017 diff hist +12 m Category:134 Engineering Professional Services further, minor update of Form 134.2.2.2
- 13:35, 16 May 2017 diff hist +3 m Category:101 Standard Forms minor update of Form 134.2.2.2
- 13:26, 16 May 2017 diff hist +10 m 751.22 Prestressed Concrete I Girders →751.22.3.6.2 Shear Reinforcement: Per BR, added a common, available wire size that was inadvertently excluded in the original Nov 22, '17 revision.
- 12:12, 16 May 2017 diff hist +3 m 238.3 Route Surveying updated GPS reference station network link
- 12:09, 16 May 2017 diff hist 0 m Category:134 Engineering Professional Services updated GPS Reference Station network link
- 15:22, 12 May 2017 diff hist -2 m Main Page
- 15:01, 12 May 2017 diff hist -7 m Category:101 Standard Forms Per LPA, updated two forms: Submittal to Professioanl Services Committee and the Consultant Rating Form
- 14:59, 12 May 2017 diff hist 0 N File:134.2.2.5.1 May 2017.doc current
- 14:59, 12 May 2017 diff hist 0 N File:134.2.2.2 May 2017.docx current
- 14:59, 12 May 2017 diff hist -28 m Category:134 Engineering Professional Services Per LPA, updated two forms, Figs. 134.2.2.2 and 134.2.2.5.1, with minor updates
- 12:56, 12 May 2017 diff hist -137 m Main Page EPG 236.7.2.3
- 12:37, 12 May 2017 diff hist 0 m 236.7 Negotiation →236.7.2.3 Prompt Offer of Just Compensation: Per RW, increased the minimum offer of prompt offer of just compensation from $300 to $500
- 08:53, 12 May 2017 diff hist -1 m Main Page
- 08:19, 12 May 2017 diff hist 0 N File:616.13.7.1 2017.xlsx current
- 08:19, 12 May 2017 diff hist +10 m 616.13 Work Zone Capacity, Queue and Travel Delay Per TS, updated Traffic Pacing Worksheet
- 09:46, 11 May 2017 diff hist -14 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.6.3 Work Zone Intelligent Transportation Systems (WZITS): updated jsp link
- 08:47, 10 May 2017 diff hist -13 m Main Page EPG 402 and EPG 409
- 08:30, 10 May 2017 diff hist 0 N File:402 CLC MoDOT 2017.pdf current
- 08:30, 10 May 2017 diff hist 0 N File:402 CLC Contractor 2017.pdf current
- 08:29, 10 May 2017 diff hist +10 m Category:402 Bituminous Surface Leveling Per Bidding and Contract, the MoDOT/Contractor files were further updated
- 07:33, 10 May 2017 diff hist 0 N File:409 Seal Coat MoDOT.pdf current
- 07:33, 10 May 2017 diff hist 0 N File:409 Seal Coat Contractor.pdf
- 07:32, 10 May 2017 diff hist 0 File:409 FY2018 Contract Seal Coat Guidelines.docx uploaded a new version of "Image:409 FY2018 Contract Seal Coat Guidelines.docx" current
- 07:30, 10 May 2017 diff hist 0 N File:409 FY2018 Contract Seal Coat Guidelines.docx
- 07:30, 10 May 2017 diff hist -1,223 m Category:409 Seal Coat Per Bidding and Contract, the CLC guidelines and MoDOT/Contractor files were updated
- 07:19, 10 May 2017 diff hist 0 N File:402 CLC MoDOT.pdf current
- 07:19, 10 May 2017 diff hist 0 N File:402 CLC Contractor.pdf current
- 07:19, 10 May 2017 diff hist 0 N File:402 FY2018 Contract Leveling Coat Guidelines.docx current
- 07:19, 10 May 2017 diff hist -1,085 m Category:402 Bituminous Surface Leveling Per Bidding and Contract, the CLC guidelines and MoDOT/Contractor files were updated
- 14:49, 5 May 2017 diff hist 0 m Main Page
- 14:33, 4 May 2017 diff hist +265 m 171.5 Drainage Added link to Culvert Pipe Replacement video
- 12:38, 3 May 2017 diff hist 0 m Main Page
- 09:02, 3 May 2017 diff hist -107 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.2 No-Passing Zone Pavement Markings and Warrants (MUTCD Section 3B.02): Per TR, removed an MUTCD clause since we do not use the NO PASSING ZONE sign on a statewide basis
- 08:12, 3 May 2017 diff hist +1,440 m 153.19 Multimodal Per MO, updated tables to relfect current contract listings