User contributions
Jump to navigation
Jump to search
- 12:12, 2 May 2017 diff hist +302 m Category:101 Standard Forms →Construction and Materials: Per CM, added to links: 2017 Statewide Rail Cable Fence Spreadsheets (Grading and No Grading)
- 11:19, 2 May 2017 diff hist +8 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention: Per CM, dashes allowed
- 11:04, 1 May 2017 diff hist +61 m Main Page EPG 137
- 10:12, 1 May 2017 diff hist -1 m Category:137 Construction Inspection Guidance for Records to be Maintained
- 10:10, 1 May 2017 diff hist -18 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention
- 10:09, 1 May 2017 diff hist 0 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention
- 10:08, 1 May 2017 diff hist 0 N File:137.3 good 2017.jpg current
- 10:07, 1 May 2017 diff hist -4,885 m Category:137 Construction Inspection Guidance for Records to be Maintained Per CM, updated terminology for storing project documents, which are now stored in eProjects rather than the CIA (V drive)
- 08:45, 1 May 2017 diff hist -1 m Main Page
- 15:27, 28 April 2017 diff hist -1 m Help Article →Division Contacts
- 14:20, 28 April 2017 diff hist -90 m 236.15 Requests from Cities for Annexations
- 14:20, 28 April 2017 diff hist -2,004 m 236.15 Requests from Cities for Annexations Per CCO, updated link to Voluntary Annexation Petition
- 12:34, 28 April 2017 diff hist 0 m Main Page
- 14:30, 27 April 2017 diff hist +179 m 751.8 LRFD Concrete Box Culverts →751.8.1.5 Precast Culvert: Per BR, minor clarification for precast box culvert pay item and quantity tabulations
- 12:11, 27 April 2017 diff hist +211 m LPA:136.13 LPA Policy Changes EPG 136.11.5
- 12:09, 27 April 2017 diff hist -59 m LPA:136.11 Local Public Agency Construction →136.11.5 Subcontracts: Per LPA, removed archaic statement requiring MoDOT to approve subcontracts.
- 14:50, 26 April 2017 diff hist 0 N File:134.2.2.5.1 April 26 2017.doc current
- 14:50, 26 April 2017 diff hist +3 m Category:101 Standard Forms Per LPA, updated Fig. 134.2.2.5.1
- 14:49, 26 April 2017 diff hist +12 m Category:134 Engineering Professional Services Per LPA, updated Fig. 134.2.2.5.1
- 14:42, 26 April 2017 diff hist +37 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 14:34, 26 April 2017 diff hist +1 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 14:33, 26 April 2017 diff hist +1 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 10:50, 26 April 2017 diff hist +12 m Category:101 Standard Forms Per LPA, further updated the same two forms: Fig. 134.2.2.2 and Fig. 134.2.2.5.1
- 10:50, 26 April 2017 diff hist 0 N File:134.2.2.5.1 April 2017.doc current
- 10:50, 26 April 2017 diff hist 0 N File:134.2.2.2 April 2017.docx current
- 10:49, 26 April 2017 diff hist +42 m Category:134 Engineering Professional Services Per LPA, further updated the same two forms: Fig. 134.2.2.2 and Fig. 134.2.2.5.1
- 10:34, 26 April 2017 diff hist 0 N File:134.2.2.5.1 2017.doc current
- 10:22, 26 April 2017 diff hist 0 N File:134.2.2.2 2017.docx current
- 10:21, 26 April 2017 diff hist -281 m Category:134 Engineering Professional Services Per LPA, updated two forms: Fig. 134.2.2.2 Solicitations and Request Letter, Fig. 134.2.2.5.1 Consultant Rating Form
- 10:16, 26 April 2017 diff hist -91 m Category:101 Standard Forms Per LPA, updated two forms
- 07:21, 26 April 2017 diff hist +1 m 751.35 Concrete Pile Cap Integral End Bents →751.35.5.1 Reinforcing Holes: minor correction, per BR
- 14:33, 25 April 2017 diff hist +127 m Main Page EPG 460.3.13
- 13:59, 25 April 2017 diff hist +1,403 m 460.3 Plant Inspection Per CM, new guidance for handling failing binder samples on projects and when additional testing which may take place. Also, recommendations for penalties for failing binders at the different levels.
- 14:25, 21 April 2017 diff hist -257 m Category:702 Load-Bearing Piles →702.1 Pile Types and Testing: Per BR, removed archaic info
- 10:43, 21 April 2017 diff hist -551 m Category:702 Load-Bearing Piles Per BR, minor editorial revisions.
- 07:10, 21 April 2017 diff hist -16 m Main Page
- 14:17, 20 April 2017 diff hist -4 m Main Page
- 13:56, 20 April 2017 diff hist +1 m Main Page
- 13:42, 20 April 2017 diff hist -3 m Category:101 Standard Forms →Construction and Contractor Related
- 13:31, 20 April 2017 diff hist 0 m Main Page
- 13:28, 20 April 2017 diff hist +89 m Main Page
- 13:23, 20 April 2017 diff hist 0 N File:Main Page April 19, 2017.jpg current
- 13:23, 20 April 2017 diff hist 0 N File:Main Page 2 April 20, 2017.jpg current
- 13:23, 20 April 2017 diff hist 0 N File:Main Page April 20, 2017.jpg current
- 13:22, 20 April 2017 diff hist +1,454 m Main Page
- 11:15, 20 April 2017 diff hist +287 m 751.9 LFD Seismic Per BR, added "Additional Info" box linking to the Bridge Seismic Design Process Flowchart
- 12:47, 19 April 2017 diff hist +58 m Main Page
- 15:02, 18 April 2017 diff hist 0 m Main Page
- 07:08, 18 April 2017 diff hist 0 N File:104.6 Bridge Scoping Checklist.docx current
- 07:08, 18 April 2017 diff hist -12 m 104.6 Project Scoping Checklists Per BR, updated Bridge Scoping Checklist
- 14:24, 17 April 2017 diff hist +157 m Category:101 Standard Forms →Construction and Contractor Related: Per ECR and CM, added form, MoDOT Workforce Pre-Construction Diversity Plan Report.
- 09:10, 14 April 2017 diff hist +101 m 616.5 Flagger Control (MUTCD Chapter 6E) →616.5.4 Automated Flagger Assistance Devices (MUTCD 6E.04): added link
- 09:08, 14 April 2017 diff hist +101 m 616.19 Quality Standards for Temporary Traffic Control Devices added link
- 09:05, 14 April 2017 diff hist +422 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.2.2 Flags and Advance Warning Rail System on Signs: inserted links
- 08:58, 14 April 2017 diff hist -6 m 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G) →616.7.2 Work Duration (MUTCD 6G.02)
- 08:49, 14 April 2017 diff hist +1 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings)
- 08:46, 14 April 2017 diff hist +52 m 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G) →616.7.2 Work Duration (MUTCD 6G.02): inserted link
- 10:59, 13 April 2017 diff hist 0 N File:903.7.49.1 2017.jpg current
- 10:59, 13 April 2017 diff hist +5 m 903.7 Conventional Road Guide Signs →903.7.49 Community Wayfinding Signs (MUTCD Section 2D.50): Per TS, updated Fig. 903.7.49.1 to clarify proper use of signs
- 11:08, 12 April 2017 diff hist -4 m Main Page
- 10:46, 12 April 2017 diff hist +15 m Main Page
- 10:44, 12 April 2017 diff hist 0 N File:Main Page 4 April 12, 2017.jpg current
- 10:44, 12 April 2017 diff hist 0 N File:Main Page 3 April 12, 2017.jpg current
- 10:44, 12 April 2017 diff hist 0 N File:Main Page 2 April 12, 2017.jpg current
- 10:44, 12 April 2017 diff hist 0 N File:Main Page April 12, 2017.jpg current
- 10:43, 12 April 2017 diff hist -618 m Main Page
- 07:13, 12 April 2017 diff hist +50 m 751.50 Standard Detailing Notes →G5. CIP Concrete Piles (Notes for Bridge Standard Drawings): Per BR, minor clarifications
- 14:37, 11 April 2017 diff hist +206 m 236.3 Administration Per RW, updated links
- 14:27, 11 April 2017 diff hist -1 m Main Page
- 14:22, 11 April 2017 diff hist -9 m Category:409 Seal Coat
- 13:56, 11 April 2017 diff hist +239 m Main Page EPG 751
- 13:21, 11 April 2017 diff hist 0 m 751.35 Concrete Pile Cap Integral End Bents →751.35.5.1 Reinforcing Holes
- 13:20, 11 April 2017 diff hist 0 N File:751.35.5.1 end of girder.jpg current
- 13:20, 11 April 2017 diff hist 0 N File:751.35.5.1 end of stringer.jpg current
- 13:19, 11 April 2017 diff hist 0 N File:751.35.3.4 2017.jpg current
- 13:18, 11 April 2017 diff hist 0 N File:751.35.3.3 2017.jpg current
- 13:17, 11 April 2017 diff hist +290 m 751.35 Concrete Pile Cap Integral End Bents Per BR, clarified girder chair detail and end distance from center line of bearing to end of steel and prestressed girders.
- 12:39, 11 April 2017 diff hist 0 N File:751.22.3.10 part plan skewed.jpg current
- 12:38, 11 April 2017 diff hist -62 m 751.22 Prestressed Concrete I Girders →751.22.3.10 Closed Intermediate Bent Diaphragms: Per BR, clarified girder chair detail and end distance from center line of bearing to end of steel and prestressed girders.
- 12:28, 11 April 2017 diff hist -35 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 12:27, 11 April 2017 diff hist +19 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 12:25, 11 April 2017 diff hist 0 N File:751.11.3.6 side 2017.jpg current
- 12:24, 11 April 2017 diff hist 0 N File:751.11.3.6 beam chair.jpg current
- 12:24, 11 April 2017 diff hist 0 N File:751.11.3.6 front elevation 2017.jpg current
- 12:24, 11 April 2017 diff hist +150 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs: Per BR, clarified girder chair detail and end distance from center line of bearing to end of steel and prestressed girders.
- 12:22, 11 April 2017 diff hist +24 m 751.50 Standard Detailing Notes →G1. Concrete Bents
- 11:12, 11 April 2017 diff hist +3 m LPA:136.13 LPA Policy Changes
- 11:12, 11 April 2017 diff hist +3 m LPA:136.12 Figures, Glossary and Other Useful Links
- 11:11, 11 April 2017 diff hist 0 N File:136.9.3 April 11 2017.docx
- 11:11, 11 April 2017 diff hist +21 m LPA:136.9 Plans, Specs and Estimates (PSE) Fig 136.9.3 further corrected
- 11:02, 11 April 2017 diff hist +18 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.3 WORK ZONE NO PHONE ZONE Sign: Per CM, minor clarification
- 10:57, 11 April 2017 diff hist +6 m LPA:136.13 LPA Policy Changes
- 10:56, 11 April 2017 diff hist +6 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 10:56, 11 April 2017 diff hist 0 N File:136.9.3 April 2017.docx
- 10:55, 11 April 2017 diff hist +42 m LPA:136.9 Plans, Specs and Estimates (PSE) minor correction for Fig. 136.9.3
- 13:22, 10 April 2017 diff hist +63 m Main Page EPG 750.7.3
- 12:53, 10 April 2017 diff hist +1 m 750.7 Non-Hydraulic Considerations →750.7.3.2 Hydraulic Requirements
- 12:46, 10 April 2017 diff hist 0 m 750.7 Non-Hydraulic Considerations →750.7.3.2 Hydraulic Requirements
- 12:45, 10 April 2017 diff hist 0 N File:750.7.3.2.jpg current
- 12:45, 10 April 2017 diff hist -539 m 750.7 Non-Hydraulic Considerations →750.7.3 Environmental Requirements: Per BR, updated with the new Corps of Engineers Regional Condition, which affects culvert design.