User contributions
Jump to navigation
Jump to search
- 17:00, 9 February 2018 diff hist 0 N File:1041.8 corrugated.jpg current
- 17:00, 9 February 2018 diff hist 0 N File:1041.8 steel.jpg current
- 16:57, 9 February 2018 diff hist +7,754 N 1041.8 Polypropylene Pipe (PP) Pipe Inspection Guide New page: This guide will assist in the inspection of all types and configurations of polypropylene (PP) pipe, couplings and fittings. Answer each question and take the action indicated for the answ... current
- 16:54, 9 February 2018 diff hist +2 m Category:1041 Polypropylene Culvert Pipe
- 16:54, 9 February 2018 diff hist +70 Category:1000 MATERIALS new EPG 1041
- 16:53, 9 February 2018 diff hist +11,527 N Category:1041 Polypropylene Culvert Pipe Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:47, 9 February 2018 diff hist +1,402 Category:1028 Corrugated Polyvinyl Chloride Culvert Pipe Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:45, 9 February 2018 diff hist +1,568 750.7 Non-Hydraulic Considerations →750.7.2 Types: Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:43, 9 February 2018 diff hist +3,606 Category:732 Flared End Sections Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:42, 9 February 2018 diff hist +70 Category:700 STRUCTURES AND HYDRAULICS EPG 730 Thermoplastic Pipe Culverts current
- 16:41, 9 February 2018 diff hist +5,499 N Category:730 Thermoplastic Pipe Culverts Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:39, 9 February 2018 diff hist -2,362 Category:730 Corrugated Polyethylene Pipe Culverts Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications. current
- 16:37, 9 February 2018 diff hist -1,411 Category:728 Corrugated Polyvinyl Chloride Culvert Pipe EPG 728 was deleted since there is no longer a Sec 728. current
- 16:36, 9 February 2018 diff hist +7,021 N Category:724 Pipe Culverts Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:33, 9 February 2018 diff hist +57 Category:700 STRUCTURES AND HYDRAULICS
- 16:26, 9 February 2018 diff hist -554 751.50 Standard Detailing Notes →G. Substructure Notes: Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) and replace it with AASHTO M 270, Gr 50 (ASTM A709,
- 16:23, 9 February 2018 diff hist -71 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) and replace it with AASHTO M 270, Gr 50 (ASTM A70
- 16:20, 9 February 2018 diff hist +10 751.36 Driven Piles
- 16:18, 9 February 2018 diff hist +939 751.36 Driven Piles Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Grade 36 (ASTM A 709, Grade 36) and replace it with AASHTO M 270, Grade 50 (ASTM A709, Grade 50).
- 16:14, 9 February 2018 diff hist -28 751.1 Preliminary Design →751.1.2 Bridges/Boxes: Per BR, revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) & replace it with AASHTO M 270, Gr 50 (ASTM A709, Gr 50)
- 16:09, 9 February 2018 diff hist +438 Category:702 Load-Bearing Piles Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Grade 36 (ASTM A 709, Grade 36) and replace it with AASHTO M 270, Grade 50 (ASTM A709, Grade 50).
- 16:01, 9 February 2018 diff hist -55 237.7 Equipment and Materials List Per Bidding and Contract, revision will now require designers to include the D-15 in the Electronic Deliverables.
- 15:33, 6 February 2018 diff hist +64 m Main Page EPG 108.1.3
- 15:29, 6 February 2018 diff hist 0 m Category:108 Prosecution and Progress →108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting
- 15:24, 6 February 2018 diff hist +557 m Category:108 Prosecution and Progress →108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting: Per ECR and CM, expanded and clarified guidance for contractor to fill out Form C-220.
- 14:25, 6 February 2018 diff hist +134 m Category:108 Prosecution and Progress →108.1 Subletting of Contract (for Sec 108.1): Per ECR, minor clarification
- 09:40, 5 February 2018 diff hist -421 m Main Page
- 09:39, 5 February 2018 diff hist +39 m Main Page
- 09:38, 5 February 2018 diff hist +136 m Main Page EPG 153.1.3.3
- 09:30, 5 February 2018 diff hist +793 m Category:153 Agreements and Contracts →153.1.3.2 Reviewer’s Roles and Responsibilities: Per DE, new guidance to address Agreements initiated by other entities that are not initiated in eAgreements.
- 16:06, 2 February 2018 diff hist -8 m Main Page EPG 129.12
- 16:02, 2 February 2018 diff hist +69 m Category:129 Public Involvement →129.12 Presentation for Location or Design Approval to the Commission: Per DE, clarified that location & design approval is required even if an LPA is administering & paying for improvement
- 15:46, 2 February 2018 diff hist -68 m Main Page EPG Other Aspects of Pavement Design
- 15:43, 2 February 2018 diff hist +123 m Other Aspects of Pavement Design →Minor Roads: Per DE, clarification about pavement thicknesses/types sometimes not included on typical sections. Now is effective for April 2018.
- 14:44, 2 February 2018 diff hist +227 m Main Page EPG 616.6.89
- 09:40, 2 February 2018 diff hist 0 N File:616.14 WZ Questions 2018.docx current
- 09:39, 2 February 2018 diff hist -12 m 616.14 Work Zone Safety and Mobility Policy Per TS, update to WZ Questions for the Core Team.
- 09:32, 2 February 2018 diff hist +760 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.89 Radar Speed Advisory Assembly: Per TS, expanded and updated guidance on the placement of the Radar Speed Advisory Assembly.
- 16:04, 1 February 2018 diff hist +196 m Main Page EPG 128.2 and EPG 231.2
- 15:53, 1 February 2018 diff hist -2,294 231.2 Clear Zones →231.2.1 Introduction: Per EPS and CCO, condensed and clarified guidance regarding clear zones and roadside hardware for 1R and 2R projects
- 15:49, 1 February 2018 diff hist +505 Category:128 Conceptual Studies →128.2 Preventive Maintenance Projects (1R and 2R): Per EPS and CCO, condensed and clarified guidance regarding clear zones and roadside hardware for 1R and 2R projects
- 15:01, 1 February 2018 diff hist +13 m Category:450 Bituminous Pavement Design →450.9 Safety EdgeSM
- 14:48, 1 February 2018 diff hist +2 m Main Page
- 10:28, 31 January 2018 diff hist +1 m Category:718 Temporary Bridge →718.1 Construction Inspection for Sec 718 current
- 16:07, 30 January 2018 diff hist 0 m 751.50 Standard Detailing Notes →B3a. Bridges
- 14:59, 30 January 2018 diff hist -9 751.50 Standard Detailing Notes →B3a. Bridges
- 14:57, 30 January 2018 diff hist +51 m 751.50 Standard Detailing Notes →B3a. Bridges: Per BR, updated Note B3.2
- 10:07, 30 January 2018 diff hist -1 m Category:101 Standard Forms
- 10:06, 30 January 2018 diff hist 0 N File:747 Bridge Survey Checklist 2018.doc current
- 10:06, 30 January 2018 diff hist -2 m Category:747 Bridge Reports and Layouts
- 11:03, 29 January 2018 diff hist +125 m Category:101 Standard Forms Per BR, updated Bridge Survey Checklist. Also added the Bridge Survey Location Request form to two Design locations
- 10:52, 29 January 2018 diff hist 0 N File:747 Bridge Survey Checklist 2018.docx current
- 10:52, 29 January 2018 diff hist -82 m Category:747 Bridge Reports and Layouts Per BR, updated Bridge Survey Checklist
- 15:57, 26 January 2018 diff hist -3 m 131.1 Design Exception Process →131.1.4 The Design Exception Process
- 14:30, 26 January 2018 diff hist -542 m Main Page EPG 131.1.4
- 14:14, 26 January 2018 diff hist +610 m 131.1 Design Exception Process →131.1.4 The Design Exception Process: Per DE, Design Exceptions to be stored electronically in eProjects after CO DE/BR have reviewed & approved. Guidance is now up-to-date with current practice
- 12:25, 26 January 2018 diff hist +16 m Category:132 Safety
- 12:23, 26 January 2018 diff hist +33 m Category:132 Safety updated links to various PPE guidance
- 12:16, 26 January 2018 diff hist -17 m Category:132 Safety Updated link to USDOT Emergency Response Guide
- 09:25, 26 January 2018 diff hist 0 N File:123.1.1 PoDI 2018.xlsx
- 09:24, 26 January 2018 diff hist -98 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per DE, updated PoDI list
- 15:03, 25 January 2018 diff hist +1 751.40 LFD Widening and Repair →751.40.2.4 Deck Repair and Filled Joints: Per BR, updated link
- 14:58, 25 January 2018 diff hist -1 m 751.5 Structural Detailing Guidelines →751.5.4.5 Bridge Decks: Per BR, updated link
- 11:46, 25 January 2018 diff hist 0 106.3.2.40 TM-40, A One-Point Moisture-Density Relations Test for Soils current
- 11:46, 25 January 2018 diff hist 0 N File:106.3.2.40.jpg current
- 11:45, 25 January 2018 diff hist +2 m 106.3.2.40 TM-40, A One-Point Moisture-Density Relations Test for Soils Per CM, minor correction to figure.
- 11:37, 24 January 2018 diff hist +1 m LPA:136.2 Certification and Training
- 11:21, 24 January 2018 diff hist +166 m LPA:136.13 LPA Policy Changes EPG 136.2
- 11:18, 24 January 2018 diff hist +1 m LPA:136.2 Certification and Training
- 11:18, 24 January 2018 diff hist -67 m LPA:136.2 Certification and Training Per CM, updated the contact information for the Technician Certification Program
- 10:51, 24 January 2018 diff hist +181 m 147.3 Job Order Contracting (JOC) →147.3.5 Term Extension of Job Order Contracts: Per CM, updated the 5th bullet pt. CCO requested that CM no longer submit hard copies of the new performance bond, but send them email links
- 08:14, 22 January 2018 diff hist +3 m 171.12 Maintenance Policy History →DRN(A4) Plastic Pipe
- 14:24, 19 January 2018 diff hist 0 m Category:702 Load-Bearing Piles →702.1.4.4 DFI Documents on Pile Driving and Hammers
- 14:20, 19 January 2018 diff hist 0 N File:103.1.6 Reviewers Checklist.docx current
- 14:19, 19 January 2018 diff hist -152 m 103.1 Bid Opening and Award Process Per Bidding and Est, replaced Reviewer's Checklist link with an uploaded form
- 11:30, 19 January 2018 diff hist -51 m LPA:136.13 LPA Policy Changes
- 11:24, 19 January 2018 diff hist -4 m LPA:136.13 LPA Policy Changes minor cosmetic update to Fig. 136.9.3
- 11:24, 19 January 2018 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links minor cosmetic update to Fig. 136.9.3
- 11:23, 19 January 2018 diff hist 0 N File:136.9.3 2018.docx
- 11:23, 19 January 2018 diff hist -28 m LPA:136.9 Plans, Specs and Estimates (PSE) minor cosmetic update to Fig. 136.9.3
- 12:22, 18 January 2018 diff hist 0 N File:101 Floodplain Development Permit Application 2018.pdf current
- 12:22, 18 January 2018 diff hist -7 m Category:101 Standard Forms →Bridge: Per BR, updated “Floodplain Development Permit/Application” form with minor changes made at the request of SEMA.
- 11:54, 18 January 2018 diff hist +75 m Main Page EPG 106.3.2.87, EPG 402
- 10:31, 18 January 2018 diff hist +5 m 147.3 Job Order Contracting (JOC) Per EPS, updated Fence JOC link
- 09:53, 18 January 2018 diff hist +5 m Category:625 Slab Stabilization Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:53, 18 January 2018 diff hist +5 m Category:409 Seal Coat Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:53, 18 January 2018 diff hist +5 m Category:402 Bituminous Surface Leveling Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:52, 18 January 2018 diff hist +5 m Category:401 Bituminous Base and Pavement Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:52, 18 January 2018 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments 2018.docx current
- 09:51, 18 January 2018 diff hist +5 m Category:403 Asphaltic Concrete Pavement Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 08:56, 18 January 2018 diff hist +1,259 Nm 106.3.2.87 TM-87 No-Pick-Up Time for Tack Coats Per CM, new TM for determining no pick-up-time for tack coat
- 11:51, 17 January 2018 diff hist +160 m Main Page EPG 236.3
- 11:27, 17 January 2018 diff hist +1,311 m 236.3 Administration →236.3.4 Right of Way Acquisition Authority and Project Funding: Per RW, to align w/ CFR reg, updated RW activities that can be coded to the PE number prior to receiving FHWA's "A" date approval
- 10:28, 17 January 2018 diff hist -9 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.1 Introduction to the Storm Water Permit and Storm Water Polution Prevention Plan (SWPPP): Per CADD, updated a link to EPA
- 10:16, 17 January 2018 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator 2018.xlsx
- 10:15, 17 January 2018 diff hist -8 m 606.1 Guardrail Per Charles Schumann, minor revision to guardrail calculator spreadsheet (added links to MoDOT approved MASH crashworthy end terminals and MoDOT locations for greater convenience for the user)
- 13:21, 16 January 2018 diff hist -1 m 236.3 Administration →236.3.4.1 General
- 14:43, 12 January 2018 diff hist -2,346 m Category:1037 Sheer Connectors current
- 14:37, 12 January 2018 diff hist 0 Category:1000 MATERIALS Title of EPG 1037 corrected to "Shear" from "Sheer".
- 14:37, 12 January 2018 diff hist +2,687 Nm Category:1037 Shear Connectors Title of EPG 1037 corrected to "Shear" from "Sheer". Old article had 8911 hits and only a few minor corrections from its original incorporation into EPG from Materials Manual in July 2007