User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:46, 16 July 2021 diff hist +51 m Recent Policy Changes in the EPG EPG 903.7.49
- 10:39, 16 July 2021 diff hist +445 m 903.7 Conventional Road Guide Signs →903.7.49 Community Wayfinding Signs (MUTCD Section 2D.50): Per TS, as a convenience to cities, provided a simplified document, "Key Wayfinding Requirements"
- 10:05, 16 July 2021 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator Jul 2021.xlsx current
- 10:04, 16 July 2021 diff hist 0 m 606.1 Guardrail Per Charles Schumann, updated Length of Need Calculator by removing wording associated with cautions and warnings as well as other minor revisions.
- 13:55, 15 July 2021 diff hist +50 m Recent Policy Changes in the EPG EPG 236.4.7.2
- 13:23, 15 July 2021 diff hist +325 m 236.4 Description Writing and Titles →236.4.7.2 Quitclaim Deed (to the Commission): Per RW, clarified guidance about the determination and documentation of when the release of tenant interest is required
- 08:23, 15 July 2021 diff hist -120 m Recent Policy Changes in the EPG EPG 146
- 07:38, 15 July 2021 diff hist +158 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.2.3 Commercially Useful Function (CUF): Per ECR, updated material supplier CUF frequency to every 30 days, regardless of DBE activity
- 07:34, 15 July 2021 diff hist -29 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.3 DBE Trucking Companies: removed archaic bulldozer symbol
- 12:20, 14 July 2021 diff hist -73 Category:1180 Bituminous Stockpile Patching Material
- 12:20, 14 July 2021 diff hist 0 N File:903.7.49 Key Wayfinding.pdf current
- 12:20, 14 July 2021 diff hist +73 m Category:1180 Bituminous Stockpile Patching Material
- 11:30, 14 July 2021 diff hist +1,280 m Main Page Per EPS and CCO, added disclaimer verbiage
- 10:25, 13 July 2021 diff hist +289 m LPA:136.13 LPA Policy Changes Fig. 136.3.24, TEAP Program Application
- 10:22, 13 July 2021 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Per DE, updated TEAP application by increasing federal fund limit to $12K per project and adding clarification about person in responsible charge.
- 10:21, 13 July 2021 diff hist 0 N File:Fig.136.3.24 2021.docx current
- 10:21, 13 July 2021 diff hist 0 m LPA:136.3 Federal Aid Basics Per DE, updated TEAP application by increasing federal fund limit to $12K per project and adding clarification about person in responsible charge.
- 09:16, 13 July 2021 diff hist -4 m Category:146 Disadvantaged Business Enterprise (DBE) →146.2 DBE Subcontract: Per ECR, minor clarification related to CUF Determination Form
- 13:52, 7 July 2021 diff hist +8 m Category:124 Quality Control / Quality Assurance (QC/QA) updated links for RW Plans checklist
- 13:50, 7 July 2021 diff hist 0 N File:124.2.4 Check List for RW Plans.docx current
- 13:50, 7 July 2021 diff hist -34 m Category:101 Standard Forms →Checklist: updated link to Right of Way Check List
- 13:47, 7 July 2021 diff hist +4 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting: updated link to Project Reviewing Checklist
- 13:46, 7 July 2021 diff hist -86 m Category:124 Quality Control / Quality Assurance (QC/QA) updated link to Project Reviewing Checklist
- 13:45, 7 July 2021 diff hist 0 N File:124.2.4 Project Reviewing Checklist.docx
- 13:45, 7 July 2021 diff hist -43 m Category:101 Standard Forms →Checklist: updated link to Project Reviewing Checklist
- 13:41, 7 July 2021 diff hist +11 m Category:124 Quality Control / Quality Assurance (QC/QA)
- 13:39, 7 July 2021 diff hist +6 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process: updated link to Design Progress Checklist
- 13:39, 7 July 2021 diff hist 0 N File:124.2.4 Design Progress Check list.docx current
- 13:38, 7 July 2021 diff hist -45 m Category:101 Standard Forms →Checklist: updated link to Design Progress Check List
- 13:36, 7 July 2021 diff hist -1 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process
- 13:35, 7 July 2021 diff hist +6 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process: updated link for Preliminary Plan Review Checklist
- 13:34, 7 July 2021 diff hist 0 N File:124.2.4 Check List for Preliminary Plans.docx current
- 13:31, 7 July 2021 diff hist -40 m Category:101 Standard Forms →Checklist: updated link
- 13:23, 7 July 2021 diff hist -49 m 643.2 Local Utility Adjustments - Public and Private updated D-12 link
- 13:13, 7 July 2021 diff hist -99 m 237.9 Submission of Plans and Supporting Documents updated D-12 links
- 13:09, 7 July 2021 diff hist -94 m Category:124 Quality Control / Quality Assurance (QC/QA) updated D-12 link
- 13:04, 7 July 2021 diff hist 0 N File:D-12 2021.pdf
- 13:04, 7 July 2021 diff hist -49 m Category:101 Standard Forms →Checklist: updated D-12 link
- 14:14, 2 July 2021 diff hist +40 m Category:109 Measurement and Payment →109.12.3.1 Excusable Delays for Unusual Events: inclusive language
- 13:39, 2 July 2021 diff hist -4 m 236.13 Designing Right of Way Plans inclusive language
- 13:36, 2 July 2021 diff hist +11 m 236.13 Designing Right of Way Plans inclusive language
- 13:23, 2 July 2021 diff hist -5 m 236.13 Designing Right of Way Plans
- 13:03, 2 July 2021 diff hist +1 m 238.4 Construction Surveying Inclusive language
- 12:39, 2 July 2021 diff hist +18 m 236.3 Administration inclusive laguage
- 13:06, 1 July 2021 diff hist +130 m Recent Policy Changes in the EPG EPG 1040.4
- 12:59, 1 July 2021 diff hist +94 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Three-Strand Guard Cable Material →1040.4 Crashworthy End Terminal and Qualified Plastic Guardrail Block
- 14:53, 30 June 2021 diff hist +233 m Recent Policy Changes in the EPG EPG 751.6 and EPG 751.50
- 13:19, 30 June 2021 diff hist +849 m 751.6 General Quantities Per BR, clarified guidance about System I finish field coat
- 11:16, 30 June 2021 diff hist +650 m 751.50 Standard Detailing Notes →A4a. Structural Steel Protective Coatings: Per BR, provided additional options for System I structural steel protective coatings.
- 07:56, 30 June 2021 diff hist 0 N File:751.1.2.19 Request Jun 30 2021.xlsx
- 07:55, 30 June 2021 diff hist 0 N File:751.1.2.18.2 Highway Grade Separation.docx current
- 07:55, 30 June 2021 diff hist +7 m 751.1 Preliminary Design Per BR, updated links to "Highway Grade Separation (Minor Route over Major Route)" and "Request for Final Soundings for Structures Form"
- 07:24, 30 June 2021 diff hist +15 m 748.7 Bridge Deck and Bridge End Drainage →748.7.4 Bridges on a Minor or Low Volume Route: Per BR, minor clarification
- 14:36, 29 June 2021 diff hist 0 N File:751.1.2.19 Guidance Jun 2021.xlsx
- 14:35, 29 June 2021 diff hist 0 N File:751.1.2.19 Request Jun 2021.xlsx
- 14:34, 29 June 2021 diff hist 0 m 751.1 Preliminary Design Per BR, minor updates for "Guidance for Request for Final Soundings for Structures Form" and "Request for Final Soundings for Structures Form"
- 10:46, 29 June 2021 diff hist -2 m 748.7 Bridge Deck and Bridge End Drainage →748.7.3 Bridges on a Major Route
- 10:42, 29 June 2021 diff hist +14 m 751.1 Preliminary Design →751.1.2.18.2 Content
- 10:23, 29 June 2021 diff hist +2 m 751.40 LFD Widening and Repair →751.40.4.3 Replacement of Existing Rail with Thrie Beam Rail: Per BR, minor clarification
- 08:10, 29 June 2021 diff hist -3 m 751.37 Drilled Shafts →Commentary on EPG 751.37.1 General
- 08:09, 29 June 2021 diff hist -28 m 751.38 Spread Footings Per BR, minor clarifications current
- 07:45, 29 June 2021 diff hist -11 m 751.37 Drilled Shafts Per BR, minor clarifications
- 14:59, 28 June 2021 diff hist -65 m 751.36 Driven Piles →751.36.1.5 Geotechnical Redundancy: Per BR, minor clarificaiton
- 14:55, 28 June 2021 diff hist -49 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.1.1 Application: Per BR, minor clarification
- 14:53, 28 June 2021 diff hist -10 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, minor clarifications
- 14:50, 28 June 2021 diff hist +14 m 751.2 Loads →751.2.2.2 Water Load: Per BR, minor clarification
- 14:43, 28 June 2021 diff hist -51 m 750.7 Non-Hydraulic Considerations →750.7.4.1 Standard Plans: Per BR, minor clarification to accommodate new Std Plan 504.00
- 13:41, 28 June 2021 diff hist +25 m 748.7 Bridge Deck and Bridge End Drainage Per BR, clarified terminology
- 13:39, 28 June 2021 diff hist +30 m 643.4 Railroads updated link
- 13:32, 28 June 2021 diff hist +10 m Category:712 Structural Steel Construction →712.1.4.1.4 Acceptable Field Welding Processes: Per BR, clarified terminology
- 13:28, 28 June 2021 diff hist +7 m Category:503 Bridge Approach Slabs Per BR, clarified terminology
- 13:17, 28 June 2021 diff hist 0 N File:751.38.4.3.2 2021.jpg current
- 13:17, 28 June 2021 diff hist 0 N File:751.38.4.3.1 2021.jpg current
- 13:16, 28 June 2021 diff hist 0 N File:751.38.4.2 2021.jpg current
- 13:13, 28 June 2021 diff hist 0 N File:751.38.4.1 2021.jpg current
- 13:12, 28 June 2021 diff hist 0 N File:Table 751.38.3.3 2021.jpg current
- 13:12, 28 June 2021 diff hist 0 N File:751.38.3.2 2021.jpg current
- 13:11, 28 June 2021 diff hist 0 N File:751.38.3.1 2021.jpg current
- 13:10, 28 June 2021 diff hist +39 m 751.38 Spread Footings Per BR, clarified terminology in figures
- 13:00, 28 June 2021 diff hist 0 N File:751.37.4.2.12 2021.jpg current
- 12:58, 28 June 2021 diff hist 0 N File:751.37.4.2.11 2021.jpg current
- 12:58, 28 June 2021 diff hist 0 N File:751.37.4.2.10 2021.jpg current
- 12:57, 28 June 2021 diff hist 0 N File:751.37.4.2.9 2021.jpg current
- 12:54, 28 June 2021 diff hist 0 N File:751.37.4.2.8 2021.jpg current
- 12:51, 28 June 2021 diff hist 0 N File:751.37.4.2.7 2021.jpg current
- 12:49, 28 June 2021 diff hist 0 N File:751.37.4.2.6 2021.jpg current
- 12:46, 28 June 2021 diff hist 0 N File:751.37.4.2.5 2021.jpg current
- 12:44, 28 June 2021 diff hist 0 N File:751.37.4.2.4 2021.jpg current
- 12:41, 28 June 2021 diff hist 0 N File:751.37.4.2.3 2021.jpg current
- 12:39, 28 June 2021 diff hist 0 N File:751.37.4.2.2 2021.jpg current
- 12:37, 28 June 2021 diff hist 0 N File:751.37.4.2.1 2021.jpg current
- 12:36, 28 June 2021 diff hist 0 N File:751.37.4.1.12 2021.jpg current
- 12:35, 28 June 2021 diff hist 0 N File:751.37.4.1.11 2021.jpg current
- 12:35, 28 June 2021 diff hist 0 N File:751.37.4.1.10 2021.jpg current
- 12:35, 28 June 2021 diff hist 0 N File:751.37.4.1.9 2021.jpg current
- 12:32, 28 June 2021 diff hist 0 N File:751.37.4.1.8 2021.jpg current
- 12:30, 28 June 2021 diff hist 0 N File:751.37.4.1.7 2021.jpg current
- 12:27, 28 June 2021 diff hist 0 N File:751.37.4.1.6 2021.jpg current
- 12:26, 28 June 2021 diff hist 0 N File:751.37.4.1.5 2021.jpg current
- 12:24, 28 June 2021 diff hist 0 N File:751.37.4.1.4 2021.jpg current
- 12:22, 28 June 2021 diff hist 0 N File:751.37.4.1.3 2021.jpg current
- 12:20, 28 June 2021 diff hist 0 N File:751.37.4.1.2 2021.jpg current
- 12:18, 28 June 2021 diff hist 0 N File:751.37.4.1.1 2021.jpg current
- 12:17, 28 June 2021 diff hist 0 N File:751.37.3.6.2 2021.jpg current
- 12:15, 28 June 2021 diff hist 0 N File:751.37.3.6.1 2021.jpg current
- 12:13, 28 June 2021 diff hist 0 N File:751.37.3.5.2 2021.jpg current
- 12:12, 28 June 2021 diff hist 0 N File:751.37.3.5.1 2021.jpg current
- 12:10, 28 June 2021 diff hist 0 N File:751.37.3.4.2 2021.jpg current
- 11:29, 28 June 2021 diff hist 0 N File:751.37.3.4.1 2021.jpg current
- 11:27, 28 June 2021 diff hist 0 N File:751.37.3.3.2 2021.jpg current
- 11:25, 28 June 2021 diff hist 0 N File:751.37.3.3.1 2021.jpg current
- 11:23, 28 June 2021 diff hist 0 N File:751.37.3.2.2 2021.jpg current
- 11:22, 28 June 2021 diff hist 0 N File:751.37.3.2.1 2021.jpg current
- 11:19, 28 June 2021 diff hist 0 N File:751.37.3.1.2 2021.jpg current
- 11:18, 28 June 2021 diff hist 0 N File:751.37.3.1.1 2021.jpg current
- 11:16, 28 June 2021 diff hist +162 m 751.37 Drilled Shafts Per BR, clarified terminology in numerous figures
- 08:56, 28 June 2021 diff hist 0 N File:751.22.1.2 type 4 Jun 2021.jpg current
- 08:50, 28 June 2021 diff hist +4 m 751.22 Prestressed Concrete I Girders →751.22.1.2 Geometric Dimensions
- 08:44, 28 June 2021 diff hist 0 N File:751.22.1.2 type 4 2021.jpg current
- 08:42, 28 June 2021 diff hist +5 m 751.22 Prestressed Concrete I Girders →751.22.1.2 Geometric Dimensions: Per BR, minor corrections in figures
- 15:06, 25 June 2021 diff hist 0 N File:751.1.2.18.2 Design Implications.docx current
- 15:06, 25 June 2021 diff hist +2 m 751.1 Preliminary Design →751.1.2.18.2 Content
- 15:05, 25 June 2021 diff hist 0 N File:751.1.2.18.2 Bridge Rehabilitation 2021.pdf current
- 15:05, 25 June 2021 diff hist 0 N File:751.1.2.19.2 Stream Crossing Bridge 2021.pdf current
- 15:05, 25 June 2021 diff hist 0 N File:751.1.2.18.2 Railroad Grade Separation 2021.pdf current
- 15:04, 25 June 2021 diff hist +2 m 751.1 Preliminary Design →751.1.2.18.2 Content
- 15:03, 25 June 2021 diff hist +1,069 m 751.1 Preliminary Design Per BR, added to list of items to include on the bridge memo and design layout the various classifications that have design implications; updated two linked example bridge memos and added link to new example bridge memo
- 10:39, 25 June 2021 diff hist +27 m Category:143 Practical Design →143.1 Introduction: updated link
- 10:29, 25 June 2021 diff hist -39 m Category:1000 MATERIALS Per CM, removed photo
- 10:12, 25 June 2021 diff hist +32 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, updated C-220 link
- 10:11, 25 June 2021 diff hist +32 m Category:108 Prosecution and Progress Per CM, updated C-220 link
- 10:11, 25 June 2021 diff hist +64 m Category:105 Control of Work Per CM, updated C-220 link
- 10:10, 25 June 2021 diff hist -3 m Category:101 Standard Forms →Construction and Materials: Per CM, updated links
- 08:58, 24 June 2021 diff hist 0 N File:751.11.3.2.2 Laminated Fixed 2021.jpg current
- 08:58, 24 June 2021 diff hist 0 N File:751.11.3.2.1 Laminated Fixed 2021.jpg current
- 08:57, 24 June 2021 diff hist 0 N File:751.11.3.2.2 Laminated Expansion 2021.jpg current
- 08:56, 24 June 2021 diff hist 0 N File:751.11.3.2.1 Laminated Expansion 2021.jpg current
- 08:56, 24 June 2021 diff hist -226 m 751.11 Bearings →751.11.3 Details
- 08:53, 24 June 2021 diff hist 0 N File:751.11.3.1.2 2021.jpg current
- 08:53, 24 June 2021 diff hist -113 m 751.11 Bearings →751.11.3.1 Elastomeric Bearings for P/S I-Girders
- 08:51, 24 June 2021 diff hist 0 N File:751.11.3.1.1 2021.jpg current
- 08:51, 24 June 2021 diff hist +30 m 751.11 Bearings →751.11.3 Details: Per BR, minor corrections in a couple of figures. Also clarified associated illustrations.
- 07:21, 24 June 2021 diff hist +1 m Category:101 Standard Forms →Construction and Materials
- 15:24, 23 June 2021 diff hist +159 m Category:146 Disadvantaged Business Enterprise (DBE) Per ECR and CM, retitled "CUF Determination Form Contracts Let After March 2021" from "CUF Determination Form Contracts Awarded After March 2021"
- 15:22, 23 June 2021 diff hist +53 m LPA:136.12 Figures, Glossary and Other Useful Links http://epg.modot.mo.gov/forms/CM/CUF_Determination_Form_Contracts_Let_After_03_2021.pdf
- 15:19, 23 June 2021 diff hist +106 m LPA:136.11 Local Public Agency Construction Per ECR and CM, retitled "CUF Determination Form Contracts Let After March 2021" from "CUF Determination Form Contracts Awarded After March 2021"
- 15:18, 23 June 2021 diff hist +48 m Category:101 Standard Forms Per ECR and CM, retitled "CUF Determination Form Contracts Let After March 2021" from "CUF Determination Form Contracts Awarded After March 2021"
- 13:00, 23 June 2021 diff hist 0 N File:616.13 WZ Impact 2021.xlsm current
- 13:00, 23 June 2021 diff hist -8 m 616.13 Work Zone Capacity, Queue and Travel Delay Per TS, updated MoDOT Work Zone Impact Analysis Spreadsheet program to work with the current TMS format.
- 08:39, 23 June 2021 diff hist -86 m Recent Policy Changes in the EPG EPG 146
- 08:25, 23 June 2021 diff hist +651 m LPA:136.10 Advertisement for Bid and Project Award Per CM, new references to EPG 146 added
- 08:20, 23 June 2021 diff hist +144 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.15 Disadvantaged Business Enterprise (DBE) (49 CFR Part 26): Per CM, new references to EPG 146 added
- 08:18, 23 June 2021 diff hist +651 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2 Solicitation & Selection Process: Per CM, new references to EPG 146 added
- 08:11, 23 June 2021 diff hist +9,865 m Category:146 Disadvantaged Business Enterprise (DBE) Per CM and DE, guidance forproject bid proposals that include DBE goals has been clarified and expanded.
- 13:56, 22 June 2021 diff hist 0 N File:751.5.1.3.2 plate.jpg current
- 13:56, 22 June 2021 diff hist 0 N File:751.5.1.3.2 centerline.jpg current
- 13:56, 22 June 2021 diff hist 0 N File:751.5.1.3.2 baseline.jpg current
- 13:55, 22 June 2021 diff hist +2,526 m 751.5 Structural Detailing Guidelines →751.5.1.3.2 Symbols: Per BR, updated the symbol table
- 13:34, 22 June 2021 diff hist -31 Category:1180 Bituminous Stockpile Patching Material
- 12:07, 22 June 2021 diff hist +3 Category:1180 Bituminous Stockpile Patching Material
- 11:54, 22 June 2021 diff hist +2 Category:1180 Bituminous Stockpile Patching Material
- 11:27, 22 June 2021 diff hist +26 Category:1180 Bituminous Stockpile Patching Material
- 09:25, 22 June 2021 diff hist 0 m 903.8 Freeway and Expressway Guide Signs →Table 903.8.12 Guide Sign Sizes current
- 09:23, 22 June 2021 diff hist +37 m 903.8 Freeway and Expressway Guide Signs →903.8.38 Exit Direction Signs (MUTCD Section 2E.36)
- 09:18, 22 June 2021 diff hist -11,501 m 903.8 Freeway and Expressway Guide Signs Per TS, numerous minor clarifications
- 15:10, 21 June 2021 diff hist +4 m Category:1036 Reinforcing Steel for Concrete →1036.2.1.2 Welded Wire Fabric
- 15:09, 21 June 2021 diff hist +2 m Category:1036 Reinforcing Steel for Concrete →1036.2.1.2 Welded Wire Fabric: Per CM, outdated size differential values to be updated per spec M336 6.4.5.4.2.
- 09:27, 21 June 2021 diff hist +9 m 751.1 Preliminary Design →751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts: Per BR, minor clarifications
- 13:52, 16 June 2021 diff hist +2 m 751.1 Preliminary Design →Common Bridge Barrier and Railing (for Rehabilitations)
- 13:50, 16 June 2021 diff hist +73 m Recent Policy Changes in the EPG EPG 751.1.3.4
- 13:45, 16 June 2021 diff hist 0 N File:751.1.3.4 Type G.jpg current
- 13:44, 16 June 2021 diff hist 0 N File:751.1.3.4 Type C.jpg current
- 13:44, 16 June 2021 diff hist 0 N File:751.1.3.4 Type A.jpg current
- 13:44, 16 June 2021 diff hist +597 m 751.1 Preliminary Design →751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts: Per BR, simplified guidance for barrier and railing options on existing bridges
- 10:50, 15 June 2021 diff hist -88 m Recent Policy Changes in the EPG EPG 109
- 10:45, 15 June 2021 diff hist 0 File:109.10 transfer.xlsx Smithk uploaded a new version of File:109.10 transfer.xlsx current
- 10:43, 15 June 2021 diff hist +2,662 m Category:109 Measurement and Payment →109.10 Assignments (for Sec 109.10): Per CM, expanded guidance about how to assign a contract.
- 10:22, 15 June 2021 diff hist -1 m 751.40 LFD Widening and Repair →751.40.8.6.2.1 Shear Connector Design: Per BR, minor correction
- 14:58, 14 June 2021 diff hist -76 m 236.6 Appraisal and Appraisal Review →236.6.3.1 Standard Appraisal Format: Per RW, corrected link
- 12:59, 14 June 2021 diff hist 0 File:900 Flashing Beacons.pdf Smithk reverted File:900 Flashing Beacons.pdf to an old version current
- 12:56, 14 June 2021 diff hist +296 m Category:900 TRAFFIC CONTROL Per TS, updating links to brochures
- 10:58, 14 June 2021 diff hist +28 m 751.1 Preliminary Design Inclusive language.
- 15:10, 11 June 2021 diff hist -9 m Category:702 Load-Bearing Piles →702.1.4.1 Hammer Types: Inclusive language
- 14:22, 11 June 2021 diff hist 0 N File:136.6.6 2021.pdf current
- 14:21, 11 June 2021 diff hist -1 m LPA:136.13 LPA Policy Changes Fig. 136.6.6
- 14:21, 11 June 2021 diff hist -1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.6.6
- 14:20, 11 June 2021 diff hist +5 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, updated Fig. 136.6.6 to bring it into compliance with existing guidance in EPG 136.6
- 13:37, 11 June 2021 diff hist -31 m Recent Policy Changes in the EPG EPG 616.8
- 13:16, 11 June 2021 diff hist +1 m 616.8 Typical Applications (MUTCD 6H) →616.8.1 Listing of Typical Applications
- 13:14, 11 June 2021 diff hist +86 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Maintenance
- 13:12, 11 June 2021 diff hist +132 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials
- 13:00, 11 June 2021 diff hist 0 N File:616.8.35a DECM 2021.pdf current
- 13:00, 11 June 2021 diff hist 0 N File:616.8.17a DECM 2021.pdf current
- 13:00, 11 June 2021 diff hist 0 N File:616.8.14a DECM 2021.pdf current
- 13:00, 11 June 2021 diff hist 0 N File:616.8.7b DECM 2021.pdf current
- 12:59, 11 June 2021 diff hist 0 N File:616.8.51 DECM 2021.pdf current
- 12:59, 11 June 2021 diff hist 0 N File:616.8.50 2021.pdf
- 12:58, 11 June 2021 diff hist 0 N File:616.8.46 MT 2021.pdf current
- 12:58, 11 June 2021 diff hist 0 N File:616.8.38c MT 2021.pdf current
- 12:58, 11 June 2021 diff hist 0 N File:616.8.38b MT 2021.pdf current
- 12:58, 11 June 2021 diff hist 0 N File:616.8.38a MT 2021.pdf current
- 12:57, 11 June 2021 diff hist 0 N File:616.8.38 MT 2021.pdf current
- 12:57, 11 June 2021 diff hist 0 N File:616.8.37 MT 2021.pdf current
- 12:57, 11 June 2021 diff hist 0 N File:616.8.31 MT 2021.pdf current
- 12:57, 11 June 2021 diff hist 0 N File:616.8.29 MT 2021.pdf current
- 12:56, 11 June 2021 diff hist 0 N File:616.8.28 MT 2021.pdf current
- 12:56, 11 June 2021 diff hist 0 N File:616.8.12a MT 2021.pdf current
- 12:56, 11 June 2021 diff hist 0 N File:616.8.12 MT 2021.pdf current
- 12:56, 11 June 2021 diff hist 0 N File:616.8.11 MT 2021.pdf current
- 12:55, 11 June 2021 diff hist 0 N File:616.8.10a MT 2021.pdf current
- 12:55, 11 June 2021 diff hist 0 N File:616.8.10 MT 2021.pdf current
- 12:54, 11 June 2021 diff hist +1,545 m 616.8 Typical Applications (MUTCD 6H) →616.8.1 Listing of Typical Applications: Per TS, as a convenience to readers, added a new "effective date" column to the listings
- 07:50, 11 June 2021 diff hist -5 m Category:1170 Drum-Like Channelizers current
- 07:44, 11 June 2021 diff hist +5 m Category:1170 Drum-Like Channelizers
- 07:01, 11 June 2021 diff hist +1 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.2.4 Lifting Loops
- 13:28, 10 June 2021 diff hist +1,134 m Recent Policy Changes in the EPG EPG 751
- 12:50, 10 June 2021 diff hist -5,208 751.50 Standard Detailing Notes Per BR, removed notes in accordance with spec book revisions
- 12:33, 10 June 2021 diff hist 0 N File:751.22.3.6 wwr6 table.jpg current
- 12:32, 10 June 2021 diff hist 0 N File:751.22.3.6 wwr6.jpg current
- 12:31, 10 June 2021 diff hist 0 N File:751.22.3.6 welded alternate.jpg current
- 12:23, 10 June 2021 diff hist 0 N File:751.22.3.3.2 14 to 60.jpg current
- 12:17, 10 June 2021 diff hist 0 N File:751.22.3.3.2 7 to 14.jpg current
- 12:11, 10 June 2021 diff hist 0 N File:751.22.3.3.2 0 to 7.jpg current
- 12:09, 10 June 2021 diff hist 0 N File:751.22.3.3.2 no skew.jpg current
- 12:06, 10 June 2021 diff hist 0 N File:751.22.3.3.1.jpg current
- 12:03, 10 June 2021 diff hist 0 N File:751.22.3.2.5.jpg current
- 12:02, 10 June 2021 diff hist 0 N File:751.22.3.2.4.jpg current
- 12:01, 10 June 2021 diff hist 0 N File:751.22.3.2.3.jpg current
- 11:30, 10 June 2021 diff hist 0 N File:751.22.3.2.2.jpg current
- 11:29, 10 June 2021 diff hist 0 N File:751.22.3.2.1.jpg current
- 11:27, 10 June 2021 diff hist 0 N File:751.22.3.2.jpg current
- 11:24, 10 June 2021 diff hist 0 N File:751.22.2.4 Minimum Debonded Width 2021.jpg current
- 11:22, 10 June 2021 diff hist 0 N File:751.22.1.2 NU 63 70 78.jpg current
- 11:20, 10 June 2021 diff hist 0 N File:751.22.1.2 NU 35 43 53.jpg current
- 11:19, 10 June 2021 diff hist 0 N File:751.22.1.2 type 7.jpg current
- 11:17, 10 June 2021 diff hist 0 N File:751.22.1.2 type 6.jpg current
- 11:17, 10 June 2021 diff hist 0 N File:751.22.1.2 type 4.jpg current
- 11:14, 10 June 2021 diff hist 0 N File:751.22.1.2 type 3.jpg current
- 11:14, 10 June 2021 diff hist 0 N File:751.22.1.2 type 2.jpg current
- 11:11, 10 June 2021 diff hist -84,202 751.22 Prestressed Concrete I Girders Per BR, removed notes in accordance with spec book revisions & revised layout of the standard drawings.
- 10:00, 10 June 2021 diff hist 0 m 751.9 LFD Seismic updated links
- 09:57, 10 June 2021 diff hist 0 m 751.11 Bearings updated link
- 09:53, 10 June 2021 diff hist 0 m 751.10 General Superstructure updated links
- 09:14, 10 June 2021 diff hist -265 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.9 Top Surface Preparation for Adjacent Beams: Per BR, removed notes in accordance with spec book revisions
- 09:13, 10 June 2021 diff hist -254 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.2 Beam Ends: Per BR, removed notes in accordance with spec book revisions and removed requirement for a lifting loop detail.
- 09:06, 10 June 2021 diff hist -325 751.10 General Superstructure →751.10.1.14 Girder and Beam Haunch Reinforcement: Per BR, revised end section reinforcement for NU girders
- 08:28, 10 June 2021 diff hist -175 m Recent Policy Changes in the EPG EPG 201.2.5.1
- 08:14, 10 June 2021 diff hist +1,194 Category:201 Clearing and Grubbing →201.2.5 Removal and Disposal of Material: Per CM, expanded guidance for open burning. current
- 15:08, 8 June 2021 diff hist 0 m Category:101 Standard Forms →Construction and Materials: Per CM, updated link to RE Letterhead Word form
- 14:32, 8 June 2021 diff hist -2 m Category:706 Reinforcing Steel for Concrete Structures updated Research report links current