User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:02, 29 July 2021 diff hist 0 m Recent Policy Changes in the EPG
- 08:47, 29 July 2021 diff hist -4 m 106.9 Buy America Requirement →When does Buy America apply to manufactured items?
- 08:45, 29 July 2021 diff hist +4 m 106.9 Buy America Requirement →When does Buy America apply to manufactured items?
- 08:45, 29 July 2021 diff hist +2 m 106.9 Buy America Requirement →When does Buy America apply to manufactured items?
- 08:40, 29 July 2021 diff hist -67 m Recent Policy Changes in the EPG EPG 106.9
- 08:36, 29 July 2021 diff hist +2,886 m 106.9 Buy America Requirement Per CM, revision expands the NTPEP compliance for Buy America.
- 15:23, 28 July 2021 diff hist +3 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal
- 13:45, 28 July 2021 diff hist 0 m 232.2 Passing Lanes →232.2.1 Discussion current
- 10:45, 28 July 2021 diff hist +86 m Category:101 Standard Forms →Bridge: Per BR, updated archaic Culvert Hydraulics Report with newer version
- 09:02, 28 July 2021 diff hist -1 m Recent Policy Changes in the EPG
- 09:02, 28 July 2021 diff hist -163 m Recent Policy Changes in the EPG EPG 751.11 2.1
- 08:47, 28 July 2021 diff hist +117 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, clarified that in the rare case where intermediate bents are made integral (by extending the beam cap stirrups into the diaphragm), plain neoprene bearing pads may be considered at the intermediate bent.
- 14:42, 27 July 2021 diff hist 0 m 236.6 Appraisal and Appraisal Review Per RW, updated broken links to forms
- 13:42, 27 July 2021 diff hist -39 m 626.2 Centerline Rumble Strips Per TS, replaced now-archaic special sheet with link to new Std. Plan 626.00. Also updated typical section sheet to reflect new Std. Plan 626.00.
- 13:39, 27 July 2021 diff hist +25 m Category:626 Rumble Strips Per TS, replaced now-archaic special sheet with link to new Std. Plan 626.00. current
- 13:36, 27 July 2021 diff hist 0 N File:232.2.3.2.pdf current
- 13:36, 27 July 2021 diff hist -84 m 232.2 Passing Lanes Per TS, replaced now-archaic special sheet with link to new Std. Plan 626.00. Also updated typical section sheet to reflect new Std. Plan 626.00.
- 13:18, 27 July 2021 diff hist 0 N File:903.16.24 2021.jpg current
- 13:17, 27 July 2021 diff hist 0 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes
- 13:03, 27 July 2021 diff hist 0 N File:903.16.24 2021.pdf current
- 13:02, 27 July 2021 diff hist +5 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes
- 13:01, 27 July 2021 diff hist 0 N File:903.16.24.pdf current
- 13:01, 27 July 2021 diff hist 0 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes
- 13:00, 27 July 2021 diff hist -1 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes: Per TS, updated figure to align with new Std. Plan 626.00
- 12:17, 27 July 2021 diff hist 0 N File:147.4 Programmatic Work Plan for FPVC.docx current
- 12:16, 27 July 2021 diff hist +378 m 147.4 Fixed Price Variable Scope (FPVS) Contracting Per EPS, added "Programmatic Work Plan for Utilizing FPVC..."
- 08:32, 27 July 2021 diff hist -38 m Recent Policy Changes in the EPG EPG 606
- 08:28, 27 July 2021 diff hist +277 m Category:606 Guardrail and Guard Cable Per EPS, provided a contact number for reporting damaged guardrail or guard cable
- 10:38, 26 July 2021 diff hist +67 m Category:948 Incident Response Plan and Emergency Response Management
- 15:06, 23 July 2021 diff hist -268 m Recent Policy Changes in the EPG EPG 402, EPG 409, EPG 147.4
- 15:05, 23 July 2021 diff hist 0 N File:147.4.2 FPVS JSP Example.docx current
- 14:55, 23 July 2021 diff hist +5,955 m 147.4 Fixed Price Variable Scope (FPVS) Contracting Per DE, Fixed price variable scope (FPVS) guidance was temporarily removed from the EPG. FHWA has now approved the use of FPVS at a programmatic level
- 14:11, 23 July 2021 diff hist 0 N File:409 FY2022 Contract Seal Coat Job Book Guidelines.docx current
- 14:09, 23 July 2021 diff hist 0 N File:409 FY2022 Contract Seal Coat Guidelines.docx current
- 14:08, 23 July 2021 diff hist +556 m Category:409 Seal Coat Per DE, the Seal Coat and JSP package were updated. New Seal Coat Book Job Guidelines and Seal Coat Book Job JSP Package were added.
- 13:28, 23 July 2021 diff hist 0 N File:402 FY2022 Contract Leveling Course Book Job Guidelines.docx current
- 13:28, 23 July 2021 diff hist 0 N File:402 FY2022 Contract Leveling Course Guidelines.docx current
- 13:28, 23 July 2021 diff hist +509 m Category:402 Bituminous Surface Leveling Per DE, the CLC and JSP package were updated. New CLC Book Job Guidelines and CLC Book Job JSP Package were added.
- 13:26, 21 July 2021 diff hist -1 m Recent Policy Changes in the EPG
- 13:26, 21 July 2021 diff hist -1 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.89 Radar Speed Advisory System (RSAS)
- 13:21, 21 July 2021 diff hist -35 m Recent Policy Changes in the EPG EPG 616.6.89
- 13:14, 21 July 2021 diff hist +3 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.88 Screens (MUTCD 6F.88)
- 13:13, 21 July 2021 diff hist +267 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.89 Radar Speed Advisory Assembly: Per EPS, linked new NJSP for a radar speed advisory system to renamed "Radar Speed Advisory System" (formerly "Radar Speed Advisory Assembly")
- 10:14, 21 July 2021 diff hist -1,564 m Recent Policy Changes in the EPG EPG 903.4.8 and EPG 903.4.9
- 10:11, 21 July 2021 diff hist +2,394 m 903.4 Overhead Sign Mounting Per BR and TS, in EPG 903.4.8 and .9, expanded and updated guidance for handling bridge sign attachments to current established practice. References to wall-mounted structures removed from EPG 903.4.8 and .9
- 15:09, 19 July 2021 diff hist +39 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per CM, updated link to SWPPP Form 806.8.2
- 15:07, 19 July 2021 diff hist +135 m Category:101 Standard Forms Per CM, updated links to SWPPP Form 806.8.2 and added new Non-Conformance Report (NCR) form in EPG 101
- 11:20, 16 July 2021 diff hist +68 m Help Article →EPG Approval Process
- 11:18, 16 July 2021 diff hist -65 m Help Article →EPG Approval Process
- 11:15, 16 July 2021 diff hist +2 m Help Article →EPG Ballot Cycles: updated ballot calendar
- 10:46, 16 July 2021 diff hist +51 m Recent Policy Changes in the EPG EPG 903.7.49
- 10:39, 16 July 2021 diff hist +445 m 903.7 Conventional Road Guide Signs →903.7.49 Community Wayfinding Signs (MUTCD Section 2D.50): Per TS, as a convenience to cities, provided a simplified document, "Key Wayfinding Requirements"
- 10:05, 16 July 2021 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator Jul 2021.xlsx current
- 10:04, 16 July 2021 diff hist 0 m 606.1 Guardrail Per Charles Schumann, updated Length of Need Calculator by removing wording associated with cautions and warnings as well as other minor revisions.
- 13:55, 15 July 2021 diff hist +50 m Recent Policy Changes in the EPG EPG 236.4.7.2
- 13:23, 15 July 2021 diff hist +325 m 236.4 Description Writing and Titles →236.4.7.2 Quitclaim Deed (to the Commission): Per RW, clarified guidance about the determination and documentation of when the release of tenant interest is required
- 08:23, 15 July 2021 diff hist -120 m Recent Policy Changes in the EPG EPG 146
- 07:38, 15 July 2021 diff hist +158 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.2.3 Commercially Useful Function (CUF): Per ECR, updated material supplier CUF frequency to every 30 days, regardless of DBE activity
- 07:34, 15 July 2021 diff hist -29 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.3 DBE Trucking Companies: removed archaic bulldozer symbol
- 12:20, 14 July 2021 diff hist -73 Category:1180 Bituminous Stockpile Patching Material
- 12:20, 14 July 2021 diff hist 0 N File:903.7.49 Key Wayfinding.pdf current
- 12:20, 14 July 2021 diff hist +73 m Category:1180 Bituminous Stockpile Patching Material
- 11:30, 14 July 2021 diff hist +1,280 m Main Page Per EPS and CCO, added disclaimer verbiage
- 10:25, 13 July 2021 diff hist +289 m LPA:136.13 LPA Policy Changes Fig. 136.3.24, TEAP Program Application
- 10:22, 13 July 2021 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Per DE, updated TEAP application by increasing federal fund limit to $12K per project and adding clarification about person in responsible charge.
- 10:21, 13 July 2021 diff hist 0 N File:Fig.136.3.24 2021.docx current
- 10:21, 13 July 2021 diff hist 0 m LPA:136.3 Federal Aid Basics Per DE, updated TEAP application by increasing federal fund limit to $12K per project and adding clarification about person in responsible charge.
- 09:16, 13 July 2021 diff hist -4 m Category:146 Disadvantaged Business Enterprise (DBE) →146.2 DBE Subcontract: Per ECR, minor clarification related to CUF Determination Form
- 13:52, 7 July 2021 diff hist +8 m Category:124 Quality Control / Quality Assurance (QC/QA) updated links for RW Plans checklist
- 13:50, 7 July 2021 diff hist 0 N File:124.2.4 Check List for RW Plans.docx current
- 13:50, 7 July 2021 diff hist -34 m Category:101 Standard Forms →Checklist: updated link to Right of Way Check List
- 13:47, 7 July 2021 diff hist +4 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting: updated link to Project Reviewing Checklist
- 13:46, 7 July 2021 diff hist -86 m Category:124 Quality Control / Quality Assurance (QC/QA) updated link to Project Reviewing Checklist
- 13:45, 7 July 2021 diff hist 0 N File:124.2.4 Project Reviewing Checklist.docx
- 13:45, 7 July 2021 diff hist -43 m Category:101 Standard Forms →Checklist: updated link to Project Reviewing Checklist
- 13:41, 7 July 2021 diff hist +11 m Category:124 Quality Control / Quality Assurance (QC/QA)
- 13:39, 7 July 2021 diff hist +6 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process: updated link to Design Progress Checklist
- 13:39, 7 July 2021 diff hist 0 N File:124.2.4 Design Progress Check list.docx current
- 13:38, 7 July 2021 diff hist -45 m Category:101 Standard Forms →Checklist: updated link to Design Progress Check List
- 13:36, 7 July 2021 diff hist -1 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process
- 13:35, 7 July 2021 diff hist +6 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process: updated link for Preliminary Plan Review Checklist
- 13:34, 7 July 2021 diff hist 0 N File:124.2.4 Check List for Preliminary Plans.docx current
- 13:31, 7 July 2021 diff hist -40 m Category:101 Standard Forms →Checklist: updated link
- 13:23, 7 July 2021 diff hist -49 m 643.2 Local Utility Adjustments - Public and Private updated D-12 link
- 13:13, 7 July 2021 diff hist -99 m 237.9 Submission of Plans and Supporting Documents updated D-12 links
- 13:09, 7 July 2021 diff hist -94 m Category:124 Quality Control / Quality Assurance (QC/QA) updated D-12 link
- 13:04, 7 July 2021 diff hist 0 N File:D-12 2021.pdf
- 13:04, 7 July 2021 diff hist -49 m Category:101 Standard Forms →Checklist: updated D-12 link
- 14:14, 2 July 2021 diff hist +40 m Category:109 Measurement and Payment →109.12.3.1 Excusable Delays for Unusual Events: inclusive language
- 13:39, 2 July 2021 diff hist -4 m 236.13 Designing Right of Way Plans inclusive language
- 13:36, 2 July 2021 diff hist +11 m 236.13 Designing Right of Way Plans inclusive language
- 13:23, 2 July 2021 diff hist -5 m 236.13 Designing Right of Way Plans
- 13:03, 2 July 2021 diff hist +1 m 238.4 Construction Surveying Inclusive language
- 12:39, 2 July 2021 diff hist +18 m 236.3 Administration inclusive laguage
- 13:06, 1 July 2021 diff hist +130 m Recent Policy Changes in the EPG EPG 1040.4
- 12:59, 1 July 2021 diff hist +94 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material →1040.4 Crashworthy End Terminal and Qualified Plastic Guardrail Block
- 14:53, 30 June 2021 diff hist +233 m Recent Policy Changes in the EPG EPG 751.6 and EPG 751.50
- 13:19, 30 June 2021 diff hist +849 m 751.6 General Quantities Per BR, clarified guidance about System I finish field coat
- 11:16, 30 June 2021 diff hist +650 m 751.50 Standard Detailing Notes →A4a. Structural Steel Protective Coatings: Per BR, provided additional options for System I structural steel protective coatings.
- 07:56, 30 June 2021 diff hist 0 N File:751.1.2.19 Request Jun 30 2021.xlsx
- 07:55, 30 June 2021 diff hist 0 N File:751.1.2.18.2 Highway Grade Separation.docx current
- 07:55, 30 June 2021 diff hist +7 m 751.1 Preliminary Design Per BR, updated links to "Highway Grade Separation (Minor Route over Major Route)" and "Request for Final Soundings for Structures Form"
- 07:24, 30 June 2021 diff hist +15 m 748.7 Bridge Deck and Bridge End Drainage →748.7.4 Bridges on a Minor or Low Volume Route: Per BR, minor clarification
- 14:36, 29 June 2021 diff hist 0 N File:751.1.2.19 Guidance Jun 2021.xlsx
- 14:35, 29 June 2021 diff hist 0 N File:751.1.2.19 Request Jun 2021.xlsx
- 14:34, 29 June 2021 diff hist 0 m 751.1 Preliminary Design Per BR, minor updates for "Guidance for Request for Final Soundings for Structures Form" and "Request for Final Soundings for Structures Form"
- 10:46, 29 June 2021 diff hist -2 m 748.7 Bridge Deck and Bridge End Drainage →748.7.3 Bridges on a Major Route
- 10:42, 29 June 2021 diff hist +14 m 751.1 Preliminary Design →751.1.2.18.2 Content
- 10:23, 29 June 2021 diff hist +2 m 751.40 LFD Widening and Repair →751.40.4.3 Replacement of Existing Rail with Thrie Beam Rail: Per BR, minor clarification
- 08:10, 29 June 2021 diff hist -3 m 751.37 Drilled Shafts →Commentary on EPG 751.37.1 General
- 08:09, 29 June 2021 diff hist -28 m 751.38 Spread Footings Per BR, minor clarifications current
- 07:45, 29 June 2021 diff hist -11 m 751.37 Drilled Shafts Per BR, minor clarifications
- 14:59, 28 June 2021 diff hist -65 m 751.36 Driven Piles →751.36.1.5 Geotechnical Redundancy: Per BR, minor clarificaiton
- 14:55, 28 June 2021 diff hist -49 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.1.1 Application: Per BR, minor clarification
- 14:53, 28 June 2021 diff hist -10 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, minor clarifications
- 14:50, 28 June 2021 diff hist +14 m 751.2 Loads →751.2.2.2 Water Load: Per BR, minor clarification
- 14:43, 28 June 2021 diff hist -51 m 750.7 Non-Hydraulic Considerations →750.7.4.1 Standard Plans: Per BR, minor clarification to accommodate new Std Plan 504.00
- 13:41, 28 June 2021 diff hist +25 m 748.7 Bridge Deck and Bridge End Drainage Per BR, clarified terminology
- 13:39, 28 June 2021 diff hist +30 m 643.4 Railroads updated link
- 13:32, 28 June 2021 diff hist +10 m Category:712 Structural Steel Construction →712.1.4.1.4 Acceptable Field Welding Processes: Per BR, clarified terminology
- 13:28, 28 June 2021 diff hist +7 m Category:503 Bridge Approach Slabs Per BR, clarified terminology
- 13:17, 28 June 2021 diff hist 0 N File:751.38.4.3.2 2021.jpg current
- 13:17, 28 June 2021 diff hist 0 N File:751.38.4.3.1 2021.jpg current
- 13:16, 28 June 2021 diff hist 0 N File:751.38.4.2 2021.jpg current
- 13:13, 28 June 2021 diff hist 0 N File:751.38.4.1 2021.jpg current
- 13:12, 28 June 2021 diff hist 0 N File:Table 751.38.3.3 2021.jpg current
- 13:12, 28 June 2021 diff hist 0 N File:751.38.3.2 2021.jpg current
- 13:11, 28 June 2021 diff hist 0 N File:751.38.3.1 2021.jpg current
- 13:10, 28 June 2021 diff hist +39 m 751.38 Spread Footings Per BR, clarified terminology in figures
- 13:00, 28 June 2021 diff hist 0 N File:751.37.4.2.12 2021.jpg current
- 12:58, 28 June 2021 diff hist 0 N File:751.37.4.2.11 2021.jpg current
- 12:58, 28 June 2021 diff hist 0 N File:751.37.4.2.10 2021.jpg current
- 12:57, 28 June 2021 diff hist 0 N File:751.37.4.2.9 2021.jpg current
- 12:54, 28 June 2021 diff hist 0 N File:751.37.4.2.8 2021.jpg current
- 12:51, 28 June 2021 diff hist 0 N File:751.37.4.2.7 2021.jpg current
- 12:49, 28 June 2021 diff hist 0 N File:751.37.4.2.6 2021.jpg current
- 12:46, 28 June 2021 diff hist 0 N File:751.37.4.2.5 2021.jpg current
- 12:44, 28 June 2021 diff hist 0 N File:751.37.4.2.4 2021.jpg current
- 12:41, 28 June 2021 diff hist 0 N File:751.37.4.2.3 2021.jpg current
- 12:39, 28 June 2021 diff hist 0 N File:751.37.4.2.2 2021.jpg current
- 12:37, 28 June 2021 diff hist 0 N File:751.37.4.2.1 2021.jpg current
- 12:36, 28 June 2021 diff hist 0 N File:751.37.4.1.12 2021.jpg current
- 12:35, 28 June 2021 diff hist 0 N File:751.37.4.1.11 2021.jpg current
- 12:35, 28 June 2021 diff hist 0 N File:751.37.4.1.10 2021.jpg current
- 12:35, 28 June 2021 diff hist 0 N File:751.37.4.1.9 2021.jpg current
- 12:32, 28 June 2021 diff hist 0 N File:751.37.4.1.8 2021.jpg current
- 12:30, 28 June 2021 diff hist 0 N File:751.37.4.1.7 2021.jpg current
- 12:27, 28 June 2021 diff hist 0 N File:751.37.4.1.6 2021.jpg current
- 12:26, 28 June 2021 diff hist 0 N File:751.37.4.1.5 2021.jpg current
- 12:24, 28 June 2021 diff hist 0 N File:751.37.4.1.4 2021.jpg current
- 12:22, 28 June 2021 diff hist 0 N File:751.37.4.1.3 2021.jpg current
- 12:20, 28 June 2021 diff hist 0 N File:751.37.4.1.2 2021.jpg current
- 12:18, 28 June 2021 diff hist 0 N File:751.37.4.1.1 2021.jpg current
- 12:17, 28 June 2021 diff hist 0 N File:751.37.3.6.2 2021.jpg current
- 12:15, 28 June 2021 diff hist 0 N File:751.37.3.6.1 2021.jpg current
- 12:13, 28 June 2021 diff hist 0 N File:751.37.3.5.2 2021.jpg current
- 12:12, 28 June 2021 diff hist 0 N File:751.37.3.5.1 2021.jpg current
- 12:10, 28 June 2021 diff hist 0 N File:751.37.3.4.2 2021.jpg current
- 11:29, 28 June 2021 diff hist 0 N File:751.37.3.4.1 2021.jpg current
- 11:27, 28 June 2021 diff hist 0 N File:751.37.3.3.2 2021.jpg current
- 11:25, 28 June 2021 diff hist 0 N File:751.37.3.3.1 2021.jpg current
- 11:23, 28 June 2021 diff hist 0 N File:751.37.3.2.2 2021.jpg current
- 11:22, 28 June 2021 diff hist 0 N File:751.37.3.2.1 2021.jpg current
- 11:19, 28 June 2021 diff hist 0 N File:751.37.3.1.2 2021.jpg current
- 11:18, 28 June 2021 diff hist 0 N File:751.37.3.1.1 2021.jpg current
- 11:16, 28 June 2021 diff hist +162 m 751.37 Drilled Shafts Per BR, clarified terminology in numerous figures
- 08:56, 28 June 2021 diff hist 0 N File:751.22.1.2 type 4 Jun 2021.jpg current
- 08:50, 28 June 2021 diff hist +4 m 751.22 Prestressed Concrete I Girders →751.22.1.2 Geometric Dimensions
- 08:44, 28 June 2021 diff hist 0 N File:751.22.1.2 type 4 2021.jpg current
- 08:42, 28 June 2021 diff hist +5 m 751.22 Prestressed Concrete I Girders →751.22.1.2 Geometric Dimensions: Per BR, minor corrections in figures
- 15:06, 25 June 2021 diff hist 0 N File:751.1.2.18.2 Design Implications.docx current
- 15:06, 25 June 2021 diff hist +2 m 751.1 Preliminary Design →751.1.2.18.2 Content
- 15:05, 25 June 2021 diff hist 0 N File:751.1.2.18.2 Bridge Rehabilitation 2021.pdf current
- 15:05, 25 June 2021 diff hist 0 N File:751.1.2.19.2 Stream Crossing Bridge 2021.pdf current
- 15:05, 25 June 2021 diff hist 0 N File:751.1.2.18.2 Railroad Grade Separation 2021.pdf current
- 15:04, 25 June 2021 diff hist +2 m 751.1 Preliminary Design →751.1.2.18.2 Content
- 15:03, 25 June 2021 diff hist +1,069 m 751.1 Preliminary Design Per BR, added to list of items to include on the bridge memo and design layout the various classifications that have design implications; updated two linked example bridge memos and added link to new example bridge memo
- 10:39, 25 June 2021 diff hist +27 m Category:143 Practical Design →143.1 Introduction: updated link
- 10:29, 25 June 2021 diff hist -39 m Category:1000 MATERIALS Per CM, removed photo
- 10:12, 25 June 2021 diff hist +32 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, updated C-220 link
- 10:11, 25 June 2021 diff hist +32 m Category:108 Prosecution and Progress Per CM, updated C-220 link
- 10:11, 25 June 2021 diff hist +64 m Category:105 Control of Work Per CM, updated C-220 link
- 10:10, 25 June 2021 diff hist -3 m Category:101 Standard Forms →Construction and Materials: Per CM, updated links
- 08:58, 24 June 2021 diff hist 0 N File:751.11.3.2.2 Laminated Fixed 2021.jpg current
- 08:58, 24 June 2021 diff hist 0 N File:751.11.3.2.1 Laminated Fixed 2021.jpg current
- 08:57, 24 June 2021 diff hist 0 N File:751.11.3.2.2 Laminated Expansion 2021.jpg current
- 08:56, 24 June 2021 diff hist 0 N File:751.11.3.2.1 Laminated Expansion 2021.jpg current
- 08:56, 24 June 2021 diff hist -226 m 751.11 Bearings →751.11.3 Details
- 08:53, 24 June 2021 diff hist 0 N File:751.11.3.1.2 2021.jpg current
- 08:53, 24 June 2021 diff hist -113 m 751.11 Bearings →751.11.3.1 Elastomeric Bearings for P/S I-Girders
- 08:51, 24 June 2021 diff hist 0 N File:751.11.3.1.1 2021.jpg current
- 08:51, 24 June 2021 diff hist +30 m 751.11 Bearings →751.11.3 Details: Per BR, minor corrections in a couple of figures. Also clarified associated illustrations.
- 07:21, 24 June 2021 diff hist +1 m Category:101 Standard Forms →Construction and Materials
- 15:24, 23 June 2021 diff hist +159 m Category:146 Disadvantaged Business Enterprise (DBE) Per ECR and CM, retitled "CUF Determination Form Contracts Let After March 2021" from "CUF Determination Form Contracts Awarded After March 2021"
- 15:22, 23 June 2021 diff hist +53 m LPA:136.12 Figures, Glossary and Other Useful Links http://epg.modot.mo.gov/forms/CM/CUF_Determination_Form_Contracts_Let_After_03_2021.pdf
- 15:19, 23 June 2021 diff hist +106 m LPA:136.11 Local Public Agency Construction Per ECR and CM, retitled "CUF Determination Form Contracts Let After March 2021" from "CUF Determination Form Contracts Awarded After March 2021"
- 15:18, 23 June 2021 diff hist +48 m Category:101 Standard Forms Per ECR and CM, retitled "CUF Determination Form Contracts Let After March 2021" from "CUF Determination Form Contracts Awarded After March 2021"
- 13:00, 23 June 2021 diff hist 0 N File:616.13 WZ Impact 2021.xlsm current
- 13:00, 23 June 2021 diff hist -8 m 616.13 Work Zone Capacity, Queue and Travel Delay Per TS, updated MoDOT Work Zone Impact Analysis Spreadsheet program to work with the current TMS format.
- 08:39, 23 June 2021 diff hist -86 m Recent Policy Changes in the EPG EPG 146
- 08:25, 23 June 2021 diff hist +651 m LPA:136.10 Advertisement for Bid and Project Award Per CM, new references to EPG 146 added
- 08:20, 23 June 2021 diff hist +144 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.15 Disadvantaged Business Enterprise (DBE) (49 CFR Part 26): Per CM, new references to EPG 146 added
- 08:18, 23 June 2021 diff hist +651 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2 Solicitation & Selection Process: Per CM, new references to EPG 146 added
- 08:11, 23 June 2021 diff hist +9,865 m Category:146 Disadvantaged Business Enterprise (DBE) Per CM and DE, guidance forproject bid proposals that include DBE goals has been clarified and expanded.
- 13:56, 22 June 2021 diff hist 0 N File:751.5.1.3.2 plate.jpg current
- 13:56, 22 June 2021 diff hist 0 N File:751.5.1.3.2 centerline.jpg current
- 13:56, 22 June 2021 diff hist 0 N File:751.5.1.3.2 baseline.jpg current
- 13:55, 22 June 2021 diff hist +2,526 m 751.5 Structural Detailing Guidelines →751.5.1.3.2 Symbols: Per BR, updated the symbol table
- 13:34, 22 June 2021 diff hist -31 Category:1180 Bituminous Stockpile Patching Material
- 12:07, 22 June 2021 diff hist +3 Category:1180 Bituminous Stockpile Patching Material
- 11:54, 22 June 2021 diff hist +2 Category:1180 Bituminous Stockpile Patching Material
- 11:27, 22 June 2021 diff hist +26 Category:1180 Bituminous Stockpile Patching Material
- 09:25, 22 June 2021 diff hist 0 m 903.8 Freeway and Expressway Guide Signs →Table 903.8.12 Guide Sign Sizes current
- 09:23, 22 June 2021 diff hist +37 m 903.8 Freeway and Expressway Guide Signs →903.8.38 Exit Direction Signs (MUTCD Section 2E.36)
- 09:18, 22 June 2021 diff hist -11,501 m 903.8 Freeway and Expressway Guide Signs Per TS, numerous minor clarifications
- 15:10, 21 June 2021 diff hist +4 m Category:1036 Reinforcing Steel for Concrete →1036.2.1.2 Welded Wire Fabric
- 15:09, 21 June 2021 diff hist +2 m Category:1036 Reinforcing Steel for Concrete →1036.2.1.2 Welded Wire Fabric: Per CM, outdated size differential values to be updated per spec M336 6.4.5.4.2.
- 09:27, 21 June 2021 diff hist +9 m 751.1 Preliminary Design →751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts: Per BR, minor clarifications
- 13:52, 16 June 2021 diff hist +2 m 751.1 Preliminary Design →Common Bridge Barrier and Railing (for Rehabilitations)
- 13:50, 16 June 2021 diff hist +73 m Recent Policy Changes in the EPG EPG 751.1.3.4
- 13:45, 16 June 2021 diff hist 0 N File:751.1.3.4 Type G.jpg current
- 13:44, 16 June 2021 diff hist 0 N File:751.1.3.4 Type C.jpg current
- 13:44, 16 June 2021 diff hist 0 N File:751.1.3.4 Type A.jpg current
- 13:44, 16 June 2021 diff hist +597 m 751.1 Preliminary Design →751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts: Per BR, simplified guidance for barrier and railing options on existing bridges
- 10:50, 15 June 2021 diff hist -88 m Recent Policy Changes in the EPG EPG 109
- 10:45, 15 June 2021 diff hist 0 File:109.10 transfer.xlsx Smithk uploaded a new version of File:109.10 transfer.xlsx current
- 10:43, 15 June 2021 diff hist +2,662 m Category:109 Measurement and Payment →109.10 Assignments (for Sec 109.10): Per CM, expanded guidance about how to assign a contract.
- 10:22, 15 June 2021 diff hist -1 m 751.40 LFD Widening and Repair →751.40.8.6.2.1 Shear Connector Design: Per BR, minor correction
- 14:58, 14 June 2021 diff hist -76 m 236.6 Appraisal and Appraisal Review →236.6.3.1 Standard Appraisal Format: Per RW, corrected link
- 12:59, 14 June 2021 diff hist 0 File:900 Flashing Beacons.pdf Smithk reverted File:900 Flashing Beacons.pdf to an old version current
- 12:56, 14 June 2021 diff hist +296 m Category:900 TRAFFIC CONTROL Per TS, updating links to brochures
- 10:58, 14 June 2021 diff hist +28 m 751.1 Preliminary Design Inclusive language.
- 15:10, 11 June 2021 diff hist -9 m Category:702 Load-Bearing Piles →702.1.4.1 Hammer Types: Inclusive language
- 14:22, 11 June 2021 diff hist 0 N File:136.6.6 2021.pdf current
- 14:21, 11 June 2021 diff hist -1 m LPA:136.13 LPA Policy Changes Fig. 136.6.6
- 14:21, 11 June 2021 diff hist -1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.6.6
- 14:20, 11 June 2021 diff hist +5 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, updated Fig. 136.6.6 to bring it into compliance with existing guidance in EPG 136.6
- 13:37, 11 June 2021 diff hist -31 m Recent Policy Changes in the EPG EPG 616.8
- 13:16, 11 June 2021 diff hist +1 m 616.8 Typical Applications (MUTCD 6H) →616.8.1 Listing of Typical Applications
- 13:14, 11 June 2021 diff hist +86 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Maintenance
- 13:12, 11 June 2021 diff hist +132 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials
- 13:00, 11 June 2021 diff hist 0 N File:616.8.35a DECM 2021.pdf current
- 13:00, 11 June 2021 diff hist 0 N File:616.8.17a DECM 2021.pdf current
- 13:00, 11 June 2021 diff hist 0 N File:616.8.14a DECM 2021.pdf current
- 13:00, 11 June 2021 diff hist 0 N File:616.8.7b DECM 2021.pdf current
- 12:59, 11 June 2021 diff hist 0 N File:616.8.51 DECM 2021.pdf current
- 12:59, 11 June 2021 diff hist 0 N File:616.8.50 2021.pdf
- 12:58, 11 June 2021 diff hist 0 N File:616.8.46 MT 2021.pdf current
- 12:58, 11 June 2021 diff hist 0 N File:616.8.38c MT 2021.pdf current
- 12:58, 11 June 2021 diff hist 0 N File:616.8.38b MT 2021.pdf current