Difference between revisions of "Category:101 Standard Forms"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (→‎Construction and Materials: Per CM, two new AWP forms (C-236 and C-239) were placed next to the existing non-AWP files. The existing files will remain until all SiteManager contracts are completed. Cognos report link updated and AWP version added)
m (→‎Construction and Materials: Per CM, removed AWP versions of C-236 and C-239)
Line 132: Line 132:
  
 
*[http://epg.modot.mo.gov/forms/CM/Final_Acceptance_C_239.pdf Final Acceptance Report (C-239), pdf version]
 
*[http://epg.modot.mo.gov/forms/CM/Final_Acceptance_C_239.pdf Final Acceptance Report (C-239), pdf version]
 
*[http://epg.modot.mo.gov/forms/CM/Final_Acceptance_C_239_AWP.pdf Final Acceptance Report (C-239), pdf version - AWP]
 
  
 
*[http://epg.modot.mo.gov/forms/CM/Final_Plans_Certification.pdf Final Plans Certification]
 
*[http://epg.modot.mo.gov/forms/CM/Final_Plans_Certification.pdf Final Plans Certification]
Line 245: Line 243:
  
 
*[http://epg.modot.mo.gov/forms/CM/Semi_Final_Inspection_C_236.pdf Semi-Final Inspection (C-236)]
 
*[http://epg.modot.mo.gov/forms/CM/Semi_Final_Inspection_C_236.pdf Semi-Final Inspection (C-236)]
 
*[http://epg.modot.mo.gov/forms/CM/Semi_Final_Inspection_C_236_AWP.pdf Semi-Final Inspection (C-236) - AWP]
 
  
 
*[http://epg.modot.mo.gov/forms/CM/Sitemanager_Contractor_Payment_Schedule.pdf Sitemanager Contractor Payment Schedule]
 
*[http://epg.modot.mo.gov/forms/CM/Sitemanager_Contractor_Payment_Schedule.pdf Sitemanager Contractor Payment Schedule]

Revision as of 14:51, 15 August 2019

EPG articles are not referenced as "sections" but as EPG XXX.X to avoid confusion with MoDOT specs (which are contractually binding).

Contents

Standard forms organized by functional unit are accessible from this page. The files accessible by the links below are identical to those accessed through Word, Excel or other software application by MoDOT employees. Many of these file links are also contained in Engineering Policy Guide articles that refer to the forms.


Bridge

101 Bridge.jpg

Construction and Materials

101CM.jpg

Forms for Contractor Use

Construction and Contractor Related

Materials Related

Posters, Federal Aid

Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.

Posters, State Aid

Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.

Utility or Right of Way Related

Quick Reference Guides (QRGs)

AASHTOWare Project Quick Reference Guides (QRGs)

SiteManager Quick Reference Guides (QRGs) Bulldozer.jpg

Storm Water Database Quick Reference Guides (QRGs)

Design

Microstation D-Sheets
Signing
D-28, D-29 through D-34
Signals
D-37A through D-37d, D-38 through D-38e
Typical Sections
D-49 through D-70
Miscellaneous
D-71

Bridge

Checklist

Computer

Contracts

Design Forms

Engineering Professional Services

Environmental and Cultural

Hearings

Materials

Photo

Planning

Right of Way

Scoping

101 survey.jpg

Survey

External Civil Rights

Financial Services

Maintenance

Chip Seal Forms

Bridge Maintenance

Snow & Ice Control

Rest Areas

Commuter Lots

Disasters

Performance Indicators

Pavement Management

Motor Carrier Services


Planning

Right of Way

General Information

Right of Way Organization and Personnel

Administration

Description Writing and Titles

Property Management

Appraisal and Appraisal Review

Negotiation

Relocation Assistance Program

Asbestos Abatement-Removal of Building Improvement

Right Of Way Condemnation

Mediation

Quality Assurance Reviews

Designing Right of Way Plans

Change in Route Status Report

Requests from Cities for Annexations

Outdoor Advertising

Junkyards

Local Public Agency Land Acquisition

101 bottom.jpg