Uncategorized categories

Jump to navigation Jump to search

Showing below up to 332 results in range #1 to #332.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. 1000 MATERIALS
  2. 1001 General Requirements for Material
  3. 1002 Aggregate for Asphaltic Concrete
  4. 1003 Aggregate for Seal Coats
  5. 1004 Graded Aggregate for Bituminous Surface
  6. 1005 Aggregate for Concrete
  7. 1006 Aggregate for Surfacing
  8. 1007 Aggregate for Base
  9. 1009 Aggregate for Drainage
  10. 100 GENERAL
  11. 1010 Select Granular Backfill for Structural Systems
  12. 1011 Geotextile
  13. 1012 Geocomposite Drainage Material
  14. 1013 Miscellaneous Drainage Material
  15. 1015 Bituminous Material
  16. 1017 Slag Cement
  17. 1018 Fly Ash for Concrete
  18. 1019 Cement
  19. 101 Standard Forms
  20. 1020 Corrugated Metallic-Coated Steel Culvert Pipe, Pipe-Arches and End Sections
  21. 1021 Bituminous-Coated Corrugated Metal Culvert Pipe and Pipe-Arches
  22. 1022 Corrugated Metallic-Coated Steel Pipe Underdrain
  23. 1023 Structural Plate Pipe and Pipe-Arches
  24. 1024 Corrugated Aluminum Alloy Culvert Pipe and Corrugated Aluminum Alloy Structural Plate
  25. 1025 Corrugated Aluminum Alloy Pipe Underdrains
  26. 1026 Reinforced Concrete Culvert Pipe
  27. 1027 Polymer-Coated Corrugated Metal Culvert Pipe and Pipe-Arches
  28. 1028 Corrugated Polyvinyl Chloride Culvert Pipe
  29. 1029 Fabricating Prestressed Concrete Members for Bridges
  30. 102 Bidding Requirements and Conditions
  31. 1030 Vitrified Clay Sewer and Culvert Pipe
  32. 1031 Clay Drain Tile
  33. 1032 Precast Concrete Flared End Sections
  34. 1033 Precast Drainage Units
  35. 1034 Reinforced Concrete Elliptical Culvert Pipe
  36. 1035 Reinforced Concrete Arch Culvert
  37. 1036 Reinforcing Steel for Concrete
  38. 1037 Shear Connectors
  39. 1037 Sheer Connectors
  40. 1038 Bearing Pads for Structures
  41. 1039 Polymer Products
  42. 103 Award and Execution of Contract
  43. 1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Three-Strand Guard Cable Material
  44. 1041 Polypropylene Culvert Pipe
  45. 1042 Highway Sign Material
  46. 1043 Fence Material
  47. 1044 Posts for Markers and Delineators
  48. 1045 Paint for Structural Steel
  49. 1046 Pipe Liner
  50. 1047 Corrugated Polyethylene Culvert Pipe
  51. 1048 Pavement Marking Material
  52. 1049 Precast Concrete Box Culverts
  53. 104 Scope
  54. 1050 Lumber, Timber, Piling, Posts and Poles
  55. 1051 Slotted Drains
  56. 1052 Mechanically Stabilized Earth Wall (MSE) and Sound Wall System Components
  57. 1052 Mechanically Stabilized Earth Wall System Components
  58. 1053 Concrete Sealer
  59. 1053 Concrete Sealer and Concrete Crack Filler
  60. 1054 Concrete Admixtures
  61. 1055 Concrete Curing Material
  62. 1056 Concrete Tinting and Staining Material
  63. 1057 Material for Joints
  64. 1058 Polyethylene Sheeting
  65. 1059 Protective Coating Material
  66. 105 Control of Work
  67. 1060 Electrical Conduit
  68. 1061 Electrical Conductors
  69. 1062 Pull and Junction Boxes
  70. 1063 Temporary Traffic Control Devices
  71. 1064 Temporary Concrete Traffic Barrier
  72. 1065 Concrete Traffic Barrier Delineators
  73. 1066 Mortars and Grout
  74. 1067 Truncated Domes
  75. 1068 Trench Drains
  76. 106 Control of Material
  77. 1070 Water
  78. 1071 Asphalt Release Agents, Fiber Additives and Liquid Anti-strip Additives
  79. 1073 Joint Material for Structures
  80. 1075 Centrifugally-Cast Fiberglass-Reinforced Polymer Mortar Pipe
  81. 107 Legal Relations and Responsibility to the Public
  82. 1080 Structural Steel Fabrication
  83. 1081 Coating of Structural Steel
  84. 108 Prosecution and Progress
  85. 1091 Lighting Equipment
  86. 1092 Signal Equipment
  87. 109 Measurement and Payment
  88. 109 Payment Documentation Policy
  89. 1100 MAINTENANCE MATERIALS
  90. 1101 Materials Purchased by a Department Purchase Order
  91. 1102 Antifreeze and Summer Coolant
  92. 1106 Carbide-Tipped Snowplow Blades
  93. 1108 Blades Maintainer and Loader
  94. 110 State and Federal Wage Rates and Other Requirements
  95. 1110 Calcium Chloride
  96. 1111 Herbicides, Soil Sterilants, Surfactants and Grass, Weed and Brush Killers
  97. 1112 Lubricating Products
  98. 1113 Double Boiled Linseed Oil and Mineral Spirits
  99. 1115 Polyethylene Plastic Pipe Liner
  100. 1120 Yellow and White Traffic Marking Materials
  101. 1122 Glass Beads
  102. 1124 Sodium Chloride
  103. 1125 Liquid Calcium Chloride
  104. 1130 Traffic Signal Lamps
  105. 1136 Modified Urethane or Polyurethane Elastomeric Coating
  106. 113 Construction Inspection Guidance for Contractor's Claims
  107. 1140 Polyethylene Bags
  108. 1150 Diamond Saw Blades
  109. 1160 Qualified Cleaning Compounds
  110. 1170 Drum-Like Channelizers
  111. 1180 Bituminous Stockpile Patching Material
  112. 1190 Graffiti Removers
  113. 120 Interstate Maintenance Expectations
  114. 121 Project Planning, Prioritization and STIP Commitments
  115. 122 Aviation
  116. 123 Federal-Aid Highway Program
  117. 124 Quality Control / Quality Assurance (QC/QA)
  118. 125 CADD Services
  119. 126 Location Study and Alternatives Analysis
  120. 127 MoDOT and the Environment
  121. 128 Conceptual Studies
  122. 129 Public Involvement
  123. 130 Value Engineering
  124. 131 Other General Procedures
  125. 132 Safety
  126. 133 Snow and Ice Control
  127. 134 Engineering Professional Services
  128. 135 Public Relations for Construction Activities
  129. 135 The Section 106 Process
  130. 137 Construction Inspection Guidance for Records to be Maintained
  131. 138 Project Development Chronology
  132. 139 Design - Build
  133. 140 Encroachments and Items Permitted on MoDOT’s Right of Way
  134. 141 Partnership Development
  135. 142 Missouri One Call System
  136. 143 Practical Design
  137. 144 Practical Operations
  138. 145 Transportation Management Systems (TMS)
  139. 146 Disadvantaged Business Enterprise (DBE)
  140. 147 Innovative Contracting
  141. 148 Accelerated Bridge Construction (ABC)
  142. 149 Project Delivery Determination and Initial Risk Assessment
  143. 150 Quality Management
  144. 151 Administrative Rule Creation or Modification Process
  145. 152 Contactor Bonding Responsibilities
  146. 153 Agreements and Contracts
  147. 170 Maintenance Activity Planning Guidelines
  148. 171 Maintenance Policy and Operations
  149. 172 Maintenance Facility Performance Expectations Environmental Compliance
  150. 173 Erosion Control for Maintenance Operations
  151. 174 Maintenance Management System (MMS)
  152. 174 MoDOT Management System (MMS)
  153. 200 GEOMETRICS
  154. 201 Clearing and Grubbing
  155. 202 Removal of Buildings and Structures
  156. 203 Roadway and Drainage Excavation, Embankment and Compaction
  157. 204 Embankment Monitoring
  158. 205 Modified Subgrade
  159. 206 Excavation for Structures
  160. 207 Linear Grading
  161. 208 Interception Ditch
  162. 209 Subgrade Preparation
  163. 210 Subgrade Compaction
  164. 211 Subgrade Scarifying
  165. 212 Subgrading and Shouldering
  166. 214 Rock Fill
  167. 215 Shaping Slopes
  168. 216 Removals for Bridge Structures
  169. 230 Alignment of the Roadway
  170. 231 Typical Section Elements for Roadways
  171. 232 Facility Selection
  172. 233 At - Grade Intersections
  173. 234 Interchanges
  174. 235 Preliminary Plans
  175. 236 Right of Way
  176. 237 Contract Plans
  177. 238 Surveying Activities
  178. 239 Construction Inspection Guidelines for Final Plans
  179. 240 Maintenance and Emergency Crossovers
  180. 241 Aesthetic Considerations
  181. 242 Optional and Alternate Pavement Designs
  182. 300 BASES
  183. 302 Stabilized Permeable Base
  184. 303 Rock Base
  185. 304 Aggregate Base Course
  186. 309 Laboratory Testing Guidelines for Portland Cement Concrete Base
  187. 310 Aggregate Surface
  188. 320 Soils and Geology
  189. 321 Geotechnical Engineering
  190. 350 Design for Bases and Aggregate Surfaces
  191. 360 Construction Inspection for Bases and Aggregate Surfaces
  192. 400 FLEXIBLE PAVEMENT
  193. 402 Bituminous Surface Leveling
  194. 403 Asphaltic Concrete Pavement
  195. 404 Bituminous Mixing Plants
  196. 405 Processing Reclaimed Asphalt
  197. 407 Tack Coat
  198. 408 Prime Coat
  199. 409 Seal Coat
  200. 413 Surface Treatments and Preventive Maintenance
  201. 450 Bituminous Pavement Design
  202. 451 Rehabilitation Strategies
  203. 460 General Requirements for Bituminous Construction
  204. 470 Bituminous Asphalt Maintenance
  205. 500 RIGID PAVEMENT
  206. 501 Concrete
  207. 502 Portland Cement Concrete Base and Pavement
  208. 504 Concrete Approach Pavement
  209. 505 Bridge Deck Concrete Wearing Surface
  210. 506 Concrete Overlays for Pavement
  211. 550 Portland Cement Concrete Pavement Design
  212. 570 Portland Cement Concrete Pavement Maintenance
  213. 600 INCIDENTAL CONSTRUCTION
  214. 601 Field Laboratories
  215. 602 Drain and Right of Way Markers
  216. 603 Water Line Installation
  217. 604 Miscellaneous Drainage
  218. 605 Underdrainage
  219. 606 Guardrail and Guard Cable
  220. 607 Fencing
  221. 608 Concrete Median, Median Strip, Sidewalk, Curb Ramps, Steps and Paved Approaches
  222. 609 Paved Drainage
  223. 610 Pavement Smoothness
  224. 611 Embankment Protection
  225. 612 Impact Attenuators
  226. 613 Pavement Repair
  227. 614 Drainage Fittings (Grate Inlets)
  228. 616 Temporary Traffic Control
  229. 617 Traffic Barrier
  230. 618 Mobilization
  231. 619 Pavement Edge Treatment
  232. 620 Pavement Marking
  233. 621 Flowable Backfill
  234. 622 Pavement and Bridge Surface Removal and Texturing
  235. 624 Geotextile Construction
  236. 625 Slab Stabilization
  237. 626 Rumble Strips
  238. 627 Contractor Surveying and Staking
  239. 628 High Friction Surface Treatment
  240. 640 Pavement and Median Drainage
  241. 641 Bicycle Facilities
  242. 642 Pedestrian Facilities
  243. 643 Utility Procedures
  244. 644 Weigh Stations, Rest Areas, Welcome/Information Centers and Commuter Parking Lots
  245. 645 Mailbox Turnouts and Supports
  246. 646 Other
  247. 647 Masonry Construction Laboratory Testing Guidelines
  248. 700 STRUCTURES AND HYDRAULICS
  249. 701 Drilled Shafts
  250. 702 Load-Bearing Piles
  251. 703 Concrete Masonry Construction
  252. 704 Concrete Masonry Repair
  253. 705 Prestressed Concrete Members for Bridges
  254. 706 Reinforcing Steel for Concrete Structures
  255. 707 Conduit System on Structure
  256. 710 Epoxy Coated Reinforcing Steel
  257. 711 Protective Coatings for Exposed Concrete Surfaces
  258. 712 Structural Steel Construction
  259. 713 Thrie Beam for Bridge Guardrail
  260. 713 Thrie Beam for Bridge Guard Rail
  261. 714 Tube Type Aluminum Rail Laboratory Testing Guidelines
  262. 715 Vertical Drain at End Bents
  263. 716 Neoprene Bearings
  264. 717 Flexible Joint Systems
  265. 717 Neoprene and Silicone Joint Systems
  266. 718 Temporary Bridge
  267. 720 Mechanically Stabilized Earth Wall Systems
  268. 721 Concrete Crib-Type Retaining Walls Laboratory Testing Guidelines
  269. 724 Pipe Culverts
  270. 725 Metal Pipe and Pipe-Arch Culverts
  271. 726 Rigid Pipe Culverts
  272. 727 Structural Plate Pipe and Structural Plate Pipe-Arch Culverts
  273. 728 Corrugated Polyvinyl Chloride Culvert Pipe
  274. 730 Corrugated Polyethylene Pipe Culverts
  275. 730 Thermoplastic Pipe Culverts
  276. 731 Precast Reinforced Concrete Manholes and Drop Inlets
  277. 732 Flared End Sections
  278. 733 Precast Concrete Box Culverts
  279. 734 Installation of Pipe by Horizontal Boring Methods
  280. 735 Culvert Pipe Liner
  281. 747 Bridge Reports and Layouts
  282. 748 Hydraulics and Drainage
  283. 749 Hydrologic Analysis
  284. 750 Hydraulic Analysis
  285. 751 LRFD Bridge Design Guidelines
  286. 752 Bridges Used In Place
  287. 753 Bridge Inspection Rating
  288. 754 Bridge Engineering Assistance Program (BEAP)
  289. 756 Seismic Design
  290. 760 General Construction Inspection for Structures
  291. 770 Maintenance of Bridges
  292. 771 Bridge Preventive Maintenance Guidelines
  293. 772 Bridge Inspections
  294. 773 Pipe, Box Culvert and Miscellaneous Drainage Maintenance
  295. 774 Cathodic Protection
  296. 800 ROADSIDE DEVELOPMENT
  297. 801 Lime and Fertilizer
  298. 802 Mulching
  299. 803 Sodding
  300. 804 Topsoil
  301. 805 Seeding
  302. 806 Pollution, Erosion and Sediment Control
  303. 808 Planting Trees, Shrubs, and Other Plants
  304. 821 Herbicides and Roadsides
  305. 822 Roadside Vegetation Management
  306. 823 Incarcerated Personnel Work Release Program
  307. 824 Adopt-A-Highway and Sponsor-A-Highway Programs
  308. 900 TRAFFIC CONTROL
  309. 901 Lighting
  310. 902 Signals
  311. 903 Highway Signing
  312. 904 Construction Inspection Guidance - Certification Requirements and Procedure for Lighting, Traffic Signals, Signs and Cathodic Protection
  313. 905 Traffic Studies
  314. 906 Traffic Engineering Assistance Program (TEAP)
  315. 907 Traffic Safety
  316. 908 Traffic Controls for School Areas
  317. 909 Transportation Systems Management and Operations (TSMO)
  318. 910 Intelligent Transportation Systems
  319. 940 Access Management
  320. 941 Permits and Access Requests
  321. 941 Permitting Process for Access Management
  322. 942 Approved Products List
  323. 943 Route Marking
  324. 944 Radio Operation
  325. 945 Overdimension / Overweight Permits
  326. 948 Incident Response Plan and Emergency Response Management
  327. 949 Other Aspects of Traffic
  328. 950 Automated Traffic Enforcement
  329. Good Stewards of Missouri's Natural and Cultural Rescources
  330. Minor Routes Shouldering Project Guidelines
  331. Safe and Sound
  332. Shoulder Maintenance

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)