Difference between revisions of "Recent Policy Changes in the EPG"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 231.2)
m (EPG 231.4)
Line 2: Line 2:
 
{| cellspacing="3"  
 
{| cellspacing="3"  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"|
 +
'''[[231.4 Shoulder Width#231.4.2 Pavement Resurfacing and Rehabilitation Projects|EPG 231.4.2 Pavement Resurfacing and Rehabilitation Projects]] and [[231.4 Shoulder Width#231.4.3 Shoulder Widening Projects|EPG 231.4.3 Shoulder Widening Projects]]'''
 +
 +
2/1/21: Guidance has been revised to standardize the construction of shoulder widening projects across all the districts.  This revision also establishes that Type A2 and Type A3 shoulders are used only in conjunction with the construction of new pavement. [[231.4 Shoulder Width#231.4.3 Shoulder Widening Projects|EPG 231.4.3 Shoulder Widening Projects]] replaces the former non-numbered article, [[:Category:Minor Routes Shouldering Project Guidelines|EPG Minor Routes Shouldering Project Guidelines]].
 +
 
'''[[231.2 Clear Zones|EPG 231.2 Clear Zones]]'''
 
'''[[231.2 Clear Zones|EPG 231.2 Clear Zones]]'''
  
Line 97: Line 101:
  
 
11/20/20: New standard notes for Standard Drawing RHB08 to clarify note regarding design force.
 
11/20/20: New standard notes for Standard Drawing RHB08 to clarify note regarding design force.
 
'''[[147.3 Job Order Contracting (JOC)#147.3.6 Closing JOC Contracts|EPG 147.3.6 Closing JOC Contracts]]'''
 
 
11/12/20: Clarified that a Materials Summary is not needed for Job Order Contracts.
 

Revision as of 14:37, 1 February 2021

EPG 231.4.2 Pavement Resurfacing and Rehabilitation Projects and EPG 231.4.3 Shoulder Widening Projects

2/1/21: Guidance has been revised to standardize the construction of shoulder widening projects across all the districts. This revision also establishes that Type A2 and Type A3 shoulders are used only in conjunction with the construction of new pavement. EPG 231.4.3 Shoulder Widening Projects replaces the former non-numbered article, EPG Minor Routes Shouldering Project Guidelines.

EPG 231.2 Clear Zones

2/1/21: Guidance now incorporates additional Roadside Design Guide (RDG) verbiage, RDG tables, and recommends a safety analysis as a means of documenting decisions for safety strategies.

Early Acquisition and Advance Acquisition

1/27/21: New EPG 127.14.3.7 Early and Advanced Acquisition of Right of Way and extensively updated EPG 236.3.4 Right of Way Acquisition Authority and Project Funding (especially EPG 236.3.4.4 Early and Advance Acquisition) now present guidance that match new FHWA requirements.

EPG 616.6.2.2 Flags and Advance Warning Rail System on Signs

1/26/21: Guidance about when to use flags on signs has been clarified.

QRG, AWP CO Estimate Final

1/22/21: A new QRG, AASHTOWare Final Project Estimate, is available.

EPG 751.50 Standard Detailing Notes

1/22/21: A new Standard Detailing Note, I1.71, replaces a detail on Bridge Std. Dwg. REDECK01.

EPG 129.3 “Virtual” Public Involvement (VPI)

1/21/21: Additional guidance related to recording and posting virtual events is now available.

EPG 751.5.1.1.1 CAD Levels

1/20/21: Two levels used for internal editorial purposes were added to the list of Bridge CADD levels. Also added were some basic instructions for printing editorial content in color on an otherwise black and white print drawing.

EPG 107.12 Contractor's Responsibility for Work

1/12/21: Several scenarios have been provided to clarify guidance.

EPG 109.12 Change Orders

1/7/21: Guidance has been clarified via a general re-write.

EPG 712.1.4.1.3 Shear Connector Welding

1/4/21: Guidance updated to clarify shear connector welding requirements.

EPG 231.8 Bridge Width

12/31/20: Guidance now reflects the latest practice of a 24 ft. minimum width.

EPG 712.1.5.4 Bolt Testing and Verification

12/31/20: New guidance for bolt testing and verification is now available.

EPG 751.50 Standard Detailing Notes, A1.4 Standard Plans

12/30/20: A new Standard Detailing Note A1.4, listing applicable standard plans, is now available. In EPG 751.5.1.5 Order of Plan Sheets, updates to the order of plan sheets were made. In EPG 751.5.2.1.3 Information Blocks, references to standard plans in the title block was removed.

EPG 712.1.4.1.4 Acceptable Field Welding Processes

12/23/20: Clarified the field welding procedure that uses flux cored arc welding and shielded metal arc welding.

EPG 613.1.2 Class A Partial Depth Pavement Repairs

12/22/20: New guidance for Hot Pour Polymer Modified Resin-Based Material is now available.

EPG 751.50 Standard Detailing Notes, J. MSE Wall Notes

12/18/20: Several MSE wall notes were clarified.

Pavement Type Selection Process

12/18/20: EPG 235.3.13 Pavement Type Selection was expanded to reflect current pavement type selection policies. New EPG 242 Optional and Alternate Pavement Designs is guidance moved from EPG Other Aspects of Pavement Design and updated to current pavement type selection policies.

EPG 147.3.11 Request to Subcontract Work (Form C-220)

12/16/20: Guidance about subcontracting on JOC contracts was clarified. C-220 submittals on JOCs are not to list any items due to the nature of the work.

EPG 153.6 Chief Counsel's Office

12/15/20: This new article provides details on each step and other important information needed to properly execute agreements.

EPG 751.50, H1.8

12/11/20: This standard detailing note and the guidance for the note were expanded to address non-standard faying surfaces in bolted splice connections.

Integral End Bent Simple and Rigorous Pile Design

11/30/20: Guidance in EPG 751.1.2.22 Types of Piling , EPG 751.1.2.23 Estimating the Lengths of Piles, EPG 751.35.2.4.2 Pile Design, EPG 751.36.5.2 Structural Resistance Factor (ϕc and ϕf) for Strength Limit State and EPG 751.36.5.7 Design Values for Steel Pile was updated to implement and clarify integral end bent simple and rigorous pile design procedure.

EPG 153.18 Multimodal

11/24/20: Information is now available for the new template, MO53 Preliminary Engineering Master Agreement.

EPG 136.11.13 Documentation Requirements

11/23/20: MoDOT will no longer be approving specific software for use; the LPA must ensure the software chosen meets the outlined criteria. Guidance about what should be documented in the construction diaries was clarified in EPG 136.11.13.1 Project Diaries.

EPG 751.50, I4. Fiber Reinforced Polymer (FRP) Wrap - Bent Cap Shear Strengthening

11/20/20: New standard notes for Standard Drawing RHB08 to clarify note regarding design force.