User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:00, 4 November 2020 diff hist +9 m 232.1 Climbing Lanes Per TS, minor clarifications current
- 13:30, 3 November 2020 diff hist +2 m 903.7 Conventional Road Guide Signs →Table 903.7.4 Guide Sign Sizes
- 09:06, 3 November 2020 diff hist -5 m 751.10 General Superstructure
- 09:00, 3 November 2020 diff hist 0 m 751.10 General Superstructure →751.10.1.7.2 Standard Partial Depth Precast Prestressed Panel Bridge Deck Slabs Using SIP P/C P/S Panel Forms
- 12:29, 2 November 2020 diff hist -9 m 903.15 Signing Agreements updated link
- 12:28, 2 November 2020 diff hist +3 m 903.14 Memorial Signs updated link
- 12:26, 2 November 2020 diff hist +45 m Where to Find PDM Information in the EPG updated link
- 10:36, 2 November 2020 diff hist +36 m Recent Policy Changes in the EPG EPG 751.50
- 10:30, 2 November 2020 diff hist +14 m 751.50 Standard Detailing Notes →A2. Concrete Box Culverts and Other Type Structures: Per BR, updated "subsurface drainage" to "separation" to match new wording on Standard Plans.
- 12:56, 30 October 2020 diff hist -9 m Recent Policy Changes in the EPG
- 11:57, 30 October 2020 diff hist +465 m Recent Policy Changes in the EPG EPG 129 and EPG 127.14.3
- 11:49, 30 October 2020 diff hist +1,007 m Category:101 Standard Forms →Design: Per Env'l, several same forms about public hearings provided. New forms grouped with former "Hearing" forms under new "Public Involvement" heading
- 10:28, 30 October 2020 diff hist +1,186 127.14 National Environmental Policy Act (NEPA) Classification and Documents Per Env'l, updated Programmatic Categorical Exclusion (PCE) and “virtual” public involvement requirements to bring policy into compliance with the federal NEPA regulations.
- 10:16, 30 October 2020 diff hist 0 N File:129.6.4.jpg current
- 10:15, 30 October 2020 diff hist 0 N File:129.6.2.jpg current
- 10:15, 30 October 2020 diff hist 0 N File:129.6.jpg current
- 10:14, 30 October 2020 diff hist 0 N File:129.5.1.jpg
- 10:14, 30 October 2020 diff hist 0 N File:129.4.6.jpg current
- 10:14, 30 October 2020 diff hist 0 N File:129.4.3.jpg current
- 10:13, 30 October 2020 diff hist 0 N File:129.4.jpg current
- 10:13, 30 October 2020 diff hist 0 N File:129.1.jpg current
- 10:12, 30 October 2020 diff hist 0 N File:129.jpg current
- 10:09, 30 October 2020 diff hist +43,072 Category:129 Public Involvement Per Env'l, updated Programmatic Categorical Exclusion (PCE) and “virtual” public involvement requirements to bring policy into compliance with the federal NEPA regulations.
- 07:47, 30 October 2020 diff hist +1 m Recent Policy Changes in the EPG
- 07:47, 30 October 2020 diff hist +207 m Recent Policy Changes in the EPG EPG 751.1.2.22 and EPG 751.24.2.1
- 07:36, 30 October 2020 diff hist +696 m 751.24 Retaining Walls →751.24.2.1 Design: Per BR, guidance updated to clarify pile spacer embedment requirement when rock is anticipated within 5 ft and 10 ft zone below the MSE wall leveling pad.
- 07:27, 30 October 2020 diff hist +76 m 751.6 General Quantities →751.6.2.3 Pre-bore for Piling: Per BR, added link
- 07:24, 30 October 2020 diff hist +96 m 751.1 Preliminary Design →751.1.2.22 Types of Piling: Per BR, guidance updated to clarify pile spacer embedment requirement when rock is anticipated within 5 ft and 10 ft zone below the MSE wall leveling pad.
- 09:56, 29 October 2020 diff hist 0 N File:751.35.4.2.3 Oct 2020.jpg current
- 09:55, 29 October 2020 diff hist +4 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4.2 Prestressed I-Girders, Bulb-Tee Girders and NU-Girders: Per BR, minor correction to Alternate Section A-A figure
- 06:24, 29 October 2020 diff hist +61 m Category:108 Prosecution and Progress →108.1.1 Review and Approval of a Subcontract Request: added link
- 12:48, 28 October 2020 diff hist +127 m Recent Policy Changes in the EPG EPG 612.2, EPG 612.3
- 12:38, 28 October 2020 diff hist +52 m Category:612 Impact Attenuators →612.3 Construction Inspection Guidelines
- 12:15, 28 October 2020 diff hist +531 m Category:612 Impact Attenuators Per EPS, update to clarify how the sand barrel impact attenuator arrays are paid for and used in work zones.
- 10:27, 28 October 2020 diff hist +281 m 751.14 Steel Superstructure →751.14.3.1 Field Bolted Splice Design: Per BR, added link to BR's online Structural Engineering Guidance for design of galvanized bolted connections.
- 07:23, 28 October 2020 diff hist +66 m Recent Policy Changes in the EPG EPG 134.2.4
- 07:07, 28 October 2020 diff hist -31 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts: Per LPA, updated on-call consultant information
- 13:21, 27 October 2020 diff hist +5 751.5 Structural Detailing Guidelines →751.5.2.1.3.1 Structure Description: Per BR, clarified instructions for structure description on front sheet
- 12:55, 27 October 2020 diff hist +60 751.5 Structural Detailing Guidelines →751.5.2.1.3.1 Structure Description
- 11:34, 27 October 2020 diff hist +98 751.5 Structural Detailing Guidelines →751.5.2.1.3.1 Structure Description: Per BR, clarified instructions for structure description on front sheet
- 08:18, 27 October 2020 diff hist -3,136 m 903.15 Signing Agreements Per TS, numerous minor clarifications
- 08:17, 27 October 2020 diff hist 0 m 903.15 Signing Agreements Smithk moved page 903.16 Signing Agreements to 903.15 Signing Agreements: This article and subsequent EPG 903 articles (EPG 903.15 - EPG 903.24) were renumbered (became EPG 903.14 - 903.23) when TS deleted EPG 903.14 Emergency Management Signing.
- 08:17, 27 October 2020 diff hist +39 N 903.16 Signing Agreements Smithk moved page 903.16 Signing Agreements to 903.15 Signing Agreements: This article and subsequent EPG 903 articles (EPG 903.15 - EPG 903.24) were renumbered (became EPG 903.14 - 903.23) when TS deleted EPG 903.14 Emergency Management Signing. current Tag: New redirect
- 12:36, 26 October 2020 diff hist -154 m Recent Policy Changes in the EPG EPG 237.8.2
- 12:17, 26 October 2020 diff hist +273 m 237.8 Contract Time Per Bid & Contract, clarified guidance to include needed justification on higher LDs.
- 11:37, 26 October 2020 diff hist -1 m 147.2 Add Alternate Bidding Per Bidding, updated link current
- 08:18, 26 October 2020 diff hist -800 m 903.14 Memorial Signs Per TS, numerous minor clarifications
- 08:10, 26 October 2020 diff hist 0 m 903.14 Memorial Signs Smithk moved page 903.15 Memorial Signs to 903.14 Memorial Signs: This article and subsequent EPG 903 articles were renumbered when TS deleted EPG 903.14 Emergency Management Signing.)
- 08:10, 26 October 2020 diff hist +35 N 903.15 Memorial Signs Smithk moved page 903.15 Memorial Signs to 903.14 Memorial Signs: This article and subsequent EPG 903 articles were renumbered when TS deleted EPG 903.14 Emergency Management Signing.) current Tag: New redirect
- 07:59, 26 October 2020 diff hist -15,647 m 903.14 Emergency Management Signing Per TS, deleted this article. current Tag: Replaced