User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:10, 1 February 2022 diff hist -1 m 750.7 Non-Hydraulic Considerations →750.7.3 Environmental Requirements
- 11:38, 31 January 2022 diff hist +515 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, additional updated guidance to reflect new CADD Package (Open Roads Designer) now in use.
- 09:30, 31 January 2022 diff hist 0 m 903.9 General Information Signs →903.9.5.1 Corridor Designations
- 09:29, 31 January 2022 diff hist 0 N File:M17-12.jpg current
- 09:28, 31 January 2022 diff hist -33 m 903.9 General Information Signs →903.9.5 Auto Tour Route Signs (M17 series) (MUTCD Section 2H.07): Per TS, minor relocation of route sign images to better coordinate with guidance
- 15:53, 28 January 2022 diff hist -881 m Recent Policy Changes in the EPG EPG 701
- 15:51, 28 January 2022 diff hist +1,359 m Category:701 Drilled Shafts Per CM, new guidance for the proper steps to be made to remediate a defect in a drilled shaft current
- 15:00, 28 January 2022 diff hist 0 N File:905.3.7.4 TS&O Report 2022.docx current
- 15:00, 28 January 2022 diff hist +5 m 905.3 Transportation Impact Analysis Per TS, replaced "marked-up" version of template with a "clean" version
- 14:33, 28 January 2022 diff hist +5 m 237.14 Electronic Design Data Delivery (BIM Deliverables)
- 13:54, 28 January 2022 diff hist -599 m Recent Policy Changes in the EPG EPG 237.14
- 13:49, 28 January 2022 diff hist -33 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal: updated links
- 13:45, 28 January 2022 diff hist +14 m Category:134 Engineering Professional Services →134.3.1 Engineering Services Contract (ESC)
- 13:43, 28 January 2022 diff hist -9 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification
- 13:43, 28 January 2022 diff hist +23 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: updated link
- 13:41, 28 January 2022 diff hist +38 m Category:134 Engineering Professional Services updated links
- 13:39, 28 January 2022 diff hist +38 m 237.9 Submission of Plans and Supporting Documents updated links
- 13:38, 28 January 2022 diff hist +19 m Category:237 Contract Plans updated link current
- 13:37, 28 January 2022 diff hist 0 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Smithk moved page 237.14 Electronic Design Data Delivery to 237.14 Electronic Design Data Delivery (BIM Deliverables): Per CADD
- 13:37, 28 January 2022 diff hist +71 N 237.14 Electronic Design Data Delivery Smithk moved page 237.14 Electronic Design Data Delivery to 237.14 Electronic Design Data Delivery (BIM Deliverables): Per CADD current Tag: New redirect
- 13:36, 28 January 2022 diff hist +164 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, updated guidance to reflect new CADD Package (Open Roads Designer) now in use.
- 09:06, 28 January 2022 diff hist +1 m Recent Policy Changes in the EPG
- 09:05, 28 January 2022 diff hist +1 m Recent Policy Changes in the EPG
- 09:03, 28 January 2022 diff hist +159 m Recent Policy Changes in the EPG EPG 237.9.3.2 and EPG 1081
- 08:56, 28 January 2022 diff hist -2 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal: Per Env'l, updated the Bridge Blasting and Painting Packet.
- 08:53, 28 January 2022 diff hist 0 N File:1081 Bridge Packet 2022.pdf
- 08:53, 28 January 2022 diff hist -2 m Category:1081 Coating of Structural Steel Per Env'l, updated the Bridge Blasting and Painting Packet. The Bridge Packet Memo and the Blast Label ordering instructions were updated. The 2022-01-67853 Completed 1-25-2022 was added.
- 15:47, 27 January 2022 diff hist +44 Category:1092 Signal Equipment
- 15:35, 27 January 2022 diff hist -21 m Category:1092 Signal Equipment
- 15:34, 27 January 2022 diff hist +21 m Category:1092 Signal Equipment
- 10:52, 27 January 2022 diff hist -4 m Category:101 Standard Forms →Construction and Materials
- 10:52, 27 January 2022 diff hist 0 m Category:101 Standard Forms →Construction and Materials: Per CM, correction of link
- 10:50, 27 January 2022 diff hist -4 m Category:105 Control of Work →105.9.4 Documentation Records
- 10:50, 27 January 2022 diff hist 0 m Category:105 Control of Work Per CM, corrected link
- 10:17, 27 January 2022 diff hist +310 m 153.11 Financial Services Per FS, added F36 info
- 09:21, 27 January 2022 diff hist -138 m Category:150 Quality Management Updated broken links
- 13:59, 26 January 2022 diff hist -214 m Recent Policy Changes in the EPG EPG 613.1.1
- 13:48, 26 January 2022 diff hist +2,710 Category:613 Pavement Repair →Basis of Payment: Per CM, revision expands Basis of Payment guidance for Resident Engineers about compensating contractors for concrete costs in full depth repairs that significantly exceed typical section plan depths.
- 13:24, 26 January 2022 diff hist +85 m Recent Policy Changes in the EPG EPG 104.2
- 13:10, 26 January 2022 diff hist +7,159 104.2 Project Scoping Per DE, new guidance for how and when to apply for a 5% increase of the federal cost share of innovative projects (that is, 15% state matching vs. 20% state matching).
- 12:18, 26 January 2022 diff hist +342 m Recent Policy Changes in the EPG EPG 139, EPG 149
- 12:08, 26 January 2022 diff hist +4,001 Category:149 Project Delivery Determination and Initial Risk Assessment Per DE, EPG 149's title was slightly modified and its guidance was also brought up to current practices for project delivery method determination and initial risks. Since design-build is only one method of project delivery, EPG 149 also reflects the concurrent revisions in EPG 139. current
- 11:55, 26 January 2022 diff hist 0 N File:Form 139.8.2.5a.docx current
- 11:54, 26 January 2022 diff hist +2 m Category:139 Design - Build
- 11:27, 26 January 2022 diff hist 0 N File:139.4 2021.docx current
- 11:26, 26 January 2022 diff hist 0 N File:139.2.pdf current
- 11:24, 26 January 2022 diff hist 0 N File:Form 139.8.2.5.docx current
- 11:23, 26 January 2022 diff hist +13 m Category:139 Design - Build
- 11:19, 26 January 2022 diff hist 0 N File:139.8 Design Build Process Checklist.docx current
- 11:18, 26 January 2022 diff hist +23,246 Category:139 Design - Build Per DE, the new design-build guidance in EPG 139 has been brought up to current practices, including updated forms and checklists.