User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:11, 2 July 2020 diff hist -2 m 903.5 Regulatory Signs updated links
- 08:07, 2 July 2020 diff hist 0 N File:903.2.10.2a.jpg current
- 08:07, 2 July 2020 diff hist 0 N File:903.2.10.1a.jpg current
- 08:06, 2 July 2020 diff hist 0 N File:903.2.22.1.jpg current
- 08:06, 2 July 2020 diff hist 0 N File:Table 903.2.22.jpg current
- 08:05, 2 July 2020 diff hist 0 N File:903.2.19.2.6.jpg current
- 08:05, 2 July 2020 diff hist 0 N File:903.2.19.2.5.jpg current
- 08:04, 2 July 2020 diff hist 0 N File:903.2.19.2.4.jpg current
- 08:04, 2 July 2020 diff hist 0 N File:903.2.19.2.3.jpg current
- 08:04, 2 July 2020 diff hist 0 N File:903.2.19.2.2.jpg current
- 08:03, 2 July 2020 diff hist 0 N File:903.2.25.2 2020.jpg current
- 08:02, 2 July 2020 diff hist 0 N File:903.2.9.2 2020.jpg current
- 08:02, 2 July 2020 diff hist 0 N File:903.2.9.1 2020.jpg current
- 08:02, 2 July 2020 diff hist 0 N File:903.2.7.1.jpg current
- 08:01, 2 July 2020 diff hist +46,285 m 903.2 Extent of Signing Per TS, updates to current practices including new guidance for consumable inventory and operational updates
- 07:57, 2 July 2020 diff hist 0 N File:903 c.jpg current
- 07:56, 2 July 2020 diff hist -23,144 m Category:903 Highway Signing Per TS, updated guidance to current practices
- 10:48, 1 July 2020 diff hist +279 m LPA:136.13 LPA Policy Changes EPG 136.4.3.2
- 10:45, 1 July 2020 diff hist +16 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.3.2 Supplemental Agreements: Per ECR, guidance clarified
- 09:29, 1 July 2020 diff hist -85 m Recent Policy Changes in the EPG EPG 153.14
- 09:22, 1 July 2020 diff hist +1,534 m 153.15 Information Systems Per Secr. Comm, updated signature requirements for the contracts
- 09:01, 1 July 2020 diff hist +34 m 153.13 Highway Safety
- 09:00, 1 July 2020 diff hist +34 m 153.14 Human Resources
- 08:59, 1 July 2020 diff hist -1,090 m 153.14 Human Resources Per Secr. Comm, deleted three agreements that are no longer templates in eAgreements.
- 08:52, 1 July 2020 diff hist +47 m Recent Policy Changes in the EPG EPG 153.13
- 08:50, 1 July 2020 diff hist +840 m 153.14 Human Resources Per Secr. Comm, updated signature requirements for two contracts
- 08:32, 1 July 2020 diff hist -40 m Recent Policy Changes in the EPG EPG 153.12
- 08:30, 1 July 2020 diff hist +1,772 m 153.13 Highway Safety Per Secr. Comm, updated drafting, review and signature requirements for all the contracts
- 08:26, 1 July 2020 diff hist +84 m Help Article →EPG Ballot Cycles: Per EPS, updated EPG Ballot Cycles dates for 2021
- 08:53, 30 June 2020 diff hist 0 File:236.18.1.6 Flow Chart.pdf Smithk reverted File:236.18.1.6 Flow Chart.pdf to an old version current
- 08:49, 26 June 2020 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Per BR, updated BEAP Project Tracking Form
- 08:37, 26 June 2020 diff hist 0 N File:Fig.136.3.20 June 2020.docx
- 08:36, 26 June 2020 diff hist +10 m LPA:136.3 Federal Aid Basics Per BR, updated contact info on Fig. 136.3.20, BEAP Project Tracking Form
- 08:11, 26 June 2020 diff hist 0 File:620.10 MoDOT T80.pdf Smithk reverted File:620.10 MoDOT T80.pdf to an old version current
- 14:29, 25 June 2020 diff hist -455 m Category:101 Standard Forms →Construction and Materials: Per CM, updated access to C-239
- 11:04, 25 June 2020 diff hist -535 m Recent Policy Changes in the EPG EPG 134.3.2
- 10:59, 25 June 2020 diff hist +224 m Category:134 Engineering Professional Services →134.3.2 Fixed Fee Review: Per LPA, clarified fixed fee guidance and matched the on-call master agreements.
- 09:02, 25 June 2020 diff hist +648 m 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C) Per TS, numerous minor clarifications
- 08:11, 25 June 2020 diff hist +429 m 616.23 Traffic Control for Field Operations Per TS, numerous minor clarifications
- 14:58, 24 June 2020 diff hist -269 m 616.19 Quality Standards for Temporary Traffic Control Devices Per TS, numerous minor clarifications
- 08:44, 24 June 2020 diff hist -228 m Recent Policy Changes in the EPG EPG 134.5.1
- 08:41, 24 June 2020 diff hist +139 m Category:134 Engineering Professional Services →134.5.1 Invoicing: Per BR, additional contact guidance
- 12:13, 23 June 2020 diff hist +1 m 127.25 Maintenance Environmental Policies Per Env'l, updated link
- 11:19, 23 June 2020 diff hist +15 m Category:101 Standard Forms →Construction and Materials: updated link
- 11:18, 23 June 2020 diff hist +15 m Category:703 Concrete Masonry Construction →703.2.12 Checklist: updated link
- 11:14, 23 June 2020 diff hist -477 m Recent Policy Changes in the EPG EPG 153.18
- 11:00, 23 June 2020 diff hist +503 m 153.19 Multimodal Per Multimodal, new MO-21 agreement, Coronavirus Aid Relief and Economic Security Act Agreement
- 10:05, 23 June 2020 diff hist +288 m LPA:136.13 LPA Policy Changes EPG 136.4.2.6
- 09:59, 23 June 2020 diff hist +236 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.6 Step 5 - Selection of Consultant: Per LPA, added guidance about on an LPA disqualifying a consultant.
- 09:25, 23 June 2020 diff hist +22 m Recent Policy Changes in the EPG EPG 703.2.12,EPG 101
- 09:11, 23 June 2020 diff hist 0 N File:703.2.12 PODI Bridge Deck Pour Checklist.pdf current
- 09:10, 23 June 2020 diff hist +90 m Category:101 Standard Forms →Construction and Materials: Per CM, new PODI Bridge Deck Pour Checklist
- 09:08, 23 June 2020 diff hist -4,175 m Category:703 Concrete Masonry Construction →703.2.12 Checklist: Per CM, the new, FHWA-based "PODI Bridfe Deck Pour Checklist" form replaced the former textual guidance.
- 13:41, 19 June 2020 diff hist +1 m LPA:136.13 LPA Policy Changes
- 13:40, 19 June 2020 diff hist +199 m LPA:136.13 LPA Policy Changes EPG 136.6.3
- 13:37, 19 June 2020 diff hist 0 N File:136.6.3 programmatic agreement.pdf current
- 13:36, 19 June 2020 diff hist +56 m LPA:136.6 Environmental and Cultural Requirements →136.6.3 Categorical Exclusion (CE): Per Env'l, updated guidance with FHWA agreement requirements
- 10:13, 19 June 2020 diff hist -60 m Recent Policy Changes in the EPG EPG 105.9.14
- 09:20, 19 June 2020 diff hist -1,038 m Category:105 Control of Work →105.9.14 Project Diaries: Per CM, updated guidance to current AASHTOWARE procedures. EPG had provided project diary guidance for the outdated SiteManger procedures.
- 08:11, 19 June 2020 diff hist 0 N File:139 FHWA Design Build Program Agreement 2020.pdf current
- 08:10, 19 June 2020 diff hist +82 m Category:139 Design - Build Per DE, provided latest version of FHWA Design Build Program Agreement and updated links to Mo Design-Build Statue 227.107
- 13:36, 18 June 2020 diff hist +276 m Recent Policy Changes in the EPG EPG 237.9
- 12:41, 18 June 2020 diff hist +9 m 237.9 Submission of Plans and Supporting Documents →237.9.3.6 Finalizing the PS&E for Advertisement
- 12:35, 18 June 2020 diff hist +15 m 237.9 Submission of Plans and Supporting Documents →237.9.3.6.1 Creating Bidding Documents
- 12:34, 18 June 2020 diff hist -844 m 237.9 Submission of Plans and Supporting Documents →237.9.3.7 Posting Projects for Advertisement
- 12:34, 18 June 2020 diff hist +1,199 m 237.9 Submission of Plans and Supporting Documents →237.9.3.6 Finalizing the PS&E for Advertisement: Per DE, updated guidance since proposals are not advertised anymore. The proposal is now split into a Bid Book, Roadway JSPs, and Bridge JSPs and each is advertised.
- 07:34, 18 June 2020 diff hist +16 m Category:130 Value Engineering Per CM, updated C-104 links
- 07:32, 18 June 2020 diff hist +125 m 104.13 Construction Inspection Guidance for Sec 104 Per CM, updated C-104 links
- 15:12, 17 June 2020 diff hist +184 m Recent Policy Changes in the EPG EPG 146.3.1
- 15:00, 17 June 2020 diff hist +321 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.1 DBE Subcontract – Performing Work Onsite: Per ECR, updates/clarification. When a DBE is a prime contractor, a CUF should be performed on the DBE firm as well as any other DBE firms being utilized. The CUF review should be conducted on the prime DBE every 60 days until the project is completed.
- 13:43, 17 June 2020 diff hist +1 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.1.1 Step 1, Determine Need for Cultural Resource Investigations
- 13:37, 17 June 2020 diff hist -9 m LPA:136.13 LPA Policy Changes
- 13:31, 17 June 2020 diff hist +589 m LPA:136.13 LPA Policy Changes EPG 136.6.4.1.1
- 13:29, 17 June 2020 diff hist -11,176 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.1.1 Step 1, Determine Need for Cultural Resource Investigations: Per Env'l, the LPA is to now submit a Request for Environmental Review to MoDOT.
- 12:26, 16 June 2020 diff hist +1 m 751.50 Standard Detailing Notes →K1. General: minor correction
- 08:07, 12 June 2020 diff hist -1 m 751.50 Standard Detailing Notes →B3a. Bridges: Per BR, minor correction
- 09:19, 11 June 2020 diff hist -138 m Recent Policy Changes in the EPG New QRG in EPG 101
- 09:18, 11 June 2020 diff hist +88 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, new QRG, I.A.S. Lab Audit]
- 14:04, 10 June 2020 diff hist 0 m 751.10 General Superstructure →751.10.1.2 Limit States and Load Factors
- 13:39, 10 June 2020 diff hist +172 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4.3 Wing Reinforcement: Per BR, updated link and info related to recent changes in EPG 751.12
- 13:37, 10 June 2020 diff hist +217 m 751.33 Concrete Semi Deep Abutments →751.33.4.2 Wing Elevation: Per BR, updated link and info related to recent changes in EPG 751.12
- 13:11, 10 June 2020 diff hist -71 m 751.10 General Superstructure →751.10.1.6 Slab Overhang Section Design: Per BR, updated link and info related to updates in EPG 751.12
- 13:03, 10 June 2020 diff hist +5 m 751.10 General Superstructure →751.10.1.3 Loads
- 13:02, 10 June 2020 diff hist -31 m 751.10 General Superstructure →751.10.1.3 Loads: updated link
- 07:38, 10 June 2020 diff hist -19,533 m Category:100 GENERAL Per CM, EPG 100.1 and EPG 100.2 presented archaic info as well as information that is presented in other articles. They were deleted.
- 13:56, 9 June 2020 diff hist +6 m 751.50 Standard Detailing Notes →H11. Miscellaneous: updated link
- 13:41, 9 June 2020 diff hist +114 m Recent Policy Changes in the EPG EPG 751.12
- 11:06, 9 June 2020 diff hist 0 N File:751.12.3.3.jpg current
- 11:06, 9 June 2020 diff hist 0 N File:751.12.3.2.jpg current
- 11:05, 9 June 2020 diff hist 0 N File:751.12.3.1.jpg current
- 11:05, 9 June 2020 diff hist 0 N File:751.12.1.6.1.jpg current
- 11:04, 9 June 2020 diff hist 0 N File:751.12.1.6.jpg current
- 11:04, 9 June 2020 diff hist 0 N File:751.12.1.5.2.jpg current
- 11:03, 9 June 2020 diff hist 0 N File:751.12.1.5.1.jpg current
- 11:03, 9 June 2020 diff hist 0 N File:751.12.1.4.3.6.jpg current
- 11:02, 9 June 2020 diff hist 0 N File:751.12.1.4.3.5.jpg current
- 11:02, 9 June 2020 diff hist 0 N File:751.12.1.4.3.4.jpg current
- 11:02, 9 June 2020 diff hist 0 N File:751.12.1.4.3.3.jpg current
- 11:01, 9 June 2020 diff hist 0 N File:751.12.1.4.3.2.jpg current
- 11:01, 9 June 2020 diff hist 0 N File:751.12.1.4.3.1.jpg current
- 11:01, 9 June 2020 diff hist 0 N File:751.12.1.4.2.jpg current
- 11:00, 9 June 2020 diff hist 0 N File:751.12.1.4.1.jpg current
- 11:00, 9 June 2020 diff hist 0 N File:751.12.1.3.3.8.jpg current
- 10:59, 9 June 2020 diff hist 0 N File:751.12.1.3.3.7.jpg current
- 10:59, 9 June 2020 diff hist 0 N File:751.12.1.3.3.6.jpg current
- 10:59, 9 June 2020 diff hist 0 N File:751.12.1.3.3.5.2.jpg current
- 10:58, 9 June 2020 diff hist 0 N File:751.12.1.3.3.5.1.jpg current
- 10:58, 9 June 2020 diff hist 0 N File:751.12.1.3.3.4.2.jpg current
- 10:58, 9 June 2020 diff hist 0 N File:751.12.1.3.3.4.1.jpg current
- 10:57, 9 June 2020 diff hist 0 N File:751.12.1.3.3.3.2.jpg current
- 10:57, 9 June 2020 diff hist 0 N File:751.12.1.3.3.3.1.jpg current
- 10:56, 9 June 2020 diff hist 0 N File:751.12.1.3.3.2.2.jpg current
- 10:56, 9 June 2020 diff hist 0 N File:751.12.1.3.3.2.1.jpg current
- 10:56, 9 June 2020 diff hist 0 N File:751.12.1.3.3.1.2.jpg current
- 10:55, 9 June 2020 diff hist 0 N File:751.12.1.3.3.1.1.jpg current
- 10:54, 9 June 2020 diff hist 0 N File:751.12.1.3.2.jpg current
- 10:54, 9 June 2020 diff hist 0 N File:751.12.1.3.1.jpg current
- 10:53, 9 June 2020 diff hist 0 N File:751.12.2.7.2.jpg current
- 10:53, 9 June 2020 diff hist 0 N File:751.12.2.7.1.jpg current
- 10:53, 9 June 2020 diff hist 0 N File:751.12.2.6 end bents.jpg current
- 10:52, 9 June 2020 diff hist 0 N File:751.12.2.5.2.jpg current
- 10:52, 9 June 2020 diff hist 0 N File:751.12.2.5.1.jpg current
- 10:51, 9 June 2020 diff hist 0 N File:751.12.1.2.2.2.jpg current
- 10:51, 9 June 2020 diff hist 0 N File:751.12.1.2.2.1.jpg current
- 10:51, 9 June 2020 diff hist 0 N File:751.12.1.jpg current
- 10:50, 9 June 2020 diff hist +3,313 m 751.12 Barriers, Railings, Curbs and Fences Per BR, EPG 751.12 Protective Barriers renamed EPG 751.12 Barriers, Curbs and Fences. Replaced most of EPG 751.12 with guidance for new Type H. Type D is now the standard barrier for most bridges.
- 10:44, 9 June 2020 diff hist +47 N 751.12 Protective Barriers Smithk moved page 751.12 Protective Barriers to 751.12 Barriers, Curbs and Fences: Per BR, EPG 751.12 Protective Barriers renamed EPG 751.12 Barriers, Curbs and Fences. Replaced most of EPG 751.12 with guidance for new Type H. Type D is now the standard barrier for most bridges. current Tag: New redirect
- 10:44, 9 June 2020 diff hist 0 m 751.12 Barriers, Railings, Curbs and Fences Smithk moved page 751.12 Protective Barriers to 751.12 Barriers, Curbs and Fences: Per BR, EPG 751.12 Protective Barriers renamed EPG 751.12 Barriers, Curbs and Fences. Replaced most of EPG 751.12 with guidance for new Type H. Type D is now the standard barrier for most bridges.
- 15:12, 5 June 2020 diff hist 0 Recent Policy Changes in the EPG
- 15:12, 5 June 2020 diff hist -7 m Recent Policy Changes in the EPG EPG 153.21
- 15:09, 5 June 2020 diff hist +433 m 153.22 Transportation Planning Per TP, new agreement, "Planning Consolidated Grant and Surface Transportation Block Grant Program_Agreement"
- 15:25, 4 June 2020 diff hist 0 File:751.5 flange edge ns.gif Smithk uploaded a new version of File:751.5 flange edge ns.gif current
- 15:24, 4 June 2020 diff hist 0 File:751.5 flange edge fs.gif Smithk uploaded a new version of File:751.5 flange edge fs.gif current
- 15:22, 4 June 2020 diff hist 0 File:751.5 flange corner ns.gif Smithk uploaded a new version of File:751.5 flange corner ns.gif current
- 15:20, 4 June 2020 diff hist 0 File:751.5 flange corner fs.gif Smithk uploaded a new version of File:751.5 flange corner fs.gif current
- 15:19, 4 June 2020 diff hist 0 File:751.5 Finished Ground Line.gif Smithk uploaded a new version of File:751.5 Finished Ground Line.gif current
- 15:15, 4 June 2020 diff hist 0 File:751.5 fillet welds with abrupt changes in direction.gif Smithk uploaded a new version of File:751.5 fillet welds with abrupt changes in direction.gif current
- 15:16, 2 June 2020 diff hist -2 m 236.5 Property Management →236.5.25.9 Lease/Licenses/Airspace License Agreements Submittals to Right of Way Section: Per RW, updated link
- 13:16, 2 June 2020 diff hist +18 m Recent Policy Changes in the EPG EPG 174
- 13:05, 2 June 2020 diff hist +2 Category:100 GENERAL
- 13:04, 2 June 2020 diff hist +78 m Category:100 GENERAL New article, EPG 174 Maintenance Management System (MMS)
- 13:03, 2 June 2020 diff hist 0 N File:174.jpg current
- 13:01, 2 June 2020 diff hist +2,709 N Category:174 MoDOT Management System (MMS) Per MT, new article is a high-level introduction to MMS and to provide users with access to the web-based program. MMS is already established practice.
- 15:26, 29 May 2020 diff hist 0 File:751.5 fillet ns.gif Smithk uploaded a new version of File:751.5 fillet ns.gif current
- 15:26, 29 May 2020 diff hist 0 File:751.5 fillet fs.gif Smithk uploaded a new version of File:751.5 fillet fs.gif current
- 15:04, 29 May 2020 diff hist 0 File:751.5 fillet bs.gif Smithk uploaded a new version of File:751.5 fillet bs.gif current
- 14:59, 29 May 2020 diff hist 0 File:751.5 Filled Joint Detail.gif Smithk uploaded a new version of File:751.5 Filled Joint Detail.gif current
- 14:57, 29 May 2020 diff hist 0 File:751.5 field weld.gif Smithk uploaded a new version of File:751.5 field weld.gif current
- 12:23, 29 May 2020 diff hist +15 m 821.18 Noxious Weeds current
- 10:28, 29 May 2020 diff hist 0 N File:616.8.39 Sheet 2 DECM 2020.pdf current
- 10:27, 29 May 2020 diff hist 0 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per TS, in Fig. 616.8.39 DECM, Sheet 2, updated the WO5-1 sign label to correctly identify it as the R5-1 DO NOT ENTER sign
- 14:41, 27 May 2020 diff hist +313 m Category:104 Scope Per TP, clarified guidance
- 08:54, 27 May 2020 diff hist +1 m 751.50 Standard Detailing Notes →A4a1. Steel Structures- Nonweathering Steel: Per BR, minor correction
- 10:01, 22 May 2020 diff hist +7 m Category:625 Slab Stabilization
- 10:01, 22 May 2020 diff hist +7 m Category:409 Seal Coat
- 10:00, 22 May 2020 diff hist +7 m 413.3 Ultrathin Bonded Asphalt Wearing Surface
- 10:00, 22 May 2020 diff hist +7 m Category:403 Asphaltic Concrete Pavement
- 09:59, 22 May 2020 diff hist +7 Category:402 Bituminous Surface Leveling
- 09:58, 22 May 2020 diff hist +7 m Category:401 Bituminous Base and Pavement
- 09:58, 22 May 2020 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments May 22 2020.docx current
- 09:55, 22 May 2020 diff hist +7 m Recent Policy Changes in the EPG
- 07:57, 22 May 2020 diff hist +173 m Recent Policy Changes in the EPG
- 07:55, 22 May 2020 diff hist +352 m Recent Policy Changes in the EPG
- 07:19, 22 May 2020 diff hist 0 N File:409 FY2021 Contract Seal Coat Guidelines b.docx current
- 07:18, 22 May 2020 diff hist 0 m Category:409 Seal Coat Per CM, updated the Contract Seal Coat Guidelines for the use of CMS boards on Seal Coat jobs
- 07:04, 22 May 2020 diff hist -4 m Category:625 Slab Stabilization Per CM and DE, in the "Guidance for Asphalt Cement Price Index Adjustments" added CMS boards to Seal Coat projects
- 07:03, 22 May 2020 diff hist -4 m 413.3 Ultrathin Bonded Asphalt Wearing Surface Per CM and DE, in the "Guidance for Asphalt Cement Price Index Adjustments" added CMS boards to Seal Coat projects
- 07:01, 22 May 2020 diff hist -4 m Category:402 Bituminous Surface Leveling Per CM and DE, in the "Guidance for Asphalt Cement Price Index Adjustments" added CMS boards to Seal Coat projects
- 07:01, 22 May 2020 diff hist -4 m Category:401 Bituminous Base and Pavement Per CM and DE, in the "Guidance for Asphalt Cement Price Index Adjustments" added CMS boards to Seal Coat projects
- 15:10, 21 May 2020 diff hist +231 m Recent Policy Changes in the EPG EPG 403 and EPG 409
- 15:01, 21 May 2020 diff hist -4 m Category:403 Asphaltic Concrete Pavement Per CM and DE, in the "Guidance for Asphalt Cement Price Index Adjustments" added CMS boards to Seal Coat projects
- 15:00, 21 May 2020 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments 2020.docx current
- 14:59, 21 May 2020 diff hist -4 m Category:409 Seal Coat Per CM and DE, in the "Guidance for Asphalt Cement Price Index Adjustments" added CMS boards to Seal Coat projects
- 14:52, 21 May 2020 diff hist 0 N File:409 FY May 21 2021 Seal Coat Plans.pdf
- 14:47, 21 May 2020 diff hist +3 m Category:409 Seal Coat Per EPS, updated Contract Seal Coat pdf Plan Sheets pdf files
- 11:26, 21 May 2020 diff hist +9 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, updated barrier pay items
- 07:03, 21 May 2020 diff hist -21 m 751.5 Structural Detailing Guidelines →751.5.1.7 Contract Addendums and Construction Changes: Per BR, updated link
- 12:54, 19 May 2020 diff hist -26 m Recent Policy Changes in the EPG EPG 751.50
- 12:44, 19 May 2020 diff hist +18 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per BR, LRFD design specification notes were updated to reflect the required use of new or previous AASHTO releases
- 07:23, 19 May 2020 diff hist 0 N File:239 RE certification.pdf current
- 07:23, 19 May 2020 diff hist 0 N File:239 Not a certified document.pdf current
- 07:23, 19 May 2020 diff hist 0 N File:239 Checkmark2.pdf current
- 07:22, 19 May 2020 diff hist 0 N File:239 Checkmark1.pdf current
- 07:22, 19 May 2020 diff hist +2 m Category:239 Construction Inspection Guidelines for Final Plans Per EPS, correct Bluebeam Revu User files to pdf files
- 10:47, 18 May 2020 diff hist 0 File:751.5 edge joint.gif Smithk uploaded a new version of File:751.5 edge joint.gif current
- 10:46, 18 May 2020 diff hist 0 File:751.5 edge flange welding symbol.gif Smithk uploaded a new version of File:751.5 edge flange welding symbol.gif current
- 13:30, 15 May 2020 diff hist -74 m Recent Policy Changes in the EPG EPG 101
- 13:26, 15 May 2020 diff hist +147 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, new AWP CO Contract Payment Estimate Exception Override
- 12:45, 15 May 2020 diff hist +42 m Recent Policy Changes in the EPG EPG 616.6.2.2
- 11:35, 15 May 2020 diff hist 0 N File:616.6.2.2 Typical sign and AWRS.jpg current
- 11:34, 15 May 2020 diff hist 0 N File:616.6.2.2 Typical road work ahead and flagger ahead.jpg current
- 11:33, 15 May 2020 diff hist +34 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.2 General Characteristics of Signs (MUTCD 6F.02): Per TS, guidance has been updated because flags now shall be used on the ROAD/BRIDGE WORK AHEAD signs during short durations projects in daytime hours. Revised the photo of the sign and AWRS assemble without the flags.
- 09:49, 15 May 2020 diff hist -233 m 606.2 Guard Cable Per CCO and EPS, deleted archaic additional information
- 09:55, 14 May 2020 diff hist +31 m 943.3 AASHTO Policy on Route Marking and Application Updated U.S. Route Numbering - Electronic Application Form current
- 08:38, 14 May 2020 diff hist 0 File:751.5 Dual Lane Structures Tied at Fill Face of End Bent.gif Smithk uploaded a new version of File:751.5 Dual Lane Structures Tied at Fill Face of End Bent.gif current
- 08:38, 14 May 2020 diff hist 0 File:751.5 Dual Lane Structure Tied at Intersection.gif Smithk uploaded a new version of File:751.5 Dual Lane Structure Tied at Intersection.gif current
- 08:32, 14 May 2020 diff hist 0 File:751.5 double-fillet welding symbol.gif Smithk uploaded a new version of File:751.5 double-fillet welding symbol.gif current
- 08:30, 14 May 2020 diff hist 0 File:751.5 double-bevel-groove welding symbol.gif Smithk uploaded a new version of File:751.5 double-bevel-groove welding symbol.gif current
- 07:58, 14 May 2020 diff hist 0 File:751.5 development of standard hooks in tension.gif Smithk uploaded a new version of File:751.5 development of standard hooks in tension.gif current
- 15:25, 13 May 2020 diff hist 0 File:751.5 development of non-epoxy coated grade 40 deformed bars in tension.gif Smithk uploaded a new version of File:751.5 development of non-epoxy coated grade 40 deformed bars in tension.gif current
- 15:10, 13 May 2020 diff hist 0 File:751.5 development and tension lap splice lengths-top bars.gif Smithk uploaded a new version of File:751.5 development and tension lap splice lengths-top bars.gif current
- 14:50, 13 May 2020 diff hist 0 File:751.5 development and tension lap splice lengths-bars in compression.gif Smithk uploaded a new version of File:751.5 development and tension lap splice lengths-bars in compression.gif current
- 14:34, 13 May 2020 diff hist 0 File:751.5 development and tension lap splice lengths-other than top bars.gif Smithk uploaded a new version of File:751.5 development and tension lap splice lengths-other than top bars.gif current
- 14:32, 13 May 2020 diff hist 0 File:751.5 details near free edge or const joint.gif Smithk uploaded a new version of File:751.5 details near free edge or const joint.gif current
- 14:30, 13 May 2020 diff hist 0 File:751.5 detail of steel pile splice.gif Smithk uploaded a new version of File:751.5 detail of steel pile splice.gif current
- 14:45, 12 May 2020 diff hist -53 m Category:1048 Pavement Marking Material →1048.2.10 Type 1 and Type 2 Temporary Raised Pavement Markers: Per CM and TS, removed the archaic “Type 1/Type 2” designation from temporary raised pavement markers.
- 14:20, 12 May 2020 diff hist +16 m Category:139 Design - Build
- 14:18, 12 May 2020 diff hist +88 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.11 Raised Pavement Markers (MUTCD Section 3B.11): Per CM and TS, removed the archaic “Type 1/Type 2” designation from temporary raised pavement markers.
- 12:54, 12 May 2020 diff hist -2 m Category:139 Design - Build
- 10:04, 12 May 2020 diff hist +159 m Recent Policy Changes in the EPG EPG 751.50
- 09:53, 12 May 2020 diff hist 0 m 751.50 Standard Detailing Notes
- 09:30, 12 May 2020 diff hist -5 m 751.50 Standard Detailing Notes →H10a. Cast-In-Place Permanent Barrier
- 09:14, 12 May 2020 diff hist -1,314 m 751.50 Standard Detailing Notes Per BR, revised H10 so notes work with all barriers.
- 13:48, 7 May 2020 diff hist +325 m Recent Policy Changes in the EPG EPG 642.4, EPG 902.4, EPG 902.5.9
- 13:26, 7 May 2020 diff hist +716 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.9 Provisions for Pedestrians (MUTCD Section 4D.03): Per TS, updated guidance for the installation of audible pedestrian signals at intersections of projects requiring ADA upgrades. This guidance also applies to new construction projects.
- 13:21, 7 May 2020 diff hist +994 902.4 Signal Installations and Equipment Per TS, updated guidance for the installation of audible pedestrian signals at intersections of projects requiring ADA upgrades. This guidance also applies to new construction projects.
- 13:14, 7 May 2020 diff hist 0 m 642.4 Impact of the Project Category on ADA →642.4.2.1 Definition of Alteration
- 13:12, 7 May 2020 diff hist 0 N File:642.4.2.1.jpg current
- 13:12, 7 May 2020 diff hist +1,309 642.4 Impact of the Project Category on ADA Per TS, updated guidance for the installation of audible pedestrian signals at intersections of projects requiring ADA upgrades. This guidance also applies to new construction projects.
- 10:56, 7 May 2020 diff hist +19 m Recent Policy Changes in the EPG EPG 413.1
- 09:26, 7 May 2020 diff hist +6,629 413.1 Micro-Surfacing Per CM, guidance for single pass and double pass micro-surfacing was expanded; guidance for micro-surfacing grade selection and surface preparation also expanded. New guidance for post construction and the method of measurement and basis of payment now available.
- 07:28, 7 May 2020 diff hist -45 m Category:1180 Bituminous Stockpile Patching Material
- 07:27, 7 May 2020 diff hist +4 Category:1180 Bituminous Stockpile Patching Material
- 07:24, 7 May 2020 diff hist 0 N File:Hi 642.4.2.1.pdf current
- 07:24, 7 May 2020 diff hist +3 Category:1180 Bituminous Stockpile Patching Material
- 07:23, 7 May 2020 diff hist 0 N File:642.4.2.1.pdf current
- 07:23, 7 May 2020 diff hist +38 Category:1180 Bituminous Stockpile Patching Material
- 13:21, 5 May 2020 diff hist 0 File:751.5 corner joint.gif Smithk uploaded a new version of File:751.5 corner joint.gif current
- 13:15, 5 May 2020 diff hist 0 File:751.5 Coordinating Substructure on Tangent Alignment.gif Smithk uploaded a new version of File:751.5 Coordinating Substructure on Tangent Alignment.gif current
- 13:12, 5 May 2020 diff hist 0 File:751.5 convex contour symbol.gif Smithk uploaded a new version of File:751.5 convex contour symbol.gif current
- 09:41, 4 May 2020 diff hist 0 m Recent Policy Changes in the EPG
- 09:21, 4 May 2020 diff hist 0 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87)
- 09:20, 4 May 2020 diff hist 0 N File:Fig 616.6.87.2.2 2020.jpg current
- 09:20, 4 May 2020 diff hist 0 N File:Fig 616.6.87.2.1 2020.jpg current
- 09:19, 4 May 2020 diff hist 0 N File:Fig 616.6.87.1.2 2020.jpg current
- 09:19, 4 May 2020 diff hist 0 N File:Fig 616.6.87.1.1 2020.jpg current
- 09:18, 4 May 2020 diff hist +20 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): Per TS, in Figs. 616.6.87.1 and 616.6.87.2, revised the rumble strip spacing to the manufacturer's recommendations. For speed limits 60-70, the spacing changed from 30 to 35 feet.
- 15:18, 1 May 2020 diff hist +1 147.4 Fixed Price Variable Scope (FPVS) Contracting
- 15:18, 1 May 2020 diff hist -5,873 m 147.4 Fixed Price Variable Scope (FPVS) Contracting Per EPS, article temporarily removed Tag: Replaced
- 15:07, 1 May 2020 diff hist +2 m 236.5 Property Management
- 15:05, 1 May 2020 diff hist +112 m 236.6 Appraisal and Appraisal Review
- 15:03, 1 May 2020 diff hist +20 m 236.5 Property Management →236.5.25.9 Lease/Licenses/Airspace License Agreements Submittals to Right of Way Section
- 14:43, 1 May 2020 diff hist -15 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.1 Employee Interviews
- 14:40, 1 May 2020 diff hist +913 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, minor clarifications for guidance about contracts that include multiple projects and about employee interviews
- 14:36, 1 May 2020 diff hist +31 m Category:101 Standard Forms →Construction and Materials
- 13:59, 1 May 2020 diff hist +362 m Recent Policy Changes in the EPG EPG 236
- 13:37, 1 May 2020 diff hist +114 m 236.8 Relocation Assistance Program Per RW, added RWPA checklist
- 13:33, 1 May 2020 diff hist +111 m 236.10 Right Of Way Condemnation
- 13:32, 1 May 2020 diff hist +308 m 236.10 Right Of Way Condemnation →236.10.7.10 Recovering Damages and Fees (RSMo 523.259): Per RW, guidance for RWPA data entry and media upload requirements was added.
- 13:25, 1 May 2020 diff hist +2,080 m 236.7 Negotiation Per RW, guidance for RAI and RWPA data entry and media upload requirements was clarified