Search results

Jump to navigation Jump to search
  • ...mental specialist will evaluate project corridors for waste sites, provide management and oversight of waste sites acquired, and monitor projects for compliance ...ardous waste; cleanup of hazardous waste and hazardous substance releases; management and removal of petroleum storage tanks; and cleanup of leaking petroleum st
    20 KB (2,896 words) - 12:16, 24 November 2021
  • ...aulic conditions created by a project be consistent with Federal Emergency Management Agency (FEMA) standards established for the NFIP. ...cy (FEMA) through the National Flood Insurance Program (NFIP) requires the management of development within regulated floodplains. FEMA defines development as:
    20 KB (3,124 words) - 09:26, 3 September 2019
  • ...or Material#1001.2 Producer Quality Management|EPG 1001.2 Producer Quality Management]]. ...or Material#1001.2 Producer Quality Management|EPG 1001.2 Producer Quality Management]].
    1 member (0 subcategories, 0 files) - 13:15, 1 October 2021
  • ...tive Order 11988, Floodplain Management, and subsequent federal floodplain management guidelines. When available, flood hazard boundary maps [[748.8 National Fl ...lain. For projects that involve the state of Missouri, the State Emergency Management Agency (SEMA) issues [[:Category:101 Standard Forms|floodplain development
    18 KB (2,703 words) - 15:15, 16 September 2020
  • ...||ADM(A6)||[[171.1 Administration#ADM(A6) Private Property Damage |Private Property Damage ]] ...||ADM(A7)||[[171.1 Administration#ADM(A7) Property Damage Numbers |Private Property Damage Numbers ]]
    12 members (0 subcategories, 0 files) - 14:57, 1 September 2022
  • ...– National Flood Insurance Program) provides flood insurance protection to property owners in flood-prone areas. Code of Federal Regulations title 44 (44 CFR C :* Executive Order 11988: Floodplain Management (DOT Order 5650.2, 23 CFR 771, 23 CFR 650, Subpart A) of 1977 seeks “to a
    11 KB (1,498 words) - 14:53, 28 April 2022
  • ...20of%20Interest%20(2-1-17).docx&action=default&DefaultItemOpen=1 Personnel Management Manual] provides guidelines concerning political activities authorized, and ...s%20of%20Conduct%20(6-1-16).doc&action=default&DefaultItemOpen=1 Personnel Management Manual].
    27 KB (4,057 words) - 08:50, 3 June 2021
  • ==172.1 Salt Management – Salt Kill== Remediate salt kills on and off MoDOT property.
    0 members (0 subcategories, 0 files) - 12:54, 14 November 2023
  • ...e to using that land and if the project is planned to minimize harm to the property. These types of properties are often referred to as Section 4(f) resources The environmental specialist maintains a library of maps and property ownership information for all lands under the jurisdiction of the Missouri
    23 KB (3,293 words) - 16:08, 8 February 2024
  • ...e generation, transmission or distribution of electricity or any damage to property or facilities that causes or could cause such an interruption. ...et management system called [http://www.managetickets.com/ National Ticket Management System (NTMS)]. All costs associated with performing locate requests (tick
    0 members (0 subcategories, 0 files) - 15:49, 10 October 2023
  • ...ments|removed]] under construction contracts, except guardrail, become the property of the contractor, unless otherwise specified in the contract. ...il and large culvert structures. Salvaged bridge materials may become the property of the contractor as specified in the standard specifications or may, by sp
    0 members (0 subcategories, 0 files) - 14:30, 31 March 2022
  • ...cement, and maintenance of TTC devices used for TTC zones and for incident management. :C. The needs of abutting property owners, residents, and businesses should be assessed and appropriate accomm
    9 KB (1,430 words) - 13:45, 7 April 2017
  • ...mple_Letter_Notifying_Property_Owner_of_Survey.doc Sample Letter Notifying Property Owner of Survey Work] |[https://epg.modot.org/forms/DE%202017%20Forms/RW/238.2_Form_A-472.pdf Property Damage Release Form A-472]
    38 KB (5,959 words) - 11:43, 11 January 2024
  • ...traffic record system is also called the [http://tms/home/ Transportation Management System (TMS)]. The TMS system uses roadway and crash information to develo :* Crash severity (EPDO – Equivalent Property Damage Only)
    5 KB (765 words) - 12:02, 19 September 2023
  • '''(a)''' Obtaining permission for access to private property except railroads. The latter is handled through the Railroad Liaison Engine '''4.''' Notify Risk Management as soon as possible. Normally the supervisory personnel will handle this, b
    6 KB (851 words) - 09:17, 27 March 2024
  • ...lic health. Secondary standards are intended to prevent environmental and property damage (i.e., damage to crops, vegetation, buildings). Air quality standar ::* How will the project affect the tax base or property values?
    36 KB (5,463 words) - 12:24, 27 October 2015
  • ...and. The goal of Realty Asset Management is to retain a minimum of excess property, while pursuing the best value for every dollar spent for the properties th ...shown to represent the [[236.5 Property Management#236.5.17 Valuing Excess Property|approximate fair market value]].
    91 KB (13,929 words) - 11:01, 4 March 2024
  • ...volume minor roadways are intended to provide suitable access to adjacent property. Normally, access control is not considered. ...nt of permitted access. Additional information can be found in the Access Management Guidelines.
    60 KB (9,315 words) - 13:59, 19 December 2023
  • Review reports from management, Audits and Investigations, FHWA and others. ...isit. Disagreements with report recommendations are resolved through upper management. The Asst. to the State Design Engineer - Right of Way is the final arbiter
    17 KB (2,458 words) - 08:37, 18 October 2023
  • ...tion and Materials. Prior to allowing production under a producer quality management plan, the district must confirm that the producer’s certification is curr ! style="background:#BEBEBE" |Tested Property<sup>1</sup>!! style="background:#BEBEBE" |Test Method !! style="background:
    0 members (0 subcategories, 0 files) - 16:15, 9 November 2021
  • ===127.25.1.3 Tire Management=== ...ules/csr/current/10csr/10c80-8.pdf 10 CSR 80-8.010 - 80-8.040] Solid Waste Management
    52 KB (7,448 words) - 12:50, 15 March 2023
  • ...4) to tailor the standard Section 106 process to better fit in with agency management or decision making. PAs may identify how specific resources may be treated, ...s. “Adverse effects” are those that diminish characteristics qualifying a property for inclusion in the National Register.
    47 KB (6,899 words) - 15:51, 26 July 2023
  • ...uct with contractors and the public and employee stewardship of government property. Absolute integrity of all department personnel is essential if public con ...oses. No such official or employee shall take any active part in political management or in political campaigns. All such persons shall retain the right to vote
    1 member (0 subcategories, 1 file) - 14:45, 24 January 2024
  • ===106.20.1.3 Quality Management AWP Reporting=== Refer to [[:Category:150 Quality Management|EPG 150 Quality Management]] for guidance.
    26 KB (4,023 words) - 14:03, 6 December 2021
  • ...Post Office standards. Questionable situations should be referred to risk management. ...in a timely manner and liability problems with use of equipment on private property
    14 KB (2,098 words) - 10:54, 3 January 2024
  • ...nd worker safety are integral and high-priority elements of every incident management, construction, maintenance, permit and utility operation. Consideration of * Communicating with and providing reasonable accommodations for adjoining property owners.
    42 KB (6,035 words) - 15:56, 10 October 2023
  • ...to the State Design Engineer - Right of Way has authority to acquire land, property and rights as indicated on right of way plans through the district right of Acquisition of property rights cannot commence on any project until the project manager obtains acq
    126 KB (19,061 words) - 11:05, 4 March 2024
  • ...is included to that effect. If any alternate includes [[127.9 Floodplain Management and the Regulatory Floodway|significant encroachment on the floodplain]], i '''Convey to Adjacent Property Owners'''
    0 members (0 subcategories, 0 files) - 10:10, 22 September 2023
  • ...ased on field survey measures and verifications. The district will obtain property ownership information to show on the preliminary plan as early as possible ...are determined in accordance with [[:Category:940 Access Management|Access Management Guidelines]]. For fully limited access right of way projects where constru
    0 members (0 subcategories, 0 files) - 12:07, 26 March 2024
  • ...on MHTC’s right of way. [[:Category:940 Access Management|EPG 940 Access Management]] should be reviewed thoroughly along with this article. [[image:941 Permitting Process for Access Management.jpg|right|400px]]
    0 members (0 subcategories, 0 files) - 14:40, 24 April 2024
  • ==236.4.1 Property Descriptions== ...d are used to calculate the areas of the land lots, they do not constitute property lines. See '''Exhibit 236.4.2.9''', an example of a fractional section.
    96 KB (15,015 words) - 10:58, 4 March 2024
  • ...ch as the Missouri Department of Natural Resources and the State Emergency Management Agency may need to grant approval for the improvement to proceed. ...R/W Clear]]''' - Date MoDOT has taken legal and physical possession of all property and district has submitted the r/w clearance certification to Central Offic
    0 members (0 subcategories, 0 files) - 16:42, 21 September 2023
  • ...mple Letter Notifying Property Owner of Survey.doc|Sample Letter Notifying Property Owner of Survey Work]] ...llection, Construction, Machine Control, Automatic Vehicle Location, Asset Management, Automated road salting, Snowplow guidance, unmanned mowers.
    58 KB (8,878 words) - 13:57, 18 February 2022
  • ...rage, collect electronic data, automate workflow processes and aid process management for agreements between MoDOT and external parties. Standard multi-use agree :* Attach the Property Page from the eAgreements SharePoint site to all agreements.
    20 members (0 subcategories, 0 files) - 09:29, 7 May 2024
  • The [[616.14 Work Zone Safety and Mobility Policy|“Work Zone Traffic Management Plan”]] special provision is required with all plans. This special provis ...l highway construction, utility work, maintenance operations, and incident management including minor maintenance and utility projects prior to occupying the TTC
    44 KB (6,776 words) - 14:50, 22 May 2024
  • ...dered prior to condemnation action, as determined by district right of way management. ...with supporting financial data for its determinations of the value of the property for purposes of the offer made in subsection 1 of this section. (2) Any ap
    221 KB (32,649 words) - 11:04, 4 March 2024
  • Printed out versions of these web pages were put in binders and mailed to management, all districts, and all divisions with a letter from Jim Jackson dated Apri ...manner to prevent loss of material and prevent damage to State or private property. All bulk salt shall be stored in roofed buildings. Asphalt pads are to b
    99 KB (14,748 words) - 14:21, 24 November 2021
  • ...ural Resources (MDNR). The following guidance outlines MoDOT’s stormwater management program in accordance with the Clean Water Act, National Pollution Discharg ...f activities, prohibitions of practices, maintenance procedures, and other management practices to prevent or reduce the pollution of waters of the state. BMPs
    53 KB (7,691 words) - 10:41, 22 June 2022
  • [[236.5 Property Management#236.5.25.5 Risk Assessment|EPG 236.5.25.5 Risk Assessment]] - Sovereign imm ...Documents|EPG 137.6 Close Out Procedure for External CM SharePoint Quality Management Documents]] now present updated information about how CM Division stores el
    48 KB (6,056 words) - 13:28, 28 May 2024
  • ...te and/or check legal descriptions for acquisition of land, access rights, property rights and easements and the disposal of excess right of way, excess land, :'''1. Land, Improvements, Property Rights and Damages'''
    131 KB (19,803 words) - 13:48, 8 April 2024
  • ...cies, such as zoning ordinances, environmental quality regulations, growth management and adequate public facilities and services, legislation, and comprehensive * Uniform Relocation Assistance and Real Property Acquisition Policies Act (1970, referred to as the “Uniform Act”), as a
    27 KB (3,753 words) - 10:46, 5 March 2024
  • :* adjacent property owners and tenants ...ormation to the public about traffic impacts as part of its Transportation Management Plan (TMP) for projects ([https://epg.modot.org/index.php/616.13_Work_Zone_
    0 members (0 subcategories, 0 files) - 08:24, 30 May 2024
  • ...of way is one of the few occasions where MoDOT’s contractor is working on property not controlled by the Commission. Railroads have the authority to operate t ...in yellow on the plans emphasizes all notes pertinent to work on railroad property, especially those on the proposed handling of drainage.
    67 KB (10,110 words) - 12:48, 24 January 2024
  • Partnering is a management technique used to improve communications and establish an environment of co ...s project-level personnel, prime and subcontractor upper and project-level management, representatives of utilities and other public agencies should attend.
    1 member (0 subcategories, 1 file) - 10:06, 28 May 2024
  • Surface roughening is a temporary erosion control best management practice that will reduce runoff velocity and erosion potential by increasi ...und:#BEBEBE" width="380"|Minimum FRM Performance and Physical Requirements Property!! style="background:#BEBEBE" |Required Value
    25 KB (3,646 words) - 08:20, 15 September 2022
  • '''Easement''' - Agreement between MoDOT and property owner to allow MoDOT to construct or maintain roadway facilities off of the '''Malfunction Management Unit (MMU)''' - A device used to continually check for the presence of conf
    45 KB (6,826 words) - 09:18, 5 November 2015
  • ...hearing date in case any property has changed ownership and an additional property owner must be served. A notice of hearing on service line connections will ===643.2.6.3 Service Lines Owned by Property Owners===
    115 KB (17,569 words) - 14:45, 29 September 2023
  • ...ergency Management Agency (FEMA) Flood Buyout Properties|Federal Emergency Management Agency (FEMA) buyout properties]], [[127.2 Historic Preservation and Cultur ...p?title=127.9_Floodplain_Management_and_the_Regulatory_Floodway Floodplain Management and Regulatory Floodway]
    70 KB (10,443 words) - 08:28, 16 August 2023
  • ...ls that holds a title, deed or other legal documentation of ownership of a property or residence. '''Activity Category C.''' Each potentially affected property will be analyzed for traffic noise impact, which would be a substantial inc
    104 KB (15,688 words) - 10:31, 17 April 2024
  • :11. Emergency management signs ...traditional MoDOT ID on the front of the sign identifying it as Commission Property and listing the penalty for tampering and/or theft. The requirement to add
    110 KB (17,587 words) - 11:03, 27 March 2023
  • <categorytree mode=all>909 Transportation Systems Management and Operations (TSMO)</categorytree> <categorytree mode=all>940 Access Management</categorytree>
    0 members (0 subcategories, 0 files) - 11:57, 15 November 2021
  • ...LPA consultants, see [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4.1.5 Consultant Qualification]]. ...(§105.454(2), (3) RSMo. 2005). However, this provision does not apply to property that is condemned by the agency from its officer or employee (§105.466.3 R
    1 member (0 subcategories, 0 files) - 13:28, 26 March 2024
  • ...g the letting, analyzing the bid results and providing a recommendation to management for award or reject of projects. '''Feature Definition.''' The feature definition typically is a property applied to Open Roads Designer plan view civil geometry. (eg. special ditch
    57 KB (8,795 words) - 10:34, 14 March 2024
  • ...Erosion and Sediment Control#806.7.3 Best Management Practices (BMP) |Best Management Practices (BMPs)]] in order to reduce the amount of sediment and other poll :*'''Best Management Practices for Erosion and Sediment Control''', (Report No. FHWA-FLP-94-005)
    99 KB (15,183 words) - 14:31, 17 July 2023
  • ...inventory system is maintained in MoDOT's [http://tms/home/ Transportation Management System (TMS)]. This allows staff to directly link to relevant MoDOT applica ...d claims growing out of damages of any nature whatsoever, to any person or property arising out of performance or non-performance of said work, or existence of
    91 KB (13,302 words) - 15:42, 13 November 2023
  • This property, also known as flat and elongated, is the percentage of coarse aggregates t ...://www.modot.org/business/contractor_resources/Quality_Management/ Quality Management] website. Furthermore, this information is quarried regularly and, provide
    0 members (0 subcategories, 0 files) - 13:30, 16 June 2023
  • ...e practice of controlling eroded soil in disturbed areas by deploying best management practices (BMPs) to capture and retain the eroded material before it leaves ...e right of way where runoff attempts to leave the project onto an adjacent property or into an adjacent body of water or wetland. Silt fence must never be us
    27 KB (4,262 words) - 14:26, 17 July 2023
  • ...re is no temptation to “go over the heads” of the team members to pressure management into making decisions that may conflict with the decisions of the project t ...ator or State Design Engineer to discuss making arrangements for executive management to consider the project. If design-build is the concurred project delivery
    0 members (0 subcategories, 0 files) - 12:22, 26 March 2024
  • ...shall also be evaluated, with special attention to any risks to people or property. This is done to ensure that there are no unexpected flood hazards inherent ...hat the final design meets all requirements of the NFIP. Federal Emergency Management Agency (FEMA) Flood Insurance Study (FIS) maps should be consulted to deter
    0 members (0 subcategories, 0 files) - 15:04, 23 April 2019
  • :*Notes regarding damage to private property caused by contractor's equipment and/or operations ...or. For this reason the contractor must obtain a written release from the property owner to document that the owner suffered no damage.
    0 members (0 subcategories, 0 files) - 13:00, 10 May 2022
  • |'''Asset Management''' |'''Asset Management'''
    50 KB (7,321 words) - 10:38, 22 June 2022
  • ...Property%20236.8.8.3.E.2.pdf Condemnation Agreement other than Residential Property (Form 236.8.8.3(e)(2))] ...l%20Property%20Form%20236.8.8.3.E.1.pdf Condemnation Agreement Residential Property (Form 236.8.8.3(e)(1))]
    713 KB (112,088 words) - 11:51, 9 August 2023
  • ...ts by commercial motor vehicles in emergency situations to protect life or property. Engine braking systems on rescue vehicles, city and state vehicles are ex ==903.5.48 Access Management Signing (R21-1 through R21-5)==
    126 KB (20,803 words) - 08:31, 6 December 2023
  • ...e upcoming work zone. At a minimum, the brochure should be mailed to every property directly along the affected work area. This is important because the privat ...scenes as described in [[616.9 Control of Traffic Through Traffic Incident Management Areas (MUTCD 6I)#616.9.1 General (MUTCD 6I)|EPG 616.9.1]].
    43 KB (6,963 words) - 14:51, 27 September 2023
  • ...maintained by MoDOT per the agreement. These signs will always remain the property of the Commission and at the end of their life span will be disposed of as ...hese signs should be coordinated and reviewed by the department’s roadside management personnel.
    73 KB (11,633 words) - 14:36, 8 April 2024
  • ...torized traffic and worker safety is an integral element of every incident management, maintenance, permit, and utility operation. Consideration of the following :* Communicate with and provide reasonable accommodations for adjoining property owners.
    62 KB (8,930 words) - 07:49, 3 May 2024
  • ...r coding include guide signs for roadways approaching or inside an airport property with multiple terminals serving multiple airlines, and community wayfinding '''Standard.''' The [http://wasprod/sms/catalog/index.do MoDOT Sign Management System (SMS) Sign Catalog] shall be used for designing route signs. The aut
    113 KB (17,834 words) - 15:10, 26 October 2021
  • ...h these agencies must be undertaken. Coordination with the State Emergency Management Agency (SEMA), the U.S. Coast Guard, the U.S. Army Corps of Engineers, and ...permits]] for work in special flood hazard areas from the State Emergency Management Agency (SEMA).
    156 KB (23,937 words) - 10:13, 9 May 2024
  • ...and optimization, dynamic traffic assignments, freeway operations, traffic management strategies, pedestrian flows, and the interaction of different transportati ...ash Prediction Tool is internal to MoDOT staff and utilizes Transportation Management Systems (TMS) data to analyze rural two-lane highways. The tool is used for
    359 KB (53,362 words) - 09:26, 26 July 2023

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)