Difference between revisions of "Recent Policy Changes in the EPG"

From Engineering_Policy_Guide
Jump to navigation Jump to search
Line 1: Line 1:
 
<div style="border: 1px solid #74BAAC; background:#DCEDEA"; padding:5px>
 
<div style="border: 1px solid #74BAAC; background:#DCEDEA"; padding:5px>
 +
<!--
 +
INSTRUCTIONS FOR ADDING A DEFAULT DIVISION STYLE OF BOXES
  
 +
1) Copy the next 4 lines of code below
 +
2) Paste code below where you want to insert your update
 +
3) Update the Date and Text
 +
 +
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">September 20, 1971
 +
----
 +
TEXT FOR RECENT UPDATES SHOULD BE IN THIS AREA
 +
</div>
 +
 +
-->
 +
<!-- ADD NEW CONTENT BELOW THIS LINE -->
 
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">September 13, 2022
 
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">September 13, 2022
 
----
 
----
 
Updated wording in [[806.1 Erosion Control Measures#806.1.7 Temporary Seeding|EPG 806.1.7 Temporary Seeding]], [[806.1 Erosion Control Measures#806.1.7.1 Design Considerations|EPG 806.1.7.1 Design Considerations]] and [[806.8 Storm Water Pollution Prevention Plan (SWPPP)|EPG 806.8.6.3.7.1 Temporary Seeding and Mulching ]]to be in sync with the July 2022 Revisions.
 
Updated wording in [[806.1 Erosion Control Measures#806.1.7 Temporary Seeding|EPG 806.1.7 Temporary Seeding]], [[806.1 Erosion Control Measures#806.1.7.1 Design Considerations|EPG 806.1.7.1 Design Considerations]] and [[806.8 Storm Water Pollution Prevention Plan (SWPPP)|EPG 806.8.6.3.7.1 Temporary Seeding and Mulching ]]to be in sync with the July 2022 Revisions.
 +
</div>
 +
 +
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">September 8, 2022
 +
----
 +
Updated the guidance for [[:Category:129 Public Involvement|EPG Category:129 Public Involvement]]
 
</div>
 
</div>
  
Line 38: Line 56:
 
</div>
 
</div>
  
'''[[620.6 Colored Pavements#620.6.1 School Logo Pavement Markings|EPG 620.6.1 School Logo Pavement Markings]]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 29, 2022
 +
----
 +
[[620.6 Colored Pavements#620.6.1 School Logo Pavement Markings|EPG 620.6.1 School Logo Pavement Markings]] - This new guidance clarifies that these markings are not permitted.
 +
</div>
  
6/29/22: This new guidance clarifies that these markings are not permitted.
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 27, 2022
 +
----
 +
File Naming Convention for all eProject Documents - New guidelines are available in [[237.13 Contract Plan File Name Convention#237.13.1 Design Contract Plans|EPG 237.13.1 Design Contract Plans]] for a filing convention that is searchable without bringing undue pressure or constraint upon the districts.
 +
</div>
  
'''File Naming Convention for all eProject Documents'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 24, 2022
 +
----
 +
[[751.14 Steel Superstructure|EPG 751.14 Steel Superstructure]] - Guidance for tension flanges with holes was clarified in [[751.14 Steel Superstructure#Tension Flanges with Holes|EPG 751.14.2.2 Analysis Methods]], [[751.14 Steel Superstructure#Holes in the tension flange1|EPG 751.14.5.1 Bearing Stiffeners]] and [[751.14 Steel Superstructure#Holes in the tension flange2|EPG 751.14.5.2 Int. Diaphragms and Cross Frames]].
 +
</div>
  
6/27/22: New guidelines are available in [[237.13 Contract Plan File Name Convention#237.13.1 Design Contract Plans|EPG 237.13.1 Design Contract Plans]] for a filing convention that is searchable without bringing undue pressure or constraint upon the districts.
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 21, 2022
 +
----
 +
Pushbutton Locations - In [[902.6 Pedestrian Control Features (MUTCD Chapter 4E)#902.6.8 Pedestrian Detectors (MUTCD Section 4E.08)|EPG 902.6.8 Pedestrian Detectors]] and in the [https://epg.modot.org/forms/CM/ADA_Checklist.pdf ADA Checklist], guidance has been updated to reflect the minimum distance of pushbuttons from the curb line has been returned to 30 inches.
 +
</div>
  
'''[[751.14 Steel Superstructure|EPG 751.14 Steel Superstructure]]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 3, 2022
 +
----
 +
[[236.5 Property Management#236.5.25.5 Risk Assessment|EPG 236.5.25.5 Risk Assessment]] - Sovereign immunity limits increased in January 2022 and MoDOT's per occurrence coverage increased from $3.0 M to $3.5 M.
 +
</div>
  
6/24/22: Guidance for tension flanges with holes was clarified in [[751.14 Steel Superstructure#Tension Flanges with Holes|EPG 751.14.2.2 Analysis Methods]], [[751.14 Steel Superstructure#Holes in the tension flange1|EPG 751.14.5.1 Bearing Stiffeners]] and [[751.14 Steel Superstructure#Holes in the tension flange2|EPG 751.14.5.2 Int. Diaphragms and Cross Frames]].
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 1, 2022
 +
----
 +
In [[751.11 Bearings#751.11.3.6 Girder/Beam Chairs|EPG 751.11.3.6 Girder/Beam Chairs]], [[751.22 Prestressed Concrete I Girders#751.22.3.5 Strands at Girder Ends|EPG 751.22.3.5 Strands at Girder Ends]] and [[751.22 Prestressed Concrete I Girders#751.22.3.7 Closed Concrete Intermediate Diaphragms|EPG 751.22.3.7 Closed Concrete Intermediate Diaphragms through EPG 751.22.3.11 Steel Intermediate Diaphragms]], guidance was revised to decrease the footprint of girder/beam chairs, clarify and expand concrete diaphragm details to incorporate larger girders, and remove web coil ties in bulb-tees and NU girders to reflect the recent change to standard drawings.
 +
</div>
  
'''Pushbutton Locations'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">May 20, 2022
 +
----
 +
[[907.8 Speed Trailers Deployed by Others|EPG 907.8 Speed Trailers Deployed by Others]] - This new article provides guidance for speed trailer deployment to aid local law enforcement in the proper use of these devices.
  
6/21/22: In [[902.6 Pedestrian Control Features (MUTCD Chapter 4E)#902.6.8 Pedestrian Detectors (MUTCD Section 4E.08)|EPG 902.6.8 Pedestrian Detectors]] and in the [https://epg.modot.org/forms/CM/ADA_Checklist.pdf ADA Checklist], guidance has been updated to reflect the minimum distance of pushbuttons from the curb line has been returned to 30 inches.
+
[[:Category:941 Permits and Access Requests#941.10 Automated License Plate Readers and Pan-Tilt-Zoom Cameras|EPG 941.10 Automated License Plate Readers and Pan-Tilt-Zoom Cameras]] - Guidance for the License Plate Reader (LPR) was clarified and expanded for proper LPR installations as identified through processing initial requests.
 +
</div>
  
'''[[236.5 Property Management#236.5.25.5 Risk Assessment|EPG 236.5.25.5 Risk Assessment]]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">May 19, 2022
 +
----
 +
[[:Category:747 Bridge Reports and Layouts#747.2.2.4 HEC-RAS GEO Files for Stream Crossings|EPG 747.2.2.4 HEC-RAS GEO Files for Stream Crossings]] - This subarticle was retitled and its guidance updated to reflect the current use of the "HEC-RAS Convertor for Open Roads Designer" spreadsheet.
 +
</div>
  
6/3/22: Sovereign immunity limits increased in January 2022 and MoDOT's per occurrence coverage increased from $3.0 M to $3.5 M.
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">May 16, 2022
 +
----
 +
The guidelines, book job guidelines, JSP packages, book job JSP packages and contractor pdf files were updated in [[:Category:402 Bituminous Surface Leveling|EPG 402 Bituminous Surface Leveling]] and [[:Category:409 Seal Coat|EPG 409 Seal Coat]].
 +
</div>
  
'''Concrete Diaphragms on Bridges'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">May 11, 2022
 
+
----
6/1/22: In [[751.11 Bearings#751.11.3.6 Girder/Beam Chairs|EPG 751.11.3.6 Girder/Beam Chairs]], [[751.22 Prestressed Concrete I Girders#751.22.3.5 Strands at Girder Ends|EPG 751.22.3.5 Strands at Girder Ends]] and [[751.22 Prestressed Concrete I Girders#751.22.3.7 Closed Concrete Intermediate Diaphragms|EPG 751.22.3.7 Closed Concrete Intermediate Diaphragms through EPG 751.22.3.11 Steel Intermediate Diaphragms]], guidance was revised to decrease the footprint of girder/beam chairs, clarify and expand concrete diaphragm details to incorporate larger girders, and remove web coil ties in bulb-tees and NU girders to reflect the recent change to standard drawings.
+
[[751.9 LFD Seismic#751.9.3.1.1 Anchor Bolts|EPG 751.9.3.1.1 Anchor Bolts through EPG 751.9.3.1.4 Concrete Shear Blocks]], [[751.11 Bearings#Anchor Bolts|EPG 751.11.2.1 Elastomeric Bearings]], [[751.11 Bearings#751.11.3.5 Anchor Bolts|EPG 751.11.3.5 Anchor Bolts]], [[751.22 Prestressed Concrete I Girders#751.22.2.7 Dowel Bars|EPG 751.22.2.7 Dowel Bars]] and [[751.22 Prestressed Concrete I Girders#751.22.3.14 Concrete Shear Blocks|EPG 751.22.3.14 Concrete Shear Blocks]] - Guidance for the design of bearing anchor bolt, dowel bar and shear block has been expanded and clarified.
 
+
</div>
'''[[907.8 Speed Trailers Deployed by Others|EPG 907.8 Speed Trailers Deployed by Others]]'''
 
 
 
5/20/22: This new article provides guidance for speed trailer deployment to aid local law enforcement in the proper use of these devices.
 
  
'''[[:Category:941 Permits and Access Requests#941.10 Automated License Plate Readers and Pan-Tilt-Zoom Cameras|EPG 941.10 Automated License Plate Readers and Pan-Tilt-Zoom Cameras]]'''
 
  
5/20/22: Guidance for the License Plate Reader (LPR) was clarified and expanded for proper LPR installations as identified through processing initial requests.
 
  
'''[[:Category:747 Bridge Reports and Layouts#747.2.2.4 HEC-RAS GEO Files for Stream Crossings|EPG 747.2.2.4 HEC-RAS GEO Files for Stream Crossings]]'''
 
  
5/19/22: This subarticle was retitled and its guidance updated to reflect the current use of the "HEC-RAS Convertor for Open Roads Designer" spreadsheet.
 
  
'''Contract Leveling Course and Seal Coat Guidelines and Book Job Guidelines'''
 
  
5/16/22: The guidelines, book job guidelines, JSP packages, book job JSP packages and contractor pdf files were updated in [[:Category:402 Bituminous Surface Leveling|EPG 402 Bituminous Surface Leveling]] and [[:Category:409 Seal Coat|EPG 409 Seal Coat]].
 
  
'''[[751.9 LFD Seismic#751.9.3.1.1 Anchor Bolts|EPG 751.9.3.1.1 Anchor Bolts through EPG 751.9.3.1.4 Concrete Shear Blocks]], [[751.11 Bearings#Anchor Bolts|EPG 751.11.2.1 Elastomeric Bearings]], [[751.11 Bearings#751.11.3.5 Anchor Bolts|EPG 751.11.3.5 Anchor Bolts]], [[751.22 Prestressed Concrete I Girders#751.22.2.7 Dowel Bars|EPG 751.22.2.7 Dowel Bars]] and [[751.22 Prestressed Concrete I Girders#751.22.3.14 Concrete Shear Blocks|EPG 751.22.3.14 Concrete Shear Blocks]]'''
 
  
5/11/22:  Guidance for the design of bearing anchor bolt, dowel bar and shear block has been expanded and clarified.
 
  
 
'''[[:Category:105 Control of Work#105.15 Project Acceptance|EPG 105.15 Project Acceptance]]'''
 
'''[[:Category:105 Control of Work#105.15 Project Acceptance|EPG 105.15 Project Acceptance]]'''

Revision as of 10:14, 29 September 2022

September 13, 2022

Updated wording in EPG 806.1.7 Temporary Seeding, EPG 806.1.7.1 Design Considerations and EPG 806.8.6.3.7.1 Temporary Seeding and Mulching to be in sync with the July 2022 Revisions.

September 8, 2022

Updated the guidance for EPG Category:129 Public Involvement

September 1, 2022

Updated figures 136.6.15 Example e106 Form and 136.6.16 LPA Project Checklist for Adverse Effects in EPG LPA:136.6 Environmental and Cultural Requirements

Updated the table in EPG 153.21 Traffic TR06 was modified and TR07 and TR30 were removed

August 31, 2022

Noise Ordinance Signing overhauled to EPG 903.5.43 Engine Brake Muffler Required Signing

July 28, 2022

Update to EPG 616.14.3.4 Work Zone Review Team - During work zone reviews, video recording is used to help viewing work zone after the formal review if there is questions of the work zone. The video recording allows to retain up to 5 buisiness days and then shall be deleted.

July 25, 2022

The Bridge Inspection Rating Manual has been updated.

June 29, 2022

EPG 620.6.1 School Logo Pavement Markings - This new guidance clarifies that these markings are not permitted.

June 27, 2022

File Naming Convention for all eProject Documents - New guidelines are available in EPG 237.13.1 Design Contract Plans for a filing convention that is searchable without bringing undue pressure or constraint upon the districts.

June 21, 2022

Pushbutton Locations - In EPG 902.6.8 Pedestrian Detectors and in the ADA Checklist, guidance has been updated to reflect the minimum distance of pushbuttons from the curb line has been returned to 30 inches.

June 3, 2022

EPG 236.5.25.5 Risk Assessment - Sovereign immunity limits increased in January 2022 and MoDOT's per occurrence coverage increased from $3.0 M to $3.5 M.

June 1, 2022

In EPG 751.11.3.6 Girder/Beam Chairs, EPG 751.22.3.5 Strands at Girder Ends and EPG 751.22.3.7 Closed Concrete Intermediate Diaphragms through EPG 751.22.3.11 Steel Intermediate Diaphragms, guidance was revised to decrease the footprint of girder/beam chairs, clarify and expand concrete diaphragm details to incorporate larger girders, and remove web coil ties in bulb-tees and NU girders to reflect the recent change to standard drawings.

May 20, 2022

EPG 907.8 Speed Trailers Deployed by Others - This new article provides guidance for speed trailer deployment to aid local law enforcement in the proper use of these devices.

EPG 941.10 Automated License Plate Readers and Pan-Tilt-Zoom Cameras - Guidance for the License Plate Reader (LPR) was clarified and expanded for proper LPR installations as identified through processing initial requests.

May 19, 2022

EPG 747.2.2.4 HEC-RAS GEO Files for Stream Crossings - This subarticle was retitled and its guidance updated to reflect the current use of the "HEC-RAS Convertor for Open Roads Designer" spreadsheet.

May 16, 2022

The guidelines, book job guidelines, JSP packages, book job JSP packages and contractor pdf files were updated in EPG 402 Bituminous Surface Leveling and EPG 409 Seal Coat.

May 11, 2022

EPG 751.9.3.1.1 Anchor Bolts through EPG 751.9.3.1.4 Concrete Shear Blocks, EPG 751.11.2.1 Elastomeric Bearings, EPG 751.11.3.5 Anchor Bolts, EPG 751.22.2.7 Dowel Bars and EPG 751.22.3.14 Concrete Shear Blocks - Guidance for the design of bearing anchor bolt, dowel bar and shear block has been expanded and clarified.





EPG 105.15 Project Acceptance

4/29/22: Guidance for project acceptance has been clarified and updated to current practice in EPG 105.15, EPG 108.16.1 Informational Dates and EPG 109.8 Final Acceptance and Payment.

EPG 712.1.4 Welding

4/21/22: Guidance for stud welding has been updated to align with Sec 712.6.3. Also, outdated references to field welder cards has been removed.

Construction Inspection Guidance for Records to be Maintained

4/20/22: EPG 137.1 Location and EPG 137.6 Close Out Procedure for External CM SharePoint Quality Management Documents now present updated information about how CM Division stores electronic contract documents.

EPG 903.3.4.3 Perforated Square Steel Tube Posts (PSST)

4/20/22: Guidance for PSST anchor installations has been updated and clarified.

Seeding, Mulching and Temporary Seeding

4/20/22: Guidance in EPG 802 Mulching, EPG 805 Seeding, EPG 806.1 Erosion Control Measures and EPG 806.8.6.3.7.1 Temporary Seeding and Mulching reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new Standard Plan 805.00 Seeding) to promote a more effective vegetative establishment, allowing for quicker project finalization. MoDOT is obligated to stabilize disturbed areas with permanent building materials or perennial vegetative cover to minimize erosion and sedimentation of disturbed areas. New guidance for cool season and warm season grasses is available. Mulching will not be required for final seeded areas where temporary seeding is planned for temporary stabilization of areas to receive warm season grasses. A new Guide for Grass Species is available in EPG 805.2.4 Acceptance to assist with general inspection and acceptance of vegetative covers.

Pre-MASH 2016 Temporary Traffic Control Device Sunset Dates

4/20/22: Guidance in EPG 612 Impact Attenuators, EPG 616.6 Temporary Traffic Control Zone Devices, EPG 616.18 Construction Inspection Guidelines for Sec 616, EPG 616.19 Quality Standards for Temporary Traffic Control Devices, EPG 616.23 Traffic Control for Field Operations, EPG 617.1 Temporary Traffic Barriers, EPG 617.2 Construction Inspection Guidelines for Sec 617, EPG 1063 Temporary Traffic Control Devices and EPG 1064 Temporary Concrete Traffic Barrier now reflects that all temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant. The use of two-loop temporary Type F concrete traffic barrier shall not be allowed after January 1, 2023.

EPG 403.1.19 Acceptance of Material

4/20/22: The maximum number of contractor QC sublots that can be used for one lot of superpave asphalt pavement is 28. Regardless of lot size, QA testing will always be at a frequency of one per four sublots. Any remaining quantity less than 4000 tons, that cannot be treated as a separate lot, will be combined with the previous full lot and the pay factors will be determined on the combined lot.

Guidance Documents Needed for Property Closings

4/18/22: In EPG 236.7.1.13 Pre-Negotiation Preparation and EPG 236.7.4.1 Purpose, additional guidance is available for greater clarity about what is needed from property owners to close on the properties either with MoDOT or a title company.

Prestressed Concrete I Girders

4/11/22: In EPG 751.22.2.5 Pretensioned Anchorage Zones, the bursting resistance guidance now allows a larger number of bonded strands for many of these girders, effectively increasing the span limits for the girders. Guidance was expanded in EPG 751.22.3.2.1 through 751.22.3.2.6 to eliminate or reduce conflict between the lowest middle two strands and the B bars.

EPG 127.2.5 Approximate Timelines for Section 106 Compliance

4/5/22: Guidance about the timelines for completing the Section 106 of the National Historic Preservation Act review process has been clarified.

Coil Ties in Prestressed Girder Webs

3/28/22: In several EPG 751.50 Standard Detailing Notes, references to web coil ties in bulb-tee and NU girders have been removed since these are now no longer being used.

EPG 109.11 Compensation for Project Delays

3/16/22: Guidance has been expanded to produce more uniform administration of delay claims.

EPG 902.4.2.1 Controller and Cabinet Replacement Program

2/16/22: The recommended replacement age for signal cabinets was updated to 25 years from 20 years.

Right of Way Mediation

2/15/22: In EPG 236.7.2.19 Acquisition by Mediation and EPG 236.11.1.3 Purpose, guidance has been updated to reflect current process and procedures, including the MoDOT Impasse Letter.