- 14:32, 22 November 2016 diff hist +2 m Main Page
- 14:31, 22 November 2016 diff hist -149 m Main Page EPG 751.50
- 14:28, 22 November 2016 diff hist +279 m 751.50 Standard Detailing Notes →J1. General: Per BR, clarified responsibility of MSE wall designer/manufacturer to show range of acceptable ɵ angle for slope excavation line on drawings to be consistent w/ design computations
- 13:58, 22 November 2016 diff hist -77 m Main Page EPG 751.10, EPG 751.22
- 13:29, 22 November 2016 diff hist -19 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.1 Introduction to the Storm Water Permit and Storm Water Polution Prevention Plan (SWPPP): updated link
- 11:21, 22 November 2016 diff hist +2,566 m 751.22 Prestressed Concrete I Girders Per BR, updated guidance for shear reinforcement to current practice and preferences of manufacturers and reinforcement suppliers. A1 reinforcement will not use WWR located in the flange of NU girders
- 10:05, 22 November 2016 diff hist -2 m Category:700 STRUCTURES AND HYDRAULICS
- 10:05, 22 November 2016 diff hist +2,215 Nm Category:771 Bridge Preventive Maintenance Guidelines Per BR, EPG 771's "Preventative" updated to "Preventive". EPG 771 was originally set up Dec 21, 2007. There were absolutely no changes to this page since 2007. current
- 09:58, 22 November 2016 diff hist -2 m 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking)
- 09:58, 22 November 2016 diff hist -2 m 771.2 Bridge Cleaning and Flushing
- 09:58, 22 November 2016 diff hist -2 m 771.3 Shaving Shoulder and Around Guardrail current
- 09:57, 22 November 2016 diff hist -2 m 771.4 Drain Basin Maintenance current
- 09:57, 22 November 2016 diff hist -2 m 771.5 Mat Gutter Maintenance current
- 09:57, 22 November 2016 diff hist -2 m 771.6 Channel Work - Gabion Installation current
- 09:56, 22 November 2016 diff hist -2 m 771.7 Channel Work - Rock Blanket current
- 09:56, 22 November 2016 diff hist -2 m 771.8 Remove Drift current
- 09:56, 22 November 2016 diff hist -2 m 771.9 Temporary Bridge Deck Repair
- 09:55, 22 November 2016 diff hist -2 m 771.10 Bridge Joint Sealing - Hot Pour current
- 09:55, 22 November 2016 diff hist -2 m 771.11 Bridge Joint Sealing - Silicone
- 09:54, 22 November 2016 diff hist -2 m 771.12 Bridge Joint Sealing - Polytite current
- 09:54, 22 November 2016 diff hist -2 m 771.13 Sealing Abutment and Pier Caps current
- 09:54, 22 November 2016 diff hist -2 m 771.14 Spot Painting of Bearings and Piling
- 09:53, 22 November 2016 diff hist -2 m 771.15 Concrete Bridge Deck Sealer Selection Matrix current
- 09:53, 22 November 2016 diff hist -2 m 771.16 Penetrating Concrete Sealer - Silane current
- 09:52, 22 November 2016 diff hist -2 m 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) current
- 09:52, 22 November 2016 diff hist -2 m 771.18 In-Deck Bridge Deck Crack Filler current
- 09:51, 22 November 2016 diff hist -2 m 771.19 Chip Seal to Entire Deck
- 09:50, 22 November 2016 diff hist -2 m 771.20 Cut and Spray Brush and Vines current
- 09:50, 22 November 2016 diff hist -2 m 771.21 Rainy Day Bridge Activities current
- 09:24, 22 November 2016 diff hist -290 m 751.22 Prestressed Concrete I Girders →751.22.3.8 Camber, Haunching and Girder Steps: Per BR, clarified hairpin guidance
- 09:17, 22 November 2016 diff hist 0 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details
- 09:16, 22 November 2016 diff hist +177 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details: Per BR, hairpin guidance clarified
- 09:11, 22 November 2016 diff hist 0 N File:751.14.4.5.jpg current
- 09:09, 22 November 2016 diff hist -34 m 751.5 Structural Detailing Guidelines updated link
- 09:07, 22 November 2016 diff hist +12 m 751.10 General Superstructure →751.10.1.14 Girder Haunch Reinforcement
- 09:05, 22 November 2016 diff hist 0 N File:751.10.1.14 shape 10.jpg current
- 09:04, 22 November 2016 diff hist 0 N File:751.10.1.14 example.jpg current
- 09:04, 22 November 2016 diff hist 0 N File:751.10.1.14 part section.jpg current
- 09:04, 22 November 2016 diff hist +2,248 m 751.10 General Superstructure Per BR, expanded and clarified hairpin guidance especially that their location should be clearly shown and that these bars should be included in the bill of reinforcing steel.
- 08:31, 22 November 2016 diff hist +28 m 751.5 Structural Detailing Guidelines updated link
- 16:14, 21 November 2016 diff hist +1 m Main Page
- 13:43, 21 November 2016 diff hist -94 m 751.5 Structural Detailing Guidelines →751.5.9.2.8.4 Notes: Per BR, further clarified revision from 7/10/14 about mechanical bar splices
- 13:42, 21 November 2016 diff hist +118 m 751.5 Structural Detailing Guidelines →751.5.9.2.8 Mechanical Bar Splices: Per BR, further clarified revision from 7/10/14 about mechanical bar splices by updating MBS example figure
- 16:05, 18 November 2016 diff hist 0 m Main Page
- 14:17, 18 November 2016 diff hist 0 N File:751.5.9.2.8 example.pdf
- 14:17, 18 November 2016 diff hist -22 m 751.5 Structural Detailing Guidelines →751.5.9.2.8 Mechanical Bar Splices: Per Bridge, clarified revision from 7/10/14 about mechanical bar splices. Updated Mechanical Bar Splice Ex. figure
- 14:12, 18 November 2016 diff hist +147 m 751.6 General Quantities Per Bridge, clarified revision from 7/10/14 about mechanical bar splices.
- 14:10, 18 November 2016 diff hist -660 m 751.50 Standard Detailing Notes Per Bridge, clarified revision from 7/10/14 about mechanical bar splices. Note B1.9.7 removed.
- 11:23, 18 November 2016 diff hist 0 m 103.1 Bid Opening and Award Process Per DE, updated due dates chart link
- 11:21, 18 November 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.3 PS&E Submittal Guidelines: Per DE, updated due dates chart link