User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:46, 23 April 2020 diff hist -40 m Category:747 Bridge Reports and Layouts Per BR, updated links to Structural Rehabilitation Checklist
- 12:44, 23 April 2020 diff hist -19 m Category:101 Standard Forms →Bridge: Per BR, updated link to Structural Rehabilitation Checklist
- 08:37, 23 April 2020 diff hist 0 File:101 No Rise Certificate July 2019.pdf Smithk uploaded a new version of File:101 No Rise Certificate July 2019.pdf current
- 08:36, 23 April 2020 diff hist 0 File:101 No Rise Certificate 2019.pdf Smithk uploaded a new version of File:101 No Rise Certificate 2019.pdf current
- 08:35, 23 April 2020 diff hist 0 File:101 No Rise Certificate 2018.pdf Smithk uploaded a new version of File:101 No Rise Certificate 2018.pdf current
- 08:35, 23 April 2020 diff hist 0 File:101 No Rise Certificate.pdf Smithk uploaded a new version of File:101 No Rise Certificate.pdf current
- 15:14, 22 April 2020 diff hist -111 m Recent Policy Changes in the EPG EPG 236.17
- 14:54, 22 April 2020 diff hist -512 m 236.17 Junkyards Per RW, clarified and updated guidance
- 12:36, 22 April 2020 diff hist -84 m Category:1180 Bituminous Stockpile Patching Material
- 12:34, 22 April 2020 diff hist 0 N File:StartUpSequence2.gif current
- 12:34, 22 April 2020 diff hist +84 m Category:1180 Bituminous Stockpile Patching Material
- 07:50, 22 April 2020 diff hist 0 N File:101 No Rise Certificate 2020.pdf current
- 07:50, 22 April 2020 diff hist -5 m Category:101 Standard Forms →Bridge: Per BR, minor revision to the No-Rise Certification form at the request of SEMA
- 07:19, 22 April 2020 diff hist -120 m Category:101 Standard Forms →Construction and Materials: Per CM, updated link and removed archaic link
- 15:09, 20 April 2020 diff hist -1 m Category:139 Design - Build →139.8.2.2.4 Additional Applicable Standards (AAS) and Design Exceptions: minor correction
- 14:45, 17 April 2020 diff hist -9 m Recent Policy Changes in the EPG EPG 134
- 14:34, 17 April 2020 diff hist -4,495 m Category:134 Engineering Professional Services Per LPA, streamlined the process for consultant agreements and clarified other guidance.
- 12:27, 17 April 2020 diff hist +441 m Recent Policy Changes in the EPG EPG 751.32 and EPG 751.35
- 11:11, 17 April 2020 diff hist 0 N File:751.35.4.2.4 2020.jpg current
- 11:10, 17 April 2020 diff hist 0 N File:751.35.4.2.3 2020.jpg current
- 11:10, 17 April 2020 diff hist 0 N File:751.35.4.2.2 2020.jpg current
- 11:09, 17 April 2020 diff hist 0 N File:751.35.4.1.4 2020.jpg current
- 11:08, 17 April 2020 diff hist +11 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4.1 Wide Flange Beams & Plate Girders
- 11:01, 17 April 2020 diff hist 0 N File:751.35.4.1.3 2020.jpg current
- 11:01, 17 April 2020 diff hist 0 N File:751.35.4.1.2 2020.jpg current
- 11:00, 17 April 2020 diff hist 0 N File:751.35.4.1.1 2020.jpg current
- 10:59, 17 April 2020 diff hist +1,301 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4 Reinforcement: Per BR, clarified additional flexure reinforcement requirements between piles for pile cap intermediate bents and integral end bents and skin reinforcement spacing requirements.
- 10:17, 17 April 2020 diff hist +307 m 751.35 Concrete Pile Cap Integral End Bents Per BR, added links for more convenient guidance
- 09:33, 17 April 2020 diff hist +1 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.2 Encased Pile Cap Bent
- 09:33, 17 April 2020 diff hist 0 N File:751.32.4.2 part section 2020.jpg current
- 09:32, 17 April 2020 diff hist 0 N File:751.32.4.2 part elev 2020.jpg current
- 09:32, 17 April 2020 diff hist +99 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4 Reinforcement: Per BR, clarified additional flexure reinforcement requirements between piles for pile cap intermediate bents and integral end bents and skin reinforcement spacing requirements.
- 09:12, 17 April 2020 diff hist 0 N File:751.32.4.1 2020.jpg current
- 09:11, 17 April 2020 diff hist +164 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.1 Typical Pile Cap Bent: Per BR, clarified additional flexure reinforcement requirements between piles for pile cap intermediate bents and integral end bents and skin reinforcement spacing requirements.
- 12:34, 15 April 2020 diff hist -1 m Category:102 Bidding Requirements and Conditions Per ECR, updated contact info
- 12:30, 15 April 2020 diff hist +81 m Category:101 Standard Forms →DBE: Per ECR, added DBE and Non-DBE Subcontractor Report Form
- 11:05, 15 April 2020 diff hist +18 m Category:101 Standard Forms →Scoping
- 10:48, 15 April 2020 diff hist 0 N File:104.6 Traffic Checklist 2020.docx current
- 10:47, 15 April 2020 diff hist +6 m 104.6 Project Scoping Checklists Per TS, minor clarifications to Traffic Checklist
- 15:16, 14 April 2020 diff hist +18 m Recent Policy Changes in the EPG
- 15:15, 14 April 2020 diff hist +255 m Recent Policy Changes in the EPG EPG 616.6.87
- 15:07, 14 April 2020 diff hist 0 N File:Fig 616.6.87.2.2.jpg current
- 15:07, 14 April 2020 diff hist 0 N File:Fig 616.6.87.2.1.jpg current
- 15:06, 14 April 2020 diff hist 0 N File:Fig 616.6.87.1.2.jpg current
- 15:04, 14 April 2020 diff hist 0 N File:Fig 616.6.87.1.1.jpg current
- 15:03, 14 April 2020 diff hist 0 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): Per TS, updated Figs 616.6.87.1 & 2 Rumble Strip Placement. Rumble strip spacing updated to the manufacturer recommendations
- 10:52, 14 April 2020 diff hist -61 m 751.50 Standard Detailing Notes Per BR, minor clarifications to standard detailing notes
- 09:02, 14 April 2020 diff hist +71 m Category:146 Disadvantaged Business Enterprise (DBE) Per CM, updated links
- 07:02, 14 April 2020 diff hist +123 m Category:101 Standard Forms →Construction and Contractor Related: Per CM, added Excel form of C-220
- 09:13, 10 April 2020 diff hist 0 N File:239 Recertification.jpg current
- 09:13, 10 April 2020 diff hist 0 N File:239 Not a certified document.jpg current
- 09:13, 10 April 2020 diff hist 0 N File:239 Checkmark2.jpg current
- 09:12, 10 April 2020 diff hist 0 N File:239 Checkmark1.jpg current
- 09:12, 10 April 2020 diff hist 0 N File:239 Final Plans Efficiency Team - 2014.pdf current
- 09:12, 10 April 2020 diff hist 0 N File:239 Example Title Sheet.pdf current
- 09:11, 10 April 2020 diff hist +388 m Category:239 Construction Inspection Guidelines for Final Plans Per EPG, added more files for Bluebeam use
- 08:41, 10 April 2020 diff hist +1 m Recent Policy Changes in the EPG
- 08:41, 10 April 2020 diff hist +336 m Recent Policy Changes in the EPG EPG 239
- 08:09, 10 April 2020 diff hist 0 m Category:239 Construction Inspection Guidelines for Final Plans
- 07:58, 10 April 2020 diff hist 0 N File:239 Revu 2015 Training Manual.pdf current
- 07:05, 10 April 2020 diff hist -168 m 751.50 Standard Detailing Notes →H1. Steel
- 12:02, 9 April 2020 diff hist 0 N File:239 Where to Save Stamps.pdf
- 12:01, 9 April 2020 diff hist 0 N File:239 Preparing As-Built Plans.pdf current
- 12:00, 9 April 2020 diff hist 0 N File:239 Creating Digital IDs in Bluebeam Revu.pdf current
- 11:58, 9 April 2020 diff hist +1 m Category:239 Construction Inspection Guidelines for Final Plans
- 11:38, 9 April 2020 diff hist +429 m Category:239 Construction Inspection Guidelines for Final Plans Per EPS, added Bluebeam Revu User Resources
- 10:22, 9 April 2020 diff hist +224 m 751.50 Standard Detailing Notes →H1. Steel: Per BR, further revision of H1
- 10:40, 8 April 2020 diff hist 0 m 751.50 Standard Detailing Notes →A5. Miscellaneous
- 10:32, 8 April 2020 diff hist +113 m 751.50 Standard Detailing Notes →A5. Miscellaneous: Per BR, further revision
- 10:10, 8 April 2020 diff hist -137 m 751.50 Standard Detailing Notes →A5. Miscellaneous: Per BR, further revision of A5.1
- 13:44, 7 April 2020 diff hist +177 m Recent Policy Changes in the EPG EPG 751.5 and EPG 751.50
- 13:41, 7 April 2020 diff hist +24 m 751.50 Standard Detailing Notes →H. Superstructure Notes
- 13:07, 7 April 2020 diff hist +678 m 751.50 Standard Detailing Notes Per BR, moved Fracture Critical Member (FCM) notes from EPG 751.5.9.3.3 to EPG 751.50. Revised notes to refer to the specifications.
- 12:37, 7 April 2020 diff hist -427 m 751.5 Structural Detailing Guidelines →751.5.9.3.3 Fracture Control Plan (FCP) *: Per BR, moved Fracture Critical Member (FCM) notes from EPG 751.5.9.3.3 to EPG 751.50. Revised notes to refer to the specifications.
- 07:28, 7 April 2020 diff hist -71 m Recent Policy Changes in the EPG EPG 127.29.8
- 07:25, 7 April 2020 diff hist 0 N File:127.29.9 FRCP.pdf current
- 07:24, 7 April 2020 diff hist -37 m Category:101 Standard Forms →Maintenance: Per MT, replaced Deer Death Form with FRCP (Facility Runoff Control Plans) form
- 07:22, 7 April 2020 diff hist +1,004 m 127.29 Stormwater →127.29.8 MCM 6: Pollution Prevention/Good Housekeeping: Per Env'l, expanded facility runoff control plan guidance
- 08:20, 6 April 2020 diff hist -292 m Recent Policy Changes in the EPG EPG 236.16
- 08:18, 6 April 2020 diff hist +3,201 m 236.16 Outdoor Advertising Per RW, updated and clarified article. Updated vegetation policies to match traffic policies for work on right of way
- 15:02, 2 April 2020 diff hist +88 m Recent Policy Changes in the EPG EPG 113
- 14:38, 2 April 2020 diff hist -7,697 m Category:113 Construction Inspection Guidance for Contractor's Claims Per CM, revised the Claims Process guidance.
- 12:42, 2 April 2020 diff hist +9 m 127.25 Maintenance Environmental Policies →127.25.6.2 Tier II Reporting: Per Env'l, updated link
- 10:40, 1 April 2020 diff hist +64 m Recent Policy Changes in the EPG EPG 903.9.9
- 10:31, 1 April 2020 diff hist +169 m 903.9 General Information Signs →903.9.9 City/County Limit Signs (I4, I5, I6 Series): Per TS, clarified guidance for where inadaquate space exists to install a city limits sign at the standard location.
- 14:09, 31 March 2020 diff hist +38 m Recent Policy Changes in the EPG EPG 153.8
- 14:02, 31 March 2020 diff hist +814 m 153.9 Design Per Env'l, new guidance for DE62 Stream Wetland Credit Purchase Agreement and DE66 TCF Bat Habitat Credit Purchase Agreement
- 13:54, 26 March 2020 diff hist +496 m 153.7 Construction and Materials Per CM, added new Task Order contract, CMB 7 Task Order Contract with MCTI
- 14:36, 25 March 2020 diff hist +7 m Recent Policy Changes in the EPG
- 14:34, 25 March 2020 diff hist -428 m Recent Policy Changes in the EPG EPG 402 and 409
- 14:27, 25 March 2020 diff hist 0 N File:402 FY2021 Contract Leveling Coat Guidelines b.docx current
- 14:27, 25 March 2020 diff hist 0 m Category:402 Bituminous Surface Leveling
- 14:23, 25 March 2020 diff hist 0 N File:402 FY2021 Contract Leveling Coat Guidelines a.docx current
- 14:23, 25 March 2020 diff hist +2 m Category:402 Bituminous Surface Leveling
- 13:59, 25 March 2020 diff hist -101 m Recent Policy Changes in the EPG EPG 147.4
- 13:17, 25 March 2020 diff hist 0 N File:147.4.2.docx current
- 13:13, 25 March 2020 diff hist 0 N File:409 FY 2021 Seal Coat Plans.pdf current
- 13:12, 25 March 2020 diff hist 0 N File:409 FY2021 Contract Seal Coat Guidelines a.docx current
- 13:12, 25 March 2020 diff hist 0 m Category:409 Seal Coat Per EPS, updated Seal Coat guidance for FY 2021
- 12:35, 25 March 2020 diff hist 0 N File:402 CLC 2021 Plans.pdf current
- 12:34, 25 March 2020 diff hist 0 N File:402 FY2021 Contract Leveling Coat Guidelines.docx current
- 12:34, 25 March 2020 diff hist 0 m Category:402 Bituminous Surface Leveling Per EPS, updated CLC guidance for FY 2021
- 11:21, 25 March 2020 diff hist +6,296 N 147.4 Fixed Price Variable Scope (FPVS) Contracting Per DE, new article provides guidance for new contracting method, Fixed Price Variable Scope (FPVS) Contracting
- 13:29, 24 March 2020 diff hist +6 m Recent Policy Changes in the EPG
- 13:29, 24 March 2020 diff hist -84 m Recent Policy Changes in the EPG EPG 153.19
- 12:59, 24 March 2020 diff hist +1,259 m 153.20 Right of Way Per RW, added info for 6 agreements
- 10:33, 24 March 2020 diff hist -1 m Main Page
- 08:34, 24 March 2020 diff hist -2 m 606.2 Guard Cable →606.2.1 Guard Cable Types: updated links
- 15:14, 20 March 2020 diff hist +51 m 153.11 Financial Services Per FS, updated agreement requirements
- 11:25, 20 March 2020 diff hist +92 m Recent Policy Changes in the EPG EPG 642
- 11:18, 20 March 2020 diff hist +4,228 N 642.14 ADA Transition Plan Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12.
- 11:13, 20 March 2020 diff hist +1,400 N 642.13 ADA Self-Evaluation Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12. current
- 11:01, 20 March 2020 diff hist +1,393 N 642.7 Maintenance Responsibility Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12. current
- 11:00, 20 March 2020 diff hist -42 m 642.6 Local Projects and ADA Considerations →642.6.2 Agreements current
- 10:59, 20 March 2020 diff hist +2,619 N 642.6 Local Projects and ADA Considerations Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12.
- 10:56, 20 March 2020 diff hist +905 N 642.5 Maximum Extent Feasible Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12. current
- 10:49, 20 March 2020 diff hist +6,250 N 642.4 Impact of the Project Category on ADA Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12.
- 10:47, 20 March 2020 diff hist 0 m 642.3 Americans with Disabilities Act of 1990 current
- 10:46, 20 March 2020 diff hist +2,074 N 642.3 Americans with Disabilities Act of 1990 Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12.
- 10:44, 20 March 2020 diff hist +2,887 N 642.2 Consideration of Pedestrian Facilites on Projects Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12. current
- 10:38, 20 March 2020 diff hist +1,172 N 642.1 Integrating Non-Motorized Facilities Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12. current
- 10:36, 20 March 2020 diff hist +48 N 642.14 Pedestrians and Roundabouts Smithk moved page 642.14 Pedestrians and Roundabouts to 642.12 Pedestrians and Roundabouts current Tag: New redirect
- 10:36, 20 March 2020 diff hist 0 m 642.12 Pedestrians and Roundabouts Smithk moved page 642.14 Pedestrians and Roundabouts to 642.12 Pedestrians and Roundabouts current
- 10:36, 20 March 2020 diff hist +9 642.12 Pedestrians and Roundabouts Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12.
- 10:35, 20 March 2020 diff hist +48 N 642.5 Pedestrians and Roundabouts Smithk moved page 642.5 Pedestrians and Roundabouts to 642.14 Pedestrians and Roundabouts current Tag: New redirect
- 10:35, 20 March 2020 diff hist 0 m 642.12 Pedestrians and Roundabouts Smithk moved page 642.5 Pedestrians and Roundabouts to 642.14 Pedestrians and Roundabouts
- 10:35, 20 March 2020 diff hist +1 642.11 Pedestrian Grade Separations Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12. current
- 10:34, 20 March 2020 diff hist -496 642.11 Pedestrian Grade Separations
- 10:26, 20 March 2020 diff hist +49 N 642.4 Pedestrian Grade Separations Smithk moved page 642.4 Pedestrian Grade Separations to 642.11 Pedestrian Grade Separations current Tag: New redirect
- 10:26, 20 March 2020 diff hist 0 m 642.11 Pedestrian Grade Separations Smithk moved page 642.4 Pedestrian Grade Separations to 642.11 Pedestrian Grade Separations
- 10:25, 20 March 2020 diff hist +2 642.9 Sidewalk Ramp and Curb Ramp Design Criteria Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12.
- 10:25, 20 March 2020 diff hist +1 642.8 Sidewalk Design Criteria Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12.
- 10:24, 20 March 2020 diff hist +6 642.10 Curb Ramp Applications current
- 10:23, 20 March 2020 diff hist +43 N 642.3 Curb Ramp Applications Smithk moved page 642.3 Curb Ramp Applications to 642.10 Curb Ramp Applications current Tag: New redirect
- 10:23, 20 March 2020 diff hist 0 m 642.10 Curb Ramp Applications Smithk moved page 642.3 Curb Ramp Applications to 642.10 Curb Ramp Applications
- 10:23, 20 March 2020 diff hist -620 642.9 Sidewalk Ramp and Curb Ramp Design Criteria
- 10:22, 20 March 2020 diff hist +68 N Talk:642.2 Sidewalk Ramp and Curb Ramp Design Criteria Smithk moved page Talk:642.2 Sidewalk Ramp and Curb Ramp Design Criteria to Talk:642.9 Sidewalk Ramp and Curb Ramp Design Criteria current Tag: New redirect
- 10:22, 20 March 2020 diff hist 0 m Talk:642.9 Sidewalk Ramp and Curb Ramp Design Criteria Smithk moved page Talk:642.2 Sidewalk Ramp and Curb Ramp Design Criteria to Talk:642.9 Sidewalk Ramp and Curb Ramp Design Criteria current
- 10:22, 20 March 2020 diff hist +63 N 642.2 Sidewalk Ramp and Curb Ramp Design Criteria Smithk moved page 642.2 Sidewalk Ramp and Curb Ramp Design Criteria to 642.9 Sidewalk Ramp and Curb Ramp Design Criteria current Tag: New redirect
- 10:22, 20 March 2020 diff hist 0 m 642.9 Sidewalk Ramp and Curb Ramp Design Criteria Smithk moved page 642.2 Sidewalk Ramp and Curb Ramp Design Criteria to 642.9 Sidewalk Ramp and Curb Ramp Design Criteria
- 10:22, 20 March 2020 diff hist -57 642.8 Sidewalk Design Criteria
- 10:21, 20 March 2020 diff hist +49 N Talk:642.1 Sidewalk Design Criteria Smithk moved page Talk:642.1 Sidewalk Design Criteria to Talk:642.8 Sidewalk Design Criteria current Tag: New redirect
- 10:21, 20 March 2020 diff hist 0 m Talk:642.8 Sidewalk Design Criteria Smithk moved page Talk:642.1 Sidewalk Design Criteria to Talk:642.8 Sidewalk Design Criteria current
- 10:21, 20 March 2020 diff hist +44 N 642.1 Sidewalk Design Criteria Smithk moved page 642.1 Sidewalk Design Criteria to 642.8 Sidewalk Design Criteria current Tag: New redirect
- 10:21, 20 March 2020 diff hist 0 m 642.8 Sidewalk Design Criteria Smithk moved page 642.1 Sidewalk Design Criteria to 642.8 Sidewalk Design Criteria
- 10:20, 20 March 2020 diff hist 0 N File:642a.jpg current
- 10:20, 20 March 2020 diff hist -21,013 Category:642 Pedestrian Facilities Per DE, please closely read the article since most of the article has been re-written. current Tag: Replaced
- 10:18, 19 March 2020 diff hist +95 m Category:613 Pavement Repair →613.1.1 Full Depth Pavement Repairs (Sec 613.10): Per CM, added link
- 14:18, 16 March 2020 diff hist -60 m Recent Policy Changes in the EPG EPG 127.27
- 13:42, 16 March 2020 diff hist -19 m 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities →127.27.5 Wetlands and Streams
- 13:29, 16 March 2020 diff hist +2,290 m 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities Per Env'l, revised borrow requirements. Clarified current practice and provided new permit information.
- 12:10, 16 March 2020 diff hist +115 m Recent Policy Changes in the EPG EPG 108.1.3
- 12:05, 16 March 2020 diff hist +295 m Category:108 Prosecution and Progress →108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting: Per ECR, provided guidance for the DBE and Non-DBE Subcontractor Reporting Form
- 15:24, 13 March 2020 diff hist -163 m Recent Policy Changes in the EPG EPG 127.12
- 15:23, 13 March 2020 diff hist +83 m 127.12 Air Quality Per Env'l, clarified existing practice current
- 13:46, 13 March 2020 diff hist +99 m 147.3 Job Order Contracting (JOC) →147.3.10.1 Initial Response and Delineation of Damaged Guardrail
- 13:37, 13 March 2020 diff hist +33 m Recent Policy Changes in the EPG
- 12:41, 13 March 2020 diff hist 0 751.1 Preliminary Design →751.1.2.18.2 Content
- 12:40, 13 March 2020 diff hist 0 m 751.1 Preliminary Design →751.1.2.18.1 Purpose
- 09:04, 13 March 2020 diff hist +31 m Recent Policy Changes in the EPG EPG 147.3.10
- 08:54, 13 March 2020 diff hist +12 147.3 Job Order Contracting (JOC) →147.3.10 Guardrail and Guard Cable Repair
- 08:31, 13 March 2020 diff hist +1 m 147.3 Job Order Contracting (JOC) →147.3.10.1 Initial Response and Delineation of Damaged Guardrail
- 08:30, 13 March 2020 diff hist +15 m 147.3 Job Order Contracting (JOC) →147.3.10.1 Initial Response and Delineation of Damaged Guardrail
- 08:20, 13 March 2020 diff hist 0 N File:147.3.10.2.1.3.jpg current
- 08:20, 13 March 2020 diff hist 0 N File:147.3.10.2.1.2.jpg current
- 08:20, 13 March 2020 diff hist 0 N File:147.3.10.2.1.1.jpg current
- 08:19, 13 March 2020 diff hist +8,075 m 147.3 Job Order Contracting (JOC) Per DE, new EPG 147.3.10 Guardrail and Guard Cable Repair; prioritization of guardrail and guard cable repairs. New guidance will assist guardrail and guard cable JOC administrators to identify high priority repairs and will better align the repairs with MoDOT's incident response plan.
- 09:48, 11 March 2020 diff hist +33 m Category:644 Weigh Stations, Rest Areas, Welcome/Information Centers and Commuter Parking Lots updated links
- 15:06, 9 March 2020 diff hist 0 N File:140.1 Greene County 160a.pdf current
- 15:06, 9 March 2020 diff hist 0 N File:140.1 Barry County 37a.pdf current
- 15:05, 9 March 2020 diff hist 0 N File:140.1 St. Louis County I-64a.pdf current
- 15:05, 9 March 2020 diff hist 0 N File:140.1 Osage County Da.pdf current
- 15:04, 9 March 2020 diff hist +4 m Category:143 Practical Design
- 14:48, 9 March 2020 diff hist +29 m 236.3 Administration →236.3.12.2 On-call and solicitation for Consultant Services Process – Right of Way: Per RW, updated link
- 13:42, 9 March 2020 diff hist -187 m Recent Policy Changes in the EPG EPG 751.1.2.7-751.1.2.17
- 13:27, 9 March 2020 diff hist 0 m Category:747 Bridge Reports and Layouts →747.4.1 Bridge Memorandum: updated link
- 13:27, 9 March 2020 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.8 Slope Protection: updated links
- 13:25, 9 March 2020 diff hist 0 m 751.1 Preliminary Design →751.1.4.2 Types of Walls
- 13:24, 9 March 2020 diff hist 0 m 751.1 Preliminary Design →751.1.3.2 Documentation
- 13:18, 9 March 2020 diff hist -23 m 751.1 Preliminary Design →751.1.2.12 Temporary Barriers
- 13:10, 9 March 2020 diff hist +79,775 751.1 Preliminary Design →751.1.2 Bridges/Boxes: Per BR, updated superstructure selection guidance. Removed outdated pricing and bridge replacement information.
- 09:22, 6 March 2020 diff hist -924 m Category:140 Encroachments and Items Permitted on MoDOT’s Right of Way updated links to forms
- 09:06, 6 March 2020 diff hist -616 m 171.6 Roadsides updated links
- 13:50, 4 March 2020 diff hist -32 m Recent Policy Changes in the EPG EPG 127.26
- 13:48, 4 March 2020 diff hist 0 m 127.26 Environmental Classification current
- 13:32, 4 March 2020 diff hist -227 m 127.26 Environmental Classification Per Env'l, updated the NEPA definitions
- 12:02, 3 March 2020 diff hist -67 m 751.50 Standard Detailing Notes →K1. General: Per BR, numerous minor revisions
- 09:11, 3 March 2020 diff hist +4 m 236.7 Negotiation Per RW, updated link to Form 7.2.12
- 10:09, 28 February 2020 diff hist -3 m 903.18 Signing for School Areas →903.19.5.1 School Assembly Installation Contracts: Per TS, minor correction
- 16:10, 27 February 2020 diff hist +40 m Recent Policy Changes in the EPG EPG 136.4.2.4.3
- 16:04, 27 February 2020 diff hist +1,329 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, added two new categories (environmental and historic preservation) to LPA on-call consultant guidance
- 13:15, 26 February 2020 diff hist +2 m 236.6 Appraisal and Appraisal Review →236.6.3.9 Other Agency Valuations: Per RW, minor correction
- 11:04, 26 February 2020 diff hist +70 m 236.4 Description Writing and Titles →236.4.2 Public Land Surveys
- 10:29, 26 February 2020 diff hist 0 N File:236.4.4 Request for ADA Responsibility Determination 2020.docx current
- 10:28, 26 February 2020 diff hist -4 m 236.4 Description Writing and Titles →236.4.4 Title Services and Responsibility
- 09:51, 26 February 2020 diff hist +39 m Recent Policy Changes in the EPG
- 09:36, 26 February 2020 diff hist -354 m Recent Policy Changes in the EPG EPG 236.4.4
- 09:31, 26 February 2020 diff hist +1 236.4 Description Writing and Titles →236.4.4.1 Purpose
- 09:29, 26 February 2020 diff hist +705 236.4 Description Writing and Titles →236.4.4 Title Datum and Allied Services: Per RW, ADA responsibility and ownership section is being updated to reflect current policy, business practice and direction by executive management.
- 11:56, 25 February 2020 diff hist -8 m 236.8 Relocation Assistance Program Per RW, updated links to two brochures
- 10:17, 21 February 2020 diff hist +44 m Category:760 General Construction Inspection for Structures Per CM, updated link for Bridge Clearance Report form
- 14:25, 20 February 2020 diff hist +64 m Category:101 Standard Forms →Motor Carrier Services: Per MCS, updated form links
- 13:33, 19 February 2020 diff hist -89 m Category:101 Standard Forms →Motor Carrier Services: Per MCS, removed letterhead form
- 15:53, 18 February 2020 diff hist -81,136 m 751.1 Preliminary Design Per BR, deleted info at the request of MoDOT Director
- 15:41, 18 February 2020 diff hist 0 m 750.7 Non-Hydraulic Considerations updated links
- 10:49, 18 February 2020 diff hist +11 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per ECR, minor update
- 13:33, 14 February 2020 diff hist +2 m Recent Policy Changes in the EPG EPG 607.1
- 13:30, 14 February 2020 diff hist -15 m 607.1 Applications Per TS, revised interstate highway guidance to current, long-established practice current
- 12:16, 14 February 2020 diff hist +78 m Category:146 Disadvantaged Business Enterprise (DBE) updated links
- 12:15, 14 February 2020 diff hist -58 m Category:108 Prosecution and Progress updated link
- 12:08, 14 February 2020 diff hist -76 m LPA:136.11 Local Public Agency Construction →136.11.14.1 Labor Records: Per ECR, updated links
- 11:53, 14 February 2020 diff hist +1 m LPA:136.11 Local Public Agency Construction →136.11.13.5 American’s with Disabilities Act (ADA) Check List: Per ECR, there is no Title V
- 11:50, 14 February 2020 diff hist -68 m LPA:136.11 Local Public Agency Construction →136.11.10 On-the-job Training (OJT): Per ECR, updated links and tel no.
- 11:16, 14 February 2020 diff hist -2 m LPA:136.11 Local Public Agency Construction →136.11.8 Disadvantaged Business Enterprise (DBE): Per ECR, added and updated links
- 11:07, 14 February 2020 diff hist -58 m LPA:136.11 Local Public Agency Construction →136.11.8 Disadvantaged Business Enterprise (DBE): updated link
- 10:56, 14 February 2020 diff hist -8 m LPA:136.11 Local Public Agency Construction ECR pointed out the link to Fig. 136.11.6 was incorrect. Replaced with new link to Fig. 136.11.8.
- 10:48, 14 February 2020 diff hist -3 m Category:110 State and Federal Wage Rates and Other Requirements →110.5.2 Equal Employment Opportunity: Per ECR, minor clarification
- 10:22, 14 February 2020 diff hist +172 m Category:108 Prosecution and Progress →108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting: Per ECR, added two links
- 10:06, 14 February 2020 diff hist +998 m Category:101 Standard Forms →External Civil Rights: Per ECR, entered several forms
- 13:39, 13 February 2020 diff hist -39 m 617.2 Construction Inspection Guidelines for Sec 617 updated link
- 11:39, 13 February 2020 diff hist -37 m 751.6 General Quantities →751.6.2.17 Excavation: Per BR, further clarification
- 16:09, 11 February 2020 diff hist +900 m 153.11 Financial Services Per FS, added three agreements (FS33, 34 and 35)
- 16:09, 10 February 2020 diff hist -42 m 751.6 General Quantities →751.6.2.17 Excavation: Per BR, reorganized guidance for clarification
- 16:06, 10 February 2020 diff hist 0 m 751.1 Preliminary Design →751.1.3.6 Deck Treatment
- 14:48, 10 February 2020 diff hist +681 m 751.1 Preliminary Design →751.1.3 Wearing Surfaces/Rehabs/Redecks/Widenings
- 13:31, 10 February 2020 diff hist -146 751.50 Standard Detailing Notes Per BR, deck rehabilitation notes further updated to current methods.
- 12:10, 10 February 2020 diff hist +2 m 751.40 LFD Widening and Repair →751.40.8.10.1.3 Prestress Loss and Prestress Camber
- 11:52, 10 February 2020 diff hist -4 m 751.40 LFD Widening and Repair →751.40.8.4.1 Welding Details
- 11:44, 10 February 2020 diff hist +2 m 751.40 LFD Widening and Repair →751.40.8.4.1 Welding Details
- 11:25, 10 February 2020 diff hist -1 m 751.40 LFD Widening and Repair →751.40.2.5 Temporary Traffic Control Device
- 11:20, 10 February 2020 diff hist +153 m 751.1 Preliminary Design →751.1.3.6 Deck Treatment
- 11:16, 10 February 2020 diff hist +8,367 751.1 Preliminary Design →751.1.3 Wearing Surfaces/Rehabs/Redecks/Widenings: Per BR, deck rehabilitation guidance further updated to current methods.
- 10:06, 10 February 2020 diff hist -16 m Category:409 Seal Coat updated link
- 10:01, 10 February 2020 diff hist 0 N File:751.1.2.12 Freestanding.jpg current
- 10:00, 10 February 2020 diff hist -82 751.1 Preliminary Design →751.1.2.12 Temporary Barriers
- 09:49, 10 February 2020 diff hist -1 Category:1039 Polymer Products →1039.2.4.2.1 Epoxy
- 09:41, 10 February 2020 diff hist 0 m Category:1039 Polymer Products →1039.2.2.4 Epoxy Polymer
- 15:52, 7 February 2020 diff hist +7 m LPA:136.12 Figures, Glossary and Other Useful Links Figs. 136.9.5 and 136.10.1
- 15:50, 7 February 2020 diff hist 0 N File:136.9.5 2020.docx current
- 15:48, 7 February 2020 diff hist +2 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, minor update to Fig. 136.9.5
- 15:47, 7 February 2020 diff hist 0 N File:136.10.1 2020.docx
- 15:46, 7 February 2020 diff hist +12 m LPA:136.10 Advertisement for Bid and Project Award Per LPA, minor updates to Fig 136.10.1
- 14:44, 7 February 2020 diff hist 0 m 902.15 Designing a Traffic Signal →902.15.3.2 Induction Loop Detectors: Per TS, corrected the phase for one of the channel numbers
- 14:27, 6 February 2020 diff hist +1 m Recent Policy Changes in the EPG
- 13:58, 6 February 2020 diff hist +674 m Recent Policy Changes in the EPG EPG 216, EPG 751, EPG 1039
- 13:18, 6 February 2020 diff hist 0 N File:751.1.3.6 Bridge Wearing Surface Flowchart.pdf current
- 13:18, 6 February 2020 diff hist +4 m 751.1 Preliminary Design →751.1.3.6 Asphalt Wearing Surface
- 13:17, 6 February 2020 diff hist +253 m 751.1 Preliminary Design →751.1.3.6 Asphalt Wearing Surface: Per BR, added Bridge Wearing Surface Flowchart
- 12:26, 6 February 2020 diff hist +11,432 751.50 Standard Detailing Notes Per BR, standard detailing note updated to reflect deck rehabilitation being revised to current methods
- 16:02, 5 February 2020 diff hist +2 m 751.40 LFD Widening and Repair →751.40.8.4.2.6 Development of uncoated Grade 40 deformed bars in tension, \, L_d (AASHTO 8.25)