User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:57, 19 April 2021 diff hist +628 m 237.3 Summary and Tabulation of Quantities Info about the Excel sheet for loading the D-2BS Sheet was added current
- 13:01, 16 April 2021 diff hist -75 m 106.12 Pre-Acceptance Lists (PAL) Per CM, removed archaic references to SiteManager and replaced them with AASHTOWare Project (AWP)
- 13:31, 15 April 2021 diff hist +16 m 751.50 Standard Detailing Notes →J1. General
- 13:30, 15 April 2021 diff hist -64 m 751.50 Standard Detailing Notes →J1. General: Per BR, minor clarification for J1.20a table
- 10:30, 15 April 2021 diff hist +112 m 616.14 Work Zone Safety and Mobility Policy Updated links to TMP Example figures for security
- 09:30, 15 April 2021 diff hist +16 m 320.4 Procedure for Final Sounding Per BR, further minor editorial revision to "Request for Final Soundings for Structures Form"
- 09:29, 15 April 2021 diff hist +8 m 320.3 Drilling Operations Per BR, further minor editorial revision to "Request for Final Soundings for Structures Form"
- 09:28, 15 April 2021 diff hist +4 m Category:101 Standard Forms Per BR, further minor editorial revision to "Request for Final Soundings for Structures Form"
- 09:27, 15 April 2021 diff hist 0 N File:751.1.2.20 Guidance Apr 2021.xlsx current
- 09:27, 15 April 2021 diff hist 0 N File:751.1.2.20 Request Apr 2021.xlsx
- 09:26, 15 April 2021 diff hist +16 m 751.1 Preliminary Design Per BR, further minor editorial revision to "Request for Final Soundings for Structures Form" and "Guidance for Request for Final Soundings for Structures Form"
- 08:21, 15 April 2021 diff hist -72 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.4.2 SS4 or SS10 Power GEOPAK Requirements: updated links
- 09:01, 14 April 2021 diff hist -445 m Recent Policy Changes in the EPG EPG 134.5.1.1
- 08:13, 14 April 2021 diff hist +336 m Category:101 Standard Forms →Construction and Materials: Per CM, added updated JOCs for 2021
- 13:57, 13 April 2021 diff hist +68 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: Per BR, minor clarification
- 07:32, 13 April 2021 diff hist -1 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.8.3.1 Preventive Maintenance
- 13:37, 12 April 2021 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator Apr 2021.xlsx
- 13:37, 12 April 2021 diff hist +8 m 606.1 Guardrail Per Charles Schumann, further updated Guardrail Length of Need Calculator with minor clarification
- 14:51, 6 April 2021 diff hist 0 N File:641.1 Bicycle Facilities 2021.pdf current
- 14:50, 6 April 2021 diff hist +5 m Category:641 Bicycle Facilities →641.1 Types of Facilities current
- 14:37, 6 April 2021 diff hist 0 N File:641.1 Bicycle Facilities.pdf current
- 14:36, 6 April 2021 diff hist +39 m Category:641 Bicycle Facilities →641.1 Types of Facilities: Per EPS, uploaded pdf for ''Guide for the Development of Bicycle Facilities 2012''
- 14:31, 6 April 2021 diff hist -79 m Category:641 Bicycle Facilities →641.1 Types of Facilities: Per EPS, temporarily removed an unsatisfactory link to "Guide for the Development of Bicycle Facilities 2012"
- 13:42, 6 April 2021 diff hist +144 m Recent Policy Changes in the EPG EPG 751.1.3.4
- 13:32, 6 April 2021 diff hist +36 m 751.1 Preliminary Design →Common Bridge Barrier and Railing (for Rehabilitations): Per BR, the use of MGS approach rail with non-blocked thrie beam bridge rail is restricted
- 12:46, 6 April 2021 diff hist +20 m 320.4 Procedure for Final Sounding Per BR, minor editorial revisions to "Request for Final Soundings for Structures Form"
- 12:45, 6 April 2021 diff hist +10 m 320.3 Drilling Operations Per BR, minor editorial revisions to "Request for Final Soundings for Structures Form"
- 12:44, 6 April 2021 diff hist +5 m Category:101 Standard Forms Per BR, minor editorial revisions to "Request for Final Soundings for Structures Form"
- 12:44, 6 April 2021 diff hist 0 N File:751.1.2.20 Guidance 2021.xlsx current
- 12:43, 6 April 2021 diff hist 0 N File:751.1.2.20 Request 2021.xlsx current
- 12:42, 6 April 2021 diff hist +20 m 751.1 Preliminary Design Per BR, minor editorial revisions to "Request for Final Soundings for Structures Form" and "Guidance for Request for Final Soundings for Structures Form"
- 08:44, 6 April 2021 diff hist -7 m 751.22 Prestressed Concrete I Girders →751.22.3.8 Camber, Haunching, and Stepping and Sloping of Top Flange Camber
- 08:38, 6 April 2021 diff hist +15 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.2.2 End Blocks Lengths and Weights
- 08:26, 6 April 2021 diff hist -1 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.2.3 Temporary Tensile Stress Reinforcement
- 07:56, 6 April 2021 diff hist +1 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.1.2 Material Properties
- 07:52, 6 April 2021 diff hist +7 m 751.10 General Superstructure →751.10.1.14 Girder and Beam Haunch Reinforcement: Per BR, minor clarifications
- 07:03, 6 April 2021 diff hist -1 m Help Article →Division Contacts: Updated MT contact
- 13:17, 2 April 2021 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links minor clarification to ADA Checklist
- 13:17, 2 April 2021 diff hist +4 m LPA:136.13 LPA Policy Changes
- 13:15, 2 April 2021 diff hist +8 m LPA:136.9 Plans, Specs and Estimates (PSE) minor clarification to ADA Checklist
- 13:14, 2 April 2021 diff hist +4 m Category:101 Standard Forms minor clarification to ADA Checklist
- 13:13, 2 April 2021 diff hist 0 N File:136.9.4 Mar 2021.docx current
- 13:13, 2 April 2021 diff hist +4 m 642.8 Sidewalk Design Criteria minor clarification to ADA Checklist
- 12:46, 2 April 2021 diff hist +96 m Recent Policy Changes in the EPG EPG 134.2.2.5
- 12:41, 2 April 2021 diff hist 0 N File:134.2.2.5.3 2021.docx current
- 12:26, 2 April 2021 diff hist +152 m Category:134 Engineering Professional Services Per LPA,PSC signature lines have been removed from Fig. 134.2.2.5.3 since the PSC no longer is required to sign this request. Also, clarified guidance in EPG 134.2.2.5.
- 12:01, 2 April 2021 diff hist 0 m Recent Policy Changes in the EPG
- 11:32, 2 April 2021 diff hist +4 m Recent Policy Changes in the EPG
- 11:31, 2 April 2021 diff hist +14 m Recent Policy Changes in the EPG
- 11:30, 2 April 2021 diff hist +1,637 m Recent Policy Changes in the EPG EPG 751
- 11:28, 2 April 2021 diff hist +44 N 751.40 Widening and Repair (LFD and Not Updated) Smithk moved page 751.40 Widening and Repair (LFD and Not Updated) to 751.40 LFD Widening and Repair: Per BR, retitled article current Tag: New redirect
- 11:28, 2 April 2021 diff hist 0 m 751.40 LFD Widening and Repair Smithk moved page 751.40 Widening and Repair (LFD and Not Updated) to 751.40 LFD Widening and Repair: Per BR, retitled article
- 11:06, 2 April 2021 diff hist -109 m 751.50 Standard Detailing Notes Per BR, revised several notes to correspond with new EPG 751.21 Prestressed Concrete Slab and Box Beams
- 09:59, 2 April 2021 diff hist +60 N 751.23 P/S Concrete Double Tee Smithk moved page 751.23 P/S Concrete Double Tee to 751.23 Prestressed Concrete Double Tee Girders: Per BR, article renamed current Tag: New redirect
- 09:59, 2 April 2021 diff hist 0 m 751.23 Prestressed Concrete Double Tee Girders Smithk moved page 751.23 P/S Concrete Double Tee to 751.23 Prestressed Concrete Double Tee Girders: Per BR, article renamed current
- 09:22, 2 April 2021 diff hist 0 N File:751.22.2.4 Minimum Debonded Width.jpg current
- 09:18, 2 April 2021 diff hist 0 N File:751.22.1.4.2 2021.jpg current
- 09:13, 2 April 2021 diff hist +472 m 751.22 Prestressed Concrete I Girders Per BR, updated guidance to correspond to new guidance in EPG 751.21 Prestressed Concrete Slab and Box Beams
- 08:40, 2 April 2021 diff hist +51 N 751.22 P/S Concrete I Girders Smithk moved page 751.22 P/S Concrete I Girders to 751.22 Prestressed Concrete I Girders: Per BR, renamed article to "Prestressed" instead of "P/S" current Tag: New redirect
- 08:40, 2 April 2021 diff hist 0 m 751.22 Prestressed Concrete I Girders Smithk moved page 751.22 P/S Concrete I Girders to 751.22 Prestressed Concrete I Girders: Per BR, renamed article to "Prestressed" instead of "P/S"
- 08:38, 2 April 2021 diff hist 0 m 751.18 Concrete Multicell Box Girder Bridges Per BR, article renamed and renumbered current
- 08:37, 2 April 2021 diff hist 0 m 751.18 Concrete Multicell Box Girder Bridges Smithk moved page 751.21 Concrete Box Girder to 751.18 Concrete Multicell Box Girder Bridges: Per BR, renamed and renumbered
- 08:37, 2 April 2021 diff hist +58 N 751.21 Concrete Box Girder Smithk moved page 751.21 Concrete Box Girder to 751.18 Concrete Multicell Box Girder Bridges: Per BR, renamed and renumbered current Tag: New redirect
- 08:36, 2 April 2021 diff hist +36 m 751.5 Structural Detailing Guidelines Per BR, updated link
- 08:33, 2 April 2021 diff hist 0 m 751.17 Concrete Slab Bridges Per BR, renamed and renumbered
- 08:31, 2 April 2021 diff hist +42 N 751.20 Continuous Concrete Slab Bridges Smithk moved page 751.20 Continuous Concrete Slab Bridges to 751.17 Concrete Slab Bridges: Per BR, renamed and renumbered current Tag: New redirect
- 08:31, 2 April 2021 diff hist 0 m 751.17 Concrete Slab Bridges Smithk moved page 751.20 Continuous Concrete Slab Bridges to 751.17 Concrete Slab Bridges: Per BR, renamed and renumbered
- 08:30, 2 April 2021 diff hist -22 m 751.5 Structural Detailing Guidelines updated link
- 08:10, 2 April 2021 diff hist 0 m 751.21 Prestressed Concrete Slab and Box Beams
- 08:06, 2 April 2021 diff hist 0 N File:751.21.3.10.jpg current
- 08:06, 2 April 2021 diff hist 0 N File:751.21.3.8.jpg current
- 08:05, 2 April 2021 diff hist 0 N File:751.21.3.7 exterior beam.jpg current
- 08:05, 2 April 2021 diff hist 0 N File:751.21.3.7.jpg current
- 08:05, 2 April 2021 diff hist 0 N File:751.21.3.6.4.jpg current
- 08:04, 2 April 2021 diff hist 0 N File:751.21.3.6.3 2.jpg current
- 08:04, 2 April 2021 diff hist 0 N File:751.21.3.6.3 1.jpg current
- 08:03, 2 April 2021 diff hist 0 N File:751.21.3.6.2.jpg current
- 08:03, 2 April 2021 diff hist 0 N File:751.21.3.6.1 3.jpg current
- 08:02, 2 April 2021 diff hist 0 N File:751.21.3.6.1 2.jpg current
- 08:02, 2 April 2021 diff hist 0 N File:751.21.3.6.1 1.jpg current
- 08:01, 2 April 2021 diff hist 0 N File:751.21.3.4.3.jpg current
- 08:01, 2 April 2021 diff hist 0 N File:751.21.3.4.2.jpg current
- 08:00, 2 April 2021 diff hist 0 N File:751.21.3.4.1 voided.jpg current
- 08:00, 2 April 2021 diff hist 0 N File:751.21.3.4.1 box.jpg current
- 08:00, 2 April 2021 diff hist 0 N File:751.21.3.3.1 bending3.jpg current
- 07:59, 2 April 2021 diff hist 0 N File:751.21.3.3.1 bending2.jpg current
- 07:59, 2 April 2021 diff hist 0 N File:751.21.3.3.1 bending1.jpg current
- 07:58, 2 April 2021 diff hist 0 N File:751.21.3.3.1 spread2.jpg current
- 07:58, 2 April 2021 diff hist 0 N File:751.21.3.3.1 spread1.jpg current
- 07:58, 2 April 2021 diff hist 0 N File:751.21.3.2.4.jpg current
- 07:57, 2 April 2021 diff hist 0 N File:751.21.3.2.3.jpg current
- 07:57, 2 April 2021 diff hist 0 N File:751.21.3.2.2.jpg current
- 07:57, 2 April 2021 diff hist 0 N File:751.21.3.2.1.jpg current
- 07:56, 2 April 2021 diff hist 0 N File:751.21.1.3 box and solid.jpg current
- 07:55, 2 April 2021 diff hist 0 N File:751.21.1.3 solid.jpg current
- 07:55, 2 April 2021 diff hist 0 N File:751.21.1.3 adjacent voided 3.jpg current
- 07:54, 2 April 2021 diff hist 0 N File:751.21.1.3 adjacent voided 4.jpg current
- 07:54, 2 April 2021 diff hist 0 N File:751.21.1.3 spread voided.jpg current
- 07:54, 2 April 2021 diff hist 0 N File:751.21.1.3 adjacent box 3.jpg current
- 07:53, 2 April 2021 diff hist 0 N File:751.21.1.3 adjacent box 4.jpg current
- 07:53, 2 April 2021 diff hist 0 N File:751.21.1.3 spread box.jpg current
- 07:52, 2 April 2021 diff hist +26,392 N 751.21 Prestressed Concrete Slab and Box Beams Per BR, new EPG 751.21 to provide guidance for beams we have been designing and using for over a decade
- 11:06, 1 April 2021 diff hist +345 m 751.10 General Superstructure →751.10.1.14 Girder Haunch Reinforcement: Per BR, revisions to apply to new guidance in EPG 751.21 Prestressed Concrete Slab and Box Beams
- 10:19, 1 April 2021 diff hist +54 m 751.22 Prestressed Concrete I Girders Per BR, updated links
- 10:16, 1 April 2021 diff hist +18 m 751.22 Prestressed Concrete I Girders Per Br, updated link
- 10:04, 1 April 2021 diff hist +334 m 751.1 Preliminary Design Per BR, minor clarifications
- 11:22, 31 March 2021 diff hist 0 N File:903.2a Signpost Selection Guide 2021.xls current
- 11:21, 31 March 2021 diff hist 0 m Category:903 Highway Signing Per TS, minor clarifications and corrections for Signpost Selection Guide
- 11:21, 31 March 2021 diff hist 0 m 903.3 Ground-Mounted Sign Supports Per TS, minor clarifications and corrections for Signpost Selection Guide
- 09:52, 30 March 2021 diff hist -122 m 127.25 Maintenance Environmental Policies Per Maintenance, deleted archaic Deer Death Report Form and Map
- 07:53, 30 March 2021 diff hist +4 m 127.2 Historic Preservation and Cultural Resources
- 07:49, 30 March 2021 diff hist +474 m 127.2 Historic Preservation and Cultural Resources Per Env'l, updated Mo Historic Bridge Inventory links
- 11:21, 29 March 2021 diff hist +120 m 127.2 Historic Preservation and Cultural Resources Per Env'l, archaic link restored until further notice
- 11:12, 29 March 2021 diff hist -120 m 127.2 Historic Preservation and Cultural Resources
- 11:09, 29 March 2021 diff hist 0 m 127.2 Historic Preservation and Cultural Resources Per Env'l, updated Mo Historic Bridge Inventory link
- 13:46, 26 March 2021 diff hist -791 m Recent Policy Changes in the EPG EPG 501.1.3.5
- 13:33, 26 March 2021 diff hist +2,044 m Category:501 Concrete →501.1 Construction Inspection for Sec 501: Per CM, clarification of curing and testing procedures for cores and cylinders in projects with paving and structures.
- 08:14, 25 March 2021 diff hist -89 m Recent Policy Changes in the EPG EPG 751.50
- 08:10, 25 March 2021 diff hist +356 m 751.50 Standard Detailing Notes →H5a. Finger Plate: Per BR, updated note to clarify procedure for making holes for connection.
- 14:50, 24 March 2021 diff hist +201 m Category:108 Prosecution and Progress →108.1.1 Review and Approval of a Subcontract Request: Per CM, clarifed guidance. The MoDOT Contractor report is no longer useful in checking contractor insurance and it is causing some confusion.
- 13:17, 24 March 2021 diff hist 0 N File:129.3 temporary.docx current
- 13:17, 24 March 2021 diff hist -9 m Recent Policy Changes in the EPG EPG 129
- 13:11, 24 March 2021 diff hist -20 m Category:129 Public Involvement →129.6.4 Presentation for Location and Design Approval to the Commission and Commission Actions Needed
- 13:10, 24 March 2021 diff hist -75 m Category:129 Public Involvement →129.6.4 Presentation for Location and Design Approval to the Commission and Commission Actions Needed
- 13:09, 24 March 2021 diff hist +1,485 m Category:129 Public Involvement Per Env'l, FHWA will temporarily allow all public involvement activities previously conducted in person to exclusively use virtual techniques.
- 08:29, 24 March 2021 diff hist -603 m Recent Policy Changes in the EPG EPG 236.15
- 08:25, 24 March 2021 diff hist +241 m 236.16 Outdoor Advertising →236.16.15 Vegetation Removal: Per ODA, updated Vegetation Process in EPG. The current practice has been in place for several years. Unfortunately, it was overlooked on ODA’s part in the EPG.
- 10:53, 23 March 2021 diff hist -26 m Recent Policy Changes in the EPG EPG 108.1.1
- 10:45, 23 March 2021 diff hist +2,690 m Category:108 Prosecution and Progress →108.1.1 Review and Approval of a Subcontract Request: Per CM, new guidance about when subletting requirements can be adjusted
- 15:13, 19 March 2021 diff hist +4 m 642.9 Sidewalk Ramp and Curb Ramp Design Criteria →642.9.1 Slope and Rise of Sidewalk Ramps: Per DE, correction: minimum curb height for sidewalk ramp edge protection is 4 inches, not 2 inches.
- 14:56, 19 March 2021 diff hist -320 m Recent Policy Changes in the EPG EPG 109.12.3.2
- 14:50, 19 March 2021 diff hist +2,569 m Category:109 Measurement and Payment →109.12.3 Time Adjustment Change Orders: Per CM, new useful guidance for addressing time adjustment change orders as well as the supporting documentation
- 12:13, 19 March 2021 diff hist -134 m Category:108 Prosecution and Progress →108.7 Contract Time for Completion of the Work: Per CM, deleted sentence that is contrary to specifications
- 07:12, 18 March 2021 diff hist 0 File:235.2.3 Exhibit A.pdf Smithk reverted File:235.2.3 Exhibit A.pdf to an old version current
- 07:10, 18 March 2021 diff hist -24 m Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10): updated link
- 12:25, 17 March 2021 diff hist -44 m Recent Policy Changes in the EPG EPG 903.15.1
- 12:22, 17 March 2021 diff hist +1,550 m 903.14 Memorial Signs →903.14.1 Memorial Designation Programs: Per TS, new Memorial Designation Programs guidance for statewide uniformity.
- 08:55, 17 March 2021 diff hist +2 m 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column
- 08:48, 17 March 2021 diff hist +4 m 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column
- 14:41, 15 March 2021 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator 2021.xlsx
- 14:40, 15 March 2021 diff hist +10 m 606.1 Guardrail Per Charles Schumann, updated Guardrail Length of Need Calculator to allow selection of a barrier w/ an extended curb so the add'l 12.5’ of guardrail is included if there is not sufficient LON to cover it. Also informational notes and warnings were updated and added
- 13:36, 15 March 2021 diff hist +171 m Recent Policy Changes in the EPG EPG 751.2 and EPG 751.31
- 13:02, 15 March 2021 diff hist +935 m 751.2 Loads →751.2.2.6 Other Loads: Per BR, updated pier protectin guidance to reflect latest AASHTO collision requirements with MoDOT policy exceptions.
- 11:15, 15 March 2021 diff hist +262 m 751.1 Preliminary Design →751.1.2.6.1 Grade Separations: Per BR, updated pier protectin guidance to reflect latest AASHTO collision requirements with MoDOT policy exceptions.
- 08:33, 15 March 2021 diff hist +1,568 m 751.31 Open Concrete Intermediate Bents Per BR, updated pier protectin guidance to reflect latest AASHTO collision requirements with MoDOT policy exceptions.
- 14:42, 12 March 2021 diff hist +85 m Recent Policy Changes in the EPG EPG 751.10.1.3
- 14:26, 12 March 2021 diff hist +4,349 m 751.10 General Superstructure Per BR, provided deck cantilever design guidance for the MASH Type D and H barriers.
- 09:44, 12 March 2021 diff hist +49 m Recent Policy Changes in the EPG EPG 751.1.3.4
- 09:22, 12 March 2021 diff hist 0 N File:751.1.3.4 vertical section.jpg current
- 09:21, 12 March 2021 diff hist 0 N File:751.1.3.4 vertical.jpg current
- 09:19, 12 March 2021 diff hist +1,611 m 751.1 Preliminary Design →751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts: Per BR, refined guidance for use of MASH and NCHRP 350 barrier and rail.
- 09:23, 11 March 2021 diff hist +24 m 903.1 Highway Signing General Information Per EPS, added "(for internal use only)" to a link current
- 13:20, 9 March 2021 diff hist +328 m Recent Policy Changes in the EPG EPG 101
- 13:12, 9 March 2021 diff hist +94 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, added AWP QRG Revision Dates information
- 16:29, 8 March 2021 diff hist +4 m Category:107 Legal Relations and Responsibility to the Public →107.12 Contractor's Responsibility for Work
- 16:29, 8 March 2021 diff hist -5,126 m Category:107 Legal Relations and Responsibility to the Public →107.12 Contractor's Responsibility for Work: Per CM, removed archaic guidance
- 16:15, 8 March 2021 diff hist -155 m Recent Policy Changes in the EPG EPG 105.15.1
- 15:52, 8 March 2021 diff hist +469 m Category:107 Legal Relations and Responsibility to the Public →107.12 Contractor's Responsibility for Work: Per CM, several scenarios provided to further clarify guidance following input from REs
- 15:30, 8 March 2021 diff hist 0 N File:105.15.1.docx current
- 15:30, 8 March 2021 diff hist +1,691 m Category:105 Control of Work →105.15 Acceptance (Sec 105.15): Per CM, several scenarios provided to further clarify guidance following input from REs
- 12:28, 8 March 2021 diff hist +9 m 751.50 Standard Detailing Notes →A. General Notes
- 12:26, 8 March 2021 diff hist +10 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses and Standard Plans
- 12:25, 8 March 2021 diff hist +515 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses and Standard Plans: aesthetic revision, per BR
- 11:51, 8 March 2021 diff hist 0 N File:712 Fabrication Inspection Report secure.pdf current
- 11:50, 8 March 2021 diff hist +7 m Category:702 Load-Bearing Piles Updated figure for security
- 11:14, 8 March 2021 diff hist 0 N File:702 secure.pdf current
- 11:14, 8 March 2021 diff hist +7 m Category:702 Load-Bearing Piles →702.1.5 Pile Driving Documentation: Updated figure for security
- 11:09, 8 March 2021 diff hist 0 N File:702 Pile Driving Worksheet secure.pdf current
- 10:37, 8 March 2021 diff hist +14 m Category:702 Load-Bearing Piles Updated figure for security
- 11:58, 5 March 2021 diff hist 0 N File:105.9.11 secure.pdf current
- 11:57, 5 March 2021 diff hist +7 m Category:105 Control of Work →105.9.11 Order Record: Updated figure for security
- 09:38, 5 March 2021 diff hist -5 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.6 Type 4: Directional Median Opening with Downstream U-Turns
- 09:35, 5 March 2021 diff hist +185 m Recent Policy Changes in the EPG EPG 233.2.6, EPG 233.3
- 09:19, 5 March 2021 diff hist +757 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.6 Type 4: Directional Median Opening with Downstream U-Turns: Per TS, expanded guidance to draw additional attention to the benefits of public involvement for J-Turn and roundabout designs.
- 09:13, 5 March 2021 diff hist -1 m 233.3 Roundabouts
- 09:10, 5 March 2021 diff hist +774 m 233.3 Roundabouts Per TS, expanded guidance to draw additional attention to the benefits of public involvement for J-Turn and roundabout designs.
- 08:07, 5 March 2021 diff hist -39 m 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C) →616.3.16 Temporary Two-Lane, Two-Way Operations: updated link
- 16:14, 4 March 2021 diff hist 0 N File:123 Stewardship-Oversight Agreement addendum secure.pdf current
- 16:13, 4 March 2021 diff hist +7 m Category:123 Federal-Aid Highway Program Updated figure for security
- 13:52, 4 March 2021 diff hist 0 N File:127.14.3.5 secure.pdf current
- 13:52, 4 March 2021 diff hist +7 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents →127.14.3.5 FHWA/MoDOT Environmental Partnering Agreement: Updated figure for security
- 08:32, 4 March 2021 diff hist +112 m Recent Policy Changes in the EPG EPG 616.6.61
- 08:29, 4 March 2021 diff hist +41 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.61 Arrow Boards (MUTCD 6F.61): Per TS, revised the Sign Display table to show that the Work Type for Flashing Double Arrows is both Stationary and Mobile Operations (not just Stationary). The Flashing Double Arrow has been used in both stationary and mobile operations for years.
- 14:01, 3 March 2021 diff hist 0 N File:237.9.6.3.1 secure.jpg current
- 14:00, 3 March 2021 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.1 Roadway Plans
- 13:56, 3 March 2021 diff hist 0 N File:237.9.6.3.1 secure.pdf current
- 13:56, 3 March 2021 diff hist +7 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.1 Roadway Plans: Updated figure for security
- 13:47, 3 March 2021 diff hist +14 m LPA:136.11 Local Public Agency Construction Updated figure for security
- 13:46, 3 March 2021 diff hist 0 N File:Fig. 136.11.14 secure.pdf current
- 13:45, 3 March 2021 diff hist +7 m LPA:136.12 Figures, Glossary and Other Useful Links Updated figure for security
- 16:29, 2 March 2021 diff hist +7 m 236.8 Relocation Assistance Program →236.8.8.3 Payment Computations
- 16:25, 2 March 2021 diff hist 0 m 236.8 Relocation Assistance Program →236.8.8.3 Payment Computations
- 14:32, 2 March 2021 diff hist -97 m Category:109 Measurement and Payment →109.5.2 Daily Force Account Record, Equipment and Materials Account: Per CM, updated links
- 13:35, 2 March 2021 diff hist -4 m LPA:136.7 Design updated link
- 13:35, 2 March 2021 diff hist -1 m LPA:136.3 Federal Aid Basics updated link
- 13:34, 2 March 2021 diff hist +24 m LPA:136.8 Local Public Agency Land Acquisition updated links
- 13:31, 2 March 2021 diff hist +26 m LPA:136.6 Environmental and Cultural Requirements updated links
- 13:30, 2 March 2021 diff hist -3 m LPA:136.4 Consultant Selection and Consultant Contract Management updated links
- 13:28, 2 March 2021 diff hist +23 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) updated link
- 13:27, 2 March 2021 diff hist -14 m 236.8 Relocation Assistance Program updated link
- 13:25, 2 March 2021 diff hist +5 m 236.6 Appraisal and Appraisal Review updated links
- 13:23, 2 March 2021 diff hist -28 m 903.5 Regulatory Signs updated links
- 13:07, 2 March 2021 diff hist -1 m Category:109 Measurement and Payment updated links
- 13:05, 2 March 2021 diff hist -1 m 236.1 General Information updated link
- 13:04, 2 March 2021 diff hist -18 m 236.7 Negotiation updated links
- 12:27, 2 March 2021 diff hist +15 m 141.2 Missouri Transportation Finance Corporation (MTFC) Loans updated link current
- 12:25, 2 March 2021 diff hist -96 m 236.3 Administration updated links
- 12:22, 2 March 2021 diff hist -20 m Category:113 Construction Inspection Guidance for Contractor's Claims updated link
- 12:20, 2 March 2021 diff hist +4 m Category:950 Automated Traffic Enforcement updated link
- 12:19, 2 March 2021 diff hist -92 m 236.5 Property Management updated links
- 12:16, 2 March 2021 diff hist -4 m Category:142 Missouri One Call System updated link
- 12:15, 2 March 2021 diff hist +30 m Category:102 Bidding Requirements and Conditions updated links
- 12:00, 2 March 2021 diff hist -29 m 141.3 Local Funding Options updated links
- 11:56, 2 March 2021 diff hist -89 m 127.25 Maintenance Environmental Policies updated links
- 11:48, 2 March 2021 diff hist +18 m 171.7 Bridge Maintenance Updated link current
- 11:47, 2 March 2021 diff hist 0 m 133.4 Snow and Ice Control Operations updated links
- 11:43, 2 March 2021 diff hist -36 m Category:172 Maintenance Facility Performance Expectations Environmental Compliance updated links
- 11:40, 2 March 2021 diff hist 0 m Category:151 Administrative Rule Creation or Modification Process updated link current
- 11:40, 2 March 2021 diff hist 0 m Category:152 Contactor Bonding Responsibilities updated links current
- 11:38, 2 March 2021 diff hist +60 m Category:141 Partnership Development updated links current
- 11:33, 2 March 2021 diff hist -1 m LPA:136.9 Plans, Specs and Estimates (PSE) updated links
- 11:17, 2 March 2021 diff hist +119 m 616.19 Quality Standards for Temporary Traffic Control Devices
- 11:16, 2 March 2021 diff hist +118 m Recent Policy Changes in the EPG EPG 616.19
- 11:12, 2 March 2021 diff hist +152 m Recent Policy Changes in the EPG EPG 616.19
- 11:05, 2 March 2021 diff hist 0 N File:616.19 flyer.pdf
- 10:57, 2 March 2021 diff hist +608 616.19 Quality Standards for Temporary Traffic Control Devices Per EPS and CM, new work zone flyer (Quality Standards for Temporary Traffic Control Devices) and guidance for TTCD retroreflectivity
- 10:05, 2 March 2021 diff hist +248 m 751.12 Barriers, Railings, Curbs and Fences Per BR, added link to 21-01-SEG Anchoring Barriers Over Precast Panels
- 08:50, 2 March 2021 diff hist 0 m 236.8 Relocation Assistance Program →236.8.8.3 Payment Computations
- 15:29, 1 March 2021 diff hist 0 N File:104.11 Completed SIMS form 2012 secure.pdf current
- 15:28, 1 March 2021 diff hist +14 m 104.11 Project Scoping Documentation Updated figure for security
- 11:19, 1 March 2021 diff hist 0 N File:237.4.10 seed files secure.pdf current
- 11:19, 1 March 2021 diff hist 0 m 237.4 Plan-Profile Sheets →237.4.10 Typical Section Sheets
- 11:18, 1 March 2021 diff hist +7 m 237.4 Plan-Profile Sheets →237.4.10 Typical Section Sheets: Updated for security
- 12:09, 26 February 2021 diff hist 0 N File:109.12 Truth Table Feb 2021.docx current
- 12:08, 26 February 2021 diff hist +8 m Category:109 Measurement and Payment →109.12.1.1 Change Order Approval Level Criteria: Per CM, a note about "zero dollar" change orders was clarified in the Change Order Approval Level Determination Chart
- 16:10, 25 February 2021 diff hist +1 m Category:129 Public Involvement →129.8 Section 4(f) Lands: minor correction
- 11:59, 25 February 2021 diff hist +365 m Recent Policy Changes in the EPG EPG 106.9, EPG 106.21
- 11:51, 25 February 2021 diff hist +187 m 106.21 Summary of Materials Inspected →106.21.1.1 Summary Packet of Materials Inspected: Per CM, added guidance to utilize NTPEP compliance that AASHTO already has in place for programmatic acceptance of Buy America. It significantly reduces paperwork and effort from suppliers, contractors, MoDOT and FHWA.
- 11:48, 25 February 2021 diff hist +1,054 m 106.9 Buy America Requirement Per CM, added guidance to utilize NTPEP compliance that AASHTO already has in place for programmatic acceptance of Buy America. It significantly reduces paperwork and effort from suppliers, contractors, MoDOT and FHWA.
- 14:14, 24 February 2021 diff hist +31 m Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14): Per CM, minor clarification
- 08:37, 24 February 2021 diff hist +794 m 751.50 Standard Detailing Notes →H3. Bearings: Per BR, added links and underlining
- 15:04, 23 February 2021 diff hist +2 m 903.5 Regulatory Signs Per TS, updated "How Speed Limits are Established" link
- 13:20, 23 February 2021 diff hist +158 m Recent Policy Changes in the EPG EPG 751.50
- 13:13, 23 February 2021 diff hist +52 m 751.50 Standard Detailing Notes →H3. Bearings
- 12:12, 23 February 2021 diff hist +1,338 m 751.50 Standard Detailing Notes →H3. Bearings: Per BR, updated notes to clarify sole plate and anchor bolt coating requirements when superstructure is galvanized.
- 11:59, 22 February 2021 diff hist +451 m Recent Policy Changes in the EPG EPG 902.2.17, EPG 903.18
- 11:24, 22 February 2021 diff hist +31 m Recent Policy Changes in the EPG
- 11:08, 22 February 2021 diff hist 0 N File:902.12.7 packet 2021.pdf current
- 11:07, 22 February 2021 diff hist +5 m 902.12 Flashing Beacons (MUTCD Chapter 4L) →902.12.7 Procedures for Advance Beacon Installations by Outside Parties: Per TS, updated School Flasher Packet
- 10:10, 22 February 2021 diff hist +734 m Recent Policy Changes in the EPG EPG 902.6, EPG 101, EPG 136.9 and EPG 642.8