- 10:20, 14 August 2017 diff hist +330 m 751.50 Standard Detailing Notes →G7. Steel HP Pile: Per BR, revised and added std detailing notes for the anchorage of pile for seismic jobs
- 10:04, 14 August 2017 diff hist +206 m 751.9 LFD Seismic →751.9.3.1.7 T- Joint Connections: Per BR, added link to revised info about anchorage of pile for seismic jobs
- 09:54, 14 August 2017 diff hist +19 m 751.36 Driven Piles →751.36.2 Steel Pile
- 09:53, 14 August 2017 diff hist 0 N File:751.36.2.jpg current
- 09:52, 14 August 2017 diff hist +947 m 751.36 Driven Piles →751.36.2 Steel Pile: Per BR, revised the anchorage of pile for seismic jobs
- 08:39, 14 August 2017 diff hist +318 m Category:138 Project Development Chronology added 2017 map
- 07:38, 14 August 2017 diff hist 0 236.5 Property Management
- 14:46, 11 August 2017 diff hist -2 m Main Page
- 13:52, 11 August 2017 diff hist +296 m 236.15 Requests from Cities for Annexations Per RW, updated links to form 39
- 13:47, 11 August 2017 diff hist -1,128 m 236.11 Mediation Per RW, updated links to forms
- 12:49, 11 August 2017 diff hist -12,818 m 236.7 Negotiation Per RW, updated links to forms
- 11:29, 11 August 2017 diff hist -3,848 m 236.6 Appraisal and Appraisal Review updated links to forms
- 11:15, 11 August 2017 diff hist -363 m 236.5 Property Management
- 11:10, 11 August 2017 diff hist -158 m 236.5 Property Management
- 11:09, 11 August 2017 diff hist -8,484 m 236.5 Property Management updated links to forms
- 10:23, 11 August 2017 diff hist -5 m 236.4 Description Writing and Titles
- 10:08, 11 August 2017 diff hist -1,580 m 236.4 Description Writing and Titles Per RW, updated form links
- 10:57, 10 August 2017 diff hist -8 m Main Page EPG 625.1.2
- 10:55, 10 August 2017 diff hist +298 m Category:625 Slab Stabilization →625.1.2 Construction Inspection for Sec 625.10 Slab Undersealing: Per CM, clarified measurement of liquid asphalt cement
- 09:27, 10 August 2017 diff hist -46 m Main Page EPG 760.1
- 09:23, 10 August 2017 diff hist +672 m Category:760 General Construction Inspection for Structures →760.1 Preparation For Inspection: Per CM and BR, clarified overhead work on bridges safety guidance
- 09:10, 10 August 2017 diff hist 0 m Category:950 Automated Traffic Enforcement
- 09:09, 10 August 2017 diff hist 0 m 907.3 Travel Safe Zones updated division's name
- 09:07, 10 August 2017 diff hist +8 m 907.1 Safety Program Guidelines
- 09:06, 10 August 2017 diff hist -1 m 907.1 Safety Program Guidelines →907.1.3 District Safety Plans and Project Reporting
- 09:05, 10 August 2017 diff hist +4 m 907.1 Safety Program Guidelines updated division's name
- 09:03, 10 August 2017 diff hist +100 m 153.21 Traffic Updated division's name
- 08:06, 10 August 2017 diff hist +1,609 m 237.11 Signing and Sealing Per CADD, moved slightly updated guidance from a link into the "Additional Information" box.
- 07:44, 10 August 2017 diff hist +15 m 237.11 Signing and Sealing updated archaic Design link
- 15:14, 9 August 2017 diff hist 0 m Main Page
- 13:40, 9 August 2017 diff hist +2 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, further updated D-12
- 13:40, 9 August 2017 diff hist +4 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, further updated D-12
- 13:39, 9 August 2017 diff hist 0 N File:D-12 Aug 9 2017.docx current
- 13:39, 9 August 2017 diff hist +4 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, further updated D-12
- 13:38, 9 August 2017 diff hist +2 m Category:101 Standard Forms →Design: Per Bidding and Est'g, further updated D-12
- 12:06, 9 August 2017 diff hist 0 N File:756 flow chart 2017.pdf current
- 12:06, 9 August 2017 diff hist +5 m Category:756 Seismic Design Per BR, minor updates to Bridge Seismic Design Process Flowchart
- 13:31, 8 August 2017 diff hist +34 m Main Page
- 13:30, 8 August 2017 diff hist +1 m Main Page
- 13:29, 8 August 2017 diff hist +44 m Main Page EPG 240
- 13:13, 8 August 2017 diff hist +133 m Category:240 Maintenance and Emergency Crossovers Per TS, revised the standard for Emergency Vehicle Crossovers to 20' wide with 10' radius to allow fire/EMS responders to utilized the emergency crossovers.
- 14:59, 7 August 2017 diff hist -86 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): Per EPG, updated JSP links
- 14:40, 7 August 2017 diff hist 0 m Main Page
- 13:27, 7 August 2017 diff hist +4 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, updated D-12
- 13:26, 7 August 2017 diff hist +8 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, updated D-12
- 13:26, 7 August 2017 diff hist +4 m Category:101 Standard Forms Per Bidding and Est'g, updated D-12
- 13:25, 7 August 2017 diff hist 0 N File:D-12 Aug 2017.docx current
- 13:25, 7 August 2017 diff hist +8 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, updated D-12
- 11:19, 7 August 2017 diff hist -230 m Main Page
- 15:30, 4 August 2017 diff hist +59 m Category:610 Pavement Smoothness →610.7 Dispute Resolution (Sec 610.5.5)
- 15:26, 4 August 2017 diff hist +48 Category:610 Pavement Smoothness →610.7 Dispute Resolution (Sec 610.5.5)
- 15:22, 4 August 2017 diff hist +11 m Category:610 Pavement Smoothness →610.4 Smoothness Increments (Sec 610.4.1)
- 14:48, 4 August 2017 diff hist -31 m Category:600 INCIDENTAL CONSTRUCTION
- 14:46, 4 August 2017 diff hist +6 m Category:610 Pavement Smoothness →610.2 Inertial Profilers (Sec 610.2.1)
- 14:44, 4 August 2017 diff hist 0 m Category:610 Pavement Smoothness
- 14:41, 4 August 2017 diff hist 0 N File:610.7.jpg current
- 14:41, 4 August 2017 diff hist 0 N File:610.2 inertial profilers.jpg current
- 14:40, 4 August 2017 diff hist 0 N File:610.2.jpg current
- 14:40, 4 August 2017 diff hist 0 N File:610.2 rod and level.jpg current
- 14:39, 4 August 2017 diff hist 0 N File:610.1.jpg current
- 14:38, 4 August 2017 diff hist +313 Category:610 Pavement Smoothness Per CM, guidance for the new Sec 610
- 13:17, 4 August 2017 diff hist +10,224 N Category:610 Pavement Smoothness Per CM, new guidance for the new spec
- 11:04, 4 August 2017 diff hist -211 m 751.50 Standard Detailing Notes →H10. Barrier Curbs: Per BR, deleted archaic note H10.84
- 08:04, 4 August 2017 diff hist -18 m Help Article →Division Contacts
- 08:04, 4 August 2017 diff hist -18 m Help Article →Division Contacts
- 08:52, 3 August 2017 diff hist +204 m 230.1 Horizontal Alignment →230.1.5 Spiral Transition Curves: Per DE, clarified spiral transition curves guidance and bring them into compliance with standard plans
- 08:42, 3 August 2017 diff hist -50 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Per EPG, updated JSP links
- 09:17, 2 August 2017 diff hist 0 N File:237.9 MHTC Agenda Item Checklist 2017.docx current
- 09:17, 2 August 2017 diff hist -10 m 237.9 Submission of Plans and Supporting Documents Per MHTC, updated MHTC Agenda Item Checklist
- 12:41, 1 August 2017 diff hist 0 N File:Main Page 2 Aug 1, 2017.jpg current
- 12:41, 1 August 2017 diff hist 0 N File:Main Page Aug 1, 2017.jpg current
- 12:41, 1 August 2017 diff hist +182 m Main Page
- 14:26, 31 July 2017 diff hist 0 N File:134.5.2 2017.docx
- 14:25, 31 July 2017 diff hist 0 m Category:134 Engineering Professional Services Per LPA, updated the fiscal years in the cost area of PSC Approval to Execute Supplemental Agreement, Fig. 134.5.2
- 11:33, 31 July 2017 diff hist +5 m Main Page
- 09:52, 31 July 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator 2017.xlsx
- 09:52, 31 July 2017 diff hist +10 m 606.1 Guardrail Per Charles Schumann (original creator of the G'rail LON Calculator), minor corrections to the spreadsheet.
- 10:42, 28 July 2017 diff hist +119 m Category:173 Erosion Control for Maintenance Operations Per MT, Per MT, clarification reflecting actual field activities was added at the request of FEMA
- 10:11, 28 July 2017 diff hist 0 N File:903.17.23 2017.jpg current
- 10:11, 28 July 2017 diff hist +3 m 903.16 Typical Signing Applications →Figure 903.17.23 Location of Yield and Lane Ends Sign for Acceleration Ramps: Per Traffic, fig corrected to be in compliance with written guidance
- 15:22, 25 July 2017 diff hist 0 m Main Page
- 15:06, 25 July 2017 diff hist +12 m Main Page EPG 751.50
- 14:57, 25 July 2017 diff hist +51 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: Per BR, combined and revised notes H2c.1.10 and H2c.1.11 and revised note H2c1.38 to clarify the location of the coil tie being referenced.
- 08:40, 25 July 2017 diff hist 0 N File:D-12 2017.docx current
- 08:40, 25 July 2017 diff hist -53 m 643.2 Local Utility Adjustments - Public and Private Per EPG, minor update to D-12
- 08:39, 25 July 2017 diff hist 0 m 237.9 Submission of Plans and Supporting Documents Per EPG, minor update to D-12
- 08:38, 25 July 2017 diff hist 0 m Category:101 Standard Forms Per EPG, minor update to D-12
- 08:37, 25 July 2017 diff hist -106 m Category:124 Quality Control / Quality Assurance (QC/QA) Per EPG, minor update to D-12
- 12:48, 24 July 2017 diff hist -748 m Main Page
- 12:46, 24 July 2017 diff hist -24 m 643.1 Utilities - Status Letter →643.1.2 Utility Status: minor improvement
- 12:28, 24 July 2017 diff hist -52 m Main Page EPG 643.1
- 10:03, 24 July 2017 diff hist -40 m 643.1 Utilities - Status Letter →643.1.2 Utility Status: Per EPG, updated guidance to current practice and clarified D-12 with minor updates
- 15:02, 21 July 2017 diff hist +1 m Main Page
- 09:01, 21 July 2017 diff hist 0 N File:Fig 616.6.87.2 July 2017.jpg current
- 09:00, 21 July 2017 diff hist +5 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Fig. 616.6.87.2 Rumble Strip Placement on a Divided Highway: Per TS, minor correction of Fig. 616.6.87.2
- 08:09, 19 July 2017 diff hist -1,747 m 236.14 Change in Route Status Report Per RW, removed archaic links to RW 27 and RW 32.
- 10:46, 18 July 2017 diff hist 0 m 903.9 General Information Signs →Table 903.9.23 National Known, National Prominent Sites
- 10:35, 18 July 2017 diff hist +44 m 903.9 General Information Signs →Table 903.9.23 National Known, National Prominent Sites: Per TS, added Ulysses S. Grant Nat'l Historic Site to listing
- 15:21, 17 July 2017 diff hist -4 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.1.2 State Law
- 14:52, 17 July 2017 diff hist -3 m Main Page
- 14:51, 17 July 2017 diff hist 0 N File:Main Page 3 July 17, 2017.jpg current
- 14:50, 17 July 2017 diff hist 0 N File:Main Page 2 July 17, 2017.jpg current
- 14:50, 17 July 2017 diff hist 0 N File:Main Page July 17, 2017.jpg current
- 14:50, 17 July 2017 diff hist +348 m Main Page
- 07:58, 17 July 2017 diff hist -440 m Category:101 Standard Forms →Construction and Materials: Per CM and Stormwater Compliance Coordinator, deleted 3 archaic Land Disturbance Inspection Record forms
- 14:36, 13 July 2017 diff hist 0 N File:Main Page July 13, 2017.jpg current
- 14:36, 13 July 2017 diff hist +297 m Main Page
- 08:59, 13 July 2017 diff hist 0 m Main Page
- 08:34, 11 July 2017 diff hist +301 m Main Page EPG 134
- 08:28, 11 July 2017 diff hist 0 N File:134.2.4 July 11 2017.doc current
- 08:28, 11 July 2017 diff hist 0 N File:134.2.2 July 11 2017.doc current
- 08:27, 11 July 2017 diff hist +9 m Category:134 Engineering Professional Services Per LPA, cosmetically updated Figs. 134.2.2 and 134.2.4
- 14:24, 10 July 2017 diff hist 0 N File:134.2.4 July 10 2017.doc current
- 14:23, 10 July 2017 diff hist 0 N File:134.2.2 July 2017.doc current
- 14:22, 10 July 2017 diff hist +18 m Category:134 Engineering Professional Services Per LPA, updated Figs. 134.2.2 and 134.2.4 to accommodate new Docusign instructions.
- 13:42, 10 July 2017 diff hist 0 N File:134 Docusign.pdf current
- 13:41, 10 July 2017 diff hist +108 m Category:134 Engineering Professional Services Per LPA, added DocuSign instructions
- 08:57, 10 July 2017 diff hist -28 m Category:747 Bridge Reports and Layouts →747.1.2.4 GEO Files for Stream Crossings: Per BR, updated link
- 08:21, 10 July 2017 diff hist -2 m Main Page
- 12:40, 6 July 2017 diff hist 0 m 121.3 The Statewide Transportation Improvement Program (STIP) updated STIP link
- 09:57, 6 July 2017 diff hist +19 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, updated archaic PoDI links
- 15:27, 5 July 2017 diff hist -220 m Main Page EPG 134.2.4
- 15:09, 5 July 2017 diff hist +496 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts: Per LPA, new 2017-2020 on-call consultant categories and lists
- 12:33, 5 July 2017 diff hist -1 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System
- 12:33, 5 July 2017 diff hist -1 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System
- 11:22, 5 July 2017 diff hist +6 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: old PODI link re-established
- 11:21, 5 July 2017 diff hist -6 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per Bidding and Est, updated PODI link
- 10:03, 5 July 2017 diff hist +360 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, updated to match bit item listing for monolithic deck repair
- 09:52, 5 July 2017 diff hist 0 N File:134.2.4 July 5 2017.doc current
- 09:51, 5 July 2017 diff hist +6 m Category:134 Engineering Professional Services
- 09:26, 5 July 2017 diff hist 0 N File:134.2.4 July 2017.doc current
- 09:26, 5 July 2017 diff hist +15 m Category:134 Engineering Professional Services Per LPA, cosmetically updated Fig. 134.2.4
- 09:05, 5 July 2017 diff hist -260 m Main Page EPG 822
- 08:55, 5 July 2017 diff hist +1 m Category:822 Roadside Vegetation Management
- 08:54, 5 July 2017 diff hist -117 m 822.4 Best Practices current
- 08:53, 5 July 2017 diff hist -49 m 822.4 Best Practices
- 08:52, 5 July 2017 diff hist -1 m 822.9 Maintenance Planning Guidelines for Tree Removal current
- 08:52, 5 July 2017 diff hist 0 m 822.9 Maintenance Planning Guidelines for Tree Removal 822.10 Maintenance Planning Guidelines for Tree Removal moved to 822.9 Maintenance Planning Guidelines for Tree Removal
- 08:52, 5 July 2017 diff hist +68 N 822.10 Maintenance Planning Guidelines for Tree Removal 822.10 Maintenance Planning Guidelines for Tree Removal moved to 822.9 Maintenance Planning Guidelines for Tree Removal current
- 08:52, 5 July 2017 diff hist 0 822.8 Maintenance Planning Guidelines for Brush Cutting current
- 08:52, 5 July 2017 diff hist 0 m 822.8 Maintenance Planning Guidelines for Brush Cutting 822.9 Maintenance Planning Guidelines for Brush Cutting moved to 822.8 Maintenance Planning Guidelines for Brush Cutting
- 08:52, 5 July 2017 diff hist +69 N 822.9 Maintenance Planning Guidelines for Brush Cutting 822.9 Maintenance Planning Guidelines for Brush Cutting moved to 822.8 Maintenance Planning Guidelines for Brush Cutting current
- 08:51, 5 July 2017 diff hist 0 m 822.7 Maintenance Planning Guidelines for Mowing Operations
- 08:51, 5 July 2017 diff hist 0 m 822.7 Maintenance Planning Guidelines for Mowing Operations 822.8 Maintenance Planning Guidelines for Mowing Operations moved to 822.7 Maintenance Planning Guidelines for Mowing Operations
- 08:51, 5 July 2017 diff hist +73 N 822.8 Maintenance Planning Guidelines for Mowing Operations 822.8 Maintenance Planning Guidelines for Mowing Operations moved to 822.7 Maintenance Planning Guidelines for Mowing Operations current
- 08:51, 5 July 2017 diff hist 0 m 822.6 Hay and Other Crops on the Right of Way current
- 08:51, 5 July 2017 diff hist 0 m 822.6 Hay and Other Crops on the Right of Way 822.7 Hay and Other Crops on the Right of Way moved to 822.6 Hay and Other Crops on the Right of Way
- 08:51, 5 July 2017 diff hist +59 N 822.7 Hay and Other Crops on the Right of Way 822.7 Hay and Other Crops on the Right of Way moved to 822.6 Hay and Other Crops on the Right of Way current
- 08:50, 5 July 2017 diff hist +672 m 822.5 Definitions Per MT, updates to promote and enhance pollinator habitat on r/w while addressing traveler safety and noxious weeds
- 08:48, 5 July 2017 diff hist 0 m 822.5 Definitions 822.6 Definitions moved to 822.5 Definitions: Renumbered by MT
- 08:48, 5 July 2017 diff hist +31 N 822.6 Definitions 822.6 Definitions moved to 822.5 Definitions: Renumbered by MT current
- 08:48, 5 July 2017 diff hist -4,490 m 822.4 Best Practices Moved to EPG 822.4 Recommended Practices.
- 08:45, 5 July 2017 diff hist 0 N File:822.4 cl.jpg current
- 08:45, 5 July 2017 diff hist +5,250 m 822.4 Recommended Practices Per MT, updates to promote and enhance pollinator habitat on r/w while addressing traveler safety and noxious weeds current
- 08:44, 5 July 2017 diff hist 0 m 822.4 Recommended Practices 822.5 Recommended Practices moved to 822.4 Recommended Practices: MT combined E 822.5 Recommended Practices with E 822.4 Best Practices
- 08:44, 5 July 2017 diff hist +41 N 822.5 Recommended Practices 822.5 Recommended Practices moved to 822.4 Recommended Practices: MT combined E 822.5 Recommended Practices with E 822.4 Best Practices current
- 08:39, 5 July 2017 diff hist 0 N File:822.2.1 2017.jpg current
- 08:38, 5 July 2017 diff hist +223 m 822.2 Vegetation Management for Minor Roads Per MT, updates to promote and enhance pollinator habitat on r/w while addressing traveler safety and noxious weeds current
- 08:37, 5 July 2017 diff hist 0 N File:822.1.3 2017.jpg current
- 08:37, 5 July 2017 diff hist 0 N File:822.1.2 2017.jpg current
- 08:37, 5 July 2017 diff hist 0 N File:822.1.1 2017.jpg current
- 08:36, 5 July 2017 diff hist +83 m 822.1 Vegetation Management for Major Roads Per MT, updates to promote and enhance pollinator habitat on r/w while addressing traveler safety and noxious weeds
- 08:35, 5 July 2017 diff hist 0 N File:822 2017.pdf current
- 08:35, 5 July 2017 diff hist 0 N File:822 2017.jpg current
- 08:34, 5 July 2017 diff hist -114 m Category:822 Roadside Vegetation Management Per MT, updates to promote and enhance pollinator habitat on r/w while addressing traveler safety and noxious weeds
- 12:54, 3 July 2017 diff hist +1 m Main Page
- 07:56, 3 July 2017 diff hist +290 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.5 Threatened and Endangered Species: Per Env'l, replaced 19-min "MoDOT T&E Prog Guidance" video with two MoDOT T&E guidance videos and a MDC tutorial video
- 14:55, 29 June 2017 diff hist +76 m Category:941 Permits and Access Requests
- 14:18, 29 June 2017 diff hist +19 m 903.3 Ground-Mounted Sign Supports →903.3.21 Sign Inspection and Inventory
- 14:17, 29 June 2017 diff hist +87 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)
- 14:01, 29 June 2017 diff hist +57 m 903.7 Conventional Road Guide Signs
- 13:58, 29 June 2017 diff hist +8 907.7 Highway Safety Manual →907.7.5 What Additional Resources are Available to Aid in an HSM Analysis?
- 13:57, 29 June 2017 diff hist +19 m 236.14 Change in Route Status Report →236.14.7 AASHTO Application
- 13:56, 29 June 2017 diff hist +38 m 233.2 At-Grade Intersections with Stop and Yield Control
- 13:54, 29 June 2017 diff hist +58 m 903.2 Extent of Signing
- 13:52, 29 June 2017 diff hist +19 m 902.4 Signal Installations and Equipment →902.4.3 Annual Orders and District Signal and Lighting Equipment Purchases
- 13:51, 29 June 2017 diff hist +19 m 234.2 Diamond Interchanges
- 13:50, 29 June 2017 diff hist +19 m 230.2 Vertical Alignment
- 13:49, 29 June 2017 diff hist +19 m 616.13 Work Zone Capacity, Queue and Travel Delay
- 13:48, 29 June 2017 diff hist +38 m Category:900 TRAFFIC CONTROL
- 13:44, 29 June 2017 diff hist +27 m 233.3 Roundabouts
- 13:43, 29 June 2017 diff hist +19 m 902.17 Execution of Contracts for Signal or Flasher Installation →902.17.1 Pre-approved CCO Forms
- 13:42, 29 June 2017 diff hist +18 m 106.16 Special Designs and Shop Drawings →106.16.2.1 Requirements
- 13:41, 29 June 2017 diff hist +19 m 620.11 Guidelines for Using Water-Borne Traffic Paint
- 13:41, 29 June 2017 diff hist +68 m 106.1 Source of Supply and Quality Requirements →Traffic
- 13:21, 29 June 2017 diff hist +19 m Category:233 At - Grade Intersections
- 13:20, 29 June 2017 diff hist +19 m Category:241 Aesthetic Considerations →241.5 Constraints
- 13:19, 29 June 2017 diff hist +19 m Category:241 Aesthetic Considerations →241.5 Constraints
- 13:17, 29 June 2017 diff hist 0 m Category:134 Engineering Professional Services
- 13:06, 29 June 2017 diff hist 0 m 233.2 At-Grade Intersections with Stop and Yield Control
- 13:05, 29 June 2017 diff hist 0 m 903.3 Ground-Mounted Sign Supports
- 12:59, 29 June 2017 diff hist 0 m Category:941 Permits and Access Requests
- 12:53, 29 June 2017 diff hist +1 m Category:100 GENERAL
- 12:52, 29 June 2017 diff hist +4 m Category:900 TRAFFIC CONTROL
- 12:51, 29 June 2017 diff hist 0 m 903.19 Signing for Rail and Light Rail Transit Grade Crossings
- 12:50, 29 June 2017 diff hist +2 m 616.13 Work Zone Capacity, Queue and Travel Delay
- 12:49, 29 June 2017 diff hist 0 m 903.1 Highway Signing General Information
- 12:48, 29 June 2017 diff hist 0 m 616.16 Law Enforcement Services
- 12:48, 29 June 2017 diff hist 0 m 907.1 Safety Program Guidelines
- 12:47, 29 June 2017 diff hist +1 m 907.7 Highway Safety Manual
- 10:49, 29 June 2017 diff hist -10 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per Bidding and Est, updated link to PODI List for 2018
- 08:53, 29 June 2017 diff hist +90 m LPA:136.13 LPA Policy Changes
- 08:52, 29 June 2017 diff hist +1 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.1 Introduction
- 07:37, 29 June 2017 diff hist +373 m LPA:136.13 LPA Policy Changes EPG 136.4.1
- 07:29, 29 June 2017 diff hist 0 N File:136.4.1.ppt current
- 07:28, 29 June 2017 diff hist +269 m LPA:136.4 Consultant Selection and Consultant Contract Management Per CM, added ppt "Construction Inspection"
- 08:45, 28 June 2017 diff hist 0 m Main Page
- 07:45, 28 June 2017 diff hist -7 Category:403 Asphaltic Concrete Pavement →403.3.1.1 Trial Mixtures: Per CM,
- 07:13, 28 June 2017 diff hist 0 m Category:403 Asphaltic Concrete Pavement →403.3.1.1 Trial Mixtures
- 07:10, 28 June 2017 diff hist +7 m Category:403 Asphaltic Concrete Pavement →403.3.1.1 Trial Mixtures
- 07:09, 28 June 2017 diff hist 0 m Category:403 Asphaltic Concrete Pavement →403.3.1.1 Trial Mixtures: minor correction, per CM
- 15:00, 26 June 2017 diff hist 0 N File:Main Page June 26, 2017.jpg current
- 15:00, 26 June 2017 diff hist +96 m Main Page
- 12:41, 23 June 2017 diff hist +202 m LPA:136.13 LPA Policy Changes Fig. 136.3.1
- 12:39, 23 June 2017 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.1
- 12:38, 23 June 2017 diff hist 0 N File:136.3.1 2017.doc current
- 12:38, 23 June 2017 diff hist 0 m LPA:136.3 Federal Aid Basics Per LPA, Fig. 136.3.1 updated to show the LPA Internal Procedures Manual requires LPAs submit the FFATA form with the programming data form.
- 12:16, 23 June 2017 diff hist +363 m Main Page EPG 403
- 11:31, 23 June 2017 diff hist 0 m Category:402 Bituminous Surface Leveling →402.1.1 Plan Preparation
- 11:30, 23 June 2017 diff hist 0 m Category:402 Bituminous Surface Leveling →402.1.1 Plan Preparation
- 11:28, 23 June 2017 diff hist -133 m Category:402 Bituminous Surface Leveling Per CM, removed archaic "Asphalt Cement Price Index Example Calculations"
- 11:26, 23 June 2017 diff hist -117 m Category:401 Bituminous Base and Pavement Per CM, removed archaic "Asphalt Cement Price Index Example Calculations"
- 10:59, 23 June 2017 diff hist +322 m Category:625 Slab Stabilization →625.1.2 Construction Inspection for Sec 625.10 Slab Undersealing: Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:55, 23 June 2017 diff hist +369 m Category:409 Seal Coat Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:43, 23 June 2017 diff hist +163 m Category:402 Bituminous Surface Leveling →402.1 Design of Contract Leveling Course Projects: Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:40, 23 June 2017 diff hist +166 m Category:401 Bituminous Base and Pavement Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:38, 23 June 2017 diff hist -81 m Category:403 Asphaltic Concrete Pavement Per CM, deleted archaic "Asphalt Cement Price Adjustment (for Square Yard Items)".
- 10:36, 23 June 2017 diff hist -156 m 413.3 Ultrathin Bonded Asphalt Wearing Surface
- 10:36, 23 June 2017 diff hist -99 m 413.3 Ultrathin Bonded Asphalt Wearing Surface Per CM, deleted archaic "Asphalt Cement Price Adjustment (for Square Yard Items)".
- 08:08, 23 June 2017 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments.docx current
- 08:08, 23 June 2017 diff hist +305 m Category:403 Asphaltic Concrete Pavement Per CM, added "Guidance for Asphalt Cement Price Index Adjustments". Also moved Asphalt Cement Price Adjustment (for Square Yard Items) from EPG 413
- 15:26, 22 June 2017 diff hist -100 m Category:101 Standard Forms →Construction and Materials: Per CM, removed "UBAWS AC Membrane Adjustment" link since it was already replaced with other forms
- 10:27, 21 June 2017 diff hist -4 m Main Page
- 08:20, 21 June 2017 diff hist +176 m Main Page EPG 751.31, EPG 751.32
- 08:17, 21 June 2017 diff hist +26 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.1 Typical Pile Cap Bent
- 08:15, 21 June 2017 diff hist +29 m 751.31 Open Concrete Intermediate Bents
- 08:47, 20 June 2017 diff hist 0 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems
- 08:45, 20 June 2017 diff hist +36 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 12:08, 19 June 2017 diff hist -16 m 153.9 Design
- 15:12, 16 June 2017 diff hist +314 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.1 Typical Pile Cap Bent: Per BR, clarified and corrected foundation data
- 15:05, 16 June 2017 diff hist 0 N File:751.31.3.1 Longitudinal Beam Steps.jpg current
- 15:04, 16 June 2017 diff hist +281 m 751.31 Open Concrete Intermediate Bents →751.31.3.1 Beam Cap: BR, clarified reinforcement details for longitudinal beam step.
- 14:59, 16 June 2017 diff hist 0 N File:Main Page June 16, 2017.jpg current
- 14:58, 16 June 2017 diff hist +92 m Main Page
- 14:52, 16 June 2017 diff hist -8 m 751.6 General Quantities →751.6.2.17 Excavation
- 14:29, 16 June 2017 diff hist -3 m Main Page
- 14:27, 16 June 2017 diff hist +36 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:41, 16 June 2017 diff hist -5 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems
- 12:33, 16 June 2017 diff hist +11 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:32, 16 June 2017 diff hist -66 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:30, 16 June 2017 diff hist +57 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:03, 16 June 2017 diff hist +125 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, clarified and corrected foundation data
- 10:42, 16 June 2017 diff hist -33 m Main Page EPG 751.22.3.15
- 10:38, 16 June 2017 diff hist +222 m 751.9 LFD Seismic Per BR, clarified length requirements for dowel bars for prestressed girder bridges. Re-named "dowel rods" as "dowel bars".
- 10:32, 16 June 2017 diff hist 0 m 751.9 LFD Seismic
- 10:28, 16 June 2017 diff hist +6 m 751.22 Prestressed Concrete I Girders →751.22.3.15 Dowel Bars (Rods)
- 10:23, 16 June 2017 diff hist 0 N File:751.22.3.15.jpg current
- 10:22, 16 June 2017 diff hist -33 m 751.22 Prestressed Concrete I Girders →751.22.3.15 Dowel Bars (Rods): Per BR, clarified length requirements for dowel bars for prestressed girder bridges. Re-named "dowel rods" as "dowel bars".
- 08:58, 16 June 2017 diff hist -9 m Main Page EPG 606.1
- 08:58, 16 June 2017 diff hist +32 m 606.1 Guardrail
- 08:50, 16 June 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator.xlsx
- 08:49, 16 June 2017 diff hist +2 m 606.1 Guardrail
- 08:46, 16 June 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator.xls
- 08:46, 16 June 2017 diff hist +547 m 606.1 Guardrail Per CADD, added Guardrail Length of Need Calculator
- 14:40, 15 June 2017 diff hist +65 m 153.9 Design Per LPA, updated some contract titles and a few other items
- 14:02, 15 June 2017 diff hist 0 N File:902.5.29 Flashing Yellow Arrow brochure.pdf current
- 14:02, 15 June 2017 diff hist -11 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.29 Guidelines for Use of the Flashing Yellow Left Arrow: Updated link
- 13:44, 15 June 2017 diff hist +210 m Main Page EPG 751.6.2.17, EPG 747.1.6.2
- 13:38, 15 June 2017 diff hist +425 751.50 Standard Detailing Notes →J. MSE Wall Notes (Notes for Bridge Standard Drawings): Per BR, new J1.30 notes the revision of Bridge standard drawings for MSE wall for excavation
- 13:34, 15 June 2017 diff hist +427 751.24 LFD Retaining Walls →751.24.2.2 Details: Per BR, Cross-reference added for excavation and division responsibilities for preparing MSE wall plans, computing excavation class and quantities.
- 13:20, 15 June 2017 diff hist 0 m 751.6 General Quantities
- 13:19, 15 June 2017 diff hist 0 N File:751.6.2.17 case 7b.jpg current
- 13:19, 15 June 2017 diff hist 0 N File:751.6.2.17 case 7a.jpg current
- 13:19, 15 June 2017 diff hist 0 N File:751.6.2.17 case 6.jpg current
- 13:18, 15 June 2017 diff hist 0 N File:751.6.2.17 case 5b.jpg current
- 13:18, 15 June 2017 diff hist 0 m 751.6 General Quantities
- 13:17, 15 June 2017 diff hist 0 N File:751.6.2.17 case 5a.jpg current
- 13:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 4.jpg current
- 13:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 3.jpg current
- 13:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 2.jpg current
- 13:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 1.jpg current
- 13:15, 15 June 2017 diff hist 0 m 751.6 General Quantities
- 13:14, 15 June 2017 diff hist 0 N File:751.6.2.17.jpg current
- 13:13, 15 June 2017 diff hist 0 m 751.6 General Quantities →751.6.2.17 Excavation
- 13:12, 15 June 2017 diff hist 0 N File:751.6.2.17 earth work.jpg current
- 13:11, 15 June 2017 diff hist 0 N File:751.6.2.17 Semi Deep Case 1 Section AA.jpg current
- 13:11, 15 June 2017 diff hist +6,439 751.6 General Quantities →751.6.2.17 Excavation: Per BR, different possible cases for MSE wall excavation added
- 10:49, 15 June 2017 diff hist +175 m Main Page EPG 620, EPG 1048
- 10:40, 15 June 2017 diff hist -1,423 620.12 Construction Inspection for Sec 620 Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance
- 10:31, 15 June 2017 diff hist -310 620.1 General (MUTCD Chapter 3A) Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance.
- 10:20, 15 June 2017 diff hist +97 Category:1048 Pavement Marking Material →1048.2.1 Type 1 and Type 2 Preformed Marking Tape: Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance
- 10:11, 15 June 2017 diff hist 0 m Category:620 Pavement Marking current
- 10:10, 15 June 2017 diff hist 0 N File:620 decision 2017.jpg current
- 10:10, 15 June 2017 diff hist 0 N File:620 Durable.doc current
- 10:10, 15 June 2017 diff hist +321 Category:620 Pavement Marking Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance.
- 08:34, 15 June 2017 diff hist +3,710 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems: Per BR, division responsibilities for preparing MSE wall plans, computing excavation quantities and locations added
- 15:22, 14 June 2017 diff hist -2 m Main Page
- 13:56, 9 June 2017 diff hist -58 m Main Page EPG 402, EPG 450, EPG 751.24, EPG 760
- 12:48, 9 June 2017 diff hist 0 N File:760.4.2 FAQ 2017.docx current
- 12:48, 9 June 2017 diff hist +5 m Category:760 General Construction Inspection for Structures
- 12:47, 9 June 2017 diff hist +5 m Category:760 General Construction Inspection for Structures Per TP, also updated FAQ document
- 12:37, 9 June 2017 diff hist +1,465 Category:760 General Construction Inspection for Structures →760.4 Vertical Clearance: Per TP, expanded and clarified guidance for the measurement and reporting of vertical clearance.
- 11:36, 9 June 2017 diff hist +137 751.24 LFD Retaining Walls →751.24.2.1 Design: Per BR, the types of pipes permitted as pipe pile spacers behind MSE walls for driving piling during bridge construction were expanded.
- 11:29, 9 June 2017 diff hist -94 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, the types of pipes permitted as pipe pile spacers behind MSE walls for driving piling during bridge construction were expanded.
- 11:20, 9 June 2017 diff hist +446 Category:450 Bituminous Pavement Design →450.3 Layer Design: Per CM, guidance has been expanded to provide suggested additional quantities amounts for addressing the surface irregularities of existing pavement.
- 11:15, 9 June 2017 diff hist +1,745 Category:402 Bituminous Surface Leveling →402.1.2 Mix and Quantities: Per CM, guidance has been expanded to provide suggested additional quantities amounts for addressing the surface irregularities of existing pavement.
- 10:17, 9 June 2017 diff hist +436 m LPA:136.13 LPA Policy Changes EPG 136.6.4.9
- 10:15, 9 June 2017 diff hist 0 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.9 Borrow Sites and Other Land Disturbance Activities Outside Right of Way
- 10:12, 9 June 2017 diff hist +140 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.9 Borrow Sites and Other Land Disturbance Activities Outside Right of Way: Per Hist. Pres., guidance for env'l clearance help clarified
- 13:45, 8 June 2017 diff hist -282 m Main Page EPG 751.50
- 13:29, 8 June 2017 diff hist +89 m 751.50 Standard Detailing Notes
- 12:33, 8 June 2017 diff hist +1,386 m 751.50 Standard Detailing Notes Per BR, added Redeck Standard Notes and made minor revisions to Notes B3.32 and B3.33.
- 10:51, 8 June 2017 diff hist +101 m Main Page
- 10:48, 8 June 2017 diff hist +129 m Main Page EPG 134
- 10:42, 8 June 2017 diff hist -2 m Category:101 Standard Forms Per LPA, updated Submittal to Professional Services Committee
- 10:41, 8 June 2017 diff hist 0 N File:134.3.1 2017.doc current
- 10:41, 8 June 2017 diff hist 0 N File:134.2.4 2017.doc current
- 10:41, 8 June 2017 diff hist 0 m Category:134 Engineering Professional Services
- 10:40, 8 June 2017 diff hist 0 Category:134 Engineering Professional Services →134.1.3 Consultant Qualification
- 10:38, 8 June 2017 diff hist 0 N File:134.2.2.2 June 2017.docx current
- 10:38, 8 June 2017 diff hist 0 N File:134.2.2 2017.doc current
- 10:37, 8 June 2017 diff hist +6,789 m Category:134 Engineering Professional Services Per LPA, revised guidance for eAgreement (electronic vs wet signatures) workflow changes and to incorporate more-than-Taking Care of the System (TSCO) planning studies.
- 13:49, 7 June 2017 diff hist +13 m Main Page
- 13:31, 7 June 2017 diff hist -5 m Main Page EPG 903.15.3
- 12:13, 7 June 2017 diff hist +329 m 903.14 Memorial Signs →903.15.3 Heroes Way Interchange Program: Per TS, updated guidance to reflect current practice.
- 08:39, 7 June 2017 diff hist 0 N File:Main Page June 7, 2017.jpg current
- 08:39, 7 June 2017 diff hist -106 m Main Page
- 07:22, 7 June 2017 diff hist 0 N File:101 Workforce Pilot Program Employee Notification.pdf current
- 07:21, 7 June 2017 diff hist 0 N File:101 Sample Company Workforce Diversity Job Special Provision Action Plan.docx current
- 07:21, 7 June 2017 diff hist 0 N File:101 Contractor's Monthly New Employee Report.pdf current
- 07:21, 7 June 2017 diff hist -4 m Category:101 Standard Forms →External Civil Rights
- 07:20, 7 June 2017 diff hist +403 m Category:101 Standard Forms Three new forms from ECR
- 10:02, 6 June 2017 diff hist +296 m Category:900 TRAFFIC CONTROL
- 09:59, 6 June 2017 diff hist +300 m Category:1000 MATERIALS
- 09:57, 6 June 2017 diff hist +300 m Category:800 ROADSIDE DEVELOPMENT
- 09:54, 6 June 2017 diff hist +298 m Category:109 Measurement and Payment
- 09:53, 6 June 2017 diff hist +298 m Category:105 Control of Work
- 09:52, 6 June 2017 diff hist +301 m Category:101 Standard Forms
- 14:33, 5 June 2017 diff hist 0 m Main Page
- 09:27, 5 June 2017 diff hist -153 m Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10): Per DE, updated language to current Agreements Review Group's process for reviewing DE10 and DE11
- 09:25, 5 June 2017 diff hist -346 m 153.9 Design Per DE, updated language to EPG 153.8 DE Table and EPG 235.2.3 to current Agreements Review Group process for reviewing DE10 and DE11.
- 13:06, 2 June 2017 diff hist -5 m LPA:136.4 Consultant Selection and Consultant Contract Management updated broken 23 CFR 172.3 link
- 12:21, 2 June 2017 diff hist +8 m 103.1 Bid Opening and Award Process Per DE, the Bidding and Contract Group further clarified that Permitted Combination of Projects for lettings is no longer allowed.
- 08:25, 2 June 2017 diff hist +2 m Main Page EPG 103.1
- 08:23, 2 June 2017 diff hist -449 m 103.1 Bid Opening and Award Process Per DE, the Bidding and Contract Group no longer allows Permitted Combination of Projects for lettings.
- 07:12, 2 June 2017 diff hist -7 m Category:101 Standard Forms →Construction and Contractor Related: Per ECR, updated link to MoDOT Workforce JSP Cumulative Workforce Hours Report
- 13:42, 1 June 2017 diff hist -51 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: updated link
- 13:20, 1 June 2017 diff hist +2 m Main Page
- 10:23, 1 June 2017 diff hist +8 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 10:44, 31 May 2017 diff hist +13 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per LPA, clarified Landscape Architects as "Professional Landscape Architects".
- 09:58, 31 May 2017 diff hist +4 m Category:101 Standard Forms →Construction and Materials
- 09:53, 31 May 2017 diff hist -466 m Category:108 Prosecution and Progress
- 09:51, 31 May 2017 diff hist +466 m Category:108 Prosecution and Progress Per CM, updated link to Final Acceptance Report (C-239)
- 09:45, 31 May 2017 diff hist +498 m Category:101 Standard Forms →Construction and Materials: Per CM, updated several links
- 15:09, 30 May 2017 diff hist +96 m Category:101 Standard Forms →Construction and Materials: Per CM, added link to Final Acceptance Report (C-239)
- 15:08, 30 May 2017 diff hist +62 m Category:108 Prosecution and Progress Per CM, added link to Final Acceptance Report (C-239)
- 13:28, 30 May 2017 diff hist 0 N File:108.16.2 Sample Final Inspection Letter 2017.pdf current
- 13:28, 30 May 2017 diff hist +5 m Category:108 Prosecution and Progress Per CM, updated Fig. 108.16.2, Sample Final Inspection letter, by adding a statement to remind contractors to upload any remaining QC documents.
- 12:55, 30 May 2017 diff hist +49 m Main Page EPG 101
- 12:30, 30 May 2017 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 11:31, 30 May 2017 diff hist +7 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per Envir'l, clarified Consent Decree Initial Set-Up QRG per no. of disturbed acres when adding a project to database as well as prerequisite dates for Insp.
- 14:29, 26 May 2017 diff hist -526 m Category:240 Maintenance and Emergency Crossovers
- 14:52, 25 May 2017 diff hist 0 m Main Page
- 13:33, 25 May 2017 diff hist +10 m Main Page
- 08:29, 24 May 2017 diff hist +29 m LPA:136.13 LPA Policy Changes
- 08:28, 24 May 2017 diff hist +94 m LPA:136.13 LPA Policy Changes Fig. 136.3.20
- 08:27, 24 May 2017 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.20
- 08:27, 24 May 2017 diff hist 0 N File:Fig.136.3.20 2017.docx
- 08:26, 24 May 2017 diff hist 0 m LPA:136.3 Federal Aid Basics Per BR, updated Fig. 136.3.20, BEAP Project Tracking Form
- 14:31, 22 May 2017 diff hist 0 N File:Main Page 3 May 22, 2017.jpg current
- 14:31, 22 May 2017 diff hist 0 N File:Main Page 2 May 22, 2017.jpg current
- 14:31, 22 May 2017 diff hist 0 N File:Main Page May 22, 2017.jpg current
- 14:30, 22 May 2017 diff hist +45 m Main Page
- 10:14, 22 May 2017 diff hist +307 m 153.9 Design Per DE, revised who need to review several agreements
- 14:59, 19 May 2017 diff hist 0 N File:Main Page May 19, 2017.jpg current
- 14:59, 19 May 2017 diff hist -424 m Main Page EPG 751
- 13:45, 19 May 2017 diff hist +126 m 751.50 Standard Detailing Notes →G. Substructure Notes: Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 13:35, 19 May 2017 diff hist 0 N File:751.39 2017.jpg current
- 13:34, 19 May 2017 diff hist -144 m 751.39 Pile Footings Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 13:28, 19 May 2017 diff hist +3 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.5 Wing & Detached Wing Walls
- 13:27, 19 May 2017 diff hist 0 N File:751.35.3.5 detached wing 2017.jpg current
- 13:26, 19 May 2017 diff hist 0 N File:751.35.3.5 2017.jpg current
- 13:26, 19 May 2017 diff hist 0 N File:751.35.3.4 May 2017.jpg current
- 13:26, 19 May 2017 diff hist 0 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.3 Prestressed Girder End Bent
- 13:25, 19 May 2017 diff hist 0 N File:751.35.3.3 May 2017.jpg current
- 13:25, 19 May 2017 diff hist +136 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3 Dimensions: Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 13:09, 19 May 2017 diff hist +2 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.2 Wide Flange Beams, Plate Girders and Prestressed Girders
- 13:06, 19 May 2017 diff hist 0 N File:751.34.3.2 safety barrier.jpg current
- 13:06, 19 May 2017 diff hist 0 N File:751.34.3.2 part section.jpg current
- 13:05, 19 May 2017 diff hist 0 N File:751.34.3.2.jpg current
- 13:05, 19 May 2017 diff hist +10 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.2.2 Loads
- 13:03, 19 May 2017 diff hist 0 N File:751.34.2.2 detached wing.jpg current
- 13:02, 19 May 2017 diff hist 0 N File:751.34.2.2 elevation.jpg current
- 13:02, 19 May 2017 diff hist +55 m 751.34 Concrete Pile Cap Non-Integral End Bents Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 12:42, 19 May 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2 Typical Pile Cap Bent
- 12:34, 19 May 2017 diff hist 0 N File:751.32.3.3 part elev 2017.jpg current
- 12:34, 19 May 2017 diff hist 0 N File:751.32.3.2 2017.jpg current
- 12:33, 19 May 2017 diff hist +10 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3 Details: Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 15:04, 17 May 2017 diff hist +8 m Main Page
- 15:03, 17 May 2017 diff hist 0 N File:Main Page May 17, 2017.jpg current
- 15:03, 17 May 2017 diff hist -350 m Main Page
- 10:49, 17 May 2017 diff hist +77 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.3 Prestressed Girder End Bent: Per BR, further clarified girder chair detail & end distance from center line of bearing to end of steel & prestressed girders w/ info left out from 4/11/17
- 10:43, 17 May 2017 diff hist 0 N File:751.22.3.10 part plan skewed 2017.jpg current
- 10:43, 17 May 2017 diff hist +255 m 751.22 Prestressed Concrete I Girders →751.22.3.10 Closed Intermediate Bent Diaphragms: Per BR, girder chair detail & end distance from center line of bearing to end of steel & prestressed girders w/ info left out from 4/11/17 revision
- 10:04, 17 May 2017 diff hist 0 N File:751.11.3.6 side May 17 2017.jpg current
- 10:02, 17 May 2017 diff hist +3 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 10:00, 17 May 2017 diff hist 0 N File:751.11.3.6 side May 2017.jpg current
- 10:00, 17 May 2017 diff hist +4 m 751.11 Bearings →751.11.3 Details: Per BR, further clarified girder chair detail and end distance from center line of bearing to end of steel and prestressed girders w/ info inadvertently left out by division
- 13:37, 16 May 2017 diff hist 0 N File:134.2.2.2 May 16 2017.docx current
- 13:36, 16 May 2017 diff hist +12 m Category:134 Engineering Professional Services further, minor update of Form 134.2.2.2
- 13:35, 16 May 2017 diff hist +3 m Category:101 Standard Forms minor update of Form 134.2.2.2
- 13:26, 16 May 2017 diff hist +10 m 751.22 Prestressed Concrete I Girders →751.22.3.6.2 Shear Reinforcement: Per BR, added a common, available wire size that was inadvertently excluded in the original Nov 22, '17 revision.
- 12:12, 16 May 2017 diff hist +3 m 238.3 Route Surveying updated GPS reference station network link
- 12:09, 16 May 2017 diff hist 0 m Category:134 Engineering Professional Services updated GPS Reference Station network link
- 15:22, 12 May 2017 diff hist -2 m Main Page
- 15:01, 12 May 2017 diff hist -7 m Category:101 Standard Forms Per LPA, updated two forms: Submittal to Professioanl Services Committee and the Consultant Rating Form
- 14:59, 12 May 2017 diff hist 0 N File:134.2.2.5.1 May 2017.doc current
- 14:59, 12 May 2017 diff hist 0 N File:134.2.2.2 May 2017.docx current
- 14:59, 12 May 2017 diff hist -28 m Category:134 Engineering Professional Services Per LPA, updated two forms, Figs. 134.2.2.2 and 134.2.2.5.1, with minor updates
- 12:56, 12 May 2017 diff hist -137 m Main Page EPG 236.7.2.3
- 12:37, 12 May 2017 diff hist 0 m 236.7 Negotiation →236.7.2.3 Prompt Offer of Just Compensation: Per RW, increased the minimum offer of prompt offer of just compensation from $300 to $500
- 08:53, 12 May 2017 diff hist -1 m Main Page
- 08:19, 12 May 2017 diff hist 0 N File:616.13.7.1 2017.xlsx current
- 08:19, 12 May 2017 diff hist +10 m 616.13 Work Zone Capacity, Queue and Travel Delay Per TS, updated Traffic Pacing Worksheet
- 09:46, 11 May 2017 diff hist -14 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.6.3 Work Zone Intelligent Transportation Systems (WZITS): updated jsp link
- 08:47, 10 May 2017 diff hist -13 m Main Page EPG 402 and EPG 409
- 08:30, 10 May 2017 diff hist 0 N File:402 CLC MoDOT 2017.pdf current
- 08:30, 10 May 2017 diff hist 0 N File:402 CLC Contractor 2017.pdf current
- 08:29, 10 May 2017 diff hist +10 m Category:402 Bituminous Surface Leveling Per Bidding and Contract, the MoDOT/Contractor files were further updated
- 07:33, 10 May 2017 diff hist 0 N File:409 Seal Coat MoDOT.pdf current
- 07:33, 10 May 2017 diff hist 0 N File:409 Seal Coat Contractor.pdf
- 07:32, 10 May 2017 diff hist 0 File:409 FY2018 Contract Seal Coat Guidelines.docx uploaded a new version of "Image:409 FY2018 Contract Seal Coat Guidelines.docx" current
- 07:30, 10 May 2017 diff hist 0 N File:409 FY2018 Contract Seal Coat Guidelines.docx
- 07:30, 10 May 2017 diff hist -1,223 m Category:409 Seal Coat Per Bidding and Contract, the CLC guidelines and MoDOT/Contractor files were updated
- 07:19, 10 May 2017 diff hist 0 N File:402 CLC MoDOT.pdf current
- 07:19, 10 May 2017 diff hist 0 N File:402 CLC Contractor.pdf current
- 07:19, 10 May 2017 diff hist 0 N File:402 FY2018 Contract Leveling Coat Guidelines.docx current
- 07:19, 10 May 2017 diff hist -1,085 m Category:402 Bituminous Surface Leveling Per Bidding and Contract, the CLC guidelines and MoDOT/Contractor files were updated
- 14:49, 5 May 2017 diff hist 0 m Main Page
- 14:33, 4 May 2017 diff hist +265 m 171.5 Drainage Added link to Culvert Pipe Replacement video
- 12:38, 3 May 2017 diff hist 0 m Main Page
- 09:02, 3 May 2017 diff hist -107 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.2 No-Passing Zone Pavement Markings and Warrants (MUTCD Section 3B.02): Per TR, removed an MUTCD clause since we do not use the NO PASSING ZONE sign on a statewide basis
- 08:12, 3 May 2017 diff hist +1,440 m 153.19 Multimodal Per MO, updated tables to relfect current contract listings
- 12:12, 2 May 2017 diff hist +302 m Category:101 Standard Forms →Construction and Materials: Per CM, added to links: 2017 Statewide Rail Cable Fence Spreadsheets (Grading and No Grading)
- 11:19, 2 May 2017 diff hist +8 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention: Per CM, dashes allowed
- 11:04, 1 May 2017 diff hist +61 m Main Page EPG 137
- 10:12, 1 May 2017 diff hist -1 m Category:137 Construction Inspection Guidance for Records to be Maintained
- 10:10, 1 May 2017 diff hist -18 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention
- 10:09, 1 May 2017 diff hist 0 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention
- 10:08, 1 May 2017 diff hist 0 N File:137.3 good 2017.jpg current
- 10:07, 1 May 2017 diff hist -4,885 m Category:137 Construction Inspection Guidance for Records to be Maintained Per CM, updated terminology for storing project documents, which are now stored in eProjects rather than the CIA (V drive)
- 08:45, 1 May 2017 diff hist -1 m Main Page
- 15:27, 28 April 2017 diff hist -1 m Help Article →Division Contacts
- 14:20, 28 April 2017 diff hist -90 m 236.15 Requests from Cities for Annexations
- 14:20, 28 April 2017 diff hist -2,004 m 236.15 Requests from Cities for Annexations Per CCO, updated link to Voluntary Annexation Petition
- 12:34, 28 April 2017 diff hist 0 m Main Page
- 14:30, 27 April 2017 diff hist +179 m 751.8 LRFD Concrete Box Culverts →751.8.1.5 Precast Culvert: Per BR, minor clarification for precast box culvert pay item and quantity tabulations
- 12:11, 27 April 2017 diff hist +211 m LPA:136.13 LPA Policy Changes EPG 136.11.5
- 12:09, 27 April 2017 diff hist -59 m LPA:136.11 Local Public Agency Construction →136.11.5 Subcontracts: Per LPA, removed archaic statement requiring MoDOT to approve subcontracts.
- 14:50, 26 April 2017 diff hist 0 N File:134.2.2.5.1 April 26 2017.doc current
- 14:50, 26 April 2017 diff hist +3 m Category:101 Standard Forms Per LPA, updated Fig. 134.2.2.5.1
- 14:49, 26 April 2017 diff hist +12 m Category:134 Engineering Professional Services Per LPA, updated Fig. 134.2.2.5.1
- 14:42, 26 April 2017 diff hist +37 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 14:34, 26 April 2017 diff hist +1 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 14:33, 26 April 2017 diff hist +1 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 10:50, 26 April 2017 diff hist +12 m Category:101 Standard Forms Per LPA, further updated the same two forms: Fig. 134.2.2.2 and Fig. 134.2.2.5.1
- 10:50, 26 April 2017 diff hist 0 N File:134.2.2.5.1 April 2017.doc current
- 10:50, 26 April 2017 diff hist 0 N File:134.2.2.2 April 2017.docx current
- 10:49, 26 April 2017 diff hist +42 m Category:134 Engineering Professional Services Per LPA, further updated the same two forms: Fig. 134.2.2.2 and Fig. 134.2.2.5.1
- 10:34, 26 April 2017 diff hist 0 N File:134.2.2.5.1 2017.doc current
- 10:22, 26 April 2017 diff hist 0 N File:134.2.2.2 2017.docx current
- 10:21, 26 April 2017 diff hist -281 m Category:134 Engineering Professional Services Per LPA, updated two forms: Fig. 134.2.2.2 Solicitations and Request Letter, Fig. 134.2.2.5.1 Consultant Rating Form
- 10:16, 26 April 2017 diff hist -91 m Category:101 Standard Forms Per LPA, updated two forms
- 07:21, 26 April 2017 diff hist +1 m 751.35 Concrete Pile Cap Integral End Bents →751.35.5.1 Reinforcing Holes: minor correction, per BR
- 14:33, 25 April 2017 diff hist +127 m Main Page EPG 460.3.13
- 13:59, 25 April 2017 diff hist +1,403 m 460.3 Plant Inspection Per CM, new guidance for handling failing binder samples on projects and when additional testing which may take place. Also, recommendations for penalties for failing binders at the different levels.
- 14:25, 21 April 2017 diff hist -257 m Category:702 Load-Bearing Piles →702.1 Pile Types and Testing: Per BR, removed archaic info
- 10:43, 21 April 2017 diff hist -551 m Category:702 Load-Bearing Piles Per BR, minor editorial revisions.
- 07:10, 21 April 2017 diff hist -16 m Main Page
- 14:17, 20 April 2017 diff hist -4 m Main Page
- 13:56, 20 April 2017 diff hist +1 m Main Page
- 13:42, 20 April 2017 diff hist -3 m Category:101 Standard Forms →Construction and Contractor Related
- 13:31, 20 April 2017 diff hist 0 m Main Page
- 13:28, 20 April 2017 diff hist +89 m Main Page
- 13:23, 20 April 2017 diff hist 0 N File:Main Page April 19, 2017.jpg current
- 13:23, 20 April 2017 diff hist 0 N File:Main Page 2 April 20, 2017.jpg current
- 13:23, 20 April 2017 diff hist 0 N File:Main Page April 20, 2017.jpg current
- 13:22, 20 April 2017 diff hist +1,454 m Main Page
- 11:15, 20 April 2017 diff hist +287 m 751.9 LFD Seismic Per BR, added "Additional Info" box linking to the Bridge Seismic Design Process Flowchart
- 12:47, 19 April 2017 diff hist +58 m Main Page
- 15:02, 18 April 2017 diff hist 0 m Main Page
- 07:08, 18 April 2017 diff hist 0 N File:104.6 Bridge Scoping Checklist.docx current
- 07:08, 18 April 2017 diff hist -12 m 104.6 Project Scoping Checklists Per BR, updated Bridge Scoping Checklist
- 14:24, 17 April 2017 diff hist +157 m Category:101 Standard Forms →Construction and Contractor Related: Per ECR and CM, added form, MoDOT Workforce Pre-Construction Diversity Plan Report.
- 09:10, 14 April 2017 diff hist +101 m 616.5 Flagger Control (MUTCD Chapter 6E) →616.5.4 Automated Flagger Assistance Devices (MUTCD 6E.04): added link
- 09:08, 14 April 2017 diff hist +101 m 616.19 Quality Standards for Temporary Traffic Control Devices added link
- 09:05, 14 April 2017 diff hist +422 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.2.2 Flags and Advance Warning Rail System on Signs: inserted links
- 08:58, 14 April 2017 diff hist -6 m 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G) →616.7.2 Work Duration (MUTCD 6G.02)
- 08:49, 14 April 2017 diff hist +1 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings)
- 08:46, 14 April 2017 diff hist +52 m 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G) →616.7.2 Work Duration (MUTCD 6G.02): inserted link