- 17:00, 9 February 2018 diff hist 0 N File:1041.8 corrugated.jpg current
- 17:00, 9 February 2018 diff hist 0 N File:1041.8 steel.jpg current
- 16:57, 9 February 2018 diff hist +7,754 N 1041.8 Polypropylene Pipe (PP) Pipe Inspection Guide New page: This guide will assist in the inspection of all types and configurations of polypropylene (PP) pipe, couplings and fittings. Answer each question and take the action indicated for the answ... current
- 16:54, 9 February 2018 diff hist +2 m Category:1041 Polypropylene Culvert Pipe
- 16:54, 9 February 2018 diff hist +70 Category:1000 MATERIALS new EPG 1041
- 16:53, 9 February 2018 diff hist +11,527 N Category:1041 Polypropylene Culvert Pipe Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:47, 9 February 2018 diff hist +1,402 Category:1028 Corrugated Polyvinyl Chloride Culvert Pipe Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:45, 9 February 2018 diff hist +1,568 750.7 Non-Hydraulic Considerations →750.7.2 Types: Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:43, 9 February 2018 diff hist +3,606 Category:732 Flared End Sections Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:42, 9 February 2018 diff hist +70 Category:700 STRUCTURES AND HYDRAULICS EPG 730 Thermoplastic Pipe Culverts current
- 16:41, 9 February 2018 diff hist +5,499 N Category:730 Thermoplastic Pipe Culverts Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:39, 9 February 2018 diff hist -2,362 Category:730 Corrugated Polyethylene Pipe Culverts Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications. current
- 16:37, 9 February 2018 diff hist -1,411 Category:728 Corrugated Polyvinyl Chloride Culvert Pipe EPG 728 was deleted since there is no longer a Sec 728. current
- 16:36, 9 February 2018 diff hist +7,021 N Category:724 Pipe Culverts Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:33, 9 February 2018 diff hist +57 Category:700 STRUCTURES AND HYDRAULICS
- 16:26, 9 February 2018 diff hist -554 751.50 Standard Detailing Notes →G. Substructure Notes: Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) and replace it with AASHTO M 270, Gr 50 (ASTM A709,
- 16:23, 9 February 2018 diff hist -71 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) and replace it with AASHTO M 270, Gr 50 (ASTM A70
- 16:20, 9 February 2018 diff hist +10 751.36 Driven Piles
- 16:18, 9 February 2018 diff hist +939 751.36 Driven Piles Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Grade 36 (ASTM A 709, Grade 36) and replace it with AASHTO M 270, Grade 50 (ASTM A709, Grade 50).
- 16:14, 9 February 2018 diff hist -28 751.1 Preliminary Design →751.1.2 Bridges/Boxes: Per BR, revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) & replace it with AASHTO M 270, Gr 50 (ASTM A709, Gr 50)
- 16:09, 9 February 2018 diff hist +438 Category:702 Load-Bearing Piles Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Grade 36 (ASTM A 709, Grade 36) and replace it with AASHTO M 270, Grade 50 (ASTM A709, Grade 50).
- 16:01, 9 February 2018 diff hist -55 237.7 Equipment and Materials List Per Bidding and Contract, revision will now require designers to include the D-15 in the Electronic Deliverables.
- 15:33, 6 February 2018 diff hist +64 m Main Page EPG 108.1.3
- 15:29, 6 February 2018 diff hist 0 m Category:108 Prosecution and Progress →108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting
- 15:24, 6 February 2018 diff hist +557 m Category:108 Prosecution and Progress →108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting: Per ECR and CM, expanded and clarified guidance for contractor to fill out Form C-220.
- 14:25, 6 February 2018 diff hist +134 m Category:108 Prosecution and Progress →108.1 Subletting of Contract (for Sec 108.1): Per ECR, minor clarification
- 09:40, 5 February 2018 diff hist -421 m Main Page
- 09:39, 5 February 2018 diff hist +39 m Main Page
- 09:38, 5 February 2018 diff hist +136 m Main Page EPG 153.1.3.3
- 09:30, 5 February 2018 diff hist +793 m Category:153 Agreements and Contracts →153.1.3.2 Reviewer’s Roles and Responsibilities: Per DE, new guidance to address Agreements initiated by other entities that are not initiated in eAgreements.
- 16:06, 2 February 2018 diff hist -8 m Main Page EPG 129.12
- 16:02, 2 February 2018 diff hist +69 m Category:129 Public Involvement →129.12 Presentation for Location or Design Approval to the Commission: Per DE, clarified that location & design approval is required even if an LPA is administering & paying for improvement
- 15:46, 2 February 2018 diff hist -68 m Main Page EPG Other Aspects of Pavement Design
- 15:43, 2 February 2018 diff hist +123 m Other Aspects of Pavement Design →Minor Roads: Per DE, clarification about pavement thicknesses/types sometimes not included on typical sections. Now is effective for April 2018.
- 14:44, 2 February 2018 diff hist +227 m Main Page EPG 616.6.89
- 09:40, 2 February 2018 diff hist 0 N File:616.14 WZ Questions 2018.docx current
- 09:39, 2 February 2018 diff hist -12 m 616.14 Work Zone Safety and Mobility Policy Per TS, update to WZ Questions for the Core Team.
- 09:32, 2 February 2018 diff hist +760 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.89 Radar Speed Advisory Assembly: Per TS, expanded and updated guidance on the placement of the Radar Speed Advisory Assembly.
- 16:04, 1 February 2018 diff hist +196 m Main Page EPG 128.2 and EPG 231.2
- 15:53, 1 February 2018 diff hist -2,294 231.2 Clear Zones →231.2.1 Introduction: Per EPS and CCO, condensed and clarified guidance regarding clear zones and roadside hardware for 1R and 2R projects
- 15:49, 1 February 2018 diff hist +505 Category:128 Conceptual Studies →128.2 Preventive Maintenance Projects (1R and 2R): Per EPS and CCO, condensed and clarified guidance regarding clear zones and roadside hardware for 1R and 2R projects
- 15:01, 1 February 2018 diff hist +13 m Category:450 Bituminous Pavement Design →450.9 Safety EdgeSM
- 14:48, 1 February 2018 diff hist +2 m Main Page
- 10:28, 31 January 2018 diff hist +1 m Category:718 Temporary Bridge →718.1 Construction Inspection for Sec 718 current
- 16:07, 30 January 2018 diff hist 0 m 751.50 Standard Detailing Notes →B3a. Bridges
- 14:59, 30 January 2018 diff hist -9 751.50 Standard Detailing Notes →B3a. Bridges
- 14:57, 30 January 2018 diff hist +51 m 751.50 Standard Detailing Notes →B3a. Bridges: Per BR, updated Note B3.2
- 10:07, 30 January 2018 diff hist -1 m Category:101 Standard Forms
- 10:06, 30 January 2018 diff hist 0 N File:747 Bridge Survey Checklist 2018.doc current
- 10:06, 30 January 2018 diff hist -2 m Category:747 Bridge Reports and Layouts
- 11:03, 29 January 2018 diff hist +125 m Category:101 Standard Forms Per BR, updated Bridge Survey Checklist. Also added the Bridge Survey Location Request form to two Design locations
- 10:52, 29 January 2018 diff hist 0 N File:747 Bridge Survey Checklist 2018.docx current
- 10:52, 29 January 2018 diff hist -82 m Category:747 Bridge Reports and Layouts Per BR, updated Bridge Survey Checklist
- 15:57, 26 January 2018 diff hist -3 m 131.1 Design Exception Process →131.1.4 The Design Exception Process
- 14:30, 26 January 2018 diff hist -542 m Main Page EPG 131.1.4
- 14:14, 26 January 2018 diff hist +610 m 131.1 Design Exception Process →131.1.4 The Design Exception Process: Per DE, Design Exceptions to be stored electronically in eProjects after CO DE/BR have reviewed & approved. Guidance is now up-to-date with current practice
- 12:25, 26 January 2018 diff hist +16 m Category:132 Safety
- 12:23, 26 January 2018 diff hist +33 m Category:132 Safety updated links to various PPE guidance
- 12:16, 26 January 2018 diff hist -17 m Category:132 Safety Updated link to USDOT Emergency Response Guide
- 09:25, 26 January 2018 diff hist 0 N File:123.1.1 PoDI 2018.xlsx
- 09:24, 26 January 2018 diff hist -98 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per DE, updated PoDI list
- 15:03, 25 January 2018 diff hist +1 751.40 LFD Widening and Repair →751.40.2.4 Deck Repair and Filled Joints: Per BR, updated link
- 14:58, 25 January 2018 diff hist -1 m 751.5 Structural Detailing Guidelines →751.5.4.5 Bridge Decks: Per BR, updated link
- 11:46, 25 January 2018 diff hist 0 106.3.2.40 TM-40, A One-Point Moisture-Density Relations Test for Soils current
- 11:46, 25 January 2018 diff hist 0 N File:106.3.2.40.jpg current
- 11:45, 25 January 2018 diff hist +2 m 106.3.2.40 TM-40, A One-Point Moisture-Density Relations Test for Soils Per CM, minor correction to figure.
- 11:37, 24 January 2018 diff hist +1 m LPA:136.2 Certification and Training
- 11:21, 24 January 2018 diff hist +166 m LPA:136.13 LPA Policy Changes EPG 136.2
- 11:18, 24 January 2018 diff hist +1 m LPA:136.2 Certification and Training
- 11:18, 24 January 2018 diff hist -67 m LPA:136.2 Certification and Training Per CM, updated the contact information for the Technician Certification Program
- 10:51, 24 January 2018 diff hist +181 m 147.3 Job Order Contracting (JOC) →147.3.5 Term Extension of Job Order Contracts: Per CM, updated the 5th bullet pt. CCO requested that CM no longer submit hard copies of the new performance bond, but send them email links
- 08:14, 22 January 2018 diff hist +3 m 171.12 Maintenance Policy History →DRN(A4) Plastic Pipe
- 14:24, 19 January 2018 diff hist 0 m Category:702 Load-Bearing Piles →702.1.4.4 DFI Documents on Pile Driving and Hammers
- 14:20, 19 January 2018 diff hist 0 N File:103.1.6 Reviewers Checklist.docx current
- 14:19, 19 January 2018 diff hist -152 m 103.1 Bid Opening and Award Process Per Bidding and Est, replaced Reviewer's Checklist link with an uploaded form
- 11:30, 19 January 2018 diff hist -51 m LPA:136.13 LPA Policy Changes
- 11:24, 19 January 2018 diff hist -4 m LPA:136.13 LPA Policy Changes minor cosmetic update to Fig. 136.9.3
- 11:24, 19 January 2018 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links minor cosmetic update to Fig. 136.9.3
- 11:23, 19 January 2018 diff hist 0 N File:136.9.3 2018.docx
- 11:23, 19 January 2018 diff hist -28 m LPA:136.9 Plans, Specs and Estimates (PSE) minor cosmetic update to Fig. 136.9.3
- 12:22, 18 January 2018 diff hist 0 N File:101 Floodplain Development Permit Application 2018.pdf current
- 12:22, 18 January 2018 diff hist -7 m Category:101 Standard Forms →Bridge: Per BR, updated “Floodplain Development Permit/Application” form with minor changes made at the request of SEMA.
- 11:54, 18 January 2018 diff hist +75 m Main Page EPG 106.3.2.87, EPG 402
- 10:31, 18 January 2018 diff hist +5 m 147.3 Job Order Contracting (JOC) Per EPS, updated Fence JOC link
- 09:53, 18 January 2018 diff hist +5 m Category:625 Slab Stabilization Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:53, 18 January 2018 diff hist +5 m Category:409 Seal Coat Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:53, 18 January 2018 diff hist +5 m Category:402 Bituminous Surface Leveling Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:52, 18 January 2018 diff hist +5 m Category:401 Bituminous Base and Pavement Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:52, 18 January 2018 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments 2018.docx current
- 09:51, 18 January 2018 diff hist +5 m Category:403 Asphaltic Concrete Pavement Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 08:56, 18 January 2018 diff hist +1,259 Nm 106.3.2.87 TM-87 No-Pick-Up Time for Tack Coats Per CM, new TM for determining no pick-up-time for tack coat
- 11:51, 17 January 2018 diff hist +160 m Main Page EPG 236.3
- 11:27, 17 January 2018 diff hist +1,311 m 236.3 Administration →236.3.4 Right of Way Acquisition Authority and Project Funding: Per RW, to align w/ CFR reg, updated RW activities that can be coded to the PE number prior to receiving FHWA's "A" date approval
- 10:28, 17 January 2018 diff hist -9 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.1 Introduction to the Storm Water Permit and Storm Water Polution Prevention Plan (SWPPP): Per CADD, updated a link to EPA
- 10:16, 17 January 2018 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator 2018.xlsx
- 10:15, 17 January 2018 diff hist -8 m 606.1 Guardrail Per Charles Schumann, minor revision to guardrail calculator spreadsheet (added links to MoDOT approved MASH crashworthy end terminals and MoDOT locations for greater convenience for the user)
- 13:21, 16 January 2018 diff hist -1 m 236.3 Administration →236.3.4.1 General
- 14:43, 12 January 2018 diff hist -2,346 m Category:1037 Sheer Connectors current
- 14:37, 12 January 2018 diff hist 0 Category:1000 MATERIALS Title of EPG 1037 corrected to "Shear" from "Sheer".
- 14:37, 12 January 2018 diff hist +2,687 Nm Category:1037 Shear Connectors Title of EPG 1037 corrected to "Shear" from "Sheer". Old article had 8911 hits and only a few minor corrections from its original incorporation into EPG from Materials Manual in July 2007
- 09:24, 11 January 2018 diff hist 0 N File:910.3.2.13.2.jpg current
- 09:24, 11 January 2018 diff hist +71 m 910.3 Dynamic Message Signs (DMS) →910.3.2.13.2 Other Weather Messages
- 15:38, 10 January 2018 diff hist -4 m Main Page EPG 104.7
- 15:02, 10 January 2018 diff hist +1 m 104.7 Scoping Estimates
- 15:01, 10 January 2018 diff hist +1 m 104.7 Scoping Estimates
- 15:01, 10 January 2018 diff hist 0 N File:104.7 EngFac SFY 15 to 17.pdf current
- 15:01, 10 January 2018 diff hist -119 m 104.7 Scoping Estimates Per TP, updated Engineering Factors Report to SFY 2015 - 2017
- 10:47, 10 January 2018 diff hist +32 m 147.3 Job Order Contracting (JOC) Per EPG, upated JOC JSP links
- 11:58, 9 January 2018 diff hist +622 m 153.9 Design Per DE, added info for DE63
- 10:42, 9 January 2018 diff hist +27 m 102.2 Contractor Performance Rating System Per CM, updated link to Contractor Performance Questionnaire
- 08:51, 4 January 2018 diff hist 0 m Help Article →EPG Ballot Cycles
- 15:41, 3 January 2018 diff hist +1 m Other Aspects of Pavement Design →Minor Roads
- 14:35, 3 January 2018 diff hist +49 m Category:134 Engineering Professional Services updated link
- 14:25, 3 January 2018 diff hist +1 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.1 Specifications of Electronic Design of Contract Plans for Automated Machine Guidance (AMG): minor correction
- 09:31, 2 January 2018 diff hist +1 m Main Page
- 09:55, 29 December 2017 diff hist 0 N File:Main Page Dec 29, 2017.jpg current
- 09:54, 29 December 2017 diff hist +72 m Main Page
- 08:34, 29 December 2017 diff hist +360 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per CM, link added for payroll training course
- 08:17, 29 December 2017 diff hist 0 N File:616.14 WZ Questions Dec 2017.docx current
- 08:16, 29 December 2017 diff hist +12 m 616.14 Work Zone Safety and Mobility Policy Per EPServices, updated Work Zone Questions for the Core Team
- 12:17, 27 December 2017 diff hist 0 N File:121.1 RPC MPO 2017.pdf current
- 12:16, 27 December 2017 diff hist +5 m 121.2 The Planning Framework for Transportation Decision-Making Per Planning, updated RPC MPO figure
- 12:28, 26 December 2017 diff hist +403 m LPA:136.13 LPA Policy Changes EPG 136.3.8.11
- 12:24, 26 December 2017 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.24
- 12:23, 26 December 2017 diff hist 0 N File:Fig.136.3.24 2017.docx current
- 12:23, 26 December 2017 diff hist +285 m LPA:136.3 Federal Aid Basics Per LPA, updated Fig. 136.3.24 TEAP Application
- 11:17, 22 December 2017 diff hist -2 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, minor clarification
- 10:04, 20 December 2017 diff hist +145 m 751.6 General Quantities →751.6.2.10 Bridge Slabs: Per BR, added link
- 09:43, 20 December 2017 diff hist -5 m 620.1 General (MUTCD Chapter 3A) →620.1.8 Temporary Pavement Markings
- 08:34, 19 December 2017 diff hist +172 m 910.4 ITS Architecture Updated link to Bi-State St. Louis Regional ITS Architecture
- 13:16, 18 December 2017 diff hist 0 N File:Fig 104.7 Dec 18 2017.doc
- 13:16, 18 December 2017 diff hist +6 m 104.7 Scoping Estimates minor revision to Cost Estimate Guide for Rural Preliminary Design
- 09:53, 18 December 2017 diff hist +179 m Main Page EPG 104.7
- 09:51, 18 December 2017 diff hist 0 m 104.7 Scoping Estimates
- 09:50, 18 December 2017 diff hist 0 N File:Fig 104.7 Dec 2017.doc
- 09:50, 18 December 2017 diff hist +8 m 104.7 Scoping Estimates Per BR, revised a few Bridge Structure entries in Fig. 104.7 Cost Estimate Guide for Rural Preliminary Design
- 15:57, 15 December 2017 diff hist 0 N File:Main Page Dec 15, 2017.jpg current
- 15:56, 15 December 2017 diff hist -38 m Main Page
- 14:12, 15 December 2017 diff hist +6 m Main Page EPG 110.1
- 13:40, 15 December 2017 diff hist +828 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per CM, expanded guidance for QA measures to assure compliance with wage rate reviews. Required by recent audit
- 10:22, 15 December 2017 diff hist -2 m Help Article
- 10:21, 15 December 2017 diff hist -1 m Category:171 Maintenance Policy and Operations
- 10:20, 15 December 2017 diff hist -1 m 106.22 Material Inspection Revisions →106.22.2 Review current
- 10:14, 15 December 2017 diff hist +449 m Help Article →EPG Ballot Cycles: Per EPS, ballot schedule table updated
- 13:04, 14 December 2017 diff hist +63 m 153.9 Design
- 12:15, 14 December 2017 diff hist -15 m 153.9 Design Per DE, removed redundant reference to DLEs
- 10:17, 14 December 2017 diff hist -132 m LPA:136.13 LPA Policy Changes
- 10:16, 14 December 2017 diff hist +315 m LPA:136.13 LPA Policy Changes Fig. 136.3.20
- 10:13, 14 December 2017 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.20
- 10:12, 14 December 2017 diff hist 0 N File:Fig.136.3.20 Dec 2017.docx
- 10:12, 14 December 2017 diff hist +92 m LPA:136.3 Federal Aid Basics Per BR, updated Fig. 136.3.20 and contact info
- 10:53, 13 December 2017 diff hist +159 m 751.50 Standard Detailing Notes →H10. Barrier Curbs: Per BR, guidance updated with lap length revisions inadvertently not included in original submission
- 10:15, 13 December 2017 diff hist 0 N File:751.12.2.3 continuous 2 2017.jpg current
- 10:15, 13 December 2017 diff hist 0 N File:751.12.2.3 Non-integral 2 2017.jpg current
- 10:14, 13 December 2017 diff hist 0 N File:751.12.2.3 Integral 2 2017.jpg current
- 10:14, 13 December 2017 diff hist +431 m 751.12 Barriers, Railings, Curbs and Fences →751.12.2 Safety Barrier Bridge Curbs (NJ Shape): Per BR, guidance updated with lap length revisions inadvertently not included in original submission
- 16:05, 12 December 2017 diff hist +2 m Category:1048 Pavement Marking Material Per TS, updated EPG labels of three documents
- 15:46, 12 December 2017 diff hist -121 m Other Aspects of Pavement Design →Thickness Determination: Per EPG, deleted most recent revision. Proposed revision to go into effect in April 2018.
- 15:02, 12 December 2017 diff hist +122 m Other Aspects of Pavement Design →Minor Roads: Per DE, clarification about pavement thicknesses/types sometimes not included on typical sections
- 13:21, 11 December 2017 diff hist +2 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, corrected pay item
- 13:13, 11 December 2017 diff hist -1 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings): Per BR, minor correction
- 09:55, 11 December 2017 diff hist +423 m 750.6 Erosion Control and Energy Dissipation →750.6.3.3 Rock Ditch Liner: Per BR, table from Sec 609.50 added for clarity/convenience to highway designers
- 09:38, 11 December 2017 diff hist +105 m 147.3 Job Order Contracting (JOC) Per EPG, updated JSP link
- 10:50, 6 December 2017 diff hist -37 m Category:108 Prosecution and Progress →108.7.3 Table for Contracts with Time Exclusion
- 15:46, 5 December 2017 diff hist -171 m Category:101 Standard Forms →Construction and Materials: Per CM, replaced two forms (2017 Statewide Rail Cable Fence Spreadsheet - Grading and No Grading} with "2017 Statewide Rail Cable Fence Spreadsheet"
- 14:56, 5 December 2017 diff hist -2 m Category:101 Standard Forms →Bridge
- 14:55, 5 December 2017 diff hist -56 m Category:101 Standard Forms →Bridge: Per DE, updated Vertical Clearance Design Exception Coordination with SDDCTEA form
- 14:54, 5 December 2017 diff hist 0 N File:131.1.7 Vertical Clearance Design Exception Coordination with SDDCTEA.pdf current
- 14:54, 5 December 2017 diff hist -116 m 131.1 Design Exception Process Per DE, updated Vertical Clearance Design Exception Coordination with SDDCTEA form
- 14:42, 5 December 2017 diff hist +6 m 751.50 Standard Detailing Notes →G5a Closed Ended Cast-in Place (CECIP) Concrete Pile: Per BR, minor clarification
- 11:37, 5 December 2017 diff hist -27 m 131.1 Design Exception Process →131.1.7 Deficient Vertical Clearances on Interstates: removed archaic link
- 16:13, 4 December 2017 diff hist +2 m Main Page
- 08:55, 1 December 2017 diff hist +204 m 751.1 Preliminary Design →751.1.2.19.2 Content: Per BR, minor clarification
- 08:19, 1 December 2017 diff hist -1 m Category:101 Standard Forms Per DE, updated Fig. 134.2.2.2
- 08:18, 1 December 2017 diff hist 0 N File:134.2.2.2 Nov 2017.docx current
- 08:18, 1 December 2017 diff hist -4 m Category:134 Engineering Professional Services Per DE, updated Fig. 134.2.2.2
- 15:50, 30 November 2017 diff hist +78 m Category:101 Standard Forms →Design Forms: Form 806.8.2 Project-Specific SWPPP Info
- 15:47, 30 November 2017 diff hist 0 N File:Form 806.8.2.pdf current
- 15:47, 30 November 2017 diff hist -7 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per DE, updated Form 806.8.2 Project-Specific SWPPP Info
- 14:09, 30 November 2017 diff hist +1 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, minor clarification
- 13:17, 30 November 2017 diff hist +32 m LPA:136.3 Federal Aid Basics →136.3.15.2 Audit and Final Reimbursement: Per AI, further clarification
- 12:27, 30 November 2017 diff hist +230 m LPA:136.13 LPA Policy Changes EPG 136.3.15.2
- 12:25, 30 November 2017 diff hist -100 m LPA:136.3 Federal Aid Basics →136.3.15.2 Audit and Final Reimbursement: Per AI, removed sentence stating the LPAs must supply a copy of the final audit report to the MPOs.
- 15:49, 29 November 2017 diff hist -2 m 751.50 Standard Detailing Notes →H10a. Safety, Median, Type C & D: Per BR, revised lap lengths to coordinate with standard drawings
- 15:50, 28 November 2017 diff hist -10 m Category:108 Prosecution and Progress →108.7.1 Extensions or Adjustments of Time: minor correction
- 16:11, 21 November 2017 diff hist -6 m 751.50 Standard Detailing Notes →A4a1. Steel Structures- Nonweathering Steel
- 15:15, 21 November 2017 diff hist -7 m 751.50 Standard Detailing Notes →H1. Steel: Per BR, further clarified Note H1.45
- 13:56, 21 November 2017 diff hist +40 m 751.50 Standard Detailing Notes →H1. Steel: Per BR, in H1.51, reduced showing redundant deck thickness on plans since changing thickness on details can get missed.
- 13:46, 21 November 2017 diff hist -31 m 751.50 Standard Detailing Notes Per BR, minor clarifications
- 09:56, 21 November 2017 diff hist +3 m 237.11 Signing and Sealing Per CADD, minor clarifications
- 15:37, 20 November 2017 diff hist +199 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.4.2 File Naming Conventions: Per Est and Review, updated file naming conventions
- 13:10, 20 November 2017 diff hist -103 m Category:153 Agreements and Contracts →153.1.6.2 eAgreements SharePoint Site Properties Page: Updated link
- 15:38, 17 November 2017 diff hist +73 m Main Page
- 14:47, 17 November 2017 diff hist 0 N File:Main Page Nov 17, 2017.jpg current
- 14:47, 17 November 2017 diff hist +84 m Main Page
- 13:13, 17 November 2017 diff hist 0 m 903.3 Ground-Mounted Sign Supports →Table 903.3.23 Incident Response Signing Plan: Per TS, corrected SCHOOL sign's priority to be "2" (not "3")
- 10:42, 14 November 2017 diff hist -377 m 750.3 Bridges →750.3.2.2.2 Bridge Survey: Per BR, omitted revision related to Nov 3, 2017 revision guidance for district submittal of request for valley section locations
- 09:55, 14 November 2017 diff hist +5 m 751.50 Standard Detailing Notes →H1. Steel: Per BR, minor clarification
- 09:50, 14 November 2017 diff hist +2 m 237.9 Submission of Plans and Supporting Documents
- 15:52, 13 November 2017 diff hist +37 m Main Page
- 15:51, 13 November 2017 diff hist +49 m Main Page
- 15:23, 13 November 2017 diff hist 0 N File:Main Page Nov 13, 2017.jpg current
- 15:23, 13 November 2017 diff hist +43 m Main Page
- 14:44, 13 November 2017 diff hist +306 m LPA:136.13 LPA Policy Changes EPG 136.1.2.2
- 14:40, 13 November 2017 diff hist +1,383 m LPA:136.1 Introduction →136.1.2.2 Project Sponsor Eligibility: Per LPA, expanded guidance since FAST Act extended eligibility for some programs. KC, SL & S'fld MPOs asked us allow eligibility to nonprofits in their areas
- 11:05, 13 November 2017 diff hist -48 m Main Page
- 10:25, 13 November 2017 diff hist -2 m 751.13 Expansion Joint Systems →751.13.4.4 Design Example, Strip Seal at End Bent
- 10:22, 13 November 2017 diff hist +221 m 751.13 Expansion Joint Systems →751.13.2.4.2 Design Example 2
- 10:21, 13 November 2017 diff hist +153 m 751.13 Expansion Joint Systems →751.13.2.4.1 Design Example 1
- 10:19, 13 November 2017 diff hist +170 751.13 Expansion Joint Systems →751.13.2.4.1 Design Example 1
- 10:15, 13 November 2017 diff hist -15 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing
- 10:13, 13 November 2017 diff hist -1 m 751.24 LFD Retaining Walls →751.24.2.2 Excavation
- 09:26, 13 November 2017 diff hist -5 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per BR, minor revision to Note A1.2 of E 751.50.
- 09:17, 13 November 2017 diff hist 0 N File:751.5.1.3.3 capitalization 2017.jpg current
- 09:15, 13 November 2017 diff hist +5 m 751.5 Structural Detailing Guidelines →751.5.1.3.3 Capitalization
- 09:14, 13 November 2017 diff hist 0 N File:751.5.1.3.3 capitalization.jpg current
- 09:13, 13 November 2017 diff hist +374 m 751.5 Structural Detailing Guidelines →751.5.1.3 Grammar and Punctuation: Per BR, updated capitalization rules and made minor additions to nomenclature
- 08:08, 13 November 2017 diff hist -13 m 642.10 Curb Ramp Applications
- 08:08, 13 November 2017 diff hist -13 m 642.10 Curb Ramp Applications
- 15:54, 9 November 2017 diff hist +108 m 236.7 Negotiation updated link
- 16:17, 8 November 2017 diff hist 0 N File:Main Page Nov 8, 2017.jpg current
- 16:16, 8 November 2017 diff hist -59 m Main Page
- 14:16, 8 November 2017 diff hist +5 m 751.13 Expansion Joint Systems →751.13.5.4 Flat Plate Expansion Joint System - Details
- 14:15, 8 November 2017 diff hist +5 m 751.13 Expansion Joint Systems →751.13.5.4 Flat Plate Expansion Devices - Details
- 14:14, 8 November 2017 diff hist +15 751.13 Expansion Joint Systems →751.13.4.4 Design Example, Strip Seal at End Bent
- 14:11, 8 November 2017 diff hist +22 m 751.13 Expansion Joint Systems →751.13.4.4 Design Example, Strip Seal at End Bent
- 14:06, 8 November 2017 diff hist +8 m 751.13 Expansion Joint Systems →751.13.4.3 Strip Seal Expansion Joint System – Details
- 14:05, 8 November 2017 diff hist +71 m 751.13 Expansion Joint Systems →751.13.3.6 Drainage Details
- 14:04, 8 November 2017 diff hist -1 m 751.13 Expansion Joint Systems →751.13.2.4.2 Design Example 2: minor correction
- 14:04, 8 November 2017 diff hist -2 m 751.13 Expansion Joint Systems →751.13.2.4.1 Design Example 1: minor corrections
- 13:59, 8 November 2017 diff hist -25 m 236.1 General Information →236.1.3.3 Contract Procedures: Per RW, removed unecessary subtitle
- 16:08, 7 November 2017 diff hist 0 N File:236.7.3.3.1.docx current
- 16:08, 7 November 2017 diff hist -107 m 236.7 Negotiation Per RW, updated Form 236.7.3.3.1
- 15:25, 7 November 2017 diff hist +230 m 902.11 Traffic Control for Schools →902.11.3 School Signal at Driveway: Per TS, clarified where school signals will be allowed and how they should operate when schools or special events are not in session.
- 15:15, 7 November 2017 diff hist 0 153.21 Traffic updated link
- 11:45, 7 November 2017 diff hist -1 m 751.6 General Quantities Per BR, Tack Coat plan reporting accuracy revised from 10 gal. to 1 gal. to be in accord with standard specs and official bid item listing
- 09:26, 7 November 2017 diff hist +41 m Category:134 Engineering Professional Services →134.4 Contract Approval, Execution and Distribution: Per DE, added "and please advise when we can give a NTP", per FS's request
- 15:43, 6 November 2017 diff hist +1 Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10)
- 13:50, 6 November 2017 diff hist +145 m Main Page EPG 131.1
- 13:37, 6 November 2017 diff hist +48 m 131.1 Design Exception Process
- 12:22, 6 November 2017 diff hist -434 m 131.1 Design Exception Process Per DE, revised EPG 131.1.4 about where design exceptions should be stored/filed. Deleted EPG 131.5.2, removing the requirement of a transmittal letter for design exceptions.
- 09:23, 6 November 2017 diff hist -28 m 236.13 Designing Right of Way Plans Per RW, clarify guidance by replacing "ratification" with "approval" to better explane how plans are certified and approved by Commission
- 10:22, 3 November 2017 diff hist +676 m Main Page EPG 751, EPG 127.13
- 09:20, 3 November 2017 diff hist +137 770.8 Maintenance of Bridge Substructure →770.8.4 Steel Piling and Cast In Place (C.I.P.) Piling: Per BR, added link
- 09:15, 3 November 2017 diff hist +4,079 751.40 LFD Widening and Repair →751.40.1.1 Widening and Repair of Existing Structures: Per BR, new EPG 751.40.1.2 is to be used by Bridge maintenance or district maintenance to maintain or repair existing steel HP piles
- 09:07, 3 November 2017 diff hist +332 751.50 Standard Detailing Notes →J1. General: Per BR, revised and added notes pertaining to MSE wall plans
- 08:59, 3 November 2017 diff hist 0 N File:751.10.3.3 Part Elev of Nonintegral.jpg current
- 08:58, 3 November 2017 diff hist 0 N File:751.10.3.3 Part Elev of Integral.jpg current
- 08:57, 3 November 2017 diff hist +1,338 751.10 General Superstructure →751.10.3 Bridge Deck Drainage - Slab Drains: Per BR, revised guidance for bridge deck drain, approach drainage, roadway drainage or collected drain water discharging into a MSE wall backfill area
- 08:51, 3 November 2017 diff hist 0 N File:751.24.2.1 section AA.jpg current