User contributions
Jump to navigation
Jump to search
- 11:27, 27 March 2018 diff hist 0 N File:409 FY 2019 Seal Coat MoDOT.pdf current
- 11:26, 27 March 2018 diff hist 0 N File:409 FY 2019 Seal Coat Contractor.pdf current
- 11:26, 27 March 2018 diff hist +16 m Category:409 Seal Coat Per DE, the CLC and JSP packages were updated
- 11:23, 27 March 2018 diff hist 0 N File:402 CLC MoDOT 2018.pdf current
- 11:22, 27 March 2018 diff hist 0 N File:402 CLC Contractor 2018.pdf current
- 11:21, 27 March 2018 diff hist 0 N File:402 FY2019 Contract Leveling Coat Guidelines.docx current
- 11:19, 27 March 2018 diff hist +36 m Category:402 Bituminous Surface Leveling Per DE, the CLC and JSP packages were updated
- 08:41, 27 March 2018 diff hist +107 m 751.2 Loads →751.2.2 Transient Loads: Per BR, Wind Pressure on Vehicles, Braking force, and Centrifugal force are assumed to act horizontally at the roadway surface, per AASHTO agenda 2005
- 15:00, 26 March 2018 diff hist 0 N File:127.1 Instructions.doc
- 15:00, 26 March 2018 diff hist +3 m 127.1 Request for Environmental Services
- 14:59, 26 March 2018 diff hist -56 m 127.1 Request for Environmental Services Per Env'l, updated How to Complete the Request for Env'l Services (formerly "Instructions for the RES Form")
- 14:47, 26 March 2018 diff hist -1 LPA:136.13 LPA Policy Changes
- 14:46, 26 March 2018 diff hist +131 m LPA:136.13 LPA Policy Changes Fig. 136.6.4
- 14:45, 26 March 2018 diff hist +122 m LPA:136.12 Figures, Glossary and Other Useful Links Per Env'l, updated Fig. 136.6.4 How to Complete the Request for Env'l Review
- 14:42, 26 March 2018 diff hist 0 N File:136.6.4 instructions 2018.doc
- 14:42, 26 March 2018 diff hist 0 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, updated Fig. 136.6.4 How to Complete the Request for Env'l Review
- 12:56, 23 March 2018 diff hist 0 N File:823 Incarcerated Manual.pdf current
- 12:55, 23 March 2018 diff hist -96 m Category:823 Incarcerated Personnel Work Release Program Per MT, updated link to Incarcerated Personnel Work Release Program Manual current
- 12:08, 23 March 2018 diff hist 0 m 320.4 Procedure for Final Sounding Per BR, updated Soil Properties Request Form
- 12:06, 23 March 2018 diff hist 0 m 320.3 Drilling Operations Per BR, updated Soil Properties Request Form
- 12:05, 23 March 2018 diff hist +5 m Category:101 Standard Forms →Bridge
- 12:04, 23 March 2018 diff hist -10 m Category:101 Standard Forms →Bridge: Per BR, updated Soil Properties Request Form
- 11:32, 23 March 2018 diff hist 0 N File:751.1.2.20 Request 2018.xlsx current
- 11:32, 23 March 2018 diff hist -10 m 751.1 Preliminary Design Per BR, updated Soil Properties Request Form
- 15:04, 22 March 2018 diff hist +15 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated link
- 11:33, 22 March 2018 diff hist +47 m Category:121 Project Planning, Prioritization and STIP Commitments
- 11:06, 22 March 2018 diff hist 0 N File:121 Planning Framework.docx current
- 11:05, 22 March 2018 diff hist +261 m Category:121 Project Planning, Prioritization and STIP Commitments Per TP, added document, "The Planning Framework for Transportation Decision Making"
- 09:08, 21 March 2018 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator Mar 2018.xlsx
- 09:08, 21 March 2018 diff hist +8 m 606.1 Guardrail Two minor revisions to the Guardrail Length of Need Calculator
- 15:16, 20 March 2018 diff hist +5 m Category:756 Seismic Design
- 15:12, 20 March 2018 diff hist -92 m Category:756 Seismic Design Per BR, clarified seismic information.
- 15:06, 20 March 2018 diff hist 0 N File:756 LRFD flowchart.pdf
- 14:52, 20 March 2018 diff hist +304 m 751.2 Loads →751.2.2.6 Other Loads: Per BR, clarified seismic information.
- 14:47, 20 March 2018 diff hist +1,990 m 751.1 Preliminary Design Per BR, clarified seismic information.
- 11:17, 20 March 2018 diff hist +213 m 751.5 Structural Detailing Guidelines →751.5.9.2.2 Epoxy Coated Reinforcement Requirements: Per BR, clarified Feb 2017 policy expanding the use of epoxy coated reinforcement in bridge structures
- 10:53, 20 March 2018 diff hist +40 m Main Page EPG 103.1.6.6.1.2
- 10:50, 20 March 2018 diff hist +638 m 103.1 Bid Opening and Award Process →103.1.6.6.1.2 File Naming Convention for Plan Sheet Changes: Per Bidding and Contracts, updated guidance for ProjectWise
- 10:17, 16 March 2018 diff hist -13 m Main Page EPG 237.14
- 09:57, 16 March 2018 diff hist 0 N File:237.14.2.8.jpg current
- 09:57, 16 March 2018 diff hist +30,027 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, article completely rewritten
- 09:36, 16 March 2018 diff hist +1,087 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.3 Electronic Deliverables File: "Electronic Deliverables" used to be some of the files to be included. Now each file is named and collected in a ZIP file called "Electronic Deliverables"
- 13:47, 14 March 2018 diff hist +33 m 236.3 Administration Per RW, in EPG 236.3.5.2, replaced Form 238.2.17 Professional Land Surveyor Description Review Form with new "Legal Description, Exhibit A" form
- 13:39, 14 March 2018 diff hist -1 m 236.7 Negotiation →236.7.2.20 Acquisition by Condemnation
- 13:39, 14 March 2018 diff hist +34 m 236.7 Negotiation →236.7.2.20 Acquisition by Condemnation: Per RW, replaced Form 238.2.17 Professional Land Surveyor Description Review Form with new "Legal Description, Exhibit A" form
- 13:21, 14 March 2018 diff hist -9 m 238.2 Land Surveying Per RW, replaced Form 238.2.17 Professional Land Surveyor Description Review Form with new "Legal Description, Exhibit A" form
- 12:45, 14 March 2018 diff hist -30 m Category:Safe and Sound →Schedule: updated PS&E Due Date chart link
- 12:42, 14 March 2018 diff hist -44 m 237.9 Submission of Plans and Supporting Documents updated PS&E Due Date chart link
- 12:40, 14 March 2018 diff hist -42 m 103.1 Bid Opening and Award Process updated PS&E Due Date chart link
- 11:44, 9 March 2018 diff hist -62 m Main Page EPG 751.1.2.21
- 11:42, 9 March 2018 diff hist +410 m 751.1 Preliminary Design →751.1.2.21 Substructure Type: Per BR, min galvanized penetration guidance added for retaining wall piles supported on piles & bridge end bents on piles with embankments supported by MSE walls
- 16:12, 8 March 2018 diff hist 0 m 127.16 Wetland and Stream Mitigation
- 15:54, 8 March 2018 diff hist +125 m Main Page
- 15:32, 8 March 2018 diff hist -10 m Category:101 Standard Forms →Utility or Right of Way Related: Updated link to Permit for Work on Right of Way
- 14:52, 8 March 2018 diff hist +3 m Main Page
- 13:58, 8 March 2018 diff hist -6 m Category:612 Impact Attenuators →612.1.3 MoDOT Protective Vehicle/TMA Guidelines
- 13:46, 8 March 2018 diff hist -103 m Category:101 Standard Forms Per ECR and CM, deleted archaic Spanish version of the Wage Interview Form (CR-1)
- 13:45, 8 March 2018 diff hist -110 m Category:110 State and Federal Wage Rates and Other Requirements Per ECR and CM, deleted archaic Spanish version of the Wage Interview Form (CR-1)
- 12:39, 8 March 2018 diff hist +51 m Main Page EPG 612, EPG 616.8
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35d MT 2018.pdf current
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35c MT 2018.pdf current
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35b MT 2018.pdf current
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35a MT 2018.pdf current
- 12:09, 8 March 2018 diff hist 0 N File:616.8.35 MT 2018.pdf current
- 12:09, 8 March 2018 diff hist +25 m 616.8 Typical Applications (MUTCD 6H) Per TS, the TMA Light Bar is now temporarily optional and not required to be purchased for use. TA 35 MT and TAs 35a-d MT
- 11:49, 8 March 2018 diff hist +228 m Category:612 Impact Attenuators →612.1.3 MoDOT Protective Vehicle/TMA Guidelines: Per TS, the TMA Light Bar is now temporarily optional and not required to be purchased for use.
- 16:27, 7 March 2018 diff hist -70 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills: Per Env'l, updated link
- 16:22, 7 March 2018 diff hist +49 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills: Per Env'l, updated link
- 16:14, 7 March 2018 diff hist +198 m 751.12 Barriers, Railings, Curbs and Fences →751.12.4 Chain Link Fence: Per BR, clarified wind load and dead load for chain link fence.
- 16:06, 5 March 2018 diff hist +766 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Three-Strand Guard Cable Material →Table 1040.2.1.1 List of Prequalified Guardrail Fabricators Brand Registration and Guarantee on File: Per CM, added manufacturer
- 15:20, 2 March 2018 diff hist +430 m 153.13 Highway Safety Per HS, added HS07 agreement
- 14:47, 2 March 2018 diff hist 0 m 237.13 Contract Plan File Name Convention →237.13.2 Electronic Design Data: Per CADD, corrected file naming convention
- 11:55, 2 March 2018 diff hist -242 m Category:702 Load-Bearing Piles Per CM, most recent revision deleted since it was deemed incorrect
- 11:50, 2 March 2018 diff hist 0 N File:702.pdf current
- 11:50, 2 March 2018 diff hist +12 m Category:702 Load-Bearing Piles →702.1.5 Pile Driving Documentation
- 11:47, 2 March 2018 diff hist +242 m Category:702 Load-Bearing Piles →702.1.5 Pile Driving Documentation: Per BR, clarified that reporting of PDA data is not required when piles are driven to rock.
- 11:38, 2 March 2018 diff hist +4 m 750.7 Non-Hydraulic Considerations →750.7.2.3 Roadways and Roadside Applications with ADT < 1700
- 11:35, 2 March 2018 diff hist +53 m 750.7 Non-Hydraulic Considerations →750.7.2.3 Roadways and Roadside Applications with ADT < 1700
- 11:33, 2 March 2018 diff hist +9 m Category:941 Permits and Access Requests →941.6.3.7 Construction Inspection
- 11:28, 2 March 2018 diff hist 0 N File:730.3.jpg current
- 10:56, 2 March 2018 diff hist 0 m Category:732 Flared End Sections →732.1 Installation: Corrected link
- 10:31, 2 March 2018 diff hist -2 m Main Page
- 10:06, 1 March 2018 diff hist +3 m 616.18 Construction Inspection Guidelines for Sec 616 →Flagger Requirements (for Sec 616.4.3): Updated sign no. for PLEASE WAIT FOR PILOT CAR to G20-4a
- 10:04, 1 March 2018 diff hist -2 m 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C) →616.3.13 Pilot Car Method of One-Lane, Two-Way Traffic Control (MUTCD 6C.13)
- 10:00, 1 March 2018 diff hist +17 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Table 616.6.58: Updated sign no. for PLEASE WAIT FOR PILOT CAR to G20-4a
- 08:56, 28 February 2018 diff hist -664 m 153.16 Maintenance Per TS, MT and Comm Secr, TR57 replaced MT27
- 15:46, 27 February 2018 diff hist +7 m 751.24 LFD Retaining Walls →751.24.2.1 Design: Per BR, minor clarifications
- 12:02, 27 February 2018 diff hist -239 m Main Page EPG 450
- 11:56, 27 February 2018 diff hist 0 N File:450 Estimate Factors 2018.doc current
- 11:56, 27 February 2018 diff hist +10 m Category:450 Bituminous Pavement Design Per EPS, updated Tack Coat estimate factors
- 11:36, 27 February 2018 diff hist 0 N File:Main Page Feb 27, 2018.jpg current
- 11:35, 27 February 2018 diff hist +126 m Main Page
- 11:16, 27 February 2018 diff hist 0 m 901.7 Light Source and Intensity →901.7.2 Average Maintained Intensity
- 11:01, 27 February 2018 diff hist -100 m 901.7 Light Source and Intensity →901.7.2 Average Maintained Intensity: Per EPS, updated link
- 10:27, 27 February 2018 diff hist +1,031 m 153.21 Traffic Per TS, added three new agreements (TR55, TR56, TR57)
- 15:01, 26 February 2018 diff hist -203 m 238.2 Land Surveying →238.2.8 Survey Property Damage: Per RW, removed reference to archaic RW11 agreement
- 14:51, 26 February 2018 diff hist +1 m 751.24 LFD Retaining Walls →751.24.2.1 Design
- 13:47, 26 February 2018 diff hist 0 m 751.24 LFD Retaining Walls →751.24.2.1 Design: Per Br, minor cosmetic clarification
- 12:08, 26 February 2018 diff hist +35 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, updated links
- 13:36, 23 February 2018 diff hist -714 m 236.14 Change in Route Status Report →236.14.6 Roadway Relinquishment Agreement: Per RW, removed outdated forms and references to the forms (RW5, RW6, RW19, RW32)
- 13:35, 23 February 2018 diff hist -680 m 236.6 Appraisal and Appraisal Review Per RW, removed outdated forms and references to the forms (RW5, RW6, RW19, RW32)
- 13:28, 23 February 2018 diff hist -60 m 236.7 Negotiation Per RW, removed outdated forms and references to the forms (RW5, RW6, RW19, RW32)
- 10:49, 23 February 2018 diff hist -463 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination Per TS, removed archaic non-LED figures
- 08:59, 23 February 2018 diff hist -2,359 m 153.20 Right of Way Per RW, removed obsolete forms RW05, 06, 09, 07, 11, 19, 26, 30, 32 and 38.
- 14:12, 22 February 2018 diff hist +99 m Category:450 Bituminous Pavement Design →450.9 Safety EdgeSM: Per EPS, brought article in accordance with new Std Plan 401.00 Sheet 3
- 14:11, 22 February 2018 diff hist -141 m Category:550 Portland Cement Concrete Pavement Design →550.1 Safety EdgeSM: Per EPS, brought article in accordance with new Std Plan 401.00 Sheet 3
- 13:01, 22 February 2018 diff hist -252 m Main Page EPG 146.2
- 12:57, 22 February 2018 diff hist +345 m Category:146 Disadvantaged Business Enterprise (DBE) →146.2 DBE Subcontract: Per ECR, clarification regarding overruns and underruns as they relate to DBE participation.
- 13:09, 21 February 2018 diff hist -385 m 153.21 Traffic Per MT, TS and Commission Secr, replaced TR57 with MT27.
- 13:08, 21 February 2018 diff hist -609 m 153.9 Design Per MT, DE and Commission Secr, replaced DE64 and DE65 with MT01 and MT17, respectively.
- 13:07, 21 February 2018 diff hist +1,447 m 153.16 Maintenance Per MT, DE and Commission Secr, replaced DE64 and DE65 with MT01 and MT17, respectively. Per MT, TS and Commission Secr, replaced TR57 with MT27.
- 12:23, 21 February 2018 diff hist -1,447 m 153.16 Maintenance Per MT, DE and Commission Secr, moved former MT01 and MT17 to DE64 and DE65 respectively. Per MT, TS and Commission Secr, moved former MT27 to TR57.
- 12:21, 21 February 2018 diff hist +385 m 153.21 Traffic Per MT, TS and Commission Secr, moved former MT27 to TR57.
- 12:09, 21 February 2018 diff hist +609 m 153.9 Design Per MT, DE and Commission Secr, moved former MT01 and MT17 to DE64 and DE65 respectively.
- 11:15, 21 February 2018 diff hist 0 N File:101 DBE Identification Submittal Form.pdf current
- 11:15, 21 February 2018 diff hist +6 m Category:101 Standard Forms →Construction and Contractor Related: Per ECR, added DBE Identification Submittal Form (replacing "DBE Program Submittal" form)
- 14:15, 20 February 2018 diff hist +1 m Main Page
- 13:06, 20 February 2018 diff hist -38 m 751.6 General Quantities Per BR, “Supplementary television camera inspection” was recently revised to “video camera inspection” in both the official bid listing and Sec 701
- 13:56, 16 February 2018 diff hist 0 m Category:806 Pollution, Erosion and Sediment Control →Silt Fence
- 13:49, 16 February 2018 diff hist -699 m Category:806 Pollution, Erosion and Sediment Control →806.2.1 Temporary Measures: Per DE. In 2009 Type I and Type II ditch checks were replaced w/ rock and alternate ditch checks; straw bails were removed from use as ditch checks.
- 12:21, 16 February 2018 diff hist -24 m Main Page EPG 134, EPG 153.8
- 11:11, 16 February 2018 diff hist +100 m 153.9 Design Per ECR and DE, DBE Concurrence must be requested prior to executing a consultant contracts
- 11:04, 16 February 2018 diff hist +1,830 m Category:134 Engineering Professional Services Per ECR and DE, DBE Concurrence must be requested prior to executing a consultant contracts
- 12:29, 15 February 2018 diff hist -9 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Table 616.6.50: Per TS, corrected sign no of WET PAINT (Arrow Pivots)
- 12:20, 15 February 2018 diff hist 0 N File:Figure 901.13.10.pdf current
- 12:20, 15 February 2018 diff hist -15 m 901.13 Lighting Proposed by Other Political Subdivisions on State Highways →901.13.10 Submittal: Per TS, updated Fig. 901.13.10 with LED info
- 12:17, 15 February 2018 diff hist 0 N File:901.13.4.pdf current
- 12:17, 15 February 2018 diff hist +223 m 901.13 Lighting Proposed by Other Political Subdivisions on State Highways →901.13.4 Lighting Style, Luminaire Type and Mounting Height
- 12:12, 15 February 2018 diff hist -55 m Category:101 Standard Forms Per TS, updated figures with LED info
- 12:11, 15 February 2018 diff hist 0 N File:Form D21 2018.pdf current
- 12:11, 15 February 2018 diff hist +4 m 901.6 Programming Per TS, updated D21 with LED info
- 11:50, 15 February 2018 diff hist -220 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination Per TS, updated figures with LED info
- 11:48, 15 February 2018 diff hist 0 N File:901.11.7.pdf current
- 11:48, 15 February 2018 diff hist 0 N File:901.11.6.pdf current
- 11:48, 15 February 2018 diff hist -132 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination Per TS, updated figures with LED info
- 11:44, 15 February 2018 diff hist -24 m 901.9 Layout Per TS, updated figures with LED info
- 11:41, 15 February 2018 diff hist 0 N File:901.7.5.pdf current
- 11:41, 15 February 2018 diff hist 0 N File:901.7.4.pdf current
- 11:41, 15 February 2018 diff hist 0 N File:901.7.3.pdf current
- 11:41, 15 February 2018 diff hist 0 N File:901.7.2.pdf current
- 11:41, 15 February 2018 diff hist 0 N File:901.7.1.pdf current
- 11:40, 15 February 2018 diff hist -581 m 901.7 Light Source and Intensity Per TS, updated figures with LED info
- 11:31, 15 February 2018 diff hist 0 N File:901.2.1.pdf current
- 11:30, 15 February 2018 diff hist -94 m 901.2 Lighting to be Provided, Operated, and Maintained at the Expense of the Local Political Subdivision Per TS, updated Fig. 901.2.1 with LED info
- 11:22, 15 February 2018 diff hist 0 N File:101 No Rise Certificate 2018.pdf
- 11:22, 15 February 2018 diff hist 0 m Category:101 Standard Forms →Bridge: Per BR, minor update for No-Rise Certificate
- 09:30, 15 February 2018 diff hist +934 m 153.11 Financial Services Per FS, added F31 and F32 info
- 14:31, 14 February 2018 diff hist +88 m 751.50 Standard Detailing Notes →G7. Steel HP Pile
- 14:30, 14 February 2018 diff hist +88 m 751.1 Preliminary Design →751.1.2.21 Substructure Type
- 14:20, 14 February 2018 diff hist -12 m 751.1 Preliminary Design →751.1.2.23 Types of Piling
- 14:18, 14 February 2018 diff hist +152 m 751.1 Preliminary Design →751.1.2.21 Substructure Type
- 14:15, 14 February 2018 diff hist +152 m 751.50 Standard Detailing Notes →G7. Steel HP Pile
- 14:12, 14 February 2018 diff hist 0 m 751.36 Driven Piles →751.36.3 Design Procedure: Per Br, minor corrections
- 14:09, 14 February 2018 diff hist -3 751.36 Driven Piles →751.36.2 Steel Pile
- 13:59, 14 February 2018 diff hist -709 m 153.5 Bridge Per BR, updated info for BR08 and BR10. Deleted archaic BR13.
- 14:38, 13 February 2018 diff hist 0 m 153.13 Highway Safety
- 14:37, 13 February 2018 diff hist +6 m 153.13 Highway Safety
- 14:37, 13 February 2018 diff hist +212 m 153.13 Highway Safety Per TS, provided HS2 Blueprint for Safer Roadways Agreement info so drafters know how the agreement is to be processed.
- 12:07, 13 February 2018 diff hist -2 m Main Page
- 12:06, 13 February 2018 diff hist -7 m 901.16 Construction Inspection Guidelines for Sec 901 Per TS, replaced LED wattage references with A,B and C nomenclature
- 12:03, 13 February 2018 diff hist +67 m 901.13 Lighting Proposed by Other Political Subdivisions on State Highways Per TS, replaced LED wattage references with A,B and C nomenclature
- 11:53, 13 February 2018 diff hist -16 m 901.12 Electrical Components Per TS, replaced LED wattage references with A,B and C nomenclature
- 11:52, 13 February 2018 diff hist -42 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination Per TS, replaced LED wattage references with A,B and C nomenclature
- 11:49, 13 February 2018 diff hist -14 m 901.9 Layout Per TS, replaced LED wattage references with A,B and C nomenclature
- 11:48, 13 February 2018 diff hist -49 m 901.7 Light Source and Intensity Per TS, replaced LED wattage references with A,B and C nomenclature
- 19:50, 9 February 2018 diff hist +1,637 Main Page
- 18:51, 9 February 2018 diff hist 0 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.89 Radar Speed Advisory Assembly: Per TS, expanded and updated guidance on the placement of the Radar Speed Advisory Assembly.
- 18:38, 9 February 2018 diff hist -1,209 901.16 Construction Inspection Guidelines for Sec 901 Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:36, 9 February 2018 diff hist +32 m 901.15 Glossary
- 18:33, 9 February 2018 diff hist -31 901.15 Glossary Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:32, 9 February 2018 diff hist -337 901.14 Dusk-to-Dawn Lighting Policy Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:31, 9 February 2018 diff hist +1,814 901.13 Lighting Proposed by Other Political Subdivisions on State Highways Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:29, 9 February 2018 diff hist +139 901.12 Electrical Components Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:27, 9 February 2018 diff hist -1,929 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:26, 9 February 2018 diff hist 0 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination 901.11 High Pressure Sodium Luminaire Performance and Computation of Roadway Illumination moved to 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination
- 18:26, 9 February 2018 diff hist +109 N 901.11 High Pressure Sodium Luminaire Performance and Computation of Roadway Illumination 901.11 High Pressure Sodium Luminaire Performance and Computation of Roadway Illumination moved to 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination current
- 18:25, 9 February 2018 diff hist -717 901.9 Layout Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:25, 9 February 2018 diff hist 0 m 901.9 Layout 901.9 Luminaires moved to 901.9 Layout
- 18:25, 9 February 2018 diff hist +26 N 901.9 Luminaires 901.9 Luminaires moved to 901.9 Layout current
- 18:24, 9 February 2018 diff hist +429 901.8 System Voltage Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:23, 9 February 2018 diff hist 0 m 901.8 System Voltage 901.8 Circuiting moved to 901.8 System Voltage
- 18:23, 9 February 2018 diff hist +34 N 901.8 Circuiting 901.8 Circuiting moved to 901.8 System Voltage current
- 18:22, 9 February 2018 diff hist +127 901.7 Light Source and Intensity Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:15, 9 February 2018 diff hist +12 Category:901 Lighting Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:11, 9 February 2018 diff hist -5 770.8 Maintenance of Bridge Substructure →770.8.4 Steel Piling and Cast In Place (C.I.P.) Piling: minor clarification current
- 18:01, 9 February 2018 diff hist +69 751.50 Standard Detailing Notes →A2. Concrete Box Culverts and Other Type Structures: Per BR, revision addresses collars on precast concrete box culverts when cast-in-place box culverts are called for on the project.
- 18:00, 9 February 2018 diff hist +1,153 751.8 LRFD Concrete Box Culverts Per BR, revision addresses collars on precast concrete box culverts when cast-in-place box culverts are called for. When/how geotextile fabric is used on precast joints was revised
- 17:48, 9 February 2018 diff hist +26 751.50 Standard Detailing Notes →J1. General: Per BR, revised guidance better defines where drainage/water can or cannot be discharged relative to the location of MSE walls
- 17:47, 9 February 2018 diff hist +6 751.24 LFD Retaining Walls Per BR, revised guidance better defines where drainage/water can or cannot be discharged relative to the location of MSE walls
- 17:32, 9 February 2018 diff hist +147 751.10 General Superstructure →751.10.3 Bridge Deck Drainage - Slab Drains: Per BR, revised guidance better defines where drainage/water can or cannot be discharged relative to the location of MSE walls
- 17:29, 9 February 2018 diff hist +1 751.1 Preliminary Design →751.1.4.3 MSE Walls: Per BR, revised guidance better defines where drainage/water can or cannot be discharged relative to the location of MSE walls
- 17:26, 9 February 2018 diff hist -1 751.1 Preliminary Design →751.1.2.18 Preliminary Cost Estimate: Per BR, revised guidance better defines where drainage/water can or cannot be discharged relative to the location of MSE walls
- 17:09, 9 February 2018 diff hist 0 1047.9 Laboratory Testing Guidelines for Sec 1047
- 17:09, 9 February 2018 diff hist 0 m 1047.9 Laboratory Testing Guidelines for Sec 1047 1047.6 Laboratory Testing Guidelines for Sec 1047 moved to 1047.9 Laboratory Testing Guidelines for Sec 1047
- 17:09, 9 February 2018 diff hist +63 N 1047.6 Laboratory Testing Guidelines for Sec 1047 1047.6 Laboratory Testing Guidelines for Sec 1047 moved to 1047.9 Laboratory Testing Guidelines for Sec 1047 current
- 17:08, 9 February 2018 diff hist 0 m 1047.8 Polyethylene Pipe (HDPE) Pipe Inspection Guide
- 17:07, 9 February 2018 diff hist 0 m 1047.8 Polyethylene Pipe (HDPE) Pipe Inspection Guide 1047.5 Polyethylene Pipe (HDPE) Pipe Inspection Guide moved to 1047.8 Polyethylene Pipe (HDPE) Pipe Inspection Guide
- 17:07, 9 February 2018 diff hist +67 N 1047.5 Polyethylene Pipe (HDPE) Pipe Inspection Guide 1047.5 Polyethylene Pipe (HDPE) Pipe Inspection Guide moved to 1047.8 Polyethylene Pipe (HDPE) Pipe Inspection Guide current
- 17:04, 9 February 2018 diff hist +2 m Category:1047 Corrugated Polyethylene Culvert Pipe
- 17:03, 9 February 2018 diff hist -7,149 Category:1047 Corrugated Polyethylene Culvert Pipe Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 17:00, 9 February 2018 diff hist 0 N File:1041.8 corrugated.jpg current
- 17:00, 9 February 2018 diff hist 0 N File:1041.8 steel.jpg current
- 16:57, 9 February 2018 diff hist +7,754 N 1041.8 Polypropylene Pipe (PP) Pipe Inspection Guide New page: This guide will assist in the inspection of all types and configurations of polypropylene (PP) pipe, couplings and fittings. Answer each question and take the action indicated for the answ... current
- 16:54, 9 February 2018 diff hist +2 m Category:1041 Polypropylene Culvert Pipe
- 16:54, 9 February 2018 diff hist +70 Category:1000 MATERIALS new EPG 1041
- 16:53, 9 February 2018 diff hist +11,527 N Category:1041 Polypropylene Culvert Pipe Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:47, 9 February 2018 diff hist +1,402 Category:1028 Corrugated Polyvinyl Chloride Culvert Pipe Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:45, 9 February 2018 diff hist +1,568 750.7 Non-Hydraulic Considerations →750.7.2 Types: Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:43, 9 February 2018 diff hist +3,606 Category:732 Flared End Sections Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:42, 9 February 2018 diff hist +70 Category:700 STRUCTURES AND HYDRAULICS EPG 730 Thermoplastic Pipe Culverts current
- 16:41, 9 February 2018 diff hist +5,499 N Category:730 Thermoplastic Pipe Culverts Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:39, 9 February 2018 diff hist -2,362 Category:730 Corrugated Polyethylene Pipe Culverts Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications. current
- 16:37, 9 February 2018 diff hist -1,411 Category:728 Corrugated Polyvinyl Chloride Culvert Pipe EPG 728 was deleted since there is no longer a Sec 728. current
- 16:36, 9 February 2018 diff hist +7,021 N Category:724 Pipe Culverts Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:33, 9 February 2018 diff hist +57 Category:700 STRUCTURES AND HYDRAULICS
- 16:26, 9 February 2018 diff hist -554 751.50 Standard Detailing Notes →G. Substructure Notes: Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) and replace it with AASHTO M 270, Gr 50 (ASTM A709,
- 16:23, 9 February 2018 diff hist -71 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) and replace it with AASHTO M 270, Gr 50 (ASTM A70
- 16:20, 9 February 2018 diff hist +10 751.36 Driven Piles
- 16:18, 9 February 2018 diff hist +939 751.36 Driven Piles Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Grade 36 (ASTM A 709, Grade 36) and replace it with AASHTO M 270, Grade 50 (ASTM A709, Grade 50).
- 16:14, 9 February 2018 diff hist -28 751.1 Preliminary Design →751.1.2 Bridges/Boxes: Per BR, revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) & replace it with AASHTO M 270, Gr 50 (ASTM A709, Gr 50)
- 16:09, 9 February 2018 diff hist +438 Category:702 Load-Bearing Piles Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Grade 36 (ASTM A 709, Grade 36) and replace it with AASHTO M 270, Grade 50 (ASTM A709, Grade 50).
- 16:01, 9 February 2018 diff hist -55 237.7 Equipment and Materials List Per Bidding and Contract, revision will now require designers to include the D-15 in the Electronic Deliverables.
- 15:33, 6 February 2018 diff hist +64 m Main Page EPG 108.1.3
- 15:29, 6 February 2018 diff hist 0 m Category:108 Prosecution and Progress →108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting
- 15:24, 6 February 2018 diff hist +557 m Category:108 Prosecution and Progress →108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting: Per ECR and CM, expanded and clarified guidance for contractor to fill out Form C-220.
- 14:25, 6 February 2018 diff hist +134 m Category:108 Prosecution and Progress →108.1 Subletting of Contract (for Sec 108.1): Per ECR, minor clarification
- 09:40, 5 February 2018 diff hist -421 m Main Page
- 09:39, 5 February 2018 diff hist +39 m Main Page
- 09:38, 5 February 2018 diff hist +136 m Main Page EPG 153.1.3.3
- 09:30, 5 February 2018 diff hist +793 m Category:153 Agreements and Contracts →153.1.3.2 Reviewer’s Roles and Responsibilities: Per DE, new guidance to address Agreements initiated by other entities that are not initiated in eAgreements.
- 16:06, 2 February 2018 diff hist -8 m Main Page EPG 129.12
- 16:02, 2 February 2018 diff hist +69 m Category:129 Public Involvement →129.12 Presentation for Location or Design Approval to the Commission: Per DE, clarified that location & design approval is required even if an LPA is administering & paying for improvement
- 15:46, 2 February 2018 diff hist -68 m Main Page EPG Other Aspects of Pavement Design
- 15:43, 2 February 2018 diff hist +123 m Other Aspects of Pavement Design →Minor Roads: Per DE, clarification about pavement thicknesses/types sometimes not included on typical sections. Now is effective for April 2018.
- 14:44, 2 February 2018 diff hist +227 m Main Page EPG 616.6.89
- 09:40, 2 February 2018 diff hist 0 N File:616.14 WZ Questions 2018.docx current
- 09:39, 2 February 2018 diff hist -12 m 616.14 Work Zone Safety and Mobility Policy Per TS, update to WZ Questions for the Core Team.
- 09:32, 2 February 2018 diff hist +760 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.89 Radar Speed Advisory Assembly: Per TS, expanded and updated guidance on the placement of the Radar Speed Advisory Assembly.
- 16:04, 1 February 2018 diff hist +196 m Main Page EPG 128.2 and EPG 231.2
- 15:53, 1 February 2018 diff hist -2,294 231.2 Clear Zones →231.2.1 Introduction: Per EPS and CCO, condensed and clarified guidance regarding clear zones and roadside hardware for 1R and 2R projects
- 15:49, 1 February 2018 diff hist +505 Category:128 Conceptual Studies →128.2 Preventive Maintenance Projects (1R and 2R): Per EPS and CCO, condensed and clarified guidance regarding clear zones and roadside hardware for 1R and 2R projects
- 15:01, 1 February 2018 diff hist +13 m Category:450 Bituminous Pavement Design →450.9 Safety EdgeSM
- 14:48, 1 February 2018 diff hist +2 m Main Page
- 10:28, 31 January 2018 diff hist +1 m Category:718 Temporary Bridge →718.1 Construction Inspection for Sec 718 current
- 16:07, 30 January 2018 diff hist 0 m 751.50 Standard Detailing Notes →B3a. Bridges
- 14:59, 30 January 2018 diff hist -9 751.50 Standard Detailing Notes →B3a. Bridges
- 14:57, 30 January 2018 diff hist +51 m 751.50 Standard Detailing Notes →B3a. Bridges: Per BR, updated Note B3.2
- 10:07, 30 January 2018 diff hist -1 m Category:101 Standard Forms
- 10:06, 30 January 2018 diff hist 0 N File:747 Bridge Survey Checklist 2018.doc current
- 10:06, 30 January 2018 diff hist -2 m Category:747 Bridge Reports and Layouts