Recent Policy Changes in the EPG: Difference between revisions

From Engineering Policy Guide
Jump to navigation Jump to search
No edit summary
No edit summary
 
(84 intermediate revisions by the same user not shown)
Line 14: Line 14:
</br>
</br>
<!-- ADD NEW CONTENT BELOW THIS LINE -->
<!-- ADD NEW CONTENT BELOW THIS LINE -->
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">February 2, 2026
----
* Revision to EPG [[:Category:1054_Concrete_Admixtures|1054 Concrete Admixtures]] fixes some spelling errors and makes the change that all the material under Sec 1054 can be sent in 1 quart plastic containers.
* Revised EPG [[:Category:1001_General_Requirements_for_Material#1001.4.2.2_Size_of_Sample|1001.4.2.2 Size of Sample]], [[:Category:1018_Fly_Ash_for_Concrete#1018.2.4_Destination_Inspection_of_Approved_or_Certified_Fly_Ash|1018.2.4 Destination Inspection of Approved or Certified Fly Ash]], [[:Category:1019_Cement#1019.2.4_Destination_Inspection_of_Approved_or_Company_Certified_Cement|1019.2.4 Destination Inspection of Approved or Company Certified Cement]] and [[:Category:1019_Cement#1019.3_Sampling|1019.3 Sampling]] to correct some sample sizes of material sent to the central lab.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">January 30, 2026
----
* Adding additional information for what needs to be written on QA concrete cores when they are submitted to the central lab for testing in EPG [[:Category:502_Portland_Cement_Concrete_Base_and_Pavement#502.2.4_Procedures|502 Portland Cement Concrete Base and Pavement]].
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">January 28, 2026
----
* Added new Cost Estimate Guide for Scoping in EPG [[104.7_Scoping_Estimates|104.7 Scoping Estimates]].
* Adding language to EPG [[:Category:501_Concrete#501.1.4.5_Compressive_Strength|501 Concrete]] for how concrete cylinders need to be marked when they are submitted to the central lab for testing.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">January 22, 2026
----
* Updated EPG [[107.13_Insurance_Requirements|107.13 Insurance Requirements]] to link to new Sovereign Immunity Limits.
* Minor changes were made to the wording of EPG [[106.9_Buy_America_Requirement#106.9.5_BABA_Review_Process|106.9.5 BABA Review Process]].
* Provide clearer language that is more definitive guidance for contractors in EPG [[127.27_Guidelines_for_Obtaining_Environmental_Clearance_for_Off-Site_Activities|127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities]]
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">January 22, 2026
----
* Revised EPG [[902.23_Traffic_Signal_Phasing_and_Operation#902.23.9_Power_Outages_at_Signalized_Intersections|902.23.9 Power Outages at Signalized Intersections]].
* Updated EPG [[822.2_Vegetation_Management_for_Minor_Roads|822.2 Vegetation Management for Minor Roads]] due to a change in policy for final mowing cycle.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">January 21, 2026
----
* EPG [[751.1_Preliminary_Design#751.1.2.17_Preliminary_Cost_Estimate|751.1.2.17]] and [[751.9_Bridge_Seismic_Design#751.9.1_Seismic_Analysis_and_Design_Specifications|751.9.1]] updated to provide better access to bridge preliminary seismic design map for LRFD.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:lightblue; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">January 16, 2026
----
* Updates to the EPG were made due to the '''MUTCD 11th Edition''' in EPG Articles 616, 620, 900, 903, 908, 910, 911, 913 and 914. For more information on the changes see the [https://www.modot.org/2025-mutcd-special-ballot 2025 MUTCD Special Ballot].
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">January 13, 2026
----
* Updating existing policy in EPG [[:LPA:136.4_Consultant_Selection_and_Consultant_Contract_Management#136.4.1.6_Conflict_of_Interest|136.4.1.6 Conflict of Interest]] to better describe/clarify existing requirements as it relates to consultant conflicts of interest on LPA projects,
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">January 5, 2026
----
* Updates to EPG [[:Category:501_Concrete#501.2.9_Expansive_Concrete|501.2.9]] and [[:Category:1066_Mortars_and_Grout|1066.1]] due to the phasing out the use of Aluminum powder for expansive concrete and adopting American Concrete Institute ACI-223 "Srinkage Compensating Concrete Guide"
* Updates to EPG [[750.7_Non-Hydraulic_Considerations#750.7.2_Types|750.7.2 Types]] and [[:Category:941_Permits_and_Access_Requests#941.9.8.4_Culvert_Pipe|941.9.8.4 Culvert Pipe]] to allow up to 60" SRPE in Group A Flexible Polyethylene category and updates corrugated polyethylene pipe to "double wall polyethylene" pipe. Provides details for QPL application and requirements.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">December 19, 2025
----
* Table 1001.3 Size of Original Field Samples was updated in EPG [[:Category:1001_General_Requirements_for_Material#1001.3_Sampling_Procedures|1001.3 Sampling Procedures]] to match AASHTO.
* Table 1001.5.1.2 Size of Original Field Samples was updated in EPG [[:Category:1001_General_Requirements_for_Material#1001.5.1.2_Sample_Preparation|1001.5.1.2 Sample Preparation]] to match AASHTO.
* EPG [[751.9_Bridge_Seismic_Design#751.9.1.2.4.2_Footing_(Spread_Footing_and_Pile_Footing)_Joint_Shear_Reinforcement|751.9.1.2.4.2 Footing (Spread Footing and Pile Footing) Joint Shear Reinforcement]] and [[751.39_Pile_Footings|751.39 Pile Footings]] were updated, battered piles are not permitted in pile footings.
* EPG [[320.1_Preliminary_Geotechnical_Report_(PGR)|320.1 Preliminary Geotechnical Report (PGR)]] was updated with information on when and how to request a PGR.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">November 19, 2025
----
* Changes to ASTM reinforcement notes to provide clarity on reinforcing steel specifications on bridge plans in EPG [[751.50_Standard_Detailing_Notes#A1._Design_Specifications,_Loadings_&_Unit_Stresses_and_Standard_Plans|751.50 Standard Detailing Notes A1, C1 and C2]].
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">November 18, 2025
----
* Revised EPG [[903.14_Memorial_Signs|903.14 Memorial Signs]] to add department policies to MUTCD requirements.
* Updated the Engineering Factors Report in EPG [[121.7_Program_Estimates|121.7 Program Estimates]].
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">November 13, 2025
----
* MoDOT will perform an audit on every project to ensure that the prime contractor has in their possession the Materials Certifications and PEAS confirmations for all applicable BABA materials on the project in EPG [[106.9_Buy_America_Requirement#106.9.5_BABA_Audit_Process|106.9.5 BABA Audit Process]].
* Changes to EPG [[236.3_Administration#236.3.12_Consultant_Right_of_Way_Appraisal,_Acquisition,_and_Relocation_Services_(RWRS)|236.3.12 Consultant Right of Way Appraisal, Acquisition, and Relocation Services (RWRS)]] were made to clarify the On-Call and Traditional ROW Consultant Services process and a new option of ROW Hybrid Consultant Services Process.
* Add additional Clarrifcation to EPG [[236.13_Designing_Right_of_Way_Plans#236.13.8_Plan_Requirements|236.13.8 Plan Requirements]] to include Bearing and Distance on the RW Plans or RW Supplemental Plan Sheet.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">October 22, 2025
----
* New test method EPG [[106.3.2.96_TM-96,_Standard_Test_Method_for_Chemical_Analysis_of_Concrete_Cores_by_Extraction_and_Solubility|106.3.2.96 TM-96, Standard Test Method for Chemical Analysis of Concrete Cores by Extraction and Solubility]], this test method evaluates concrete cores by concentrating on three phases (aggregate, paste, and voids) to assist and/or verify the reason(s) for the failure. This is one of three methods that could be utilized by industry to obtain measured results.
* Performance bond table added to determine minimum performance bond amounts for permitted work. in EPG [[:Category:941_Permits_and_Access_Requests#941.6.3.6_Deposit_Requirements|941.6.3.6 Deposit Requirements]]
* Updated Notice to Proceed in EPG [[108.16_Project_Dates|108.16.1 Informational Dates]] and [[237.8_Contract_Time|237.8 Contract Time]] to have consistent guidance in all policy documents.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">October 21, 2025
----
* FHWA increased the $25,000 waiver valuation and applicable appraisal templates threshold to $35,000, updated references in EPG [[:LPA:136.8_Local_Public_Agency_Land_Acquisition#136.8.6_Appraisal_and_Appraisal_Review|136.8.6 Appraisal and Appraisal Review]], [[:LPA:136.8_Local_Public_Agency_Land_Acquisition#136.8.7_Acquisition|136.8.7 Acquisition]] and [[236.6_Appraisal_and_Appraisal_Review#236.6.1_Overall_Operating_Policies|236.6.1 Overall Operating Policies]].
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">October 20, 2025
----
* Deleted paragraph in  EPG [[236.10_Right_Of_Way_Condemnation#236.10.7.6_Just_Compensation_for_Condemned_Properties_%28RSMo_523.039%29|236.10.7.6 Just Compensation for Condemned Properties RSMo 523.039]], becuse the House Bill being referenced was declared unconstitutional. 
* Changes in Route/Road Relinquishment required clauses in agreements and deeds in EPG [[236.14_Change_in_Route_Status_Report#236.14.2.1_Convey_to_Local_Government_Agency_(CRSR_required)|236.14.2.1 Convey to Local Government Agency (CRSR required)]] and [[236.14_Change_in_Route_Status_Report#236.14.6_Roadway_Relinquishment_Agreement|236.14.6 Roadway Relinquishment Agreement]].
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">September 10, 2025
----
* Updates to EPG [[127.2_Historic_Preservation_and_Cultural_Resources#127.2.6_How_does_the_District_Initiate_Section_106_Compliance|127.2.6 How does the District Initiate Section 106 Compliance]] and [[127.2_Historic_Preservation_and_Cultural_Resources#127.2.11_Early_Acquisition_of_Right-of-Way_and_Disposal_of_Uneconomic_Remnants|127.2.11 Early Acquisition of Right-of-Way and Disposal of Uneconomic Remnants]] to remove the Phased Section 106 process.
* Updated EPG [[236.7_Negotiation#236.7.4.4_Agreement_for_Purchase_of_Real_Estate|236.7.4.4 Agreement for Purchase of Real Estate]] to exclude Purchase Agreements from Railroads.
* Updated EPG [[236.16_Outdoor_Advertising#236.16.15.8_Mowing_and_Brush_Hogging|236.16.15.8 Mowing and Brush Hogging]] to update language encouraging vegetation applicants to follow Monarch Joint Venture's mowing and management guidelines.
* Renamed and updated EPG 907.5 S-HAL to [[907.5_Safety_Resources_for_Locals|907.5 Safety Resources for Locals]] to not be focused on just the S-HAL. This now has several references to various resources including the S-HAL.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">September 9, 2025
----
* Updates for Threatened and Endangered species in EPG [[:LPA:136.6_Environmental_and_Cultural_Requirements#136.6.4.5_Threatened_and_Endangered_Species_and_Migratory_Birds|136.6.4.5 Threatened and Endangered Species and Migratory Birds]] were made and Fig. 136.6.19 was updated.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">September 8, 2025
----
* Added new agreement TR63_Installation_of_Rectangular_Rapid_Flashing_Beacons in EPG [[153.21_Traffic|153.21 Traffic]].
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">September 5, 2025
----
* Updated EPG [[751.10_General_Superstructure#751.10.4_Conduit_Systems|751.10.4_Conduit_Systems]] for conduit placement requirement in barrier near expansion device to avoid interference with conduit during expansion material installation.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">August 7, 2025
----
* Updated dollar threshold from $750,000 to $1,000,000 in LPA [[:LPA:136.3_Federal_Aid_Basics#136.3.15.3_OMB_Audit|136.3.15.3 OMB Audit]] due to final guidance from OMB to 2 CFR Part 200.
* Updated EPG [[236.7_Negotiation#236.7.2.20_Acquisition_by_Condemnation|236.7.2.20 Acquisition by Condemnation]] to include Impasse Letter and purpose.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">July 14, 2025
----
* Provide an inorganic ethyl silicate topcoat option for inorganic zinc primers on structural steel and other miscellaneous coating issues are addressed in EPG 751.1.2.9.2, 751.6.1,751.6.2.11, 751.6.2.12, 751.14.5.8, 751.50 Notes in A.4, and 1045.
* Clarify conical pile points to require ASTM A148, Grade 90-60 and not allow the grade 35 shoes for CIP correlating with recent changes requiring modified Grade 3 shells with a 50 ksi yield strength in EPG [[751.50_Standard_Detailing_Notes#G5._CIP_Concrete_Piles_(Notes_for_Bridge_Standard_Drawings)|G5. CIP Concrete Piles (Notes for Bridge Standard Drawings)]]
* Adding guidance for the installation of ASTM F3148 TNA Fixed Spline bolts in EPG [[:Category:712_Structural_Steel_Construction#712.1.5_High_Strength_Bolts_(Sec_712.7)|712.1.5 - 712.3.3]], [[751.50_Standard_Detailing_Notes#H1._Steel|Standard Detailing Note H1.8.1]] and [[:Category:1080_Structural_Steel_Fabrication#1080.1_High_Strength_Bolts|1080.1 High Strength Bolts]].
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">July 11, 2025
----
* Changes made to rumble strip lift thickness in EPG [[626.1_Edgeline_Rumble_Strips|626.1 Edgeline Rumble Strips]] and [[626.2_Centerline_Rumble_Strips|626.2 Centerline Rumble Strips]].
* Provided guidance for prestressed girder stress limits in EPG [[751.21_Prestressed_Concrete_Slab_and_Box_Beams#751.21.2_Design|751.21.2 Design]] and [[751.22_Prestressed_Concrete_I_Girders#751.22.2.3_Flexure|751.22.2.3 Flexure]].
* Updated EPG [[751.31_Open_Concrete_Intermediate_Bents#751.31.2.4_Column_Analysis|751.31.2.4 Column Analysis]], added optional procedure for bridge column buckling design.
* Updated EPG [[:Category:1018_Fly_Ash_for_Concrete#1018.5_Laboratory_Procedures_for_Sec_1018|1018.5 Laboratory Procedures for Sec 1018]], removed auto-sampling references.
* Updated EPG [[751.9_Bridge_Seismic_Design#751.9.1_Seismic_Analysis_and_Design_Specifications|751.9.1Seismic Analysis and Design Specifications]], [[751.40_LFD_Widening_and_Repair#751.40.3.2_Bent_Cap_Shear_Strengthening_using_FRP_Wrap|751.40.3.2 Bent Cap Shear Strengthening using FRP Wrap]] and [[751.50_Standard_Detailing_Notes#I5._Fiber_Reinforced_Polymer_(FRP)_Wrap_–_Intermediate_Bent_Column_Strengthening_for_Seismic_Details_for_Widening._Report_following_notes_on_Intermediate_bent_plan_details.|751.50 Standard Detailing Notes - I5]] to clarify seismic details for bridge widening (one side, two sides, and FRP wrap).
* Changes to EPG [[751.24_Retaining_Walls#751.24.2.1_Design|751.24.2.1 Design]] and [[751.50_Standard_Detailing_Notes#E._General_Elevation_and_Plan_Notes|751.50 Standard Detailing Notes E. General Elevation and Plan Notes]] to clarify clear space requirement between MSE wall and front face of the abutment beam (setback distance).
* Updated  EPG [[109.10_Contract_Assignment_Process_-_Contract_Reassignment_to_a_New_Contractor_(for_Sec_109.10)|109.10]] to clarify and complete the contract reassignment process. There were a few minor steps missing in the process that by adding/clarifying will make it easier on whomever assists with this process in the future.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">July 1, 2025
----
* Updated EPG [[903.14_Memorial_Signs#903.14.3_Heroes_Way_Designation_Program|903.14.3 Heroes Way Designation Program]] to match new standards for the sign background color.
* Updated 10 Year Major Bridge Needs document in  EPG [[121.5_Asset_Management#121.5.4_Funding_Assets|121.5.4 Funding Assets]]
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 17, 2025
----
* Updated link and information in EPG [[121.5_Asset_Management|121.5 Asset Management]] for the current AMP Summary.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 12, 2025
----
* Updated EPG [[:Category:139_Design_-_Build|139 Design - Build]] with the new Design-Build Partnering Agreement.
* Clarified language in EPG [[:LPA:136.7_Design#136.7.2.7_Design_Exceptions|136.7.2.7 Design Exceptions]] to indicate if an LPA project on MoDOT right of way has a design exception, the approval needs to be funneled through the District Engineer.
* Updated EPG [[:Category:941_Permits_and_Access_Requests#941.10.3_Additional_Deployment_Criteria|941.10.3 Additional Deployment Criteria]] adding additional language to help clarify statements for LPR & PTZ network connectivity.
* Updated EPG [[236.6_Appraisal_and_Appraisal_Review#236.6.3.3_Waiver_Valuation|236.6.3.3 Waiver Valuation]], the maximum was raised from $25,000 to $35,000.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 11, 2025
----
* Updated examples in EPG [[:Category:242_Optional_and_Alternate_Pavement_Designs|242 Optional and Alternate Pavement Designs]] with more current examples.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 10, 2025
----
* EPG [[105.15_Project_Acceptance|105.15 Project Acceptance]] clarity of process updated.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">May 27, 2025
----
* Updates were made to EPG [[751.1_Preliminary_Design#751.1.2.20_Substructure_Type|751.1.2.20 Substructure Type]] to clarify guidance for galvanizing full length of friction piles.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">May 22, 2025
----
* Replace "Legal" with "Property" description in EPG [[238.2_Land_Surveying#238.2.17_Professional_Land_Surveyor_Review|238.2.17 Professional Land Surveyor Review]]. This change of removing legal with property, will make the langauge in guidance consistant throughout the EPG. 
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">May 14, 2025
----
* Updates were made to EPG [[:Category:824_Litter_Pickup|824 Litter Pickup]] to remove Adopt-a-highway, and change it to the Keeping Missouri Beautiful program.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">May 13, 2025
----
* Updated EPG [[751.50_Standard_Detailing_Notes#H6._Pouring_and_Finishing_Concrete_Slabs|751.50 Standard Detailing Notes - H6. Pouring and Finishing Concrete Slabs]] to provide guidance to use an existing note for new slab pours as well as redecks.
* Updated the current Temporary Traffic Control Inspection Worksheet located in EPG [[616.19_Quality_Standards_for_Temporary_Traffic_Control_Devices|616.19 Quality Standards for Temporary Traffic Control Devices]].
* Updated the link to the payroll training, replacing MoDOTU with MOVERS, and updated "clerk" to "Admin Tech" for consistency in EPG [[:Category:110_State_and_Federal_Wage_Rates_and_Other_Requirements|110 State and Federal Wage Rates and Other Requirements]].
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">May 7, 2025
----
* EPG [[:Category:110_State_and_Federal_Wage_Rates_and_Other_Requirements|110 State and Federal Wage Rates and Other Requirements]] was updated to provide clarity of the expectation of our process to ensure the project office staff are capturing the correct number of wage rate interviews during a project.
* Updated EPG [[:LPA:136.6_Environmental_and_Cultural_Requirements#136.6.4.1.4_Step_4,_Mitigation_of_Adverse_Effect|136.6.4.1.4 Step 4, Mitigation of Adverse Effect]] the date did not match guidance document and agreement document.
* Changed "will" to "may in EPG [[902.11_Traffic_Control_for_Schools|902.11.3 School Signal at Entrance]].
* Provide clarity of the expectation of our process to ensure the project office staff are capturing the correct number of wage rate interviews during a project in EPG [[:Category:110_State_and_Federal_Wage_Rates_and_Other_Requirements]].
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">April 25, 2025
----
* Changed date from 60 days to 6-18 months in EPG [[106.21_Summary_of_Materials_Inspected|106.21 Summary of Materials Inspected]] to clarify what types of projects (funding source) material summaries are required for.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">April 14, 2025
----
* EPG articles updated to clarify seismic detail requirements for columns, non-oversized drilled shafts (difference between drilled shaft and column diameter is ≤ 12"), oversized drilled shafts (difference between drilled shaft and column diameter is ≥ 18"), spread footings, and pile cap footings:
:• [[751.5_Structural_Detailing_Guidelines#751.5.9.2.5_Spacing_Limits|751.5.9.2.5 Spacing Limits]]
:• [[751.5_Structural_Detailing_Guidelines#751.5.9.2.6_Cover_Limits|751.5.9.2.6 Cover Limits]]
:• [[751.9_Bridge_Seismic_Design#751.9.1.2_LRFD_Seismic_Details|751.9.1.2 LRFD Seismic Details]]
:• [[751.9_Bridge_Seismic_Design#751.9.3.1.7_T-_Joint_Connections_for_LFD|751.9.3.1.7 T- Joint Connections for LFD]]
:• [[751.11_Bearings#751.11.2.1_Elastomeric_Bearings|751.11.2.1 Elastomeric Bearings]]
:• [[751.22_Prestressed_Concrete_I_Girders#751.22.2.7_Dowel_Bars|751.22.2.7 Dowel Bars]]
:• [[751.31_Open_Concrete_Intermediate_Bents#751.31.1.2_Rigid_Frame-_No_Tie_or_Web_Beam|751.31.1.2 Rigid Frame- No Tie or Web Beam - 751.31.1.5 Tie Beam with Change in Column Diameter]]
:• [[751.31_Open_Concrete_Intermediate_Bents#751.31.2.3_General_Design_Assumptions|751.31.2.3 General Design Assumptions]]
:• [[751.31_Open_Concrete_Intermediate_Bents#751.31.3.2_Column|751.31.3.2 Column]]
:• [[751.37_Drilled_Shafts#751.37.1.6_Drilled_Shaft_General_Detail_Considerations|751.37.1.6 Drilled Shaft General Detail Considerations]]
:• [[751.37_Drilled_Shafts#751.37.6.1_Reinforcement_Design|751.37.6.1 Reinforcement Design]]
:• [[751.37_Drilled_Shafts#751.37.6.2_Longitudinal_Reinforcement|751.37.6.2 Longitudinal Reinforcement]]
:• [[751.37_Drilled_Shafts#751.37.6.4_Transverse_Reinforcement|751.37.6.4 Transverse Reinforcement]],
:• [[751.38_Spread_Footings#751.38.8.3.1_Spread_Footing_Reinforcement|751.38.8.3.1 Spread Footing Reinforcement]]
:• [[751.39_Pile_Footings#751.39.1_Dimensions|751.39.1 Dimensions]]
:• [[751.39_Pile_Footings#751.39.5_Reinforcement|751.39.5 Reinforcement]]
:• [[751.40_LFD_Widening_and_Repair#751.40.8.11.5_T-_Joint_Connections|751.40.8.11.5 T- Joint Connections]]
:• [[751.50_Standard_Detailing_Notes#G1._Concrete_Bents|751.50_Standard_Detailing_Notes - G1.45]]
* Created new Standard Plans for delineators linked in EPG Articles:
:• [[620.5_Delineators_(MUTCD_Chapter_3F)#620.5.4_Delineator_Placement_and_Spacing_%28MUTCD_Section_3F.04%29|620.5.4 Delineator Placement and Spacing (MUTCD Section 3F.04)]]
:• [[620.5_Delineators_(MUTCD_Chapter_3F)#620.5.5_Guardrail_Delineation|620.5.5 Guardrail Delineation]], [[620.5_Delineators_(MUTCD_Chapter_3F)#620.5.6_Barrier_Wall_Delineation|620.5.6 Barrier Wall Delineation]]
:• [[903.2_Extent_of_Signing#903.2.25.4_Quantity_Computations|903.2.25.4 Quantity Computations]], [[903.17_Delineation_and_Object_Markers#903.17.1_Delineators|903.17.1 Delineators]]
:• [[903.17_Delineation_and_Object_Markers#903.17.5_Object_Markers_for_Ends_of_Roadways_%28MUTCD_Section_2C.66%29|903.17.5 Object Markers for Ends of Roadways (MUTCD Section 2C.66)]]
:• [[:Category:1044_Posts_for_Markers_and_Delineators#1044.2.1_Mile_and_Object_Marker%2C_and_Delineator_Posts|1044.2.1 Mile and Object Marker, and Delineator Posts]]
:• [[1044.5_Laboratory_Testing_Guidelines_for_Sec_1044#1044.5.1.2_Physical_Tests|1044.5.1.2 Physical Tests]]
* Revised splice and development lengths specified in the following EPG articles in accordance with new AASHTO standards:</br>
:• [[751.5_Structural_Detailing_Guidelines#751.5.9.2.8_Development_and_Lap_Splices|751.5.9.2.8 Development and Lap Splices]]
:• [[751.8_Concrete_Box_Culverts#751.8.3.2_Steel_Reinforcement|751.8.3.2 Steel Reinforcement]]
:• [[751.10_General_Superstructure#751.10.1.14_Girder_and_Beam_Haunch_Reinforcement|751.10.1.14 Girder and Beam Haunch Reinforcement]]
:• [[751.12_Barriers,_Railings,_Curbs_and_Fences#751.12.1.2.7_Details_of_Mounting_Light_Poles_on_Safety_Barrier_Curbs|751.12.1.2.7 Details of Mounting Light Poles on Safety Barrier Curbs]]
:• [[751.12_Barriers,_Railings,_Curbs_and_Fences#751.12.1.3.2_Typical_Section_Reinforcement|751.12.1.3.2 Typical Section Reinforcement]]
:• [[751.12_Barriers,_Railings,_Curbs_and_Fences#751.12.1.3.3_End_of_Barrier_Reinforcement|751.12.1.3.3.1 - 751.12.1.3.3.8]]
:• [[751.12_Barriers,_Railings,_Curbs_and_Fences#751.12.1.4.2_Typical_Section_Reinforcement|751.12.1.4.2 Typical Section Reinforcement]]
:• [[751.12_Barriers,_Railings,_Curbs_and_Fences#751.12.1.4.3_End_of_Barrier_Reinforcement|751.12.1.4.3 End of Barrier Reinforcement]]
:• [[751.12_Barriers,_Railings,_Curbs_and_Fences#751.12.1.6_Type_A_%2832ʺ_New_Jersey_Shaped_Median%29|751.12.1.6 Type A (32ʺ New Jersey Shaped Median)]]
:• [[751.21_Prestressed_Concrete_Slab_and_Box_Beams#751.21.3.3.1_Spread_Box_Beams|751.21.3.3.1 Spread Box Beams]]
:• [[751.21_Prestressed_Concrete_Slab_and_Box_Beams#751.21.3.6.3_Reinforcement|751.21.3.6.3 Reinforcement]]
:• [[751.22_Prestressed_Concrete_I_Girders#751.22.2.3_Flexure|751.22.2.3 Flexure]]
:• [[751.22_Prestressed_Concrete_I_Girders#751.22.3.7.2_Reinforcement|751.22.3.7.2 Reinforcement]]
:• [[751.22_Prestressed_Concrete_I_Girders#751.22.3.8.2_Reinforcement|751.22.3.8.2 Reinforcement]]
:• [[751.22_Prestressed_Concrete_I_Girders#751.22.3.9.2_Reinforcement|751.22.3.9.2 Reinforcement]]
:• [[751.22_Prestressed_Concrete_I_Girders#751.22.3.9.3_Closed_Diaphragm|751.22.3.9.3 Closed Diaphragm]]
:• [[751.31_Open_Concrete_Intermediate_Bents#751.31.3.1_Beam_Cap|751.31.3.1 Beam Cap - 751.31.3.5 Hammer Head Type]]
:• [[751.32_Concrete_Pile_Cap_Intermediate_Bents#751.32.4.1_Typical_Pile_Cap_Bent|751.32.4.1 Typical Pile Cap Bent]]
:• [[751.35_Concrete_Pile_Cap_Integral_End_Bents#751.35.4.1_Wide_Flange_Beams_%26_Plate_Girders|751.35.4.1 Wide Flange Beams & Plate Girders]]
:• [[751.35_Concrete_Pile_Cap_Integral_End_Bents#751.35.4.2_Prestressed_I-Girders%2C_Bulb-Tee_Girders_and_NU-Girders|751.35.4.2 Prestressed I-Girders, Bulb-Tee Girders and NU-Girders]]
:• [[751.35_Concrete_Pile_Cap_Integral_End_Bents#751.35.4.3_Wing_Reinforcement|751.35.4.3 Wing Reinforcement]]
:• [[751.50_Standard_Detailing_Notes|751.50 Standard Detailing Notes (Notes H10.8, H10.20, K1.5.1 and K1.5.2)]]
* Updates to EPG [[:Category:501_Concrete#501.1.6_Measurement_of_Material_%28Sec_501.6%29|501.1.6 Measurement of Material (Sec 501.6)]] revise the scale calibration process to include more detail on the process. The specification revision includes a statement on who can perform scale calibration services.
* Added concrete aggregate sampling method to EPG [[:Category:502_Portland_Cement_Concrete_Base_and_Pavement#502.1.11_Contractor_Quality_Control_(Sec_502.11)|502.1.11 Contractor Quality Control (Sec 502.11)]].
* Added sampling method standard for ashpalt aggregates in EPG articles [[:Category:403_Asphaltic_Concrete_Pavement#403.1.5_Mixture_Production_Specification_Limits_(Sec_403.5)|403.1.5 Mixture Production Specification Limits (Sec 403.5)]] and [[:Category:403_Asphaltic_Concrete_Pavement#403.1.17_Quality_Control_%28Sec_403.17%29|403.1.17 Quality Control (Sec 403.17)]].
* With the new MUTCD 11th Edition, EPG [[616.6_Temporary_Traffic_Control_Zone_Devices_(MUTCD_6F)#616.6.2.2_Flags|616.6.2.2 Flags]], [[616.19_Quality_Standards_for_Temporary_Traffic_Control_Devices#616.19.2.2.2_Sign_and_Flag_Quality|616.19.2.2.2 Sign and Flag Quality]], [[616.23_Traffic_Control_for_Field_Operations#616.23.1_Definitions|616.23.1 Definitions]], [[616.23_Traffic_Control_for_Field_Operations#616.23.2.5.1.1_Flags|616.23.2.5.1.1 Flags]] and [[616.23_Traffic_Control_for_Field_Operations#616.23.2.5.1.3_Sign_Design|616.23.2.5.1.3 Sign Design]] were updated to be more consistent with MUTCD guidance.
* Increased size of crosswalk markings for midblock and high-visibility in EPG [[620.2_Pavement_and_Curb_Markings_(MUTCD_Chapter_3B)#620.2.18_Crosswalk_Markings_%28MUTCD_Section_3B.18%29|620.2.18 Crosswalk Markings (MUTCD Section 3B.18)]].
* Updated EPG [[620.2_Pavement_and_Curb_Markings_(MUTCD_Chapter_3B)#620.2.16_Stop_and_Yield_Lines_(MUTCD_Section_3B.16)|620.2.16 Stop and Yield Lines (MUTCD Section 3B.16)]], [[620.2_Pavement_and_Curb_Markings_(MUTCD_Chapter_3B)#620.2.24_Pavement_Markings_for_Highway-Rail_Grade_Crossings_(MUTCD_Section_8B.27)|620.2.24 Pavement Markings for Highway-Rail Grade Crossings (MUTCD Section 8B.27)]] and [[620.2_Pavement_and_Curb_Markings_(MUTCD_Chapter_3B)#620.2.25_Stop_and_Yield_Lines_at_Highway-Rail_Grade_Crossings_%28MUTCD_section_8B.28%29|620.2.25 Stop and Yield Lines at Highway-Rail Grade Crossings (MUTCD section 8B.28)]] to increase yield triangle size.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">March 31, 2025
----
* Starting 4/1/2025 LPA projects bid will require a Bidders List Quote Summary, this update is to incorporate this requirement into the pertinent EPG articles and figures in [[:LPA:136.9_Plans,_Specs_and_Estimates_(PSE)#136.9.4.1.1.15_Disadvantaged_Business_Enterprise_(DBE)_(49_CFR_Part_26)|136.9.4.1.1.15 Disadvantaged Business Enterprise (DBE)]], [[:LPA:136.10_Advertisement_for_Bid_and_Project_Award#136.10.6.6_Disadvantaged_Business_Enterprise_(DBE)_Requirements|136.10.6.6 Disadvantaged Business Enterprise (DBE) Requirements]] and [[:LPA:136.10_Advertisement_for_Bid_and_Project_Award#136.10.7.1.1_Responsive_Bid|136.10.7.1.1 Responsive Bid]] and figures.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">March 19, 2025
----
* Adding a new policy in EPG [[:Category:119_Project_Schedules|119 Project Schedules]] to standardize and centralize the project schedules for every project in the STIP and provide guidelines for how schedules are modified, updated, and communicated throughout the department.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">March 18, 2025
----
* EPG [[751.38_Spread_Footings#751.38.5_Modifications_for_Load_Eccentricity|751.38.5 Modifications for Load Eccentricity]] was revised to clarify eccentricity limit for spread footing per AASHTO LRFD specifications. EPG [[751.24_Retaining_Walls#751.24.2.1_Design|751.24.2.1 Design]] and [[751.24_Retaining_Walls#751.24.3.2_Design|751.24.3.2 Design]] were revised to clarify live load requirement for seismic design.
* Added information about Performance Bonds to EPG [[:Category:941_Permits_and_Access_Requests#941.6.3.6_Deposit_Requirements|941.6.3.6 Deposit Requirements]]
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">March 6, 2025
----
* Added Balance Mix Design Q&A document in EPG [[:Category:403_Asphaltic_Concrete_Pavement|403 Asphaltic Concrete Pavement]] under the QRG's.
* Updated current practice in EPG [[751.1_Preliminary_Design#751.1.1.2_Bridge_Survey_Processing_and_Bridge_Numbering|751.1.1.2 Bridge Survey Processing and Bridge Numbering]] and added new procedure for MMA crack filler jobs on bridges.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">March 5, 2025
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">March 5, 2025
----
----
* Updated FHWA form 1391 in EPG [[:LPA:136.11_Local_Public_Agency_Construction|136.11 Local Public Agency Construction]] and [[:LPA:136.12_Figures,_Glossary_and_Other_Useful_Links|136.12 Figures, Glossary and Other Useful Links]]
* Updated FHWA form 1391 in EPG [[:LPA:136.11_Local_Public_Agency_Construction|136.11 Local Public Agency Construction]] and [[:LPA:136.12_Figures,_Glossary_and_Other_Useful_Links|136.12 Figures, Glossary and Other Useful Links]]
* Updated LPA Final Acceptance Report Form C-239 in EPG [[:LPA:136.11_Local_Public_Agency_Construction|136.11 Local Public Agency Construction]] and [[:LPA:136.12_Figures,_Glossary_and_Other_Useful_Links|136.12 Figures, Glossary and Other Useful Links]]. This updated form is more in alignment with information needed for SMS data entry and Tracker. It also includes instructions which will help with data consistency.
* Updated LPA Final Acceptance Report Form C-239 in EPG [[:LPA:136.11_Local_Public_Agency_Construction|136.11 Local Public Agency Construction]] and [[:LPA:136.12_Figures,_Glossary_and_Other_Useful_Links|136.12 Figures, Glossary and Other Useful Links]]. This updated form is more in alignment with information needed for SMS data entry and Tracker. It also includes instructions which will help with data consistency.
* Update to EPG [[:Category:1029_Fabricating_Prestressed_Concrete_Members_for_Bridges#1029.2.12_Prestress_Transfer|1029.2.12 Prestress Transfer]] to allow use of 4x8 cylinders.
</div>
</div>


Line 260: Line 548:


<!-- OLD UPDATES BELOW THIS LINE
<!-- OLD UPDATES BELOW THIS LINE


<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">October 18, 2023
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">October 18, 2023

Latest revision as of 10:23, 2 February 2026


February 2, 2026
January 30, 2026
January 28, 2026
  • Added new Cost Estimate Guide for Scoping in EPG 104.7 Scoping Estimates.
  • Adding language to EPG 501 Concrete for how concrete cylinders need to be marked when they are submitted to the central lab for testing.
January 22, 2026
January 22, 2026
January 21, 2026
  • EPG 751.1.2.17 and 751.9.1 updated to provide better access to bridge preliminary seismic design map for LRFD.
January 16, 2026
  • Updates to the EPG were made due to the MUTCD 11th Edition in EPG Articles 616, 620, 900, 903, 908, 910, 911, 913 and 914. For more information on the changes see the 2025 MUTCD Special Ballot.
January 13, 2026
  • Updating existing policy in EPG 136.4.1.6 Conflict of Interest to better describe/clarify existing requirements as it relates to consultant conflicts of interest on LPA projects,
January 5, 2026
  • Updates to EPG 501.2.9 and 1066.1 due to the phasing out the use of Aluminum powder for expansive concrete and adopting American Concrete Institute ACI-223 "Srinkage Compensating Concrete Guide"
  • Updates to EPG 750.7.2 Types and 941.9.8.4 Culvert Pipe to allow up to 60" SRPE in Group A Flexible Polyethylene category and updates corrugated polyethylene pipe to "double wall polyethylene" pipe. Provides details for QPL application and requirements.
December 19, 2025
November 19, 2025
November 18, 2025
November 13, 2025
October 22, 2025
October 21, 2025
October 20, 2025
September 10, 2025
September 9, 2025
September 8, 2025
  • Added new agreement TR63_Installation_of_Rectangular_Rapid_Flashing_Beacons in EPG 153.21 Traffic.
September 5, 2025
  • Updated EPG 751.10.4_Conduit_Systems for conduit placement requirement in barrier near expansion device to avoid interference with conduit during expansion material installation.
August 7, 2025
July 14, 2025
  • Provide an inorganic ethyl silicate topcoat option for inorganic zinc primers on structural steel and other miscellaneous coating issues are addressed in EPG 751.1.2.9.2, 751.6.1,751.6.2.11, 751.6.2.12, 751.14.5.8, 751.50 Notes in A.4, and 1045.
  • Clarify conical pile points to require ASTM A148, Grade 90-60 and not allow the grade 35 shoes for CIP correlating with recent changes requiring modified Grade 3 shells with a 50 ksi yield strength in EPG G5. CIP Concrete Piles (Notes for Bridge Standard Drawings)
  • Adding guidance for the installation of ASTM F3148 TNA Fixed Spline bolts in EPG 712.1.5 - 712.3.3, Standard Detailing Note H1.8.1 and 1080.1 High Strength Bolts.
July 11, 2025
July 1, 2025
June 17, 2025
June 12, 2025
June 11, 2025
June 10, 2025
May 27, 2025
May 22, 2025
May 14, 2025
  • Updates were made to EPG 824 Litter Pickup to remove Adopt-a-highway, and change it to the Keeping Missouri Beautiful program.
May 13, 2025
May 7, 2025
April 25, 2025
April 14, 2025
  • EPG articles updated to clarify seismic detail requirements for columns, non-oversized drilled shafts (difference between drilled shaft and column diameter is ≤ 12"), oversized drilled shafts (difference between drilled shaft and column diameter is ≥ 18"), spread footings, and pile cap footings:
751.5.9.2.5 Spacing Limits
751.5.9.2.6 Cover Limits
751.9.1.2 LRFD Seismic Details
751.9.3.1.7 T- Joint Connections for LFD
751.11.2.1 Elastomeric Bearings
751.22.2.7 Dowel Bars
751.31.1.2 Rigid Frame- No Tie or Web Beam - 751.31.1.5 Tie Beam with Change in Column Diameter
751.31.2.3 General Design Assumptions
751.31.3.2 Column
751.37.1.6 Drilled Shaft General Detail Considerations
751.37.6.1 Reinforcement Design
751.37.6.2 Longitudinal Reinforcement
751.37.6.4 Transverse Reinforcement,
751.38.8.3.1 Spread Footing Reinforcement
751.39.1 Dimensions
751.39.5 Reinforcement
751.40.8.11.5 T- Joint Connections
751.50_Standard_Detailing_Notes - G1.45
  • Created new Standard Plans for delineators linked in EPG Articles:
620.5.4 Delineator Placement and Spacing (MUTCD Section 3F.04)
620.5.5 Guardrail Delineation, 620.5.6 Barrier Wall Delineation
903.2.25.4 Quantity Computations, 903.17.1 Delineators
903.17.5 Object Markers for Ends of Roadways (MUTCD Section 2C.66)
1044.2.1 Mile and Object Marker, and Delineator Posts
1044.5.1.2 Physical Tests
  • Revised splice and development lengths specified in the following EPG articles in accordance with new AASHTO standards:
751.5.9.2.8 Development and Lap Splices
751.8.3.2 Steel Reinforcement
751.10.1.14 Girder and Beam Haunch Reinforcement
751.12.1.2.7 Details of Mounting Light Poles on Safety Barrier Curbs
751.12.1.3.2 Typical Section Reinforcement
751.12.1.3.3.1 - 751.12.1.3.3.8
751.12.1.4.2 Typical Section Reinforcement
751.12.1.4.3 End of Barrier Reinforcement
751.12.1.6 Type A (32ʺ New Jersey Shaped Median)
751.21.3.3.1 Spread Box Beams
751.21.3.6.3 Reinforcement
751.22.2.3 Flexure
751.22.3.7.2 Reinforcement
751.22.3.8.2 Reinforcement
751.22.3.9.2 Reinforcement
751.22.3.9.3 Closed Diaphragm
751.31.3.1 Beam Cap - 751.31.3.5 Hammer Head Type
751.32.4.1 Typical Pile Cap Bent
751.35.4.1 Wide Flange Beams & Plate Girders
751.35.4.2 Prestressed I-Girders, Bulb-Tee Girders and NU-Girders
751.35.4.3 Wing Reinforcement
751.50 Standard Detailing Notes (Notes H10.8, H10.20, K1.5.1 and K1.5.2)
March 31, 2025
March 19, 2025
  • Adding a new policy in EPG 119 Project Schedules to standardize and centralize the project schedules for every project in the STIP and provide guidelines for how schedules are modified, updated, and communicated throughout the department.
March 18, 2025
March 6, 2025
March 5, 2025
March 4, 2025
February 18, 2025
February 2, 2025
January 31, 2025
January 30, 2025
  • Add a note I1.62 stating that the contractor is responsible for asbestos abatement if they choose to remove the handrail to slip-form the blockout in EPG 751.50 - I1 General.
  • Updated EPG 747.2.3.4 Profile Sheets and 747.2.3.6.3 Additional Information for Railroad Crossings, field shots have been increased to 1,000 ft. each side of structure.
  • Revisions to EPG 136.3.10.1 adds language to allow special road districts to receive soft match credit, and further requires that any agency doing so must be a legally identified politial subdivision in good financial standing.
January 29, 2025
January 28, 2025
January 27, 2025
  • Updated Web Wall guidance in EPG 751.1.2.28 Web Walls to match current practice.
  • Increased minimum specified thickness for polyester polymer concrete from 3/4" to 1" minimum thickness to ensure not less than 3/4" applied in field in EPG 751.1.3.6 Deck Treatment.
January 24, 2025
  • Added EPG 233.5 Intersection Alternatives providing additional guidance about intersection types implemented throughout the state with more context for consideration and comparisons.
  • Added EPG 241.7 Roundabout Aesthetic Structure regarding new policy for determining what is allowed and the submittal/approval processes for roundabout structures on MoDOT right of way.
January 10, 2025
  • Update to EPG 110.1 Wage Rates to provide clarity to who is responsible for running the report.
January 9, 2025
January 3, 2025
  • Updated EPG 141.1 Cost Share Program to reflect the Commission policy change that increased the set aside portion for economic development from 10% to 20%.
  • EPG Fig. 136.4.18 is being revised to include supporting documentation requirements related to consultant travel expenses.
January 2, 2025
December 24, 2024
December 13, 2024
December 12, 2024
December 11, 2024
  • Removed TR17 Traffic Engineering Studies and TR18 Towing Services Agreement from EPG 153.21 Traffic, they are no longer used.
November 27, 2024
  • Added guidance to EPG 109.12.2 Change Order Approval to disallow the practice of contractors typing disclaimers on change orders when they sign.
  • Revised EPG 751.24.2.1 Design to allow wetcast modular wall blocks in splash zones for non-critical structural application.
  • Updated EPG 751.32.4.2 Encased Pile Cap Bent to allow #4 @ 12" (min.) stirrup bars for encased pile cap bents instead of #5 @ 12” (min.).
November 21, 2024
November 20, 2024
  • Updated EPG 108.16 Project Dates the internal process was rearranged so dates flow with life of project. Removed references to actual and projected dates, they are no longer used in AWP software.
October 11, 2024
October 10, 2024
October 9, 2024
September 16, 2024
July 22, 2024
July 18, 2024
July 11, 2024
  • Current armor detail is no longer in production. An optional armor detail is provided in bridge standard drawings. Added a standard note for those drawings to EPG 751.50.
July 3, 2024
July 2, 2024
  • EPG 941.9.8.4 Culvert Pipe updates the terminology of the plastic pipes and updates the guidance on use with driveways.
June 27, 2024
June 21, 2024
June 5, 2024
May 28, 2024
  • EPG 105.15.2 Final Acceptance was updated to clarify the DBE Final Payment Form now serves as the required DBE Participation List and Final Verification.
May 23, 2024
May 16, 2024
May 13, 2024
  • Updated the Missouri Uniform Crash Report Preparation Manual in EPG 907.4.
May 10, 2024
  • EPG 902.15.3.1 has been revised to allow core team to specify signal detection type to be documented with memo in eProjects instead of a design exception.
March 27, 2024
March 14, 2024
January 23, 2024