User contributions
Jump to navigation
Jump to search
- 13:22, 1 November 2017 diff hist +84 m 751.13 Expansion Joint Systems →751.13.3 Preformed Compression Seal Expansion Joint System: Per BR, clarified arrangement of article
- 13:16, 1 November 2017 diff hist +59 m 751.13 Expansion Joint Systems Per BR, clarified arrangement of article
- 12:43, 1 November 2017 diff hist -67 m 236.7 Negotiation →236.7.5.4 Acquisition from State of Missouri Agencies: Per RW, minor clarification as to which state agencies have authority to convey real property.
- 12:30, 1 November 2017 diff hist +1 m Main Page
- 08:13, 1 November 2017 diff hist +97 LPA:136.13 LPA Policy Changes
- 08:08, 1 November 2017 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 08:08, 1 November 2017 diff hist 0 N File:136.9.3 Nov 2017.docx
- 08:07, 1 November 2017 diff hist -28 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, updated link in Fig. 136.9.3
- 15:20, 31 October 2017 diff hist 0 N File:Main Page Oct 31, 2017.jpg current
- 15:19, 31 October 2017 diff hist +74 m Main Page
- 14:53, 31 October 2017 diff hist +5 m 751.6 General Quantities Per BR, assigned new pay item no. for pipe pile spacer
- 12:54, 31 October 2017 diff hist +238 m LPA:136.13 LPA Policy Changes Fig 136.6.7, the latest version
- 12:51, 31 October 2017 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.6.7
- 12:49, 31 October 2017 diff hist 0 N File:136.6.7 2017.docx current
- 12:48, 31 October 2017 diff hist +4 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, updated Fig. 136.6.7 with new “Whereas” clauses to address issues brought up by FHWA and the Advisory Council over the last few years.
- 12:24, 31 October 2017 diff hist 0 N File:616.12.3.3 2017.pdf current
- 12:24, 31 October 2017 diff hist +5 m 616.12 Work Zone Speed Limits →616.12.3 Work Zone SPEED LIMIT Figures: Per TS, revised Fig. 616.12.3.3 to include the “MERGE” sign.
- 10:42, 31 October 2017 diff hist 0 N File:132 Safety 2017.jpg current
- 10:42, 31 October 2017 diff hist +5 Category:132 Safety
- 13:59, 27 October 2017 diff hist +65 m 751.6 General Quantities Per BR, added Concrete Crack Filler to coordinate with new pay item
- 13:58, 27 October 2017 diff hist +3 Main Page
- 12:55, 27 October 2017 diff hist +284 m Main Page EPG 751.13
- 11:59, 27 October 2017 diff hist +24 m 751.6 General Quantities updated link
- 11:56, 27 October 2017 diff hist +12 m 771.11 Bridge Joint Sealing - Silicone updated link current
- 11:28, 27 October 2017 diff hist 0 N File:751.13.5.2 Beam or Girder.jpg current
- 11:27, 27 October 2017 diff hist 0 N File:751.13.5.2 Detail A.jpg current
- 11:27, 27 October 2017 diff hist 0 N File:751.13.5.2 part plan.jpg current
- 11:25, 27 October 2017 diff hist 0 N File:751.13.4.4 Part Elev.jpg current
- 11:25, 27 October 2017 diff hist -3 m 751.13 Expansion Joint Systems →751.13.4 Strip Seal Expansion Joint System
- 11:24, 27 October 2017 diff hist 0 N File:751.13.4.2 Summary.doc current
- 11:23, 27 October 2017 diff hist 0 N File:751.13.4.1 installation.jpg current
- 11:23, 27 October 2017 diff hist 0 N File:751.13.4.1 section.jpg current
- 11:22, 27 October 2017 diff hist 0 N File:751.13.4.1 plan.jpg current
- 11:22, 27 October 2017 diff hist 0 N File:751.13.4.1 squared.jpg current
- 11:21, 27 October 2017 diff hist 0 N File:751.13.3.3 Part Elevation.jpg current
- 11:21, 27 October 2017 diff hist 0 N File:751.13.3.2 Section AA.jpg current
- 11:20, 27 October 2017 diff hist 0 N File:751.13.3.1.jpg current
- 11:19, 27 October 2017 diff hist 0 N File:751.13.2.1.1 Ex 2 Step 6.jpg current
- 11:18, 27 October 2017 diff hist 0 N File:751.13.2.1.1 Ex 1 Step 6.jpg current
- 11:18, 27 October 2017 diff hist 0 N File:751.13.2 Preform Silicone.doc current
- 11:17, 27 October 2017 diff hist 0 N File:751.13.2 DS Brown.jpg current
- 11:16, 27 October 2017 diff hist 0 N File:751.13.2 Watson.jpg current
- 11:16, 27 October 2017 diff hist 0 N File:751.13.2 RJ skewed.jpg current
- 11:16, 27 October 2017 diff hist 0 N File:751.13.2 RJ model.jpg current
- 11:15, 27 October 2017 diff hist 0 N File:751.13.2 RJ.jpg current
- 11:15, 27 October 2017 diff hist 0 N File:751.13.1.4 A-A.jpg current
- 11:14, 27 October 2017 diff hist 0 N File:751.13.1.1.12 part elevation.jpg current
- 11:14, 27 October 2017 diff hist 0 N File:751.13.1.1.12 skewed.jpg current
- 11:13, 27 October 2017 diff hist 0 N File:751.13.1.1.12 squared.jpg current
- 11:13, 27 October 2017 diff hist 0 N File:751.13.1.1.12 lowest.jpg current
- 11:12, 27 October 2017 diff hist 0 N File:751.13.1.1.6.4.jpg current
- 11:12, 27 October 2017 diff hist 0 N File:751.13.1.1.6.1.3.jpg current
- 11:11, 27 October 2017 diff hist 0 N File:751.13.1.1.6.2.jpg current
- 11:11, 27 October 2017 diff hist 0 N File:751.13.1.1.6.1.jpg current
- 11:10, 27 October 2017 diff hist +56,151 m 751.13 Expansion Joint Systems Per BR, improved design and details for PCSEJS, and STSEJS
- 11:04, 27 October 2017 diff hist +1,299 m 751.50 Standard Detailing Notes →H5. Expansion Devices: Per BR, improved design and details for PCSEJS, and STSEJS
- 11:15, 25 October 2017 diff hist +166 m 751.50 Standard Detailing Notes Per BR, minor clarification (replacing "stringer" with "beam")
- 11:02, 25 October 2017 diff hist -12 m 751.35 Concrete Pile Cap Integral End Bents Per BR, minor clarification (replacing "stringer" with "beam")
- 11:01, 25 October 2017 diff hist -16 m 751.14 Steel Superstructure →751.14.5.3 End Diaphragms for Wide Flange Beams: Per BR, minor clarification (replacing "stringer" with "beam")
- 10:59, 25 October 2017 diff hist 0 m 751.14 Steel Superstructure →751.14.5.1 Bearing Stiffeners
- 10:57, 25 October 2017 diff hist 0 N File:751.14.5.1 End all Skews.jpg current
- 10:57, 25 October 2017 diff hist 0 N File:751.14.5.1 End Skews over 45.jpg current
- 10:56, 25 October 2017 diff hist 0 N File:751.14.5.1 End Skews 25 to 45.jpg current
- 10:55, 25 October 2017 diff hist 0 N File:751.14.5.1 End Skews Thru 25.jpg current
- 10:55, 25 October 2017 diff hist 0 N File:751.14 bearing end optional.jpg current
- 10:54, 25 October 2017 diff hist 0 N File:751.14.5.1 bearing end preferred.jpg current
- 10:53, 25 October 2017 diff hist 0 N File:751.14.5.1 bearing no end.jpg current
- 10:53, 25 October 2017 diff hist -993 m 751.14 Steel Superstructure →751.14.5.1 Bearing Stiffeners: Per BR, minor clarification (replacing "stringer" with "beam")
- 09:23, 25 October 2017 diff hist 0 N File:751.14.4.5 shear connector.jpg current
- 09:23, 25 October 2017 diff hist +16 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details: Per BR, minor clarification (replacing "stringer" with "beam")
- 09:16, 25 October 2017 diff hist 0 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details
- 09:15, 25 October 2017 diff hist 0 N File:751.14.4.5 D and H.jpg current
- 09:14, 25 October 2017 diff hist 0 N File:751.14.4.5 section thru.jpg current
- 09:14, 25 October 2017 diff hist -134 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details: Per BR, minor clarification (replacing "stringer" with "beam")
- 08:52, 25 October 2017 diff hist -12 m 751.14 Steel Superstructure →751.14.2.2 Analysis Methods: Per BR, minor clarification
- 12:15, 24 October 2017 diff hist -4 m 751.10 General Superstructure →751.10.1.11 Slab Elevations
- 14:51, 20 October 2017 diff hist -4 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, minor update to E2.22
- 15:21, 17 October 2017 diff hist -3 m Main Page
- 14:57, 16 October 2017 diff hist +2 m 751.23 Prestressed Concrete Double Tee Girders →751.23.1.1 Material Properties
- 14:57, 16 October 2017 diff hist +2 m 751.22 Prestressed Concrete I Girders →751.22.1.1 Material Properties
- 14:35, 16 October 2017 diff hist -2 m 643.2 Local Utility Adjustments - Public and Private Per CM, further updated D-12
- 14:35, 16 October 2017 diff hist -4 m 237.9 Submission of Plans and Supporting Documents Per CM, further updated D-12
- 14:34, 16 October 2017 diff hist -4 m Category:124 Quality Control / Quality Assurance (QC/QA) Per CM, further updated D-12
- 14:33, 16 October 2017 diff hist 0 N File:D-12 Oct 2017.docx current
- 14:33, 16 October 2017 diff hist -2 m Category:101 Standard Forms Per CM, further updated D-12
- 09:55, 16 October 2017 diff hist -4 m 751.6 General Quantities Per BR, updated Item Description for pay item 712-12.50
- 08:22, 16 October 2017 diff hist -130 m Category:101 Standard Forms Per CM, removed the link to "2015 Statewide Rail Cable Fence Spreadsheet"
- 09:23, 13 October 2017 diff hist +28 m Main Page EPG 751.22, EPG 751.23
- 08:49, 13 October 2017 diff hist +24 m 751.22 Prestressed Concrete I Girders →751.22.1.1 Material Properties
- 08:48, 13 October 2017 diff hist +1,266 m 751.23 Prestressed Concrete Double Tee Girders →751.23.1.1 Material Properties: Per BR, report on the girder plans the required number of strands by design and the total initial prestress force using EPG 751.50 Standard Detailing Notes H2c1.3.
- 08:38, 13 October 2017 diff hist +1,215 m 751.22 Prestressed Concrete I Girders →751.22.1 General: Report on the girder plans the required number of strands by design and the total initial prestress force using EPG 751.50 Standard Detailing Notes H2c1.3.
- 08:03, 13 October 2017 diff hist -1 m Main Page
- 07:09, 13 October 2017 diff hist +1 m 236.5 Property Management →236.5.25.6 Security Assessment for Leased Areas Over or Under Highway Structures: RW, corrected cattle pass info
- 11:04, 11 October 2017 diff hist -19 m Main Page EPG 236.5.25.6
- 10:59, 11 October 2017 diff hist +1,239 m 236.5 Property Management →236.5.25.6 Security Assessment for Leased Areas Over or Under Highway Structures: Per RW, clarified policies for storing items under bridges
- 08:47, 11 October 2017 diff hist +43 m Main Page EPG 236.17
- 08:18, 11 October 2017 diff hist -70 m 236.17 Junkyards Per RW, updated junkyard expiration date to match the statutes
- 14:40, 10 October 2017 diff hist +7 m Main Page EPG 237.13.2
- 14:38, 10 October 2017 diff hist -345 m 237.13 Contract Plan File Name Convention →237.13.2 Electronic Design Data: Per CADD, updated list of electronic design data files generated from GEOPAK for Roadway Contract Plans
- 12:35, 29 September 2017 diff hist +289 m Main Page EPG 751
- 08:09, 29 September 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.2.1.1.3 Boring Locations
- 08:08, 29 September 2017 diff hist 0 N File:751.5.2.1.1.3.jpg current
- 08:08, 29 September 2017 diff hist -3 m 751.5 Structural Detailing Guidelines →751.5.2.1.1.3 Boring Locations: Per BR, minor correction on boring location figure
- 15:09, 28 September 2017 diff hist -1 m 751.10 General Superstructure →751.10.1.10 Slab Offsets for Curved Bridges
- 15:07, 28 September 2017 diff hist 0 N File:751.10.1.10 2017.jpg current
- 15:06, 28 September 2017 diff hist -1 m 751.50 Standard Detailing Notes →B3c. Slabs on Steel, Concrete and Semi-Deep Abutment, and Reinforced Concrete Slab Overlays
- 15:06, 28 September 2017 diff hist +200 m 751.50 Standard Detailing Notes →B3c. Slabs on Steel, Concrete and Semi-Deep Abutment, and Reinforced Concrete Slab Overlays: Per BR, clarified how to estimate slab quantities when expansion joint systems are present.
- 15:02, 28 September 2017 diff hist +1,541 m 751.10 General Superstructure →751.10.1 Slab on Girder: Per BR, Clarified how to show and identify the end of slab in a plan of slab detail when expansion joint systems are located at the end bents
- 15:00, 28 September 2017 diff hist -1 m 751.6 General Quantities →751.6.2.10 Bridge Slabs
- 14:44, 28 September 2017 diff hist +306 m 751.6 General Quantities →751.6.2.10 Bridge Slabs: Per BR, clarified how to estimate slab quantities when expansion joint systems are present
- 14:42, 28 September 2017 diff hist +23 m 751.50 Standard Detailing Notes →B. Estimated Quantities Notes: inserted link
- 09:19, 28 September 2017 diff hist 0 N File:751.5.1.4 file names.pdf current
- 09:18, 28 September 2017 diff hist +177 m 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes
- 09:13, 28 September 2017 diff hist -415 m Main Page EPG 751.5.1.4
- 09:10, 28 September 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes
- 09:09, 28 September 2017 diff hist 0 N File:751.5.1.4 file names 2017.jpg current
- 09:09, 28 September 2017 diff hist +631 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes: Per BR, clarified guidance for change orders to bridge plans
- 07:53, 28 September 2017 diff hist +572 620.12 Construction Inspection for Sec 620 →620.12.2.4 Acceptance (Sec 620.2.4)
- 07:49, 28 September 2017 diff hist -11 620.1 General (MUTCD Chapter 3A) →620.1.4 Materials (MUTCD Section 3A.04)
- 10:04, 27 September 2017 diff hist +6 m Category:101 Standard Forms →Construction and Materials
- 09:58, 27 September 2017 diff hist +9 m Category:101 Standard Forms →Construction and Materials: Per CM, updated link
- 09:00, 27 September 2017 diff hist -413 m Main Page
- 08:54, 27 September 2017 diff hist +421 m Main Page EPG 616.14
- 08:37, 27 September 2017 diff hist +124 m 616.14 Work Zone Safety and Mobility Policy Per DE, updates regarding Work Zone Transportation Management Plan. Revised definition of "significant project" in E 616.14.8. Requirements for TCP revised in E 616.14.10.
- 07:16, 27 September 2017 diff hist -35 m 751.50 Standard Detailing Notes →B3. Estimated Quantities Tables: Per BR, minor removal of unnecessary instruction. Minor correction of terminology.
- 08:55, 26 September 2017 diff hist -156 m 238.3 Route Surveying
- 09:29, 22 September 2017 diff hist +2 m Main Page
- 11:22, 20 September 2017 diff hist +3 m LPA:136.12 Figures, Glossary and Other Useful Links
- 11:21, 20 September 2017 diff hist +21 m LPA:136.9 Plans, Specs and Estimates (PSE)
- 11:20, 20 September 2017 diff hist 0 N File:136.9.3 Sept 20 2017.docx
- 11:20, 20 September 2017 diff hist +3 m LPA:136.13 LPA Policy Changes
- 11:17, 20 September 2017 diff hist +42 m LPA:136.13 LPA Policy Changes
- 11:17, 20 September 2017 diff hist +192 m LPA:136.13 LPA Policy Changes Fig 136.9.3
- 11:15, 20 September 2017 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.9.3
- 11:15, 20 September 2017 diff hist 0 N File:136.9.3 Sept 2017.docx
- 11:15, 20 September 2017 diff hist -28 m LPA:136.9 Plans, Specs and Estimates (PSE) Per DE, updated the Subcontractor Disclosure in Fig. 136.9.3 to reflect the current section of the Missouri Standard Specification for Highway Construction.
- 10:54, 20 September 2017 diff hist +15 m 821.18 Noxious Weeds →Table 821.18.2 Musk, Canada and Scotch Thistle: Per MT, added "and Marijuana" to table title
- 13:55, 19 September 2017 diff hist 0 N File:Main Page Sep 19, 2017.jpg current
- 13:55, 19 September 2017 diff hist -68 Main Page EPG 236.5.19
- 13:31, 19 September 2017 diff hist +305 m 236.5 Property Management →236.5.19 Survey Requirements: Per RW, clarified who may prepare legal descriptions since SB828 enabled Title Companies and Legal Counsel to prepare legal descriptions
- 12:31, 19 September 2017 diff hist +26 m 751.50 Standard Detailing Notes →J1. General: added link
- 14:28, 18 September 2017 diff hist +158 m LPA:136.13 LPA Policy Changes
- 14:25, 18 September 2017 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.1
- 14:25, 18 September 2017 diff hist 0 N File:136.3.1 Sept 2017.doc current
- 14:24, 18 September 2017 diff hist +30 m LPA:136.3 Federal Aid Basics Per LPA, clarified Fig. 136.3.1
- 11:16, 18 September 2017 diff hist -2 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: minor correction, per BR
- 08:04, 18 September 2017 diff hist +118 m Main Page EPG 616.8
- 08:00, 18 September 2017 diff hist 0 N File:616.8.46 MT 2017.pdf current
- 08:00, 18 September 2017 diff hist 0 N File:616.8.10g MT 2017.pdf current
- 08:00, 18 September 2017 diff hist 0 N File:616.8.10a MT 2017.pdf current
- 08:00, 18 September 2017 diff hist 0 N File:616.8.10 MT 2017.pdf current
- 07:59, 18 September 2017 diff hist +19 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Maintenance: Per TS, implementing Nat'l Safety Council’s 3-2-1 Cone Procedure for internal operations. TA-10, TA-10a & TA-10g updated to show new cone procedure
- 12:23, 15 September 2017 diff hist +17 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 12:22, 15 September 2017 diff hist -82 m 751.36 Driven Piles →751.36.3 Design Procedure
- 11:13, 15 September 2017 diff hist +854 m 751.50 Standard Detailing Notes Per BR, clarifications related to 3/7/2017 revision. Min. hammer is not required when DT is specified. E2 table revised as well as note E2.22. Note G7.4 added.
- 11:11, 15 September 2017 diff hist +135 m 751.36 Driven Piles →751.36.3 Design Procedure: inserted links
- 10:55, 15 September 2017 diff hist +297 m 751.36 Driven Piles →751.36.3 Design Procedure: Per BR, clarifications related to 3/7/2017 revision. Min. hammer is not required when DT is specified.
- 12:27, 12 September 2017 diff hist -23 m 751.10 General Superstructure →751.10.1.14 Girder Haunch Reinforcement: Per BR, minor grammatical revision
- 11:12, 12 September 2017 diff hist +18 m Main Page EPG 751.22.2.2
- 10:26, 12 September 2017 diff hist +347 751.22 Prestressed Concrete I Girders →751.22.2.2 Prestressing Strands: Per BR, clarified that distances to hold-down devices and between hold-down devices for prestressed girders & beams should be reported on plans to nearest inch
- 13:48, 8 September 2017 diff hist 0 N File:Main Page Sep 8, 2017.jpg current
- 13:47, 8 September 2017 diff hist -333 m Main Page
- 07:03, 8 September 2017 diff hist +4 m Main Page
- 11:32, 7 September 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator Sep 2017.xlsx
- 11:31, 7 September 2017 diff hist +8 m 606.1 Guardrail Minor general cell formatting for the Guardrail Length of Need Calculator spreadsheet.
- 10:19, 7 September 2017 diff hist +28 m Category:941 Permits and Access Requests updated title
- 10:17, 7 September 2017 diff hist 0 m Category:100 GENERAL
- 10:15, 7 September 2017 diff hist +84 m 153.23 Utility updated title
- 10:13, 7 September 2017 diff hist +32 m 236.16 Outdoor Advertising updated title
- 10:12, 7 September 2017 diff hist +27 m 236.13 Designing Right of Way Plans updated title
- 10:11, 7 September 2017 diff hist +251 m 236.12 Quality Assurance Reviews updated title
- 10:08, 7 September 2017 diff hist +28 m 236.11 Mediation updated title
- 10:06, 7 September 2017 diff hist +170 m 236.8 Relocation Assistance Program updated title
- 10:03, 7 September 2017 diff hist +312 m 236.7 Negotiation updated title
- 10:01, 7 September 2017 diff hist +140 m 236.6 Appraisal and Appraisal Review updated title
- 09:59, 7 September 2017 diff hist +448 m 236.5 Property Management updated title
- 09:54, 7 September 2017 diff hist +307 m 236.3 Administration updated title
- 09:49, 7 September 2017 diff hist +134 m 236.1 General Information updated title
- 10:52, 6 September 2017 diff hist 0 N File:101 Floodplain Development Permit Application Sept 6 2017.pdf current
- 10:52, 6 September 2017 diff hist +2 m Category:101 Standard Forms Per BR, further updated Floodplain Development Permit/Application with new SEMA personnel info
- 13:54, 5 September 2017 diff hist -368 141.1 Cost Share Program
- 13:46, 5 September 2017 diff hist 0 N File:101 Floodplain Development Permit Application Sept 2017.pdf current
- 13:46, 5 September 2017 diff hist +5 m Category:101 Standard Forms →Bridge: Per BR, updated Floodplain Development Permit/Application with new SEMA personnel info
- 13:39, 1 September 2017 diff hist -16 m 751.1 Preliminary Design →751.1.2.19.2 Content: updated link
- 11:19, 1 September 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.7 Features Crossed
- 11:18, 1 September 2017 diff hist +55 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.7 Features Crossed
- 11:17, 1 September 2017 diff hist -2 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.7 Features Crossed
- 11:15, 1 September 2017 diff hist +4 m 751.5 Structural Detailing Guidelines →751.5.2.1 Plan and General Elevation (Front Sheet)
- 11:14, 1 September 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.2.1.1 Substructure Elements
- 11:07, 1 September 2017 diff hist -188 m Main Page EPG 236.16, EPG 236.4
- 10:46, 1 September 2017 diff hist +265 m LPA:136.13 LPA Policy Changes EPG 136.8.5.2
- 10:41, 1 September 2017 diff hist +152 m LPA:136.8 Local Public Agency Land Acquisition →136.8.5.2 Title Information: Per RW, added a link to a checklist of items to determine property ownership for ADA projects.
- 10:37, 1 September 2017 diff hist -2 m 236.4 Description Writing and Titles →236.4.4.1 Purpose: Per RW, added a checklist of items to determine property ownership for ADA projects.
- 10:31, 1 September 2017 diff hist 0 N File:236.4.4.1.docx current
- 10:30, 1 September 2017 diff hist +1,310 m 236.4 Description Writing and Titles →236.4.4.1 Purpose: Per RW, added a checklist of items to determine property ownership for ADA projects.
- 10:22, 1 September 2017 diff hist +109 m 236.16 Outdoor Advertising →236.16.11 Cutout and Extension Process: Per RW, updated the cutout and extension process to reflect current statutes.
- 08:35, 31 August 2017 diff hist +598 m Main Page EPG 751
- 08:19, 31 August 2017 diff hist +91 m 751.50 Standard Detailing Notes inserted links
- 13:38, 30 August 2017 diff hist +1 m 751.50 Standard Detailing Notes →E3. Miscellaneous
- 13:35, 30 August 2017 diff hist -4 m Category:941 Permits and Access Requests →941.2.2 Evaluation Guidelines and Considerations: minor correction
- 13:33, 30 August 2017 diff hist +298 m 751.50 Standard Detailing Notes Per BR, clarified guidance for bridge clearances.
- 13:16, 30 August 2017 diff hist 0 N File:751.5.2.1.2.7 construction.jpg current
- 13:16, 30 August 2017 diff hist 0 N File:751.5.2.1.2.7 min clearance.jpg current
- 13:15, 30 August 2017 diff hist 0 N File:751.5.2.1.1.5 min vert clearance.jpg current
- 13:14, 30 August 2017 diff hist -663 m 751.5 Structural Detailing Guidelines Per BR, clarified guidance for bridge clearances.
- 11:21, 30 August 2017 diff hist 0 m 751.40 LFD Widening and Repair updated link
- 11:19, 30 August 2017 diff hist +2 m 750.7 Non-Hydraulic Considerations updated links
- 11:17, 30 August 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.9 Slope Protection: updated links
- 11:15, 30 August 2017 diff hist -58 m Category:747 Bridge Reports and Layouts →747.1.3.2.3 Additional Information for Grade Separations: updated link
- 11:07, 30 August 2017 diff hist 0 N File:751.1.2.19.2 Retaining Wall.pdf current
- 11:06, 30 August 2017 diff hist 0 N File:751.1.2.19.2 Stream Crossing Culvert.pdf current
- 11:06, 30 August 2017 diff hist 0 N File:751.1.2.19.2 Stream Crossing Bridge.pdf current
- 11:06, 30 August 2017 diff hist 0 N File:751.1.2.19.2 Railroad Grade Separation.pdf current
- 11:06, 30 August 2017 diff hist -4 m 751.1 Preliminary Design →751.1.2.19.2 Content
- 11:05, 30 August 2017 diff hist 0 N File:751.1.2.19.2 Highway Grade Separation.pdf current
- 11:03, 30 August 2017 diff hist +2,052 m 751.1 Preliminary Design Per BR, clarified guidance for bridge clearances.
- 11:09, 29 August 2017 diff hist -9 m Main Page EPG 643.4
- 10:36, 29 August 2017 diff hist +5 Main Page
- 09:03, 29 August 2017 diff hist 0 N File:643.4.1.14.pdf current
- 09:02, 29 August 2017 diff hist 0 N File:643.4.1.14.jpg current
- 09:01, 29 August 2017 diff hist +691 643.4 Railroads →643.4.1.14 Railroad Crossing Median Islands: Per DE, policy for raised islands at railroad crossings now consistent w/ fed regulations by reducing the speed limit threshold from 45 to 40 mph
- 08:49, 29 August 2017 diff hist -1,404 616.23 Traffic Control for Field Operations →616.23.2.4 Flagger Control: Per TS, info moved to EPG 616.5
- 08:45, 29 August 2017 diff hist -22,546 616.20 Flagger Training Per TS, info moved to EPG 616.5 current
- 08:36, 29 August 2017 diff hist +115 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.81 Lighting Devices (MUTCD 6F.81): Per TS, due to flagger fatalities, MoDOT has implemented the National Safety Council’s 3-2-1 Cone Procedure into the MoDOT Maintenance operations.
- 08:32, 29 August 2017 diff hist 0 N File:616.5.8 nighttime.jpg current
- 08:30, 29 August 2017 diff hist 0 N File:616.5.7.1.jpg current
- 08:29, 29 August 2017 diff hist +1,433 616.5 Flagger Control (MUTCD Chapter 6E) Per TS, Nat'l Safety Council’s 3-2-1 Cone Procedure implemented for internal ops. Flagger lighting requirements for contract and MoDOT operations increased to 5.0 ft-candles to meet OSHA requirements
- 08:23, 29 August 2017 diff hist +118 616.4 Pedestrian and Worker Safety (MUTCD Chapter 6D) Per TS, due to flagger fatalities, MoDOT has implemented the National Safety Council’s 3-2-1 Cone Procedure into the MoDOT Maintenance operations.
- 12:31, 25 August 2017 diff hist 0 N File:751.9.3.1.7.6 Aug 2017.jpg current
- 12:31, 25 August 2017 diff hist 0 N File:751.9.3.1.7.4 Aug 2017.jpg current
- 12:30, 25 August 2017 diff hist +8 m 751.9 LFD Seismic →751.9.3.1.7 T- Joint Connections: Per BR, revised two figures about the splice stagger requirement for seismic column detail
- 10:44, 24 August 2017 diff hist +4 m Main Page
- 10:43, 24 August 2017 diff hist 0 N File:Main Page Aug 24, 2017.jpg current
- 10:43, 24 August 2017 diff hist -557 m Main Page EPG 751.20.3.1
- 07:16, 24 August 2017 diff hist +18 751.17 Concrete Slab Bridges →751.20.3.1 Solid Slabs
- 07:15, 24 August 2017 diff hist 0 N File:751.20.3.1 end span.jpg current
- 07:14, 24 August 2017 diff hist -38 m 751.17 Concrete Slab Bridges →751.20.3.1 Solid Slabs: Per BR, revised the intermediate bent beam cap height for solid slab end span to accommodate commercially available forming systems
- 13:07, 23 August 2017 diff hist +364 m Category:641 Bicycle Facilities added link to FHWA resources
- 13:05, 23 August 2017 diff hist +366 m LPA:136.7 Design added link to FHWA sources
- 12:59, 23 August 2017 diff hist -21 m Category:641 Bicycle Facilities →641.1 Types of Facilities: updated link
- 13:32, 22 August 2017 diff hist 0 N File:902.5.23 Left 2017.xls
- 13:32, 22 August 2017 diff hist +10 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) Per TS, corrected a formula in Left Turn Phasing Warrants spreadsheet
- 15:01, 18 August 2017 diff hist 0 m Main Page
- 13:05, 18 August 2017 diff hist -24 m 236.7 Negotiation Per RW, updated form link
- 13:02, 18 August 2017 diff hist -354 m 236.6 Appraisal and Appraisal Review Per RW, updated form link
- 12:58, 18 August 2017 diff hist -898 m 236.5 Property Management Per RW, updated form links
- 07:13, 17 August 2017 diff hist +184 m Category:903 Highway Signing updated several links
- 13:55, 16 August 2017 diff hist 0 m Main Page
- 14:53, 15 August 2017 diff hist 0 m Main Page
- 12:20, 14 August 2017 diff hist +2 m 751.36 Driven Piles →751.36.2 Steel Pile
- 11:12, 14 August 2017 diff hist -2 m Category:Safe and Sound →General: Per TS, updated "Type III" barricade to "Type 3"
- 11:10, 14 August 2017 diff hist -6 m 616.18 Construction Inspection Guidelines for Sec 616 →For Sec. 616.3.2: Per TS, updated "Type III" barricade to "Type 3"
- 11:09, 14 August 2017 diff hist -6 m 616.10 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation Per TS, updated "Type III" barricade to "Type 3"
- 11:08, 14 August 2017 diff hist +34 m Where to Find PDM Information in the EPG →Chapter VIII, Traffic Control Devices
- 11:01, 14 August 2017 diff hist -6 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Per TS, updated "Type III" barricade to "Type 3"
- 10:37, 14 August 2017 diff hist +153 m Main Page EPG 751.36.2
- 10:20, 14 August 2017 diff hist +2 751.50 Standard Detailing Notes →G7. HP Pile
- 10:20, 14 August 2017 diff hist +330 m 751.50 Standard Detailing Notes →G7. Steel HP Pile: Per BR, revised and added std detailing notes for the anchorage of pile for seismic jobs
- 10:04, 14 August 2017 diff hist +206 m 751.9 LFD Seismic →751.9.3.1.7 T- Joint Connections: Per BR, added link to revised info about anchorage of pile for seismic jobs
- 09:54, 14 August 2017 diff hist +19 m 751.36 Driven Piles →751.36.2 Steel Pile
- 09:53, 14 August 2017 diff hist 0 N File:751.36.2.jpg current
- 09:52, 14 August 2017 diff hist +947 m 751.36 Driven Piles →751.36.2 Steel Pile: Per BR, revised the anchorage of pile for seismic jobs
- 08:39, 14 August 2017 diff hist +318 m Category:138 Project Development Chronology added 2017 map
- 07:38, 14 August 2017 diff hist 0 236.5 Property Management
- 14:46, 11 August 2017 diff hist -2 m Main Page
- 13:52, 11 August 2017 diff hist +296 m 236.15 Requests from Cities for Annexations Per RW, updated links to form 39
- 13:47, 11 August 2017 diff hist -1,128 m 236.11 Mediation Per RW, updated links to forms
- 12:49, 11 August 2017 diff hist -12,818 m 236.7 Negotiation Per RW, updated links to forms
- 11:29, 11 August 2017 diff hist -3,848 m 236.6 Appraisal and Appraisal Review updated links to forms
- 11:15, 11 August 2017 diff hist -363 m 236.5 Property Management
- 11:10, 11 August 2017 diff hist -158 m 236.5 Property Management
- 11:09, 11 August 2017 diff hist -8,484 m 236.5 Property Management updated links to forms
- 10:23, 11 August 2017 diff hist -5 m 236.4 Description Writing and Titles
- 10:08, 11 August 2017 diff hist -1,580 m 236.4 Description Writing and Titles Per RW, updated form links
- 10:57, 10 August 2017 diff hist -8 m Main Page EPG 625.1.2
- 10:55, 10 August 2017 diff hist +298 m Category:625 Slab Stabilization →625.1.2 Construction Inspection for Sec 625.10 Slab Undersealing: Per CM, clarified measurement of liquid asphalt cement
- 09:27, 10 August 2017 diff hist -46 m Main Page EPG 760.1
- 09:23, 10 August 2017 diff hist +672 m Category:760 General Construction Inspection for Structures →760.1 Preparation For Inspection: Per CM and BR, clarified overhead work on bridges safety guidance
- 09:10, 10 August 2017 diff hist 0 m Category:950 Automated Traffic Enforcement
- 09:09, 10 August 2017 diff hist 0 m 907.3 Travel Safe Zones updated division's name
- 09:07, 10 August 2017 diff hist +8 m 907.1 Safety Program Guidelines
- 09:06, 10 August 2017 diff hist -1 m 907.1 Safety Program Guidelines →907.1.3 District Safety Plans and Project Reporting
- 09:05, 10 August 2017 diff hist +4 m 907.1 Safety Program Guidelines updated division's name
- 09:03, 10 August 2017 diff hist +100 m 153.21 Traffic Updated division's name
- 08:06, 10 August 2017 diff hist +1,609 m 237.11 Signing and Sealing Per CADD, moved slightly updated guidance from a link into the "Additional Information" box.
- 07:44, 10 August 2017 diff hist +15 m 237.11 Signing and Sealing updated archaic Design link
- 15:14, 9 August 2017 diff hist 0 m Main Page
- 13:40, 9 August 2017 diff hist +2 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, further updated D-12
- 13:40, 9 August 2017 diff hist +4 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, further updated D-12
- 13:39, 9 August 2017 diff hist 0 N File:D-12 Aug 9 2017.docx current
- 13:39, 9 August 2017 diff hist +4 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, further updated D-12
- 13:38, 9 August 2017 diff hist +2 m Category:101 Standard Forms →Design: Per Bidding and Est'g, further updated D-12
- 12:06, 9 August 2017 diff hist 0 N File:756 flow chart 2017.pdf current
- 12:06, 9 August 2017 diff hist +5 m Category:756 Seismic Design Per BR, minor updates to Bridge Seismic Design Process Flowchart
- 13:31, 8 August 2017 diff hist +34 m Main Page
- 13:30, 8 August 2017 diff hist +1 m Main Page
- 13:29, 8 August 2017 diff hist +44 m Main Page EPG 240
- 13:13, 8 August 2017 diff hist +133 m Category:240 Maintenance and Emergency Crossovers Per TS, revised the standard for Emergency Vehicle Crossovers to 20' wide with 10' radius to allow fire/EMS responders to utilized the emergency crossovers.
- 14:59, 7 August 2017 diff hist -86 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): Per EPG, updated JSP links
- 14:40, 7 August 2017 diff hist 0 m Main Page
- 13:27, 7 August 2017 diff hist +4 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, updated D-12
- 13:26, 7 August 2017 diff hist +8 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, updated D-12
- 13:26, 7 August 2017 diff hist +4 m Category:101 Standard Forms Per Bidding and Est'g, updated D-12
- 13:25, 7 August 2017 diff hist 0 N File:D-12 Aug 2017.docx current
- 13:25, 7 August 2017 diff hist +8 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, updated D-12
- 11:19, 7 August 2017 diff hist -230 m Main Page
- 15:30, 4 August 2017 diff hist +59 m Category:610 Pavement Smoothness →610.7 Dispute Resolution (Sec 610.5.5)
- 15:26, 4 August 2017 diff hist +48 Category:610 Pavement Smoothness →610.7 Dispute Resolution (Sec 610.5.5)
- 15:22, 4 August 2017 diff hist +11 m Category:610 Pavement Smoothness →610.4 Smoothness Increments (Sec 610.4.1)
- 14:48, 4 August 2017 diff hist -31 m Category:600 INCIDENTAL CONSTRUCTION
- 14:46, 4 August 2017 diff hist +6 m Category:610 Pavement Smoothness →610.2 Inertial Profilers (Sec 610.2.1)
- 14:44, 4 August 2017 diff hist 0 m Category:610 Pavement Smoothness
- 14:41, 4 August 2017 diff hist 0 N File:610.7.jpg current
- 14:41, 4 August 2017 diff hist 0 N File:610.2 inertial profilers.jpg current
- 14:40, 4 August 2017 diff hist 0 N File:610.2.jpg current
- 14:40, 4 August 2017 diff hist 0 N File:610.2 rod and level.jpg current
- 14:39, 4 August 2017 diff hist 0 N File:610.1.jpg current
- 14:38, 4 August 2017 diff hist +313 Category:610 Pavement Smoothness Per CM, guidance for the new Sec 610
- 13:17, 4 August 2017 diff hist +10,224 N Category:610 Pavement Smoothness Per CM, new guidance for the new spec
- 11:04, 4 August 2017 diff hist -211 m 751.50 Standard Detailing Notes →H10. Barrier Curbs: Per BR, deleted archaic note H10.84
- 08:04, 4 August 2017 diff hist -18 m Help Article →Division Contacts
- 08:04, 4 August 2017 diff hist -18 m Help Article →Division Contacts
- 08:52, 3 August 2017 diff hist +204 m 230.1 Horizontal Alignment →230.1.5 Spiral Transition Curves: Per DE, clarified spiral transition curves guidance and bring them into compliance with standard plans
- 08:42, 3 August 2017 diff hist -50 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Per EPG, updated JSP links
- 09:17, 2 August 2017 diff hist 0 N File:237.9 MHTC Agenda Item Checklist 2017.docx current
- 09:17, 2 August 2017 diff hist -10 m 237.9 Submission of Plans and Supporting Documents Per MHTC, updated MHTC Agenda Item Checklist
- 12:41, 1 August 2017 diff hist 0 N File:Main Page 2 Aug 1, 2017.jpg current
- 12:41, 1 August 2017 diff hist 0 N File:Main Page Aug 1, 2017.jpg current
- 12:41, 1 August 2017 diff hist +182 m Main Page
- 14:26, 31 July 2017 diff hist 0 N File:134.5.2 2017.docx
- 14:25, 31 July 2017 diff hist 0 m Category:134 Engineering Professional Services Per LPA, updated the fiscal years in the cost area of PSC Approval to Execute Supplemental Agreement, Fig. 134.5.2
- 11:33, 31 July 2017 diff hist +5 m Main Page
- 09:52, 31 July 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator 2017.xlsx
- 09:52, 31 July 2017 diff hist +10 m 606.1 Guardrail Per Charles Schumann (original creator of the G'rail LON Calculator), minor corrections to the spreadsheet.
- 10:42, 28 July 2017 diff hist +119 m Category:173 Erosion Control for Maintenance Operations Per MT, Per MT, clarification reflecting actual field activities was added at the request of FEMA
- 10:11, 28 July 2017 diff hist 0 N File:903.17.23 2017.jpg current
- 10:11, 28 July 2017 diff hist +3 m 903.16 Typical Signing Applications →Figure 903.17.23 Location of Yield and Lane Ends Sign for Acceleration Ramps: Per Traffic, fig corrected to be in compliance with written guidance
- 15:22, 25 July 2017 diff hist 0 m Main Page
- 15:06, 25 July 2017 diff hist +12 m Main Page EPG 751.50
- 14:57, 25 July 2017 diff hist +51 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: Per BR, combined and revised notes H2c.1.10 and H2c.1.11 and revised note H2c1.38 to clarify the location of the coil tie being referenced.
- 08:40, 25 July 2017 diff hist 0 N File:D-12 2017.docx current
- 08:40, 25 July 2017 diff hist -53 m 643.2 Local Utility Adjustments - Public and Private Per EPG, minor update to D-12
- 08:39, 25 July 2017 diff hist 0 m 237.9 Submission of Plans and Supporting Documents Per EPG, minor update to D-12
- 08:38, 25 July 2017 diff hist 0 m Category:101 Standard Forms Per EPG, minor update to D-12
- 08:37, 25 July 2017 diff hist -106 m Category:124 Quality Control / Quality Assurance (QC/QA) Per EPG, minor update to D-12
- 12:48, 24 July 2017 diff hist -748 m Main Page
- 12:46, 24 July 2017 diff hist -24 m 643.1 Utilities - Status Letter →643.1.2 Utility Status: minor improvement
- 12:28, 24 July 2017 diff hist -52 m Main Page EPG 643.1
- 10:03, 24 July 2017 diff hist -40 m 643.1 Utilities - Status Letter →643.1.2 Utility Status: Per EPG, updated guidance to current practice and clarified D-12 with minor updates
- 15:02, 21 July 2017 diff hist +1 m Main Page
- 09:01, 21 July 2017 diff hist 0 N File:Fig 616.6.87.2 July 2017.jpg current
- 09:00, 21 July 2017 diff hist +5 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Fig. 616.6.87.2 Rumble Strip Placement on a Divided Highway: Per TS, minor correction of Fig. 616.6.87.2
- 08:09, 19 July 2017 diff hist -1,747 m 236.14 Change in Route Status Report Per RW, removed archaic links to RW 27 and RW 32.
- 10:46, 18 July 2017 diff hist 0 m 903.9 General Information Signs →Table 903.9.23 National Known, National Prominent Sites
- 10:35, 18 July 2017 diff hist +44 m 903.9 General Information Signs →Table 903.9.23 National Known, National Prominent Sites: Per TS, added Ulysses S. Grant Nat'l Historic Site to listing
- 15:21, 17 July 2017 diff hist -4 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.1.2 State Law
- 14:52, 17 July 2017 diff hist -3 m Main Page
- 14:51, 17 July 2017 diff hist 0 N File:Main Page 3 July 17, 2017.jpg current
- 14:50, 17 July 2017 diff hist 0 N File:Main Page 2 July 17, 2017.jpg current
- 14:50, 17 July 2017 diff hist 0 N File:Main Page July 17, 2017.jpg current
- 14:50, 17 July 2017 diff hist +348 m Main Page
- 07:58, 17 July 2017 diff hist -440 m Category:101 Standard Forms →Construction and Materials: Per CM and Stormwater Compliance Coordinator, deleted 3 archaic Land Disturbance Inspection Record forms
- 14:36, 13 July 2017 diff hist 0 N File:Main Page July 13, 2017.jpg current
- 14:36, 13 July 2017 diff hist +297 m Main Page
- 08:59, 13 July 2017 diff hist 0 m Main Page
- 08:34, 11 July 2017 diff hist +301 m Main Page EPG 134
- 08:28, 11 July 2017 diff hist 0 N File:134.2.4 July 11 2017.doc current
- 08:28, 11 July 2017 diff hist 0 N File:134.2.2 July 11 2017.doc current
- 08:27, 11 July 2017 diff hist +9 m Category:134 Engineering Professional Services Per LPA, cosmetically updated Figs. 134.2.2 and 134.2.4
- 14:24, 10 July 2017 diff hist 0 N File:134.2.4 July 10 2017.doc current
- 14:23, 10 July 2017 diff hist 0 N File:134.2.2 July 2017.doc current
- 14:22, 10 July 2017 diff hist +18 m Category:134 Engineering Professional Services Per LPA, updated Figs. 134.2.2 and 134.2.4 to accommodate new Docusign instructions.
- 13:42, 10 July 2017 diff hist 0 N File:134 Docusign.pdf current
- 13:41, 10 July 2017 diff hist +108 m Category:134 Engineering Professional Services Per LPA, added DocuSign instructions
- 08:57, 10 July 2017 diff hist -28 m Category:747 Bridge Reports and Layouts →747.1.2.4 GEO Files for Stream Crossings: Per BR, updated link
- 08:21, 10 July 2017 diff hist -2 m Main Page
- 12:40, 6 July 2017 diff hist 0 m 121.3 The Statewide Transportation Improvement Program (STIP) updated STIP link
- 09:57, 6 July 2017 diff hist +19 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, updated archaic PoDI links
- 15:27, 5 July 2017 diff hist -220 m Main Page EPG 134.2.4
- 15:09, 5 July 2017 diff hist +496 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts: Per LPA, new 2017-2020 on-call consultant categories and lists
- 12:33, 5 July 2017 diff hist -1 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System
- 12:33, 5 July 2017 diff hist -1 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System
- 11:22, 5 July 2017 diff hist +6 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: old PODI link re-established
- 11:21, 5 July 2017 diff hist -6 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per Bidding and Est, updated PODI link
- 10:03, 5 July 2017 diff hist +360 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, updated to match bit item listing for monolithic deck repair
- 09:52, 5 July 2017 diff hist 0 N File:134.2.4 July 5 2017.doc current
- 09:51, 5 July 2017 diff hist +6 m Category:134 Engineering Professional Services
- 09:26, 5 July 2017 diff hist 0 N File:134.2.4 July 2017.doc current
- 09:26, 5 July 2017 diff hist +15 m Category:134 Engineering Professional Services Per LPA, cosmetically updated Fig. 134.2.4
- 09:05, 5 July 2017 diff hist -260 m Main Page EPG 822
- 08:55, 5 July 2017 diff hist +1 m Category:822 Roadside Vegetation Management
- 08:54, 5 July 2017 diff hist -117 m 822.4 Best Practices current
- 08:53, 5 July 2017 diff hist -49 m 822.4 Best Practices
- 08:52, 5 July 2017 diff hist -1 m 822.9 Maintenance Planning Guidelines for Tree Removal current
- 08:52, 5 July 2017 diff hist +68 N 822.10 Maintenance Planning Guidelines for Tree Removal 822.10 Maintenance Planning Guidelines for Tree Removal moved to 822.9 Maintenance Planning Guidelines for Tree Removal current
- 08:52, 5 July 2017 diff hist 0 m 822.9 Maintenance Planning Guidelines for Tree Removal 822.10 Maintenance Planning Guidelines for Tree Removal moved to 822.9 Maintenance Planning Guidelines for Tree Removal
- 08:52, 5 July 2017 diff hist 0 822.8 Maintenance Planning Guidelines for Brush Cutting current
- 08:52, 5 July 2017 diff hist +69 N 822.9 Maintenance Planning Guidelines for Brush Cutting 822.9 Maintenance Planning Guidelines for Brush Cutting moved to 822.8 Maintenance Planning Guidelines for Brush Cutting current
- 08:52, 5 July 2017 diff hist 0 m 822.8 Maintenance Planning Guidelines for Brush Cutting 822.9 Maintenance Planning Guidelines for Brush Cutting moved to 822.8 Maintenance Planning Guidelines for Brush Cutting
- 08:51, 5 July 2017 diff hist 0 m 822.7 Maintenance Planning Guidelines for Mowing Operations
- 08:51, 5 July 2017 diff hist 0 m 822.7 Maintenance Planning Guidelines for Mowing Operations 822.8 Maintenance Planning Guidelines for Mowing Operations moved to 822.7 Maintenance Planning Guidelines for Mowing Operations
- 08:51, 5 July 2017 diff hist +73 N 822.8 Maintenance Planning Guidelines for Mowing Operations 822.8 Maintenance Planning Guidelines for Mowing Operations moved to 822.7 Maintenance Planning Guidelines for Mowing Operations current
- 08:51, 5 July 2017 diff hist 0 m 822.6 Hay and Other Crops on the Right of Way current
- 08:51, 5 July 2017 diff hist +59 N 822.7 Hay and Other Crops on the Right of Way 822.7 Hay and Other Crops on the Right of Way moved to 822.6 Hay and Other Crops on the Right of Way current
- 08:51, 5 July 2017 diff hist 0 m 822.6 Hay and Other Crops on the Right of Way 822.7 Hay and Other Crops on the Right of Way moved to 822.6 Hay and Other Crops on the Right of Way
- 08:50, 5 July 2017 diff hist +672 m 822.5 Definitions Per MT, updates to promote and enhance pollinator habitat on r/w while addressing traveler safety and noxious weeds
- 08:48, 5 July 2017 diff hist +31 N 822.6 Definitions 822.6 Definitions moved to 822.5 Definitions: Renumbered by MT current
- 08:48, 5 July 2017 diff hist 0 m 822.5 Definitions 822.6 Definitions moved to 822.5 Definitions: Renumbered by MT
- 08:48, 5 July 2017 diff hist -4,490 m 822.4 Best Practices Moved to EPG 822.4 Recommended Practices.
- 08:45, 5 July 2017 diff hist 0 N File:822.4 cl.jpg current
- 08:45, 5 July 2017 diff hist +5,250 m 822.4 Recommended Practices Per MT, updates to promote and enhance pollinator habitat on r/w while addressing traveler safety and noxious weeds current
- 08:44, 5 July 2017 diff hist +41 N 822.5 Recommended Practices 822.5 Recommended Practices moved to 822.4 Recommended Practices: MT combined E 822.5 Recommended Practices with E 822.4 Best Practices current
- 08:44, 5 July 2017 diff hist 0 m 822.4 Recommended Practices 822.5 Recommended Practices moved to 822.4 Recommended Practices: MT combined E 822.5 Recommended Practices with E 822.4 Best Practices
- 08:39, 5 July 2017 diff hist 0 N File:822.2.1 2017.jpg current
- 08:38, 5 July 2017 diff hist +223 m 822.2 Vegetation Management for Minor Roads Per MT, updates to promote and enhance pollinator habitat on r/w while addressing traveler safety and noxious weeds current
- 08:37, 5 July 2017 diff hist 0 N File:822.1.3 2017.jpg current
- 08:37, 5 July 2017 diff hist 0 N File:822.1.2 2017.jpg current
- 08:37, 5 July 2017 diff hist 0 N File:822.1.1 2017.jpg current
- 08:36, 5 July 2017 diff hist +83 m 822.1 Vegetation Management for Major Roads Per MT, updates to promote and enhance pollinator habitat on r/w while addressing traveler safety and noxious weeds
- 08:35, 5 July 2017 diff hist 0 N File:822 2017.pdf current
- 08:35, 5 July 2017 diff hist 0 N File:822 2017.jpg current
- 08:34, 5 July 2017 diff hist -114 m Category:822 Roadside Vegetation Management Per MT, updates to promote and enhance pollinator habitat on r/w while addressing traveler safety and noxious weeds
- 12:54, 3 July 2017 diff hist +1 m Main Page
- 07:56, 3 July 2017 diff hist +290 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.5 Threatened and Endangered Species: Per Env'l, replaced 19-min "MoDOT T&E Prog Guidance" video with two MoDOT T&E guidance videos and a MDC tutorial video
- 14:55, 29 June 2017 diff hist +76 m Category:941 Permits and Access Requests
- 14:18, 29 June 2017 diff hist +19 m 903.3 Ground-Mounted Sign Supports →903.3.21 Sign Inspection and Inventory
- 14:17, 29 June 2017 diff hist +87 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)
- 14:01, 29 June 2017 diff hist +57 m 903.7 Conventional Road Guide Signs
- 13:58, 29 June 2017 diff hist +8 907.7 Highway Safety Manual →907.7.5 What Additional Resources are Available to Aid in an HSM Analysis?
- 13:57, 29 June 2017 diff hist +19 m 236.14 Change in Route Status Report →236.14.7 AASHTO Application
- 13:56, 29 June 2017 diff hist +38 m 233.2 At-Grade Intersections with Stop and Yield Control
- 13:54, 29 June 2017 diff hist +58 m 903.2 Extent of Signing
- 13:52, 29 June 2017 diff hist +19 m 902.4 Signal Installations and Equipment →902.4.3 Annual Orders and District Signal and Lighting Equipment Purchases
- 13:51, 29 June 2017 diff hist +19 m 234.2 Diamond Interchanges
- 13:50, 29 June 2017 diff hist +19 m 230.2 Vertical Alignment
- 13:49, 29 June 2017 diff hist +19 m 616.13 Work Zone Capacity, Queue and Travel Delay
- 13:48, 29 June 2017 diff hist +38 m Category:900 TRAFFIC CONTROL
- 13:44, 29 June 2017 diff hist +27 m 233.3 Roundabouts
- 13:43, 29 June 2017 diff hist +19 m 902.17 Execution of Contracts for Signal or Flasher Installation →902.17.1 Pre-approved CCO Forms
- 13:42, 29 June 2017 diff hist +18 m 106.16 Special Designs and Shop Drawings →106.16.2.1 Requirements
- 13:41, 29 June 2017 diff hist +19 m 620.11 Guidelines for Using Water-Borne Traffic Paint
- 13:41, 29 June 2017 diff hist +68 m 106.1 Source of Supply and Quality Requirements →Traffic
- 13:21, 29 June 2017 diff hist +19 m Category:233 At - Grade Intersections
- 13:20, 29 June 2017 diff hist +19 m Category:241 Aesthetic Considerations →241.5 Constraints
- 13:19, 29 June 2017 diff hist +19 m Category:241 Aesthetic Considerations →241.5 Constraints
- 13:17, 29 June 2017 diff hist 0 m Category:134 Engineering Professional Services
- 13:06, 29 June 2017 diff hist 0 m 233.2 At-Grade Intersections with Stop and Yield Control
- 13:05, 29 June 2017 diff hist 0 m 903.3 Ground-Mounted Sign Supports
- 12:59, 29 June 2017 diff hist 0 m Category:941 Permits and Access Requests
- 12:53, 29 June 2017 diff hist +1 m Category:100 GENERAL
- 12:52, 29 June 2017 diff hist +4 m Category:900 TRAFFIC CONTROL
- 12:51, 29 June 2017 diff hist 0 m 903.19 Signing for Rail and Light Rail Transit Grade Crossings
- 12:50, 29 June 2017 diff hist +2 m 616.13 Work Zone Capacity, Queue and Travel Delay
- 12:49, 29 June 2017 diff hist 0 m 903.1 Highway Signing General Information
- 12:48, 29 June 2017 diff hist 0 m 616.16 Law Enforcement Services
- 12:48, 29 June 2017 diff hist 0 m 907.1 Safety Program Guidelines
- 12:47, 29 June 2017 diff hist +1 m 907.7 Highway Safety Manual
- 10:49, 29 June 2017 diff hist -10 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per Bidding and Est, updated link to PODI List for 2018
- 08:53, 29 June 2017 diff hist +90 m LPA:136.13 LPA Policy Changes
- 08:52, 29 June 2017 diff hist +1 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.1 Introduction
- 07:37, 29 June 2017 diff hist +373 m LPA:136.13 LPA Policy Changes EPG 136.4.1
- 07:29, 29 June 2017 diff hist 0 N File:136.4.1.ppt current
- 07:28, 29 June 2017 diff hist +269 m LPA:136.4 Consultant Selection and Consultant Contract Management Per CM, added ppt "Construction Inspection"
- 08:45, 28 June 2017 diff hist 0 m Main Page
- 07:45, 28 June 2017 diff hist -7 Category:403 Asphaltic Concrete Pavement →403.3.1.1 Trial Mixtures: Per CM,
- 07:13, 28 June 2017 diff hist 0 m Category:403 Asphaltic Concrete Pavement →403.3.1.1 Trial Mixtures
- 07:10, 28 June 2017 diff hist +7 m Category:403 Asphaltic Concrete Pavement →403.3.1.1 Trial Mixtures
- 07:09, 28 June 2017 diff hist 0 m Category:403 Asphaltic Concrete Pavement →403.3.1.1 Trial Mixtures: minor correction, per CM
- 15:00, 26 June 2017 diff hist 0 N File:Main Page June 26, 2017.jpg current
- 15:00, 26 June 2017 diff hist +96 m Main Page
- 12:41, 23 June 2017 diff hist +202 m LPA:136.13 LPA Policy Changes Fig. 136.3.1
- 12:39, 23 June 2017 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.1
- 12:38, 23 June 2017 diff hist 0 N File:136.3.1 2017.doc current
- 12:38, 23 June 2017 diff hist 0 m LPA:136.3 Federal Aid Basics Per LPA, Fig. 136.3.1 updated to show the LPA Internal Procedures Manual requires LPAs submit the FFATA form with the programming data form.
- 12:16, 23 June 2017 diff hist +363 m Main Page EPG 403
- 11:31, 23 June 2017 diff hist 0 m Category:402 Bituminous Surface Leveling →402.1.1 Plan Preparation
- 11:30, 23 June 2017 diff hist 0 m Category:402 Bituminous Surface Leveling →402.1.1 Plan Preparation
- 11:28, 23 June 2017 diff hist -133 m Category:402 Bituminous Surface Leveling Per CM, removed archaic "Asphalt Cement Price Index Example Calculations"
- 11:26, 23 June 2017 diff hist -117 m Category:401 Bituminous Base and Pavement Per CM, removed archaic "Asphalt Cement Price Index Example Calculations"
- 10:59, 23 June 2017 diff hist +322 m Category:625 Slab Stabilization →625.1.2 Construction Inspection for Sec 625.10 Slab Undersealing: Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:55, 23 June 2017 diff hist +369 m Category:409 Seal Coat Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:43, 23 June 2017 diff hist +163 m Category:402 Bituminous Surface Leveling →402.1 Design of Contract Leveling Course Projects: Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:40, 23 June 2017 diff hist +166 m Category:401 Bituminous Base and Pavement Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:38, 23 June 2017 diff hist -81 m Category:403 Asphaltic Concrete Pavement Per CM, deleted archaic "Asphalt Cement Price Adjustment (for Square Yard Items)".
- 10:36, 23 June 2017 diff hist -156 m 413.3 Ultrathin Bonded Asphalt Wearing Surface
- 10:36, 23 June 2017 diff hist -99 m 413.3 Ultrathin Bonded Asphalt Wearing Surface Per CM, deleted archaic "Asphalt Cement Price Adjustment (for Square Yard Items)".
- 08:08, 23 June 2017 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments.docx current
- 08:08, 23 June 2017 diff hist +305 m Category:403 Asphaltic Concrete Pavement Per CM, added "Guidance for Asphalt Cement Price Index Adjustments". Also moved Asphalt Cement Price Adjustment (for Square Yard Items) from EPG 413
- 15:26, 22 June 2017 diff hist -100 m Category:101 Standard Forms →Construction and Materials: Per CM, removed "UBAWS AC Membrane Adjustment" link since it was already replaced with other forms
- 10:27, 21 June 2017 diff hist -4 m Main Page
- 08:20, 21 June 2017 diff hist +176 m Main Page EPG 751.31, EPG 751.32
- 08:17, 21 June 2017 diff hist +26 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.1 Typical Pile Cap Bent
- 08:15, 21 June 2017 diff hist +29 m 751.31 Open Concrete Intermediate Bents
- 08:47, 20 June 2017 diff hist 0 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems
- 08:45, 20 June 2017 diff hist +36 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 12:08, 19 June 2017 diff hist -16 m 153.9 Design
- 15:12, 16 June 2017 diff hist +314 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.1 Typical Pile Cap Bent: Per BR, clarified and corrected foundation data
- 15:05, 16 June 2017 diff hist 0 N File:751.31.3.1 Longitudinal Beam Steps.jpg current
- 15:04, 16 June 2017 diff hist +281 m 751.31 Open Concrete Intermediate Bents →751.31.3.1 Beam Cap: BR, clarified reinforcement details for longitudinal beam step.
- 14:59, 16 June 2017 diff hist 0 N File:Main Page June 16, 2017.jpg current