User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:48, 14 September 2021 diff hist -32 m 1049.4 Laboratory Testing Guidelines for Sec 1049 Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 10:47, 14 September 2021 diff hist -32 m 1048.3 Laboratory Testing Guidelines for Sec 1048 Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 10:46, 14 September 2021 diff hist -32 m 1047.9 Laboratory Testing Guidelines for Sec 1047 Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info current
- 10:41, 14 September 2021 diff hist -19 m 1045.6 Laboratory Testing Guidelines for Sec 1045 Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info current
- 10:39, 14 September 2021 diff hist -35 m 1043.5 Laboratory Testing Guidelines for Sec 1043 Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info current
- 10:35, 14 September 2021 diff hist -27 m 1042.1 Laboratory Testing Guidelines for Sec 1042 Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info current
- 10:30, 14 September 2021 diff hist -57 m 1040.5 Laboratory Testing Guidelines for Sec 1040 Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 10:27, 14 September 2021 diff hist -19 m 1036.7 Laboratory Testing for Sec 1036 Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info current
- 10:02, 14 September 2021 diff hist -19 m 1033.4 Laboratory Testing Guidelines for Sec 1033 Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 10:01, 14 September 2021 diff hist -55 m 1032.3 Laboratory Testing Guidelines for Sec 1032 Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 09:58, 14 September 2021 diff hist -19 m 1028.5 Laboratory Testing Guidelines for Sec 1028 Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info current
- 09:56, 14 September 2021 diff hist -35 m 1026.8 Laboratory Testing Guidelines for Sec 1026 Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 09:26, 14 September 2021 diff hist -66 m 1020.8 Laboratory Testing Guidelines for Sec 1020 Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 08:33, 14 September 2021 diff hist 0 m Category:733 Precast Concrete Box Culverts current
- 08:33, 14 September 2021 diff hist -79 m Category:733 Precast Concrete Box Culverts Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 08:31, 14 September 2021 diff hist -32 m Category:721 Concrete Crib-Type Retaining Walls Laboratory Testing Guidelines Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info current
- 08:26, 14 September 2021 diff hist -40 m Category:712 Structural Steel Construction →712.3 Lab Testing: Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 08:22, 14 September 2021 diff hist -32 m Category:704 Concrete Masonry Repair →704.3 Laboratory Testing for Sec 704: Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 08:21, 14 September 2021 diff hist -32 m Category:703 Concrete Masonry Construction →703.5 Laboratory Testing for Sec 703: Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 08:16, 14 September 2021 diff hist -56 m Category:603 Water Line Installation Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info current
- 08:10, 14 September 2021 diff hist -27 m Category:501 Concrete →501.1.3.5.2 QC/QA Testing Requirements: Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 08:08, 14 September 2021 diff hist -32 m Category:402 Bituminous Surface Leveling →402.4.2 Sample Record: Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 08:06, 14 September 2021 diff hist -32 m Category:309 Laboratory Testing Guidelines for Portland Cement Concrete Base Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 08:01, 14 September 2021 diff hist -84 m Category:239 Construction Inspection Guidelines for Final Plans Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 07:58, 14 September 2021 diff hist +34 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs)
- 13:22, 13 September 2021 diff hist -128 m LPA:136.4 Consultant Selection and Consultant Contract Management updated broken link to Consultant Certification of Indirect Cost Form
- 13:16, 13 September 2021 diff hist 0 N File:134.3.5.1 Form.pdf current
- 13:16, 13 September 2021 diff hist +10 m Category:134 Engineering Professional Services →134.3.5 Subconsultants
- 13:15, 13 September 2021 diff hist -138 m Category:134 Engineering Professional Services updated link to Consultant Certification of Indirect Cost Form
- 12:47, 13 September 2021 diff hist -601 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 12:43, 13 September 2021 diff hist -29 m Category:113 Construction Inspection Guidance for Contractor's Claims Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 12:40, 13 September 2021 diff hist -5,156 m Category:101 Standard Forms →SiteManager Quick Reference Guides (QRGs) 20px: Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 12:39, 13 September 2021 diff hist +300 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs)
- 12:39, 13 September 2021 diff hist -141 m Category:109 Measurement and Payment Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 15:19, 10 September 2021 diff hist -32 m Category:205 Modified Subgrade →205.2.2.5 Sample Record: Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info current
- 14:54, 10 September 2021 diff hist -1,211 m Category:105 Control of Work Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 14:40, 10 September 2021 diff hist +13 m 616.18 Construction Inspection Guidelines for Sec 616 Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 14:22, 10 September 2021 diff hist -13 m 238.2 Land Surveying →238.2.18.6 Recording the Location Survey Plan: Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 14:21, 10 September 2021 diff hist -28 m 132.2 Construction Inspection Guidelines for Safety Precautions →132.2.2 Traffic Control: Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 14:19, 10 September 2021 diff hist -18 m 106.3 Samples, Tests and Cited Specifications Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info current
- 14:17, 10 September 2021 diff hist -13 m Category:101 Standard Forms →Construction and Materials
- 14:14, 10 September 2021 diff hist -18 m 106.20 Reporting Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 13:46, 10 September 2021 diff hist -28 m 104.13 Construction Inspection Guidance for Sec 104 →Final Proposal
- 13:45, 10 September 2021 diff hist -39 m 103.2 Contract Bond for Sec 103.4 Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info current
- 13:42, 10 September 2021 diff hist +25 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs)
- 13:27, 9 September 2021 diff hist 0 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents →127.14.5 NEPA Glossary
- 13:26, 9 September 2021 diff hist -1,021 m Recent Policy Changes in the EPG EPG 127.14.5
- 13:22, 9 September 2021 diff hist +47 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents →127.14.5 NEPA Glossary: Per Env'l, updated the Major Traffic Disruption definition.
- 13:03, 9 September 2021 diff hist +16 m Category:101 Standard Forms →Construction and Materials: Per CM, updated link to Mobile Mixer Calibration
- 09:22, 9 September 2021 diff hist +32 m Category:134 Engineering Professional Services →Consultant Presentations and Interviews: minor clarification
- 08:15, 9 September 2021 diff hist -2 m Category:105 Control of Work Per TS, updated New Product Evaluation Form link
- 08:14, 9 September 2021 diff hist -19 m Category:1036 Reinforcing Steel for Concrete Per TS, updated New Product Evaluation Form link
- 08:13, 9 September 2021 diff hist -57 m 106.12 Pre-Acceptance Lists (PAL) Per TS, updated New Product Evaluation Form link
- 14:41, 8 September 2021 diff hist +119 m 147.3 Job Order Contracting (JOC) →147.3.9 Change Order Approvals
- 14:35, 8 September 2021 diff hist +161 m 147.3 Job Order Contracting (JOC) →147.3.9 Change Order Approvals: Per CM, clarified the fourth bullet point. This is not a change in policy, just providing an answer to a frequently asked question.
- 14:25, 7 September 2021 diff hist -32 m Category:101 Standard Forms Per TS, updated New Product Evaluation Form link
- 14:24, 7 September 2021 diff hist -68 m 902.4 Signal Installations and Equipment Per TS, updated New Product Evaluation Form link
- 14:23, 7 September 2021 diff hist -136 m 106.17 New Product Evaluation Per TS, updated New Product Evaluation Form links
- 11:29, 7 September 2021 diff hist -11 m 233.4 At-Grade Intersections with Signal Control
- 11:28, 7 September 2021 diff hist -7 m 233.4 At-Grade Intersections with Signal Control →233.4.4 Right Turn Lanes
- 11:18, 7 September 2021 diff hist -17 m Category:233 At - Grade Intersections updated broken links current
- 11:14, 7 September 2021 diff hist +1 m 233.2 At-Grade Intersections with Stop and Yield Control updated broken links
- 11:08, 7 September 2021 diff hist -429 m 233.2 At-Grade Intersections with Stop and Yield Control Updated broken links
- 10:45, 7 September 2021 diff hist 0 m Recent Policy Changes in the EPG
- 10:44, 7 September 2021 diff hist 0 N File:616.18 Unit Price 2021.pdf current
- 10:44, 7 September 2021 diff hist 0 m 616.18 Construction Inspection Guidelines for Sec 616 →Relocation of Service Signs (Supplemental Guide Sign Program Signs) on Construction Projects
- 10:34, 7 September 2021 diff hist +9 m Recent Policy Changes in the EPG
- 10:33, 7 September 2021 diff hist 0 Recent Policy Changes in the EPG
- 10:30, 7 September 2021 diff hist +166 m Recent Policy Changes in the EPG EPG 616.18
- 10:26, 7 September 2021 diff hist +33 m 616.18 Construction Inspection Guidelines for Sec 616 →Relocation of Service Signs (Supplemental Guide Sign Program Signs) on Construction Projects
- 10:24, 7 September 2021 diff hist 0 N File:616.18 Unit Price 2018.pdf current
- 10:24, 7 September 2021 diff hist +5 m 616.18 Construction Inspection Guidelines for Sec 616 Per TS, the Unit Price Table has been updated to reflect the new contract
- 09:10, 7 September 2021 diff hist 0 N File:101 Mobile Mixer Calibration 2021.xlsx current
- 09:10, 7 September 2021 diff hist +5 m Category:101 Standard Forms →Construction and Materials: Per CM, uploaded Mobile Mixer Calibration with file that does is not locked with password protect
- 09:50, 3 September 2021 diff hist 0 N File:101 Mobile Mixer Verification.pdf current
- 09:49, 3 September 2021 diff hist 0 N File:101 Mobile Mixer Calibration.xlsx current
- 09:49, 3 September 2021 diff hist -48 m Category:101 Standard Forms →Construction and Materials: Per CM, uploaded two mobile mixer files to replace broken links
- 13:03, 2 September 2021 diff hist +20 m LPA:136.3 Federal Aid Basics →136.3.8.5 Traffic Engineering Assistance Program (TEAP): Per DE, further updated TEAP application guidance by increasing federal fund limit to $12K. Based on July 13, 2021 revision
- 09:20, 2 September 2021 diff hist +80 m Category:101 Standard Forms →Design Forms: Per DE, added Tension Log Form
- 12:25, 1 September 2021 diff hist +97 m Recent Policy Changes in the EPG
- 11:10, 1 September 2021 diff hist -58 m Recent Policy Changes in the EPG EPG 134
- 10:48, 1 September 2021 diff hist 0 N File:134.2.2.5.4 2021.docx current
- 10:48, 1 September 2021 diff hist +1 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification
- 10:47, 1 September 2021 diff hist +11 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per LPA, replaced Fig. 134.2.2.5.4 "PSC Review of Short List" with "District/Division Approval of Short List"
- 10:45, 1 September 2021 diff hist +571 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant: Per LPA, streamlined the process for consultant agreements and clarified the short list process. This proposal brings the EPG up to current, established practice.
- 09:24, 1 September 2021 diff hist +19 m Category:940 Access Management
- 13:49, 31 August 2021 diff hist +63 m Recent Policy Changes in the EPG EPG 127.1
- 13:47, 31 August 2021 diff hist 0 N File:127.1 Instructions 2021.pdf current
- 13:45, 31 August 2021 diff hist +5 m 127.1 Request for Environmental Services Per Env'l, updated "How to Complete the Request for Environmental Services" to align with new web-based system
- 13:43, 31 August 2021 diff hist +165 m LPA:136.13 LPA Policy Changes Fig. 136.6.4
- 13:42, 31 August 2021 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Updated Fig. 136.6.4, How to Complete the Request for Environmental Review
- 13:41, 31 August 2021 diff hist 0 N File:136.6.4 instructions 2021.pdf current
- 13:41, 31 August 2021 diff hist 0 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, updated "Fig. 136.6.4, How to Complete the Request for Environmental Review" to align with new web-based system
- 13:06, 31 August 2021 diff hist -59 m Category:940 Access Management updated link
- 13:05, 31 August 2021 diff hist -59 m Category:941 Permits and Access Requests updated link
- 13:04, 31 August 2021 diff hist -41 m Category:941 Permits and Access Requests
- 13:03, 31 August 2021 diff hist -60 m Category:940 Access Management updated link
- 12:32, 31 August 2021 diff hist +54 Category:138 Project Development Chronology →Speaking of road maps...
- 11:56, 31 August 2021 diff hist +30 Category:138 Project Development Chronology →Speaking of road maps...
- 11:51, 31 August 2021 diff hist +50 m Category:138 Project Development Chronology →Speaking of road maps...
- 15:19, 26 August 2021 diff hist -1 m 127.25 Maintenance Environmental Policies →127.25.1.4 Street Sweepings
- 13:38, 26 August 2021 diff hist -343 m Recent Policy Changes in the EPG EPG 127.25.1.4
- 13:33, 26 August 2021 diff hist +344 m 127.25 Maintenance Environmental Policies →127.25.1.4 Street Sweepings: Per Env'l, clarified and expanded established landfill disposal guidance.
- 09:04, 25 August 2021 diff hist +78 m 626.1 Edgeline Rumble Strips
- 08:57, 25 August 2021 diff hist -172 m 626.1 Edgeline Rumble Strips Per TS, deleted sentence
- 08:37, 25 August 2021 diff hist +546 m 626.1 Edgeline Rumble Strips Per TS. repeated and slightly expanded EPG 626 guidance to clarify the need for design exceptions
- 15:26, 23 August 2021 diff hist -236 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal
- 15:19, 23 August 2021 diff hist +2 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal
- 15:18, 23 August 2021 diff hist +2 m Recent Policy Changes in the EPG
- 15:18, 23 August 2021 diff hist 0 N File:1081 Bridge Packet Memo a.pdf
- 15:18, 23 August 2021 diff hist +2 m Category:1081 Coating of Structural Steel
- 15:12, 23 August 2021 diff hist +153 m Recent Policy Changes in the EPG
- 15:11, 23 August 2021 diff hist +4 m Category:1081 Coating of Structural Steel
- 15:10, 23 August 2021 diff hist +271 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal: Per Env'l, added Bridge Blasting and Painting Packet info
- 15:02, 23 August 2021 diff hist +42 m Recent Policy Changes in the EPG EPG 1081
- 14:59, 23 August 2021 diff hist 0 N File:1081 Bridge Packet Memo.pdf current
- 14:59, 23 August 2021 diff hist +111 m Category:1081 Coating of Structural Steel Per Env'l, added Bridge Blasting and Painting Packet info
- 12:15, 19 August 2021 diff hist -1 m 751.40 LFD Widening and Repair →751.40.2.4 Deck Repair and Filled Joints: updated link
- 14:48, 18 August 2021 diff hist +4 m 171.12 Maintenance Policy History →SIC(D6) On Call: inclusive language
- 14:36, 18 August 2021 diff hist +66 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents →127.14.3.1 Categorical Exclusion: inclusive language
- 14:28, 18 August 2021 diff hist -10 m 144.5 Pavement Maintenance inclusive language
- 10:01, 18 August 2021 diff hist -218 m 642.8 Sidewalk Design Criteria updated broken link for Access Board's report
- 09:56, 18 August 2021 diff hist 0 m 642.8 Sidewalk Design Criteria minor correction
- 15:21, 17 August 2021 diff hist -1 m Category:628 High Friction Surface Treatment →Placement of HFST
- 15:20, 17 August 2021 diff hist 0 N File:628 HFST.jpg current
- 15:20, 17 August 2021 diff hist +128 m Category:628 High Friction Surface Treatment
- 14:53, 17 August 2021 diff hist +5 m Category:503 Bridge Approach Slabs updated links current
- 13:29, 17 August 2021 diff hist 0 m 751.40 LFD Widening and Repair
- 13:22, 17 August 2021 diff hist 0 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D)
- 13:21, 17 August 2021 diff hist 0 m 236.16 Outdoor Advertising →236.16.15.7 Trimming of Trees
- 13:15, 17 August 2021 diff hist 0 m 643.2 Local Utility Adjustments - Public and Private
- 12:44, 17 August 2021 diff hist 0 m Category:703 Concrete Masonry Construction
- 12:19, 17 August 2021 diff hist 0 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction
- 12:16, 17 August 2021 diff hist 0 m 902.15 Designing a Traffic Signal →902.15.16 Job Special Provisions
- 12:13, 17 August 2021 diff hist 0 m 903.10 General Service Signs
- 12:10, 17 August 2021 diff hist 0 m Category:501 Concrete
- 11:25, 17 August 2021 diff hist 0 m 238.1 Aerial Mapping and LiDAR Surveys
- 11:22, 17 August 2021 diff hist 0 m 238.4 Construction Surveying
- 11:17, 17 August 2021 diff hist 0 m 238.3 Route Surveying
- 11:15, 17 August 2021 diff hist 0 m 806.2 Sediment Control Measures
- 11:14, 17 August 2021 diff hist 0 m 617.3 Material Inspection for Sec 617 →617.3.2.8 Marking
- 11:13, 17 August 2021 diff hist 0 m Category:1060 Electrical Conduit
- 11:11, 17 August 2021 diff hist 0 m 806.4 Preactivity Meeting current
- 11:10, 17 August 2021 diff hist 0 m 171.12 Maintenance Policy History minor corrections
- 13:12, 13 August 2021 diff hist -11 m Recent Policy Changes in the EPG EPG 616.6.87
- 12:59, 13 August 2021 diff hist 0 N File:Fig 616.6.87.2.3 2021.jpg current
- 12:59, 13 August 2021 diff hist 0 N File:Fig 616.6.87.2.2 2021.jpg current
- 12:59, 13 August 2021 diff hist 0 N File:Fig 616.6.87.2.1 2021.jpg current
- 12:57, 13 August 2021 diff hist 0 N File:Fig 616.6.87.1.3 2021.jpg current
- 12:56, 13 August 2021 diff hist 0 N File:Fig 616.6.87.1.2 2021.jpg current
- 12:56, 13 August 2021 diff hist 0 N File:Fig 616.6.87.1.1 2021.jpg current
- 12:55, 13 August 2021 diff hist +98 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): Per TS, updated and expanded figures to show correct placement of both short-term and long-term rumble strips.
- 11:30, 13 August 2021 diff hist +29 m Main Page
- 11:23, 13 August 2021 diff hist -9 Engineering Policy Guide:General disclaimer current
- 11:00, 13 August 2021 diff hist +1,111 m Engineering Policy Guide:General disclaimer
- 10:55, 13 August 2021 diff hist +1 m Main Page
- 15:24, 12 August 2021 diff hist +5 m Category:138 Project Development Chronology
- 15:23, 12 August 2021 diff hist 0 N File:2021 map back.pdf current
- 15:22, 12 August 2021 diff hist 0 N File:2021 map front.pdf current
- 15:22, 12 August 2021 diff hist 0 N File:138 2021 map photo.jpg current
- 15:21, 12 August 2021 diff hist +227 m Category:138 Project Development Chronology
- 08:11, 12 August 2021 diff hist +556 m Recent Policy Changes in the EPG EPG 751.21
- 07:51, 12 August 2021 diff hist -104 m 751.21 Prestressed Concrete Slab and Box Beams
- 07:40, 12 August 2021 diff hist 0 N File:751.21.3.8 2021.jpg current
- 07:40, 12 August 2021 diff hist 0 N File:751.21.1.3 solid 2021.jpg current
- 07:39, 12 August 2021 diff hist 0 N File:751.21.1.3 adjacent voided 3 2021.jpg current
- 07:39, 12 August 2021 diff hist 0 N File:751.21.1.3 adjacent voided 4 2021.jpg current
- 07:39, 12 August 2021 diff hist 0 N File:751.21.1.3 spread voided 2021.jpg current
- 07:38, 12 August 2021 diff hist 0 N File:751.21.1.3 adjacent box 3 2021.jpg current
- 07:38, 12 August 2021 diff hist 0 N File:751.21.1.3 adjacent box 4 2021.jpg current
- 07:38, 12 August 2021 diff hist 0 N File:751.21.1.3 spread box 2021.jpg current
- 07:37, 12 August 2021 diff hist +284 m 751.21 Prestressed Concrete Slab and Box Beams Per BR, corrected voided slab beam calculations and rounding
- 10:51, 10 August 2021 diff hist -1 m Category:403 Asphaltic Concrete Pavement →403.1.4 Job Mix Formula
- 13:50, 9 August 2021 diff hist +16 m 106.1 Source of Supply and Quality Requirements →Pre-Qualified Traffic Engineering Consultants for TEAP
- 13:31, 9 August 2021 diff hist -41 m 106.1 Source of Supply and Quality Requirements updated links
- 15:23, 6 August 2021 diff hist 0 N File:138 parson.jpg current
- 15:23, 6 August 2021 diff hist +110 m Category:138 Project Development Chronology
- 15:05, 6 August 2021 diff hist +150 m Category:138 Project Development Chronology
- 14:34, 6 August 2021 diff hist -374 m 106.23 Online Research Publications (Research Publications) deleted superfluous info current
- 14:32, 6 August 2021 diff hist -14 106.23 Online Research Publications (Research Publications) Updated archaic
- 13:52, 6 August 2021 diff hist +33 m Category:138 Project Development Chronology
- 13:07, 6 August 2021 diff hist +7 m Category:138 Project Development Chronology
- 12:58, 6 August 2021 diff hist +372 m Category:138 Project Development Chronology minor updates
- 10:16, 6 August 2021 diff hist +167 m Category:138 Project Development Chronology
- 07:52, 6 August 2021 diff hist +16 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) Inclusive language
- 11:20, 5 August 2021 diff hist 0 m Category:138 Project Development Chronology
- 10:16, 5 August 2021 diff hist +46 m Category:102 Bidding Requirements and Conditions
- 10:16, 5 August 2021 diff hist +7 m Category:102 Bidding Requirements and Conditions updated link
- 09:00, 5 August 2021 diff hist 0 N File:127.25.7.4 contact.pdf current
- 09:00, 5 August 2021 diff hist +40 m 127.25 Maintenance Environmental Policies
- 08:58, 5 August 2021 diff hist -405 m 127.25 Maintenance Environmental Policies Per Env'l, updated Environmental Specialist contact info
- 15:29, 4 August 2021 diff hist -533 Category:102 Bidding Requirements and Conditions
- 15:28, 4 August 2021 diff hist +533 Category:102 Bidding Requirements and Conditions
- 13:17, 4 August 2021 diff hist -356 m Category:102 Bidding Requirements and Conditions deleting archaic information
- 12:49, 4 August 2021 diff hist -34 m Category:102 Bidding Requirements and Conditions updating archaic link and info
- 12:41, 4 August 2021 diff hist -2 m Category:102 Bidding Requirements and Conditions updating archaic information and link
- 12:37, 4 August 2021 diff hist -141 m Category:102 Bidding Requirements and Conditions updated archaic information
- 11:14, 4 August 2021 diff hist -22 m Category:102 Bidding Requirements and Conditions updating broken links
- 11:25, 2 August 2021 diff hist -6 m 236.16 Outdoor Advertising →236.16.18.1 Informal Hearing: inclusive language
- 09:48, 2 August 2021 diff hist -588 m Category:101 Standard Forms →Construction and Materials: Per CM, archaic (2018, 2019) JOC forms removed
- 09:02, 29 July 2021 diff hist 0 m Recent Policy Changes in the EPG
- 08:47, 29 July 2021 diff hist -4 m 106.9 Buy America Requirement →When does Buy America apply to manufactured items?
- 08:45, 29 July 2021 diff hist +4 m 106.9 Buy America Requirement →When does Buy America apply to manufactured items?
- 08:45, 29 July 2021 diff hist +2 m 106.9 Buy America Requirement →When does Buy America apply to manufactured items?
- 08:40, 29 July 2021 diff hist -67 m Recent Policy Changes in the EPG EPG 106.9
- 08:36, 29 July 2021 diff hist +2,886 m 106.9 Buy America Requirement Per CM, revision expands the NTPEP compliance for Buy America.
- 15:23, 28 July 2021 diff hist +3 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal
- 13:45, 28 July 2021 diff hist 0 m 232.2 Passing Lanes →232.2.1 Discussion current
- 10:45, 28 July 2021 diff hist +86 m Category:101 Standard Forms →Bridge: Per BR, updated archaic Culvert Hydraulics Report with newer version
- 09:02, 28 July 2021 diff hist -1 m Recent Policy Changes in the EPG
- 09:02, 28 July 2021 diff hist -163 m Recent Policy Changes in the EPG EPG 751.11 2.1
- 08:47, 28 July 2021 diff hist +117 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, clarified that in the rare case where intermediate bents are made integral (by extending the beam cap stirrups into the diaphragm), plain neoprene bearing pads may be considered at the intermediate bent.
- 14:42, 27 July 2021 diff hist 0 m 236.6 Appraisal and Appraisal Review Per RW, updated broken links to forms
- 13:42, 27 July 2021 diff hist -39 m 626.2 Centerline Rumble Strips Per TS, replaced now-archaic special sheet with link to new Std. Plan 626.00. Also updated typical section sheet to reflect new Std. Plan 626.00.
- 13:39, 27 July 2021 diff hist +25 m Category:626 Rumble Strips Per TS, replaced now-archaic special sheet with link to new Std. Plan 626.00. current
- 13:36, 27 July 2021 diff hist 0 N File:232.2.3.2.pdf current
- 13:36, 27 July 2021 diff hist -84 m 232.2 Passing Lanes Per TS, replaced now-archaic special sheet with link to new Std. Plan 626.00. Also updated typical section sheet to reflect new Std. Plan 626.00.
- 13:18, 27 July 2021 diff hist 0 N File:903.16.24 2021.jpg current
- 13:17, 27 July 2021 diff hist 0 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes
- 13:03, 27 July 2021 diff hist 0 N File:903.16.24 2021.pdf current
- 13:02, 27 July 2021 diff hist +5 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes
- 13:01, 27 July 2021 diff hist 0 N File:903.16.24.pdf current
- 13:01, 27 July 2021 diff hist 0 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes
- 13:00, 27 July 2021 diff hist -1 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes: Per TS, updated figure to align with new Std. Plan 626.00
- 12:17, 27 July 2021 diff hist 0 N File:147.4 Programmatic Work Plan for FPVC.docx current
- 12:16, 27 July 2021 diff hist +378 m 147.4 Fixed Price Variable Scope (FPVS) Contracting Per EPS, added "Programmatic Work Plan for Utilizing FPVC..."
- 08:32, 27 July 2021 diff hist -38 m Recent Policy Changes in the EPG EPG 606
- 08:28, 27 July 2021 diff hist +277 m Category:606 Guardrail and Guard Cable Per EPS, provided a contact number for reporting damaged guardrail or guard cable
- 10:38, 26 July 2021 diff hist +67 m Category:948 Incident Response Plan and Emergency Response Management
- 15:06, 23 July 2021 diff hist -268 m Recent Policy Changes in the EPG EPG 402, EPG 409, EPG 147.4
- 15:05, 23 July 2021 diff hist 0 N File:147.4.2 FPVS JSP Example.docx current
- 14:55, 23 July 2021 diff hist +5,955 m 147.4 Fixed Price Variable Scope (FPVS) Contracting Per DE, Fixed price variable scope (FPVS) guidance was temporarily removed from the EPG. FHWA has now approved the use of FPVS at a programmatic level
- 14:11, 23 July 2021 diff hist 0 N File:409 FY2022 Contract Seal Coat Job Book Guidelines.docx current
- 14:09, 23 July 2021 diff hist 0 N File:409 FY2022 Contract Seal Coat Guidelines.docx current
- 14:08, 23 July 2021 diff hist +556 m Category:409 Seal Coat Per DE, the Seal Coat and JSP package were updated. New Seal Coat Book Job Guidelines and Seal Coat Book Job JSP Package were added.
- 13:28, 23 July 2021 diff hist 0 N File:402 FY2022 Contract Leveling Course Book Job Guidelines.docx current
- 13:28, 23 July 2021 diff hist 0 N File:402 FY2022 Contract Leveling Course Guidelines.docx current
- 13:28, 23 July 2021 diff hist +509 m Category:402 Bituminous Surface Leveling Per DE, the CLC and JSP package were updated. New CLC Book Job Guidelines and CLC Book Job JSP Package were added.
- 13:26, 21 July 2021 diff hist -1 m Recent Policy Changes in the EPG
- 13:26, 21 July 2021 diff hist -1 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.89 Radar Speed Advisory System (RSAS)
- 13:21, 21 July 2021 diff hist -35 m Recent Policy Changes in the EPG EPG 616.6.89
- 13:14, 21 July 2021 diff hist +3 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.88 Screens (MUTCD 6F.88)
- 13:13, 21 July 2021 diff hist +267 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.89 Radar Speed Advisory Assembly: Per EPS, linked new NJSP for a radar speed advisory system to renamed "Radar Speed Advisory System" (formerly "Radar Speed Advisory Assembly")
- 10:14, 21 July 2021 diff hist -1,564 m Recent Policy Changes in the EPG EPG 903.4.8 and EPG 903.4.9
- 10:11, 21 July 2021 diff hist +2,394 m 903.4 Overhead Sign Mounting Per BR and TS, in EPG 903.4.8 and .9, expanded and updated guidance for handling bridge sign attachments to current established practice. References to wall-mounted structures removed from EPG 903.4.8 and .9
- 15:09, 19 July 2021 diff hist +39 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per CM, updated link to SWPPP Form 806.8.2
- 15:07, 19 July 2021 diff hist +135 m Category:101 Standard Forms Per CM, updated links to SWPPP Form 806.8.2 and added new Non-Conformance Report (NCR) form in EPG 101
- 11:20, 16 July 2021 diff hist +68 m Help Article →EPG Approval Process
- 11:18, 16 July 2021 diff hist -65 m Help Article →EPG Approval Process
- 11:15, 16 July 2021 diff hist +2 m Help Article →EPG Ballot Cycles: updated ballot calendar