User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:24, 7 February 2022 diff hist 0 N File:101 Request for Asphalt Cement % Grade.dotx current
- 12:23, 7 February 2022 diff hist +10 m Category:101 Standard Forms →Materials: updated archaic .dot files to .dotx
- 12:16, 7 February 2022 diff hist 0 m Category:101 Standard Forms →Scoping
- 11:31, 7 February 2022 diff hist 0 N File:101 Bridge Hydraulics Report 2022.dotx current
- 11:25, 7 February 2022 diff hist -1 m Category:101 Standard Forms →Bridge
- 11:25, 7 February 2022 diff hist +5 m Category:101 Standard Forms →Bridge: Per BR, clarified Bridge Hydraulics Report form
- 16:02, 4 February 2022 diff hist 0 N File:Fig. 903.16.1 2022.pdf current
- 16:01, 4 February 2022 diff hist +5 m 903.16 Typical Signing Applications Per TS, minor update to Fig. 903.16.1 showing that city limit signs will no longer include the population, per already updated guidance current
- 15:34, 4 February 2022 diff hist 0 N File:Utility Print Submittal Letter Revised Plans.dotx current
- 15:34, 4 February 2022 diff hist 0 N File:Utility Print Submittal Letter.dotx current
- 15:34, 4 February 2022 diff hist 0 N File:Traffic Signal Warrants, Form D22.dotx current
- 15:34, 4 February 2022 diff hist 0 N File:Test-Cultural Resource Assessment Letter.dotx current
- 15:33, 4 February 2022 diff hist 0 N File:Suggested Revision to a CADD Standard.dotx current
- 15:33, 4 February 2022 diff hist 0 N File:Project Initialization Estimate Form.dotx current
- 15:33, 4 February 2022 diff hist 0 N File:Project Data for BAMS.dotx current
- 15:19, 4 February 2022 diff hist 0 N File:Preliminary Plans Proposal Review.dotx current
- 15:18, 4 February 2022 diff hist 0 N File:Pavement Repair Log.dotx current
- 15:17, 4 February 2022 diff hist 0 N File:Pavement Distress Log Form - Concrete 11x17.dotx current
- 15:17, 4 February 2022 diff hist 0 N File:Pavement Distress Log Form - Asphalt - 11x17.dotx current
- 15:04, 4 February 2022 diff hist 0 m Category:101 Standard Forms →Design Forms: updated forms to dotx
- 14:47, 4 February 2022 diff hist -76 m Category:129 Public Involvement updated Commission Backup Form Blank link
- 14:39, 4 February 2022 diff hist 0 N File:Equipment and Materials List.dotx current
- 14:39, 4 February 2022 diff hist 0 N File:Commission Backup Form Instructions.dotx current
- 14:38, 4 February 2022 diff hist 0 N File:Commission Backup Form Blank.dotx current
- 14:38, 4 February 2022 diff hist 0 N File:Sample Scope of Services Design.dotx current
- 14:38, 4 February 2022 diff hist 0 N File:Sample Scope of Services - Location and Environment.dotx current
- 14:37, 4 February 2022 diff hist 0 N File:District Award.dotx current
- 14:37, 4 February 2022 diff hist 0 m Category:101 Standard Forms →Design: dotx files for District Award, Sample Scope of Services - Location and Environment, Sample Scope of Services Design, Commission Backup Form Blank, Commission Backup Form Instructions and Equipment and Materials List
- 14:15, 4 February 2022 diff hist -808 m Category:128 Conceptual Studies updated Conceptual Study Report, 3R Report, 4R Report and Location Study Report files from archaic .dot files to .dotx files
- 14:04, 4 February 2022 diff hist 0 N File:Conceptual Study Report.dotx current
- 14:03, 4 February 2022 diff hist 0 N File:4R Conceptual Study Report.dotx current
- 14:03, 4 February 2022 diff hist 0 N File:3R Conceptual Study Report.dotx current
- 14:03, 4 February 2022 diff hist 0 m Category:101 Standard Forms →Design Forms: dotx files for 3R Conceptual Study Report, 4R Pavement Rehabilitation Analysis Data and Conceptual Study Report and Conceptual Study Report
- 13:35, 4 February 2022 diff hist 0 N File:Location Study Report.dotx current
- 13:34, 4 February 2022 diff hist 0 m Category:101 Standard Forms →Design Forms: Location Study Report.dotx
- 13:27, 3 February 2022 diff hist -44 m Category:1092 Signal Equipment current
- 12:20, 3 February 2022 diff hist 0 N File:Turning Movement Traffic Count Request.docx current
- 12:20, 3 February 2022 diff hist 0 m Category:101 Standard Forms →Planning
- 12:12, 3 February 2022 diff hist 0 N File:Fis Formc.docx current
- 12:12, 3 February 2022 diff hist 0 N File:Conceptual Study Traffic Count Request.docx current
- 12:12, 3 February 2022 diff hist 0 m Category:101 Standard Forms →Planning
- 12:11, 3 February 2022 diff hist 0 N File:ARAN Report Request.docx current
- 12:11, 3 February 2022 diff hist +1 m Category:101 Standard Forms →Planning
- 12:10, 3 February 2022 diff hist -195 m Category:101 Standard Forms →Planning: updated archaic .dot files to .docx or dotx
- 11:08, 3 February 2022 diff hist 0 N File:Soil Survey Request.docx current
- 11:08, 3 February 2022 diff hist 0 N File:Soil Info Request.docx current
- 11:08, 3 February 2022 diff hist 0 N File:Request for Asphalt Cement % Grade.docx current
- 11:06, 3 February 2022 diff hist -129 m Category:101 Standard Forms →Materials: updated archaic .dot files to .docx
- 10:14, 3 February 2022 diff hist +1 m Category:101 Standard Forms →Design Forms
- 10:14, 3 February 2022 diff hist 0 N File:Utility Print Submittal Letter Revised Plans.docx current
- 10:13, 3 February 2022 diff hist 0 N File:Utility Print Submittal Letter.docx current
- 10:13, 3 February 2022 diff hist 0 N File:Traffic Signal Warrants, Form D22.docx current
- 10:12, 3 February 2022 diff hist 0 N File:Test-Cultural Resource Assessment Letter.docx current
- 10:12, 3 February 2022 diff hist 0 N File:Suggested Revision to a CADD Standard.docx current
- 10:12, 3 February 2022 diff hist 0 N File:Project Initialization Estimate Form.docx current
- 10:11, 3 February 2022 diff hist 0 N File:Project Data for BAMS.docx current
- 10:11, 3 February 2022 diff hist 0 N File:Preliminary Plans Proposal Review.docx current
- 10:10, 3 February 2022 diff hist 0 N File:Pavement Repair Log.docx current
- 10:09, 3 February 2022 diff hist 0 N File:Pavement Distress Log Form - Concrete 11x17.docx current
- 10:09, 3 February 2022 diff hist 0 N File:Pavement Distress Log Form - Asphalt - 11x17.docx current
- 10:08, 3 February 2022 diff hist 0 N File:Location Study Report.docx current
- 10:07, 3 February 2022 diff hist 0 N File:Equipment and Materials List.docx current
- 10:07, 3 February 2022 diff hist 0 N File:Conceptual Study Report.docx
- 10:06, 3 February 2022 diff hist 0 N File:Commission Backup Form Instructions.docx current
- 10:05, 3 February 2022 diff hist 0 N File:Commission Backup Form Blank.docx current
- 10:05, 3 February 2022 diff hist 0 N File:4R Conceptual Study Report.docx current
- 10:04, 3 February 2022 diff hist -37 m Category:101 Standard Forms →Design Forms
- 09:59, 3 February 2022 diff hist 0 N File:4R Pavement Rehabilitation Analysis Data and Conceptual Study Report.docx current
- 09:58, 3 February 2022 diff hist 0 N File:3R Conceptual Study Report.docx current
- 09:55, 3 February 2022 diff hist -798 m Category:101 Standard Forms →Design Forms: updated archaic .dot files to .docx
- 08:57, 3 February 2022 diff hist 0 N File:Sample Scope of Services Design.docx current
- 08:57, 3 February 2022 diff hist 0 N File:Sample Scope of Services - Location and Environment.docx current
- 08:56, 3 February 2022 diff hist 0 N File:District Award.docx current
- 08:56, 3 February 2022 diff hist -172 m Category:101 Standard Forms →Contracts: updated archaic .dot files to .docx
- 15:47, 2 February 2022 diff hist +1 m Category:101 Standard Forms →Design: saved "District Award" as a docx file
- 14:38, 2 February 2022 diff hist -967 m Category:101 Standard Forms →Design: Per DE, deleted archaic .dot forms Inquiry Report, Preliminary Signal Plan Submittal, Project Assignments and Completion Dates, Major Project Scope or Estimate Change, Non-Major Project Scope or Estimate Change, Project Estimate Quality Assurance Report, Project Scoping Memorandum
- 12:02, 2 February 2022 diff hist -6 m Category:134 Engineering Professional Services →134.3.4 Basis of Payment: updated federal link
- 11:58, 2 February 2022 diff hist -18 m Category:134 Engineering Professional Services →134.3.4 Basis of Payment: updated federal link
- 11:56, 2 February 2022 diff hist -16 m Category:134 Engineering Professional Services →134.3.5.1 Subconsultant Cost Exceeding $25,000: updated federal link
- 14:09, 1 February 2022 diff hist +22 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, minor corrections and clarification
- 12:18, 1 February 2022 diff hist -211 m 750.7 Non-Hydraulic Considerations updated several broken links
- 12:13, 1 February 2022 diff hist +15 m 750.7 Non-Hydraulic Considerations →750.7.2.2 Roadways with ADT ≤ 3500
- 12:10, 1 February 2022 diff hist -1 m 750.7 Non-Hydraulic Considerations →750.7.3 Environmental Requirements
- 11:38, 31 January 2022 diff hist +515 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, additional updated guidance to reflect new CADD Package (Open Roads Designer) now in use.
- 09:30, 31 January 2022 diff hist 0 m 903.9 General Information Signs →903.9.5.1 Corridor Designations
- 09:29, 31 January 2022 diff hist 0 N File:M17-12.jpg current
- 09:28, 31 January 2022 diff hist -33 m 903.9 General Information Signs →903.9.5 Auto Tour Route Signs (M17 series) (MUTCD Section 2H.07): Per TS, minor relocation of route sign images to better coordinate with guidance
- 15:53, 28 January 2022 diff hist -881 m Recent Policy Changes in the EPG EPG 701
- 15:51, 28 January 2022 diff hist +1,359 m Category:701 Drilled Shafts Per CM, new guidance for the proper steps to be made to remediate a defect in a drilled shaft current
- 15:00, 28 January 2022 diff hist 0 N File:905.3.7.4 TS&O Report 2022.docx current
- 15:00, 28 January 2022 diff hist +5 m 905.3 Transportation Impact Analysis Per TS, replaced "marked-up" version of template with a "clean" version
- 14:33, 28 January 2022 diff hist +5 m 237.14 Electronic Design Data Delivery (BIM Deliverables)
- 13:54, 28 January 2022 diff hist -599 m Recent Policy Changes in the EPG EPG 237.14
- 13:49, 28 January 2022 diff hist -33 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal: updated links
- 13:45, 28 January 2022 diff hist +14 m Category:134 Engineering Professional Services →134.3.1 Engineering Services Contract (ESC)
- 13:43, 28 January 2022 diff hist -9 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification
- 13:43, 28 January 2022 diff hist +23 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: updated link
- 13:41, 28 January 2022 diff hist +38 m Category:134 Engineering Professional Services updated links
- 13:39, 28 January 2022 diff hist +38 m 237.9 Submission of Plans and Supporting Documents updated links
- 13:38, 28 January 2022 diff hist +19 m Category:237 Contract Plans updated link current
- 13:37, 28 January 2022 diff hist 0 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Smithk moved page 237.14 Electronic Design Data Delivery to 237.14 Electronic Design Data Delivery (BIM Deliverables): Per CADD
- 13:37, 28 January 2022 diff hist +71 N 237.14 Electronic Design Data Delivery Smithk moved page 237.14 Electronic Design Data Delivery to 237.14 Electronic Design Data Delivery (BIM Deliverables): Per CADD current Tag: New redirect
- 13:36, 28 January 2022 diff hist +164 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, updated guidance to reflect new CADD Package (Open Roads Designer) now in use.
- 09:06, 28 January 2022 diff hist +1 m Recent Policy Changes in the EPG
- 09:05, 28 January 2022 diff hist +1 m Recent Policy Changes in the EPG
- 09:03, 28 January 2022 diff hist +159 m Recent Policy Changes in the EPG EPG 237.9.3.2 and EPG 1081
- 08:56, 28 January 2022 diff hist -2 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal: Per Env'l, updated the Bridge Blasting and Painting Packet.
- 08:53, 28 January 2022 diff hist 0 N File:1081 Bridge Packet 2022.pdf
- 08:53, 28 January 2022 diff hist -2 m Category:1081 Coating of Structural Steel Per Env'l, updated the Bridge Blasting and Painting Packet. The Bridge Packet Memo and the Blast Label ordering instructions were updated. The 2022-01-67853 Completed 1-25-2022 was added.
- 15:47, 27 January 2022 diff hist +44 Category:1092 Signal Equipment
- 15:35, 27 January 2022 diff hist -21 m Category:1092 Signal Equipment
- 15:34, 27 January 2022 diff hist +21 m Category:1092 Signal Equipment
- 10:52, 27 January 2022 diff hist -4 m Category:101 Standard Forms →Construction and Materials
- 10:52, 27 January 2022 diff hist 0 m Category:101 Standard Forms →Construction and Materials: Per CM, correction of link
- 10:50, 27 January 2022 diff hist -4 m Category:105 Control of Work →105.9.4 Documentation Records
- 10:50, 27 January 2022 diff hist 0 m Category:105 Control of Work Per CM, corrected link
- 10:17, 27 January 2022 diff hist +310 m 153.11 Financial Services Per FS, added F36 info
- 09:21, 27 January 2022 diff hist -138 m Category:150 Quality Management Updated broken links
- 13:59, 26 January 2022 diff hist -214 m Recent Policy Changes in the EPG EPG 613.1.1
- 13:48, 26 January 2022 diff hist +2,710 Category:613 Pavement Repair →Basis of Payment: Per CM, revision expands Basis of Payment guidance for Resident Engineers about compensating contractors for concrete costs in full depth repairs that significantly exceed typical section plan depths.
- 13:24, 26 January 2022 diff hist +85 m Recent Policy Changes in the EPG EPG 104.2
- 13:10, 26 January 2022 diff hist +7,159 104.2 Project Scoping Per DE, new guidance for how and when to apply for a 5% increase of the federal cost share of innovative projects (that is, 15% state matching vs. 20% state matching).
- 12:18, 26 January 2022 diff hist +342 m Recent Policy Changes in the EPG EPG 139, EPG 149
- 12:08, 26 January 2022 diff hist +4,001 Category:149 Project Delivery Determination and Initial Risk Assessment Per DE, EPG 149's title was slightly modified and its guidance was also brought up to current practices for project delivery method determination and initial risks. Since design-build is only one method of project delivery, EPG 149 also reflects the concurrent revisions in EPG 139. current
- 11:55, 26 January 2022 diff hist 0 N File:Form 139.8.2.5a.docx current
- 11:54, 26 January 2022 diff hist +2 m Category:139 Design - Build
- 11:27, 26 January 2022 diff hist 0 N File:139.4 2021.docx current
- 11:26, 26 January 2022 diff hist 0 N File:139.2.pdf current
- 11:24, 26 January 2022 diff hist 0 N File:Form 139.8.2.5.docx current
- 11:23, 26 January 2022 diff hist +13 m Category:139 Design - Build
- 11:19, 26 January 2022 diff hist 0 N File:139.8 Design Build Process Checklist.docx current
- 11:18, 26 January 2022 diff hist +23,246 Category:139 Design - Build Per DE, the new design-build guidance in EPG 139 has been brought up to current practices, including updated forms and checklists.
- 10:54, 26 January 2022 diff hist +1 m Category:100 GENERAL
- 10:53, 26 January 2022 diff hist +17 m Category:130 Value Engineering updated link
- 10:52, 26 January 2022 diff hist 0 m Category:149 Project Delivery Determination and Initial Risk Assessment Smithk moved page Category:149 Project Delivery Method Determination and Risk Assessment to Category:149 Project Delivery Determination and Initial Risk Assessment: Per DE
- 10:52, 26 January 2022 diff hist +86 N Category:149 Project Delivery Method Determination and Risk Assessment Smithk moved page Category:149 Project Delivery Method Determination and Risk Assessment to Category:149 Project Delivery Determination and Initial Risk Assessment: Per DE current Tag: New redirect
- 09:51, 26 January 2022 diff hist -155 m Category:403 Asphaltic Concrete Pavement minor clarification
- 11:35, 21 January 2022 diff hist -375 m Recent Policy Changes in the EPG EPG 105.9.4
- 11:28, 21 January 2022 diff hist +104 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, QRG AWP CO Documentation Records
- 11:17, 21 January 2022 diff hist +687 m Category:105 Control of Work →105.9.4 Documentation Record: Per CM, updated to reflect current methods of documentation.
- 11:04, 21 January 2022 diff hist +19 m 135.2 Public Contacts current
- 11:36, 19 January 2022 diff hist +11 m 237.9 Submission of Plans and Supporting Documents →237.9.8 Pre-Bid Conferences: updated link
- 11:34, 19 January 2022 diff hist -3 m 238.1 Aerial Mapping and LiDAR Surveys updated link
- 11:33, 19 January 2022 diff hist -3 m 910.5 ITS Improvements Procurement updated link
- 11:31, 19 January 2022 diff hist +16 m 237.7 Equipment and Materials List updated link current
- 11:29, 19 January 2022 diff hist +11 m 147.1 Alternative Technical Concepts updated link current
- 14:17, 18 January 2022 diff hist +2 m Category:106 Control of Material →Abbreviations and definitions: minor correction current
- 15:47, 14 January 2022 diff hist +60 m Category:101 Standard Forms →Right of Way: Per RW, deleted archaic .dot form with updated Word files
- 14:57, 14 January 2022 diff hist -114 m Category:101 Standard Forms →Scoping: Per Env'l, deleted archaic .dot file, "Environmental Checklist"
- 13:33, 14 January 2022 diff hist +77 m Recent Policy Changes in the EPG EPG 102, EPG 108
- 13:23, 14 January 2022 diff hist -420 m Category:108 Prosecution and Progress →108.1.1 Review and Approval of a Subcontract Request: Per CM, updated guidance to reflect that, as of Jan 3, 2022, MoDOT no longer monitors subcontractor insurance
- 12:27, 14 January 2022 diff hist +453 m Category:102 Bidding Requirements and Conditions Per CM, updated guidance to reflect that, as of Jan 3, 2022, MoDOT no longer monitors subcontractor insurance current
- 11:53, 13 January 2022 diff hist +168 m Category:101 Standard Forms →Survey: Per CADD, archaic .dot files replaced with Sample Letter Notifying Property Owner of Survey
- 11:37, 13 January 2022 diff hist -1,916 m Category:101 Standard Forms →Design: Per CADD, deleted 15 archaic forms
- 09:58, 13 January 2022 diff hist +65 m Recent Policy Changes in the EPG EPG 1036.2.1.1
- 09:46, 13 January 2022 diff hist +22 m Category:1036 Reinforcing Steel for Concrete →1036.2.1.1 Reinforcing Steel, Dowel Bars, Mechanical Bar Splices and Cold Drawn Wire: Per CM, to decrease the risk of fracture in the jaws, a 30” min. length for the #14 and #18 tension test bars is required current
- 11:33, 12 January 2022 diff hist 0 N File:134.4.1 2022.docx current
- 11:32, 12 January 2022 diff hist -10 m Category:134 Engineering Professional Services Per DE, minor update to Fig. 134.4.1, PSC Approval to Execute Contract
- 09:08, 12 January 2022 diff hist -48 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.4.2 File Naming Conventions
- 15:00, 11 January 2022 diff hist -91 m 751.50 Standard Detailing Notes Per BR, updated broken links and other minor clarifications
- 14:28, 11 January 2022 diff hist +36 m 751.40 LFD Widening and Repair Per BR, updated broken links
- 14:01, 11 January 2022 diff hist -250 m 751.36 Driven Piles Per BR, updated broken link and other minor clarification
- 13:57, 11 January 2022 diff hist -51 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4.3 Wing Reinforcement: Per BR, updated link
- 13:48, 11 January 2022 diff hist +88 m 751.35 Concrete Pile Cap Integral End Bents Per BR, updated broken links
- 13:43, 11 January 2022 diff hist +6 m 751.33 Concrete Semi Deep Abutments →751.33.4.1 Front Elevation: Per BR, updated link current
- 13:33, 11 January 2022 diff hist -28 m 751.24 LFD Retaining Walls Per BR, updated links, other minor clarifications
- 13:19, 11 January 2022 diff hist 0 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3 Details: Per BR, updated broken links
- 13:10, 11 January 2022 diff hist +18 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.3.1 Spread Box Beams: Per BR, updated link
- 13:07, 11 January 2022 diff hist +149 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.1 Standard Drawings: Per BR, minor clarification
- 12:29, 11 January 2022 diff hist -1 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.2 Design
- 12:27, 11 January 2022 diff hist +4 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.1.4 Span and Structure Lengths: Per BR, updated link
- 12:11, 11 January 2022 diff hist +161 m 751.14 Steel Superstructure Per BR, updated broken links and other clarifications
- 11:46, 11 January 2022 diff hist -160 m 751.13 Expansion Joint Systems Per BR, deleted broken links, updated broken links and other clarifications current
- 11:33, 11 January 2022 diff hist +21 m 751.10 General Superstructure Per BR, updated broken links
- 11:08, 11 January 2022 diff hist -197 m 751.9 LFD Seismic Per BR, updated several links
- 10:22, 11 January 2022 diff hist +81 751.8 LRFD Concrete Box Culverts Per BR, updated broken links
- 10:15, 11 January 2022 diff hist +33 m 751.6 General Quantities →751.6.2.11 Structural Steel Protective Coatings (Nonweathering Steel): Per BR, updated broken links
- 09:21, 11 January 2022 diff hist -287 m 751.5 Structural Detailing Guidelines Per BR, deleted broken links, updated broken links and other clarifications
- 09:00, 11 January 2022 diff hist -668 m 751.1 Preliminary Design Per BR, updated broken links and revised EPG 751.1.3.9 asbestos and lead guidance to current practice (no longer in SharePoint)
- 08:25, 11 January 2022 diff hist -107 m Category:751 LRFD Bridge Design Guidelines Per BR, deleted broken link
- 14:39, 10 January 2022 diff hist +1 m Recent Policy Changes in the EPG
- 14:39, 10 January 2022 diff hist +1 m Recent Policy Changes in the EPG EPG 173.1.6
- 14:11, 10 January 2022 diff hist +11,406 m Category:173 Erosion Control for Maintenance Operations →173.1.6 Regulatory Conditions for Working in Streams/Wetlands: NWP, Section 401 Water Quality Certification General Conditions: Per Env'l, guidance expanded to align with the updated MoDOT/MDNR Memorandum of Understanding (MOU)
- 09:50, 10 January 2022 diff hist +37 m 102.2 Contractor Performance Rating System Per CM, updated link for Contractor Performance Evaluation System
- 15:34, 7 January 2022 diff hist +1 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1)
- 15:28, 7 January 2022 diff hist -1 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per CM, updated broken payroll training link
- 10:23, 7 January 2022 diff hist +549 m Category:101 Standard Forms →Construction and Materials: Per CM, added updated JOCs for 2022
- 13:28, 6 January 2022 diff hist -254 m Category:101 Standard Forms →Public Involvement: Per Env'l, removed archaic "Notice of Formal Public Hearing", "Open House Public Hearing" and "Public Hearing Statement Form" .dot files
- 08:20, 4 January 2022 diff hist -66 m Category:101 Standard Forms →Environmental and Cultural: Per Env'l, removed archaic STRUCT form
- 14:57, 3 January 2022 diff hist 0 N File:101 Contractor Payment Schedule 2022.pdf current
- 14:57, 3 January 2022 diff hist -21 m Category:101 Standard Forms →Construction and Materials: Per CM, uploaded Contractor Payment Schedule for 2022
- 14:49, 3 January 2022 diff hist +2 m Category:101 Standard Forms →Construction and Materials: Per CM, updated Contractor Payment Schedule link for 2022
- 14:21, 3 January 2022 diff hist 0 N File:110.3 On Site Bulleting Board Inspection.pdf current
- 14:20, 3 January 2022 diff hist -10 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per EPS, updated link for the checklist of the jobsite posters
- 14:10, 3 January 2022 diff hist -63 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters
- 14:09, 3 January 2022 diff hist +46 m Category:110 State and Federal Wage Rates and Other Requirements →110.2 Federal-Aid Projects (Guidance for Sec 110.2): Per EPS, updated link for the checklist of the jobsite posters
- 13:23, 3 January 2022 diff hist +5 m Category:1035 Reinforced Concrete Arch Culvert →1035.3 Report: Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info current
- 13:22, 3 January 2022 diff hist -11 m Category:137 Construction Inspection Guidance for Records to be Maintained Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 16:23, 30 December 2021 diff hist -517 m Category:109 Measurement and Payment Per CM, minor updates to Force Account Spreadsheet (which also replaced the archaic "one day" and "multiple days" versions of the form)
- 13:51, 30 December 2021 diff hist +1 m Category:101 Standard Forms →Construction and Materials
- 10:05, 30 December 2021 diff hist +273 m Recent Policy Changes in the EPG EPG 903.9
- 10:00, 30 December 2021 diff hist 0 N File:I6-1a 2021.jpg current
- 10:00, 30 December 2021 diff hist 0 N File:I4-1a 2021.jpg current
- 09:59, 30 December 2021 diff hist 0 N File:I6-1 2021.jpg current
- 09:59, 30 December 2021 diff hist 0 N File:I5-1 2021.jpg current
- 09:59, 30 December 2021 diff hist 0 N File:I4-1 2021.jpg current
- 09:58, 30 December 2021 diff hist -6 m 903.15 Signing Agreements →903.15.3 TR15 Sign Program Participation Paid by Others: updated link
- 09:58, 30 December 2021 diff hist +1,261 m 903.9 General Information Signs Per TS, removed populations from city limit signs. City limit and county line sign designs will be modified to match the MUTCD standard layout of jurisdictional boundary signs.
- 09:15, 29 December 2021 diff hist -55 m 617.2 Construction Inspection Guidelines for Sec 617
- 08:56, 29 December 2021 diff hist -4 m Category:1001 General Requirements for Material →1001.5.2.4 Report current
- 08:54, 29 December 2021 diff hist +1 m Category:1001 General Requirements for Material →1001.4.1.12 Initial Evaluation of Material
- 08:52, 29 December 2021 diff hist 0 N File:1001.4.1.9 AS3900.pdf current
- 08:51, 29 December 2021 diff hist -42 m Category:1001 General Requirements for Material →1001.4.1 Initial Evaluation: Per CM, updated AS 3900
- 14:14, 28 December 2021 diff hist +30 m Recent Policy Changes in the EPG EPG 127.1
- 14:13, 28 December 2021 diff hist +43 m 147.3 Job Order Contracting (JOC)
- 14:06, 28 December 2021 diff hist 0 m 127.1 Request for Environmental Services →127.1.1.2 Process
- 14:04, 28 December 2021 diff hist -1 m Category:235 Preliminary Plans →235.6 Approval of Preliminary Plan: updated link
- 14:04, 28 December 2021 diff hist -321 m 127.1 Request for Environmental Services Per Env'l, clarified the process of RES submittals and emphasized the electronic process. Added email group information.
- 13:09, 28 December 2021 diff hist +190 m 147.3 Job Order Contracting (JOC) Per Env'l, clarified the process of RES submittals and emphasized the electronic process.
- 12:17, 28 December 2021 diff hist +135 m 642.8 Sidewalk Design Criteria updating broken link
- 12:13, 28 December 2021 diff hist -33 m 642.8 Sidewalk Design Criteria updating several broken links
- 15:28, 23 December 2021 diff hist +27 m Category:1001 General Requirements for Material Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 10:27, 22 December 2021 diff hist -62 m 751.50 Standard Detailing Notes →J1. General: minor clarifications
- 08:39, 22 December 2021 diff hist -27 m Recent Policy Changes in the EPG EPG 109.14
- 08:36, 22 December 2021 diff hist -12 m Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14): Per CM, guidance now explicitly excludes pay items in Job Order Contracts from qualifying for Fuel Adjustment, per Sec. 109.14.
- 16:17, 17 December 2021 diff hist +3 m 903.2 Extent of Signing →903.2.25.2 Plan Development Procedure: updated broken BR division link
- 16:10, 17 December 2021 diff hist +3 m 751.1 Preliminary Design →751.1.2.9.2 Steel Girder Options: updated broken BR division link
- 16:07, 17 December 2021 diff hist +10 m Category:1029 Fabricating Prestressed Concrete Members for Bridges updating broken BR division links
- 16:03, 17 December 2021 diff hist +3 m Category:134 Engineering Professional Services →134.5.1 Invoicing: updated broken BR division link
- 15:56, 17 December 2021 diff hist +20 m 750.7 Non-Hydraulic Considerations updating broken BR division links
- 15:50, 17 December 2021 diff hist -14 m 121.5 Asset Management →121.5.2.3 Bridges: updated broken BR division link
- 15:49, 17 December 2021 diff hist +5 m Category:206 Excavation for Structures →206.4 Construction Inspection Guidelines for Sec 206: updated broken BR division link
- 15:46, 17 December 2021 diff hist +5 m 127.9 Floodplain Management →127.9.3.3 Responsibilities: updating broken BR division link
- 15:44, 17 December 2021 diff hist -14 m 131.1 Design Exception Process →131.1.4 The Design Exception Process: updating broken BR division link
- 15:42, 17 December 2021 diff hist +3 m 616.11 Traffic Control for Waterways →616.11.1 Guidelines for Determining the Need for Work Zone Control: updating broken BR division link current
- 15:41, 17 December 2021 diff hist +6 m 903.22 Material Inspection for Sec 903 updating BR division links current
- 15:39, 17 December 2021 diff hist +3 m 903.4 Overhead Sign Mounting →903.4.1 Overhead Sign Installations (MUTCD Section 2A.17): Updating broken BR division link current
- 14:55, 17 December 2021 diff hist -9 m Category:110 State and Federal Wage Rates and Other Requirements →110.2 Federal-Aid Projects (Guidance for Sec 110.2)
- 14:27, 17 December 2021 diff hist -4,193 m Category:110 State and Federal Wage Rates and Other Requirements Per CM and ECR, deleted listing of required posters and packets to be displayed at project site. Reader is directed to MoDOT's contractor resources website.
- 13:19, 17 December 2021 diff hist +54 m Recent Policy Changes in the EPG EPG 751.24.2.1, EPG 751.50
- 11:55, 17 December 2021 diff hist +2,079 m 751.50 Standard Detailing Notes Per BR, numerous notes updated to reflect that, in lieu of using pipe pile spacers, the contractor will have the option to use pile jackets for bridges up to 200 feet long.
- 11:47, 17 December 2021 diff hist +1,450 m 751.24 LFD Retaining Walls →751.24.2.1 Design: Per BR, in lieu of using pipe pile spacers, the contractor will have the option to use pile jackets for bridges up to 200 feet long.
- 13:50, 16 December 2021 diff hist -42 m 103.1 Bid Opening and Award Process Per Bidding and Estimates, updated links to PS&E chart and calendar.
- 13:46, 16 December 2021 diff hist 0 N File:237.9.3 Due Date Calendar.pdf current
- 13:45, 16 December 2021 diff hist +19 m 237.6 Project Estimates Per Bidding and Estimates, updated links to PS&E chart and calendar.
- 13:39, 16 December 2021 diff hist 0 N File:237.9.3 PS&E Due Date Chart.pdf current
- 13:38, 16 December 2021 diff hist -267 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Estimates, updated links to PS&E chart and calendar. Deleted reference to consultants' version of this information
- 14:19, 15 December 2021 diff hist +1 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.5.2.1 Sponsor Responsibilities
- 14:14, 15 December 2021 diff hist +17 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.5.2.1 Sponsor Responsibilities
- 08:30, 15 December 2021 diff hist +963 m 751.40 LFD Widening and Repair →751.40.2.3.2 Bent Cap Shear Strengthening using FRP Wrap