User contributions
Jump to navigation
Jump to search
- 11:03, 29 January 2018 diff hist +125 m Category:101 Standard Forms Per BR, updated Bridge Survey Checklist. Also added the Bridge Survey Location Request form to two Design locations
- 10:52, 29 January 2018 diff hist 0 N File:747 Bridge Survey Checklist 2018.docx current
- 10:52, 29 January 2018 diff hist -82 m Category:747 Bridge Reports and Layouts Per BR, updated Bridge Survey Checklist
- 15:57, 26 January 2018 diff hist -3 m 131.1 Design Exception Process →131.1.4 The Design Exception Process
- 14:30, 26 January 2018 diff hist -542 m Main Page EPG 131.1.4
- 14:14, 26 January 2018 diff hist +610 m 131.1 Design Exception Process →131.1.4 The Design Exception Process: Per DE, Design Exceptions to be stored electronically in eProjects after CO DE/BR have reviewed & approved. Guidance is now up-to-date with current practice
- 12:25, 26 January 2018 diff hist +16 m Category:132 Safety
- 12:23, 26 January 2018 diff hist +33 m Category:132 Safety updated links to various PPE guidance
- 12:16, 26 January 2018 diff hist -17 m Category:132 Safety Updated link to USDOT Emergency Response Guide
- 09:25, 26 January 2018 diff hist 0 N File:123.1.1 PoDI 2018.xlsx
- 09:24, 26 January 2018 diff hist -98 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per DE, updated PoDI list
- 15:03, 25 January 2018 diff hist +1 751.40 LFD Widening and Repair →751.40.2.4 Deck Repair and Filled Joints: Per BR, updated link
- 14:58, 25 January 2018 diff hist -1 m 751.5 Structural Detailing Guidelines →751.5.4.5 Bridge Decks: Per BR, updated link
- 11:46, 25 January 2018 diff hist 0 106.3.2.40 TM-40, A One-Point Moisture-Density Relations Test for Soils current
- 11:46, 25 January 2018 diff hist 0 N File:106.3.2.40.jpg current
- 11:45, 25 January 2018 diff hist +2 m 106.3.2.40 TM-40, A One-Point Moisture-Density Relations Test for Soils Per CM, minor correction to figure.
- 11:37, 24 January 2018 diff hist +1 m LPA:136.2 Certification and Training
- 11:21, 24 January 2018 diff hist +166 m LPA:136.13 LPA Policy Changes EPG 136.2
- 11:18, 24 January 2018 diff hist +1 m LPA:136.2 Certification and Training
- 11:18, 24 January 2018 diff hist -67 m LPA:136.2 Certification and Training Per CM, updated the contact information for the Technician Certification Program
- 10:51, 24 January 2018 diff hist +181 m 147.3 Job Order Contracting (JOC) →147.3.5 Term Extension of Job Order Contracts: Per CM, updated the 5th bullet pt. CCO requested that CM no longer submit hard copies of the new performance bond, but send them email links
- 08:14, 22 January 2018 diff hist +3 m 171.12 Maintenance Policy History →DRN(A4) Plastic Pipe
- 14:24, 19 January 2018 diff hist 0 m Category:702 Load-Bearing Piles →702.1.4.4 DFI Documents on Pile Driving and Hammers
- 14:20, 19 January 2018 diff hist 0 N File:103.1.6 Reviewers Checklist.docx current
- 14:19, 19 January 2018 diff hist -152 m 103.1 Bid Opening and Award Process Per Bidding and Est, replaced Reviewer's Checklist link with an uploaded form
- 11:30, 19 January 2018 diff hist -51 m LPA:136.13 LPA Policy Changes
- 11:24, 19 January 2018 diff hist -4 m LPA:136.13 LPA Policy Changes minor cosmetic update to Fig. 136.9.3
- 11:24, 19 January 2018 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links minor cosmetic update to Fig. 136.9.3
- 11:23, 19 January 2018 diff hist 0 N File:136.9.3 2018.docx
- 11:23, 19 January 2018 diff hist -28 m LPA:136.9 Plans, Specs and Estimates (PSE) minor cosmetic update to Fig. 136.9.3
- 12:22, 18 January 2018 diff hist 0 N File:101 Floodplain Development Permit Application 2018.pdf current
- 12:22, 18 January 2018 diff hist -7 m Category:101 Standard Forms →Bridge: Per BR, updated “Floodplain Development Permit/Application” form with minor changes made at the request of SEMA.
- 11:54, 18 January 2018 diff hist +75 m Main Page EPG 106.3.2.87, EPG 402
- 10:31, 18 January 2018 diff hist +5 m 147.3 Job Order Contracting (JOC) Per EPS, updated Fence JOC link
- 09:53, 18 January 2018 diff hist +5 m Category:625 Slab Stabilization Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:53, 18 January 2018 diff hist +5 m Category:409 Seal Coat Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:53, 18 January 2018 diff hist +5 m Category:402 Bituminous Surface Leveling Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:52, 18 January 2018 diff hist +5 m Category:401 Bituminous Base and Pavement Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:52, 18 January 2018 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments 2018.docx current
- 09:51, 18 January 2018 diff hist +5 m Category:403 Asphaltic Concrete Pavement Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 08:56, 18 January 2018 diff hist +1,259 Nm 106.3.2.87 TM-87 No-Pick-Up Time for Tack Coats Per CM, new TM for determining no pick-up-time for tack coat
- 11:51, 17 January 2018 diff hist +160 m Main Page EPG 236.3
- 11:27, 17 January 2018 diff hist +1,311 m 236.3 Administration →236.3.4 Right of Way Acquisition Authority and Project Funding: Per RW, to align w/ CFR reg, updated RW activities that can be coded to the PE number prior to receiving FHWA's "A" date approval
- 10:28, 17 January 2018 diff hist -9 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.1 Introduction to the Storm Water Permit and Storm Water Polution Prevention Plan (SWPPP): Per CADD, updated a link to EPA
- 10:16, 17 January 2018 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator 2018.xlsx
- 10:15, 17 January 2018 diff hist -8 m 606.1 Guardrail Per Charles Schumann, minor revision to guardrail calculator spreadsheet (added links to MoDOT approved MASH crashworthy end terminals and MoDOT locations for greater convenience for the user)
- 13:21, 16 January 2018 diff hist -1 m 236.3 Administration →236.3.4.1 General
- 14:43, 12 January 2018 diff hist -2,346 m Category:1037 Sheer Connectors current
- 14:37, 12 January 2018 diff hist 0 Category:1000 MATERIALS Title of EPG 1037 corrected to "Shear" from "Sheer".
- 14:37, 12 January 2018 diff hist +2,687 Nm Category:1037 Shear Connectors Title of EPG 1037 corrected to "Shear" from "Sheer". Old article had 8911 hits and only a few minor corrections from its original incorporation into EPG from Materials Manual in July 2007
- 09:24, 11 January 2018 diff hist 0 N File:910.3.2.13.2.jpg current
- 09:24, 11 January 2018 diff hist +71 m 910.3 Dynamic Message Signs (DMS) →910.3.2.13.2 Other Weather Messages
- 15:38, 10 January 2018 diff hist -4 m Main Page EPG 104.7
- 15:02, 10 January 2018 diff hist +1 m 104.7 Scoping Estimates
- 15:01, 10 January 2018 diff hist +1 m 104.7 Scoping Estimates
- 15:01, 10 January 2018 diff hist 0 N File:104.7 EngFac SFY 15 to 17.pdf current
- 15:01, 10 January 2018 diff hist -119 m 104.7 Scoping Estimates Per TP, updated Engineering Factors Report to SFY 2015 - 2017
- 10:47, 10 January 2018 diff hist +32 m 147.3 Job Order Contracting (JOC) Per EPG, upated JOC JSP links
- 11:58, 9 January 2018 diff hist +622 m 153.9 Design Per DE, added info for DE63
- 10:42, 9 January 2018 diff hist +27 m 102.2 Contractor Performance Rating System Per CM, updated link to Contractor Performance Questionnaire
- 08:51, 4 January 2018 diff hist 0 m Help Article →EPG Ballot Cycles
- 15:41, 3 January 2018 diff hist +1 m Other Aspects of Pavement Design →Minor Roads
- 14:35, 3 January 2018 diff hist +49 m Category:134 Engineering Professional Services updated link
- 14:25, 3 January 2018 diff hist +1 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.1 Specifications of Electronic Design of Contract Plans for Automated Machine Guidance (AMG): minor correction
- 09:31, 2 January 2018 diff hist +1 m Main Page
- 09:55, 29 December 2017 diff hist 0 N File:Main Page Dec 29, 2017.jpg current
- 09:54, 29 December 2017 diff hist +72 m Main Page
- 08:34, 29 December 2017 diff hist +360 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per CM, link added for payroll training course
- 08:17, 29 December 2017 diff hist 0 N File:616.14 WZ Questions Dec 2017.docx current
- 08:16, 29 December 2017 diff hist +12 m 616.14 Work Zone Safety and Mobility Policy Per EPServices, updated Work Zone Questions for the Core Team
- 12:17, 27 December 2017 diff hist 0 N File:121.1 RPC MPO 2017.pdf current
- 12:16, 27 December 2017 diff hist +5 m 121.2 The Planning Framework for Transportation Decision-Making Per Planning, updated RPC MPO figure
- 12:28, 26 December 2017 diff hist +403 m LPA:136.13 LPA Policy Changes EPG 136.3.8.11
- 12:24, 26 December 2017 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.24
- 12:23, 26 December 2017 diff hist 0 N File:Fig.136.3.24 2017.docx current
- 12:23, 26 December 2017 diff hist +285 m LPA:136.3 Federal Aid Basics Per LPA, updated Fig. 136.3.24 TEAP Application
- 11:17, 22 December 2017 diff hist -2 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, minor clarification
- 10:04, 20 December 2017 diff hist +145 m 751.6 General Quantities →751.6.2.10 Bridge Slabs: Per BR, added link
- 09:43, 20 December 2017 diff hist -5 m 620.1 General (MUTCD Chapter 3A) →620.1.8 Temporary Pavement Markings
- 08:34, 19 December 2017 diff hist +172 m 910.4 ITS Architecture Updated link to Bi-State St. Louis Regional ITS Architecture
- 13:16, 18 December 2017 diff hist 0 N File:Fig 104.7 Dec 18 2017.doc
- 13:16, 18 December 2017 diff hist +6 m 104.7 Scoping Estimates minor revision to Cost Estimate Guide for Rural Preliminary Design
- 09:53, 18 December 2017 diff hist +179 m Main Page EPG 104.7
- 09:51, 18 December 2017 diff hist 0 m 104.7 Scoping Estimates
- 09:50, 18 December 2017 diff hist 0 N File:Fig 104.7 Dec 2017.doc
- 09:50, 18 December 2017 diff hist +8 m 104.7 Scoping Estimates Per BR, revised a few Bridge Structure entries in Fig. 104.7 Cost Estimate Guide for Rural Preliminary Design
- 15:57, 15 December 2017 diff hist 0 N File:Main Page Dec 15, 2017.jpg current
- 15:56, 15 December 2017 diff hist -38 m Main Page
- 14:12, 15 December 2017 diff hist +6 m Main Page EPG 110.1
- 13:40, 15 December 2017 diff hist +828 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per CM, expanded guidance for QA measures to assure compliance with wage rate reviews. Required by recent audit
- 10:22, 15 December 2017 diff hist -2 m Help Article
- 10:21, 15 December 2017 diff hist -1 m Category:171 Maintenance Policy and Operations
- 10:20, 15 December 2017 diff hist -1 m 106.22 Material Inspection Revisions →106.22.2 Review current
- 10:14, 15 December 2017 diff hist +449 m Help Article →EPG Ballot Cycles: Per EPS, ballot schedule table updated
- 13:04, 14 December 2017 diff hist +63 m 153.9 Design
- 12:15, 14 December 2017 diff hist -15 m 153.9 Design Per DE, removed redundant reference to DLEs
- 10:17, 14 December 2017 diff hist -132 m LPA:136.13 LPA Policy Changes
- 10:16, 14 December 2017 diff hist +315 m LPA:136.13 LPA Policy Changes Fig. 136.3.20
- 10:13, 14 December 2017 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.20
- 10:12, 14 December 2017 diff hist 0 N File:Fig.136.3.20 Dec 2017.docx
- 10:12, 14 December 2017 diff hist +92 m LPA:136.3 Federal Aid Basics Per BR, updated Fig. 136.3.20 and contact info
- 10:53, 13 December 2017 diff hist +159 m 751.50 Standard Detailing Notes →H10. Barrier Curbs: Per BR, guidance updated with lap length revisions inadvertently not included in original submission
- 10:15, 13 December 2017 diff hist 0 N File:751.12.2.3 continuous 2 2017.jpg current
- 10:15, 13 December 2017 diff hist 0 N File:751.12.2.3 Non-integral 2 2017.jpg current
- 10:14, 13 December 2017 diff hist 0 N File:751.12.2.3 Integral 2 2017.jpg current
- 10:14, 13 December 2017 diff hist +431 m 751.12 Barriers, Railings, Curbs and Fences →751.12.2 Safety Barrier Bridge Curbs (NJ Shape): Per BR, guidance updated with lap length revisions inadvertently not included in original submission
- 16:05, 12 December 2017 diff hist +2 m Category:1048 Pavement Marking Material Per TS, updated EPG labels of three documents
- 15:46, 12 December 2017 diff hist -121 m Other Aspects of Pavement Design →Thickness Determination: Per EPG, deleted most recent revision. Proposed revision to go into effect in April 2018.
- 15:02, 12 December 2017 diff hist +122 m Other Aspects of Pavement Design →Minor Roads: Per DE, clarification about pavement thicknesses/types sometimes not included on typical sections
- 13:21, 11 December 2017 diff hist +2 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, corrected pay item
- 13:13, 11 December 2017 diff hist -1 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings): Per BR, minor correction
- 09:55, 11 December 2017 diff hist +423 m 750.6 Erosion Control and Energy Dissipation →750.6.3.3 Rock Ditch Liner: Per BR, table from Sec 609.50 added for clarity/convenience to highway designers
- 09:38, 11 December 2017 diff hist +105 m 147.3 Job Order Contracting (JOC) Per EPG, updated JSP link
- 10:50, 6 December 2017 diff hist -37 m Category:108 Prosecution and Progress →108.7.3 Table for Contracts with Time Exclusion
- 15:46, 5 December 2017 diff hist -171 m Category:101 Standard Forms →Construction and Materials: Per CM, replaced two forms (2017 Statewide Rail Cable Fence Spreadsheet - Grading and No Grading} with "2017 Statewide Rail Cable Fence Spreadsheet"
- 14:56, 5 December 2017 diff hist -2 m Category:101 Standard Forms →Bridge
- 14:55, 5 December 2017 diff hist -56 m Category:101 Standard Forms →Bridge: Per DE, updated Vertical Clearance Design Exception Coordination with SDDCTEA form
- 14:54, 5 December 2017 diff hist 0 N File:131.1.7 Vertical Clearance Design Exception Coordination with SDDCTEA.pdf current
- 14:54, 5 December 2017 diff hist -116 m 131.1 Design Exception Process Per DE, updated Vertical Clearance Design Exception Coordination with SDDCTEA form
- 14:42, 5 December 2017 diff hist +6 m 751.50 Standard Detailing Notes →G5a Closed Ended Cast-in Place (CECIP) Concrete Pile: Per BR, minor clarification
- 11:37, 5 December 2017 diff hist -27 m 131.1 Design Exception Process →131.1.7 Deficient Vertical Clearances on Interstates: removed archaic link
- 16:13, 4 December 2017 diff hist +2 m Main Page
- 08:55, 1 December 2017 diff hist +204 m 751.1 Preliminary Design →751.1.2.19.2 Content: Per BR, minor clarification
- 08:19, 1 December 2017 diff hist -1 m Category:101 Standard Forms Per DE, updated Fig. 134.2.2.2
- 08:18, 1 December 2017 diff hist 0 N File:134.2.2.2 Nov 2017.docx current
- 08:18, 1 December 2017 diff hist -4 m Category:134 Engineering Professional Services Per DE, updated Fig. 134.2.2.2
- 15:50, 30 November 2017 diff hist +78 m Category:101 Standard Forms →Design Forms: Form 806.8.2 Project-Specific SWPPP Info
- 15:47, 30 November 2017 diff hist 0 N File:Form 806.8.2.pdf current
- 15:47, 30 November 2017 diff hist -7 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per DE, updated Form 806.8.2 Project-Specific SWPPP Info
- 14:09, 30 November 2017 diff hist +1 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, minor clarification
- 13:17, 30 November 2017 diff hist +32 m LPA:136.3 Federal Aid Basics →136.3.15.2 Audit and Final Reimbursement: Per AI, further clarification
- 12:27, 30 November 2017 diff hist +230 m LPA:136.13 LPA Policy Changes EPG 136.3.15.2
- 12:25, 30 November 2017 diff hist -100 m LPA:136.3 Federal Aid Basics →136.3.15.2 Audit and Final Reimbursement: Per AI, removed sentence stating the LPAs must supply a copy of the final audit report to the MPOs.
- 15:49, 29 November 2017 diff hist -2 m 751.50 Standard Detailing Notes →H10a. Safety, Median, Type C & D: Per BR, revised lap lengths to coordinate with standard drawings
- 15:50, 28 November 2017 diff hist -10 m Category:108 Prosecution and Progress →108.7.1 Extensions or Adjustments of Time: minor correction
- 16:11, 21 November 2017 diff hist -6 m 751.50 Standard Detailing Notes →A4a1. Steel Structures- Nonweathering Steel
- 15:15, 21 November 2017 diff hist -7 m 751.50 Standard Detailing Notes →H1. Steel: Per BR, further clarified Note H1.45
- 13:56, 21 November 2017 diff hist +40 m 751.50 Standard Detailing Notes →H1. Steel: Per BR, in H1.51, reduced showing redundant deck thickness on plans since changing thickness on details can get missed.
- 13:46, 21 November 2017 diff hist -31 m 751.50 Standard Detailing Notes Per BR, minor clarifications
- 09:56, 21 November 2017 diff hist +3 m 237.11 Signing and Sealing Per CADD, minor clarifications
- 15:37, 20 November 2017 diff hist +199 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.4.2 File Naming Conventions: Per Est and Review, updated file naming conventions
- 13:10, 20 November 2017 diff hist -103 m Category:153 Agreements and Contracts →153.1.6.2 eAgreements SharePoint Site Properties Page: Updated link
- 15:38, 17 November 2017 diff hist +73 m Main Page
- 14:47, 17 November 2017 diff hist 0 N File:Main Page Nov 17, 2017.jpg current
- 14:47, 17 November 2017 diff hist +84 m Main Page
- 13:13, 17 November 2017 diff hist 0 m 903.3 Ground-Mounted Sign Supports →Table 903.3.23 Incident Response Signing Plan: Per TS, corrected SCHOOL sign's priority to be "2" (not "3")
- 10:42, 14 November 2017 diff hist -377 m 750.3 Bridges →750.3.2.2.2 Bridge Survey: Per BR, omitted revision related to Nov 3, 2017 revision guidance for district submittal of request for valley section locations
- 09:55, 14 November 2017 diff hist +5 m 751.50 Standard Detailing Notes →H1. Steel: Per BR, minor clarification
- 09:50, 14 November 2017 diff hist +2 m 237.9 Submission of Plans and Supporting Documents
- 15:52, 13 November 2017 diff hist +37 m Main Page
- 15:51, 13 November 2017 diff hist +49 m Main Page
- 15:23, 13 November 2017 diff hist 0 N File:Main Page Nov 13, 2017.jpg current
- 15:23, 13 November 2017 diff hist +43 m Main Page
- 14:44, 13 November 2017 diff hist +306 m LPA:136.13 LPA Policy Changes EPG 136.1.2.2
- 14:40, 13 November 2017 diff hist +1,383 m LPA:136.1 Introduction →136.1.2.2 Project Sponsor Eligibility: Per LPA, expanded guidance since FAST Act extended eligibility for some programs. KC, SL & S'fld MPOs asked us allow eligibility to nonprofits in their areas
- 11:05, 13 November 2017 diff hist -48 m Main Page
- 10:25, 13 November 2017 diff hist -2 m 751.13 Expansion Joint Systems →751.13.4.4 Design Example, Strip Seal at End Bent
- 10:22, 13 November 2017 diff hist +221 m 751.13 Expansion Joint Systems →751.13.2.4.2 Design Example 2
- 10:21, 13 November 2017 diff hist +153 m 751.13 Expansion Joint Systems →751.13.2.4.1 Design Example 1
- 10:19, 13 November 2017 diff hist +170 751.13 Expansion Joint Systems →751.13.2.4.1 Design Example 1
- 10:15, 13 November 2017 diff hist -15 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing
- 10:13, 13 November 2017 diff hist -1 m 751.24 LFD Retaining Walls →751.24.2.2 Excavation
- 09:26, 13 November 2017 diff hist -5 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per BR, minor revision to Note A1.2 of E 751.50.
- 09:17, 13 November 2017 diff hist 0 N File:751.5.1.3.3 capitalization 2017.jpg current
- 09:15, 13 November 2017 diff hist +5 m 751.5 Structural Detailing Guidelines →751.5.1.3.3 Capitalization
- 09:14, 13 November 2017 diff hist 0 N File:751.5.1.3.3 capitalization.jpg current
- 09:13, 13 November 2017 diff hist +374 m 751.5 Structural Detailing Guidelines →751.5.1.3 Grammar and Punctuation: Per BR, updated capitalization rules and made minor additions to nomenclature
- 08:08, 13 November 2017 diff hist -13 m 642.10 Curb Ramp Applications
- 08:08, 13 November 2017 diff hist -13 m 642.10 Curb Ramp Applications
- 15:54, 9 November 2017 diff hist +108 m 236.7 Negotiation updated link
- 16:17, 8 November 2017 diff hist 0 N File:Main Page Nov 8, 2017.jpg current
- 16:16, 8 November 2017 diff hist -59 m Main Page
- 14:16, 8 November 2017 diff hist +5 m 751.13 Expansion Joint Systems →751.13.5.4 Flat Plate Expansion Joint System - Details
- 14:15, 8 November 2017 diff hist +5 m 751.13 Expansion Joint Systems →751.13.5.4 Flat Plate Expansion Devices - Details
- 14:14, 8 November 2017 diff hist +15 751.13 Expansion Joint Systems →751.13.4.4 Design Example, Strip Seal at End Bent
- 14:11, 8 November 2017 diff hist +22 m 751.13 Expansion Joint Systems →751.13.4.4 Design Example, Strip Seal at End Bent
- 14:06, 8 November 2017 diff hist +8 m 751.13 Expansion Joint Systems →751.13.4.3 Strip Seal Expansion Joint System – Details
- 14:05, 8 November 2017 diff hist +71 m 751.13 Expansion Joint Systems →751.13.3.6 Drainage Details
- 14:04, 8 November 2017 diff hist -1 m 751.13 Expansion Joint Systems →751.13.2.4.2 Design Example 2: minor correction
- 14:04, 8 November 2017 diff hist -2 m 751.13 Expansion Joint Systems →751.13.2.4.1 Design Example 1: minor corrections
- 13:59, 8 November 2017 diff hist -25 m 236.1 General Information →236.1.3.3 Contract Procedures: Per RW, removed unecessary subtitle
- 16:08, 7 November 2017 diff hist 0 N File:236.7.3.3.1.docx current
- 16:08, 7 November 2017 diff hist -107 m 236.7 Negotiation Per RW, updated Form 236.7.3.3.1
- 15:25, 7 November 2017 diff hist +230 m 902.11 Traffic Control for Schools →902.11.3 School Signal at Driveway: Per TS, clarified where school signals will be allowed and how they should operate when schools or special events are not in session.
- 15:15, 7 November 2017 diff hist 0 153.21 Traffic updated link
- 11:45, 7 November 2017 diff hist -1 m 751.6 General Quantities Per BR, Tack Coat plan reporting accuracy revised from 10 gal. to 1 gal. to be in accord with standard specs and official bid item listing
- 09:26, 7 November 2017 diff hist +41 m Category:134 Engineering Professional Services →134.4 Contract Approval, Execution and Distribution: Per DE, added "and please advise when we can give a NTP", per FS's request
- 15:43, 6 November 2017 diff hist +1 Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10)
- 13:50, 6 November 2017 diff hist +145 m Main Page EPG 131.1
- 13:37, 6 November 2017 diff hist +48 m 131.1 Design Exception Process
- 12:22, 6 November 2017 diff hist -434 m 131.1 Design Exception Process Per DE, revised EPG 131.1.4 about where design exceptions should be stored/filed. Deleted EPG 131.5.2, removing the requirement of a transmittal letter for design exceptions.
- 09:23, 6 November 2017 diff hist -28 m 236.13 Designing Right of Way Plans Per RW, clarify guidance by replacing "ratification" with "approval" to better explane how plans are certified and approved by Commission
- 10:22, 3 November 2017 diff hist +676 m Main Page EPG 751, EPG 127.13
- 09:20, 3 November 2017 diff hist +137 770.8 Maintenance of Bridge Substructure →770.8.4 Steel Piling and Cast In Place (C.I.P.) Piling: Per BR, added link
- 09:15, 3 November 2017 diff hist +4,079 751.40 LFD Widening and Repair →751.40.1.1 Widening and Repair of Existing Structures: Per BR, new EPG 751.40.1.2 is to be used by Bridge maintenance or district maintenance to maintain or repair existing steel HP piles
- 09:07, 3 November 2017 diff hist +332 751.50 Standard Detailing Notes →J1. General: Per BR, revised and added notes pertaining to MSE wall plans
- 08:59, 3 November 2017 diff hist 0 N File:751.10.3.3 Part Elev of Nonintegral.jpg current
- 08:58, 3 November 2017 diff hist 0 N File:751.10.3.3 Part Elev of Integral.jpg current
- 08:57, 3 November 2017 diff hist +1,338 751.10 General Superstructure →751.10.3 Bridge Deck Drainage - Slab Drains: Per BR, revised guidance for bridge deck drain, approach drainage, roadway drainage or collected drain water discharging into a MSE wall backfill area
- 08:51, 3 November 2017 diff hist 0 N File:751.24.2.1 section AA.jpg current
- 08:50, 3 November 2017 diff hist 0 N File:751.24.2.1 alternate.jpg current
- 08:49, 3 November 2017 diff hist 0 N File:751.24.2.1.jpg current
- 08:47, 3 November 2017 diff hist +9,144 751.24 LFD Retaining Walls Per BR, guidance for bridge deck drain, approach drainage, roadway drainage or collected drain water discharging into a MSE wall backfill area was revised
- 08:39, 3 November 2017 diff hist +673 751.1 Preliminary Design Per BR, guidance for bridge deck drain, approach drainage, roadway drainage or collected drain water discharging into a MSE wall backfill area was revised
- 08:17, 3 November 2017 diff hist 0 N File:751.3.1.1.2.4.1 placement.jpg current
- 08:17, 3 November 2017 diff hist 0 N File:751.3.1.1.2.4.1 initial.jpg current
- 08:16, 3 November 2017 diff hist 0 N File:750.3.1.1.1.jpg current
- 08:15, 3 November 2017 diff hist +14,683 750.3 Bridges Per BR, guidance for district submittal of request for valley section locations was expanded
- 08:12, 3 November 2017 diff hist 0 N File:747 Bridge Survey Location Request.docx
- 08:11, 3 November 2017 diff hist +3,278 Category:747 Bridge Reports and Layouts Per BR, guidance for district submittal of request for valley section locations was expanded
- 08:08, 3 November 2017 diff hist -5,313 238.3 Route Surveying →238.3.36 Bridge Surveys: Per BR, updated to reflect change in responsibility
- 07:55, 3 November 2017 diff hist 0 N File:127.13.12.3.jpg current
- 07:55, 3 November 2017 diff hist 0 N File:127.13.12.2.jpg current
- 07:54, 3 November 2017 diff hist 0 N File:127.13.12.1.jpg current
- 07:54, 3 November 2017 diff hist 0 N File:127.13 sample public.pdf current
- 07:53, 3 November 2017 diff hist +68,814 127.13 Noise Per Env'l, most revisions clarify and expand definitions and the analysis of traffic noise impacts and mitigation. New EPG 127.13.12 provides guidance for developing a sound study and report.
- 10:16, 2 November 2017 diff hist 0 N File:616.19 Inspection Worksheet 2017.docx
- 10:16, 2 November 2017 diff hist +5 m 616.19 Quality Standards for Temporary Traffic Control Devices Per TS, updated "Type III" barricade to "Type 3" in the Temporary Traffic Control Inspection Worksheet
- 10:12, 2 November 2017 diff hist 0 N File:616.8.14a DECM 2017.pdf current
- 10:12, 2 November 2017 diff hist 0 N File:616.8.29 MT 2017.pdf current
- 10:11, 2 November 2017 diff hist 0 N File:616.8.28 MT 2017.pdf current
- 10:10, 2 November 2017 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) Per TS, updated "Type III" barricade to "Type 3" in TA-14a, TA-28 and TA-29
- 14:15, 1 November 2017 diff hist 0 m 751.13 Expansion Joint Systems 751.13 Expansion Devices moved to 751.13 Expansion Joint Systems: Cuz Bridge wanted to
- 14:15, 1 November 2017 diff hist +44 N 751.13 Expansion Devices 751.13 Expansion Devices moved to 751.13 Expansion Joint Systems: Cuz Bridge wanted to current
- 14:14, 1 November 2017 diff hist +29 m 751.50 Standard Detailing Notes →H5. Expansion Devices: Per BR, minor clarifications
- 14:11, 1 November 2017 diff hist +5 m 751.13 Expansion Joint Systems →751.13.6 Finger Plate Expansion Devices
- 14:10, 1 November 2017 diff hist +10 751.13 Expansion Joint Systems
- 14:09, 1 November 2017 diff hist +23 m 751.13 Expansion Joint Systems →751.13.5 Flat Plate Expansion Devices
- 14:08, 1 November 2017 diff hist +6 m 751.13 Expansion Joint Systems →751.13.4.8 Polymer Concrete
- 14:07, 1 November 2017 diff hist +97 m 751.13 Expansion Joint Systems →751.13.4.4 Design Example, Strip Seal at End Bent
- 13:57, 1 November 2017 diff hist -5 751.13 Expansion Joint Systems →751.13.4.4 Design Example, Strip Seal at End Bent
- 13:54, 1 November 2017 diff hist +20 751.13 Expansion Joint Systems →751.13.4 Strip Seal Expansion Joint System
- 13:53, 1 November 2017 diff hist +2 m 751.13 Expansion Joint Systems →751.13.2.4.2 Design Example 2
- 13:52, 1 November 2017 diff hist +62 m 751.13 Expansion Joint Systems →751.13.2.4.1 Design Example 1
- 13:52, 1 November 2017 diff hist +62 m 751.13 Expansion Joint Systems →751.13.2.4.2 Design Example 2
- 13:50, 1 November 2017 diff hist +79 m 751.13 Expansion Joint Systems →751.13.2.4.2 Design Example 2
- 13:48, 1 November 2017 diff hist +23 751.13 Expansion Joint Systems →751.13.2.4.2 Design Example 2
- 13:47, 1 November 2017 diff hist -51 m 751.13 Expansion Joint Systems
- 13:38, 1 November 2017 diff hist +4 m 751.13 Expansion Joint Systems →751.13.2.4.1 Design Example 1
- 13:35, 1 November 2017 diff hist -86 m 751.13 Expansion Joint Systems →751.13.1.1.12 Expansion Type Selection Table
- 13:34, 1 November 2017 diff hist +37 m 751.13 Expansion Joint Systems →751.13.1.1.12 Expansion Type Selection Table
- 13:31, 1 November 2017 diff hist +51 m 751.13 Expansion Joint Systems →751.13.1.1.2 Design Movements and Loads at the Strength and Service Limit States can Include: minor clarification
- 13:29, 1 November 2017 diff hist +20 m 751.13 Expansion Joint Systems →751.13.4 Strip Seal Expansion Joint System: Per BR, clarified arrangement of article
- 13:22, 1 November 2017 diff hist +84 m 751.13 Expansion Joint Systems →751.13.3 Preformed Compression Seal Expansion Joint System: Per BR, clarified arrangement of article
- 13:16, 1 November 2017 diff hist +59 m 751.13 Expansion Joint Systems Per BR, clarified arrangement of article
- 12:43, 1 November 2017 diff hist -67 m 236.7 Negotiation →236.7.5.4 Acquisition from State of Missouri Agencies: Per RW, minor clarification as to which state agencies have authority to convey real property.
- 12:30, 1 November 2017 diff hist +1 m Main Page
- 08:13, 1 November 2017 diff hist +97 LPA:136.13 LPA Policy Changes
- 08:08, 1 November 2017 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 08:08, 1 November 2017 diff hist 0 N File:136.9.3 Nov 2017.docx
- 08:07, 1 November 2017 diff hist -28 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, updated link in Fig. 136.9.3
- 15:20, 31 October 2017 diff hist 0 N File:Main Page Oct 31, 2017.jpg current
- 15:19, 31 October 2017 diff hist +74 m Main Page
- 14:53, 31 October 2017 diff hist +5 m 751.6 General Quantities Per BR, assigned new pay item no. for pipe pile spacer
- 12:54, 31 October 2017 diff hist +238 m LPA:136.13 LPA Policy Changes Fig 136.6.7, the latest version
- 12:51, 31 October 2017 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.6.7
- 12:49, 31 October 2017 diff hist 0 N File:136.6.7 2017.docx current
- 12:48, 31 October 2017 diff hist +4 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, updated Fig. 136.6.7 with new “Whereas” clauses to address issues brought up by FHWA and the Advisory Council over the last few years.
- 12:24, 31 October 2017 diff hist 0 N File:616.12.3.3 2017.pdf current
- 12:24, 31 October 2017 diff hist +5 m 616.12 Work Zone Speed Limits →616.12.3 Work Zone SPEED LIMIT Figures: Per TS, revised Fig. 616.12.3.3 to include the “MERGE” sign.
- 10:42, 31 October 2017 diff hist 0 N File:132 Safety 2017.jpg current
- 10:42, 31 October 2017 diff hist +5 Category:132 Safety
- 13:59, 27 October 2017 diff hist +65 m 751.6 General Quantities Per BR, added Concrete Crack Filler to coordinate with new pay item
- 13:58, 27 October 2017 diff hist +3 Main Page
- 12:55, 27 October 2017 diff hist +284 m Main Page EPG 751.13
- 11:59, 27 October 2017 diff hist +24 m 751.6 General Quantities updated link
- 11:56, 27 October 2017 diff hist +12 m 771.11 Bridge Joint Sealing - Silicone updated link current
- 11:28, 27 October 2017 diff hist 0 N File:751.13.5.2 Beam or Girder.jpg current
- 11:27, 27 October 2017 diff hist 0 N File:751.13.5.2 Detail A.jpg current
- 11:27, 27 October 2017 diff hist 0 N File:751.13.5.2 part plan.jpg current
- 11:25, 27 October 2017 diff hist 0 N File:751.13.4.4 Part Elev.jpg current
- 11:25, 27 October 2017 diff hist -3 m 751.13 Expansion Joint Systems →751.13.4 Strip Seal Expansion Joint System
- 11:24, 27 October 2017 diff hist 0 N File:751.13.4.2 Summary.doc current
- 11:23, 27 October 2017 diff hist 0 N File:751.13.4.1 installation.jpg current
- 11:23, 27 October 2017 diff hist 0 N File:751.13.4.1 section.jpg current
- 11:22, 27 October 2017 diff hist 0 N File:751.13.4.1 plan.jpg current
- 11:22, 27 October 2017 diff hist 0 N File:751.13.4.1 squared.jpg current
- 11:21, 27 October 2017 diff hist 0 N File:751.13.3.3 Part Elevation.jpg current
- 11:21, 27 October 2017 diff hist 0 N File:751.13.3.2 Section AA.jpg current
- 11:20, 27 October 2017 diff hist 0 N File:751.13.3.1.jpg current
- 11:19, 27 October 2017 diff hist 0 N File:751.13.2.1.1 Ex 2 Step 6.jpg current
- 11:18, 27 October 2017 diff hist 0 N File:751.13.2.1.1 Ex 1 Step 6.jpg current
- 11:18, 27 October 2017 diff hist 0 N File:751.13.2 Preform Silicone.doc current
- 11:17, 27 October 2017 diff hist 0 N File:751.13.2 DS Brown.jpg current
- 11:16, 27 October 2017 diff hist 0 N File:751.13.2 Watson.jpg current
- 11:16, 27 October 2017 diff hist 0 N File:751.13.2 RJ skewed.jpg current
- 11:16, 27 October 2017 diff hist 0 N File:751.13.2 RJ model.jpg current
- 11:15, 27 October 2017 diff hist 0 N File:751.13.2 RJ.jpg current
- 11:15, 27 October 2017 diff hist 0 N File:751.13.1.4 A-A.jpg current
- 11:14, 27 October 2017 diff hist 0 N File:751.13.1.1.12 part elevation.jpg current
- 11:14, 27 October 2017 diff hist 0 N File:751.13.1.1.12 skewed.jpg current
- 11:13, 27 October 2017 diff hist 0 N File:751.13.1.1.12 squared.jpg current
- 11:13, 27 October 2017 diff hist 0 N File:751.13.1.1.12 lowest.jpg current
- 11:12, 27 October 2017 diff hist 0 N File:751.13.1.1.6.4.jpg current
- 11:12, 27 October 2017 diff hist 0 N File:751.13.1.1.6.1.3.jpg current
- 11:11, 27 October 2017 diff hist 0 N File:751.13.1.1.6.2.jpg current
- 11:11, 27 October 2017 diff hist 0 N File:751.13.1.1.6.1.jpg current
- 11:10, 27 October 2017 diff hist +56,151 m 751.13 Expansion Joint Systems Per BR, improved design and details for PCSEJS, and STSEJS
- 11:04, 27 October 2017 diff hist +1,299 m 751.50 Standard Detailing Notes →H5. Expansion Devices: Per BR, improved design and details for PCSEJS, and STSEJS
- 11:15, 25 October 2017 diff hist +166 m 751.50 Standard Detailing Notes Per BR, minor clarification (replacing "stringer" with "beam")
- 11:02, 25 October 2017 diff hist -12 m 751.35 Concrete Pile Cap Integral End Bents Per BR, minor clarification (replacing "stringer" with "beam")
- 11:01, 25 October 2017 diff hist -16 m 751.14 Steel Superstructure →751.14.5.3 End Diaphragms for Wide Flange Beams: Per BR, minor clarification (replacing "stringer" with "beam")
- 10:59, 25 October 2017 diff hist 0 m 751.14 Steel Superstructure →751.14.5.1 Bearing Stiffeners
- 10:57, 25 October 2017 diff hist 0 N File:751.14.5.1 End all Skews.jpg current
- 10:57, 25 October 2017 diff hist 0 N File:751.14.5.1 End Skews over 45.jpg current
- 10:56, 25 October 2017 diff hist 0 N File:751.14.5.1 End Skews 25 to 45.jpg current
- 10:55, 25 October 2017 diff hist 0 N File:751.14.5.1 End Skews Thru 25.jpg current
- 10:55, 25 October 2017 diff hist 0 N File:751.14 bearing end optional.jpg current
- 10:54, 25 October 2017 diff hist 0 N File:751.14.5.1 bearing end preferred.jpg current
- 10:53, 25 October 2017 diff hist 0 N File:751.14.5.1 bearing no end.jpg current
- 10:53, 25 October 2017 diff hist -993 m 751.14 Steel Superstructure →751.14.5.1 Bearing Stiffeners: Per BR, minor clarification (replacing "stringer" with "beam")
- 09:23, 25 October 2017 diff hist 0 N File:751.14.4.5 shear connector.jpg current
- 09:23, 25 October 2017 diff hist +16 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details: Per BR, minor clarification (replacing "stringer" with "beam")
- 09:16, 25 October 2017 diff hist 0 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details
- 09:15, 25 October 2017 diff hist 0 N File:751.14.4.5 D and H.jpg current
- 09:14, 25 October 2017 diff hist 0 N File:751.14.4.5 section thru.jpg current
- 09:14, 25 October 2017 diff hist -134 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details: Per BR, minor clarification (replacing "stringer" with "beam")
- 08:52, 25 October 2017 diff hist -12 m 751.14 Steel Superstructure →751.14.2.2 Analysis Methods: Per BR, minor clarification
- 12:15, 24 October 2017 diff hist -4 m 751.10 General Superstructure →751.10.1.11 Slab Elevations
- 14:51, 20 October 2017 diff hist -4 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, minor update to E2.22
- 15:21, 17 October 2017 diff hist -3 m Main Page
- 14:57, 16 October 2017 diff hist +2 m 751.23 Prestressed Concrete Double Tee Girders →751.23.1.1 Material Properties
- 14:57, 16 October 2017 diff hist +2 m 751.22 Prestressed Concrete I Girders →751.22.1.1 Material Properties
- 14:35, 16 October 2017 diff hist -2 m 643.2 Local Utility Adjustments - Public and Private Per CM, further updated D-12
- 14:35, 16 October 2017 diff hist -4 m 237.9 Submission of Plans and Supporting Documents Per CM, further updated D-12
- 14:34, 16 October 2017 diff hist -4 m Category:124 Quality Control / Quality Assurance (QC/QA) Per CM, further updated D-12
- 14:33, 16 October 2017 diff hist 0 N File:D-12 Oct 2017.docx current
- 14:33, 16 October 2017 diff hist -2 m Category:101 Standard Forms Per CM, further updated D-12
- 09:55, 16 October 2017 diff hist -4 m 751.6 General Quantities Per BR, updated Item Description for pay item 712-12.50
- 08:22, 16 October 2017 diff hist -130 m Category:101 Standard Forms Per CM, removed the link to "2015 Statewide Rail Cable Fence Spreadsheet"
- 09:23, 13 October 2017 diff hist +28 m Main Page EPG 751.22, EPG 751.23
- 08:49, 13 October 2017 diff hist +24 m 751.22 Prestressed Concrete I Girders →751.22.1.1 Material Properties
- 08:48, 13 October 2017 diff hist +1,266 m 751.23 Prestressed Concrete Double Tee Girders →751.23.1.1 Material Properties: Per BR, report on the girder plans the required number of strands by design and the total initial prestress force using EPG 751.50 Standard Detailing Notes H2c1.3.
- 08:38, 13 October 2017 diff hist +1,215 m 751.22 Prestressed Concrete I Girders →751.22.1 General: Report on the girder plans the required number of strands by design and the total initial prestress force using EPG 751.50 Standard Detailing Notes H2c1.3.
- 08:03, 13 October 2017 diff hist -1 m Main Page
- 07:09, 13 October 2017 diff hist +1 m 236.5 Property Management →236.5.25.6 Security Assessment for Leased Areas Over or Under Highway Structures: RW, corrected cattle pass info
- 11:04, 11 October 2017 diff hist -19 m Main Page EPG 236.5.25.6
- 10:59, 11 October 2017 diff hist +1,239 m 236.5 Property Management →236.5.25.6 Security Assessment for Leased Areas Over or Under Highway Structures: Per RW, clarified policies for storing items under bridges
- 08:47, 11 October 2017 diff hist +43 m Main Page EPG 236.17
- 08:18, 11 October 2017 diff hist -70 m 236.17 Junkyards Per RW, updated junkyard expiration date to match the statutes
- 14:40, 10 October 2017 diff hist +7 m Main Page EPG 237.13.2
- 14:38, 10 October 2017 diff hist -345 m 237.13 Contract Plan File Name Convention →237.13.2 Electronic Design Data: Per CADD, updated list of electronic design data files generated from GEOPAK for Roadway Contract Plans
- 12:35, 29 September 2017 diff hist +289 m Main Page EPG 751
- 08:09, 29 September 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.2.1.1.3 Boring Locations
- 08:08, 29 September 2017 diff hist 0 N File:751.5.2.1.1.3.jpg current
- 08:08, 29 September 2017 diff hist -3 m 751.5 Structural Detailing Guidelines →751.5.2.1.1.3 Boring Locations: Per BR, minor correction on boring location figure
- 15:09, 28 September 2017 diff hist -1 m 751.10 General Superstructure →751.10.1.10 Slab Offsets for Curved Bridges
- 15:07, 28 September 2017 diff hist 0 N File:751.10.1.10 2017.jpg current
- 15:06, 28 September 2017 diff hist -1 m 751.50 Standard Detailing Notes →B3c. Slabs on Steel, Concrete and Semi-Deep Abutment, and Reinforced Concrete Slab Overlays
- 15:06, 28 September 2017 diff hist +200 m 751.50 Standard Detailing Notes →B3c. Slabs on Steel, Concrete and Semi-Deep Abutment, and Reinforced Concrete Slab Overlays: Per BR, clarified how to estimate slab quantities when expansion joint systems are present.
- 15:02, 28 September 2017 diff hist +1,541 m 751.10 General Superstructure →751.10.1 Slab on Girder: Per BR, Clarified how to show and identify the end of slab in a plan of slab detail when expansion joint systems are located at the end bents
- 15:00, 28 September 2017 diff hist -1 m 751.6 General Quantities →751.6.2.10 Bridge Slabs
- 14:44, 28 September 2017 diff hist +306 m 751.6 General Quantities →751.6.2.10 Bridge Slabs: Per BR, clarified how to estimate slab quantities when expansion joint systems are present
- 14:42, 28 September 2017 diff hist +23 m 751.50 Standard Detailing Notes →B. Estimated Quantities Notes: inserted link
- 09:19, 28 September 2017 diff hist 0 N File:751.5.1.4 file names.pdf current
- 09:18, 28 September 2017 diff hist +177 m 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes
- 09:13, 28 September 2017 diff hist -415 m Main Page EPG 751.5.1.4
- 09:10, 28 September 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes
- 09:09, 28 September 2017 diff hist 0 N File:751.5.1.4 file names 2017.jpg current
- 09:09, 28 September 2017 diff hist +631 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes: Per BR, clarified guidance for change orders to bridge plans
- 07:53, 28 September 2017 diff hist +572 620.12 Construction Inspection for Sec 620 →620.12.2.4 Acceptance (Sec 620.2.4)
- 07:49, 28 September 2017 diff hist -11 620.1 General (MUTCD Chapter 3A) →620.1.4 Materials (MUTCD Section 3A.04)
- 10:04, 27 September 2017 diff hist +6 m Category:101 Standard Forms →Construction and Materials
- 09:58, 27 September 2017 diff hist +9 m Category:101 Standard Forms →Construction and Materials: Per CM, updated link
- 09:00, 27 September 2017 diff hist -413 m Main Page
- 08:54, 27 September 2017 diff hist +421 m Main Page EPG 616.14
- 08:37, 27 September 2017 diff hist +124 m 616.14 Work Zone Safety and Mobility Policy Per DE, updates regarding Work Zone Transportation Management Plan. Revised definition of "significant project" in E 616.14.8. Requirements for TCP revised in E 616.14.10.
- 07:16, 27 September 2017 diff hist -35 m 751.50 Standard Detailing Notes →B3. Estimated Quantities Tables: Per BR, minor removal of unnecessary instruction. Minor correction of terminology.
- 08:55, 26 September 2017 diff hist -156 m 238.3 Route Surveying
- 09:29, 22 September 2017 diff hist +2 m Main Page
- 11:22, 20 September 2017 diff hist +3 m LPA:136.12 Figures, Glossary and Other Useful Links
- 11:21, 20 September 2017 diff hist +21 m LPA:136.9 Plans, Specs and Estimates (PSE)
- 11:20, 20 September 2017 diff hist 0 N File:136.9.3 Sept 20 2017.docx
- 11:20, 20 September 2017 diff hist +3 m LPA:136.13 LPA Policy Changes
- 11:17, 20 September 2017 diff hist +42 m LPA:136.13 LPA Policy Changes
- 11:17, 20 September 2017 diff hist +192 m LPA:136.13 LPA Policy Changes Fig 136.9.3
- 11:15, 20 September 2017 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.9.3
- 11:15, 20 September 2017 diff hist 0 N File:136.9.3 Sept 2017.docx
- 11:15, 20 September 2017 diff hist -28 m LPA:136.9 Plans, Specs and Estimates (PSE) Per DE, updated the Subcontractor Disclosure in Fig. 136.9.3 to reflect the current section of the Missouri Standard Specification for Highway Construction.
- 10:54, 20 September 2017 diff hist +15 m 821.18 Noxious Weeds →Table 821.18.2 Musk, Canada and Scotch Thistle: Per MT, added "and Marijuana" to table title
- 13:55, 19 September 2017 diff hist 0 N File:Main Page Sep 19, 2017.jpg current
- 13:55, 19 September 2017 diff hist -68 Main Page EPG 236.5.19
- 13:31, 19 September 2017 diff hist +305 m 236.5 Property Management →236.5.19 Survey Requirements: Per RW, clarified who may prepare legal descriptions since SB828 enabled Title Companies and Legal Counsel to prepare legal descriptions
- 12:31, 19 September 2017 diff hist +26 m 751.50 Standard Detailing Notes →J1. General: added link
- 14:28, 18 September 2017 diff hist +158 m LPA:136.13 LPA Policy Changes
- 14:25, 18 September 2017 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.1
- 14:25, 18 September 2017 diff hist 0 N File:136.3.1 Sept 2017.doc current
- 14:24, 18 September 2017 diff hist +30 m LPA:136.3 Federal Aid Basics Per LPA, clarified Fig. 136.3.1
- 11:16, 18 September 2017 diff hist -2 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: minor correction, per BR
- 08:04, 18 September 2017 diff hist +118 m Main Page EPG 616.8
- 08:00, 18 September 2017 diff hist 0 N File:616.8.46 MT 2017.pdf current
- 08:00, 18 September 2017 diff hist 0 N File:616.8.10g MT 2017.pdf current
- 08:00, 18 September 2017 diff hist 0 N File:616.8.10a MT 2017.pdf current
- 08:00, 18 September 2017 diff hist 0 N File:616.8.10 MT 2017.pdf current
- 07:59, 18 September 2017 diff hist +19 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Maintenance: Per TS, implementing Nat'l Safety Council’s 3-2-1 Cone Procedure for internal operations. TA-10, TA-10a & TA-10g updated to show new cone procedure
- 12:23, 15 September 2017 diff hist +17 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 12:22, 15 September 2017 diff hist -82 m 751.36 Driven Piles →751.36.3 Design Procedure
- 11:13, 15 September 2017 diff hist +854 m 751.50 Standard Detailing Notes Per BR, clarifications related to 3/7/2017 revision. Min. hammer is not required when DT is specified. E2 table revised as well as note E2.22. Note G7.4 added.
- 11:11, 15 September 2017 diff hist +135 m 751.36 Driven Piles →751.36.3 Design Procedure: inserted links
- 10:55, 15 September 2017 diff hist +297 m 751.36 Driven Piles →751.36.3 Design Procedure: Per BR, clarifications related to 3/7/2017 revision. Min. hammer is not required when DT is specified.
- 12:27, 12 September 2017 diff hist -23 m 751.10 General Superstructure →751.10.1.14 Girder Haunch Reinforcement: Per BR, minor grammatical revision
- 11:12, 12 September 2017 diff hist +18 m Main Page EPG 751.22.2.2
- 10:26, 12 September 2017 diff hist +347 751.22 Prestressed Concrete I Girders →751.22.2.2 Prestressing Strands: Per BR, clarified that distances to hold-down devices and between hold-down devices for prestressed girders & beams should be reported on plans to nearest inch
- 13:48, 8 September 2017 diff hist 0 N File:Main Page Sep 8, 2017.jpg current
- 13:47, 8 September 2017 diff hist -333 m Main Page
- 07:03, 8 September 2017 diff hist +4 m Main Page
- 11:32, 7 September 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator Sep 2017.xlsx
- 11:31, 7 September 2017 diff hist +8 m 606.1 Guardrail Minor general cell formatting for the Guardrail Length of Need Calculator spreadsheet.
- 10:19, 7 September 2017 diff hist +28 m Category:941 Permits and Access Requests updated title
- 10:17, 7 September 2017 diff hist 0 m Category:100 GENERAL
- 10:15, 7 September 2017 diff hist +84 m 153.23 Utility updated title
- 10:13, 7 September 2017 diff hist +32 m 236.16 Outdoor Advertising updated title
- 10:12, 7 September 2017 diff hist +27 m 236.13 Designing Right of Way Plans updated title
- 10:11, 7 September 2017 diff hist +251 m 236.12 Quality Assurance Reviews updated title
- 10:08, 7 September 2017 diff hist +28 m 236.11 Mediation updated title
- 10:06, 7 September 2017 diff hist +170 m 236.8 Relocation Assistance Program updated title
- 10:03, 7 September 2017 diff hist +312 m 236.7 Negotiation updated title
- 10:01, 7 September 2017 diff hist +140 m 236.6 Appraisal and Appraisal Review updated title
- 09:59, 7 September 2017 diff hist +448 m 236.5 Property Management updated title
- 09:54, 7 September 2017 diff hist +307 m 236.3 Administration updated title
- 09:49, 7 September 2017 diff hist +134 m 236.1 General Information updated title
- 10:52, 6 September 2017 diff hist 0 N File:101 Floodplain Development Permit Application Sept 6 2017.pdf current
- 10:52, 6 September 2017 diff hist +2 m Category:101 Standard Forms Per BR, further updated Floodplain Development Permit/Application with new SEMA personnel info
- 13:54, 5 September 2017 diff hist -368 141.1 Cost Share Program
- 13:46, 5 September 2017 diff hist 0 N File:101 Floodplain Development Permit Application Sept 2017.pdf current
- 13:46, 5 September 2017 diff hist +5 m Category:101 Standard Forms →Bridge: Per BR, updated Floodplain Development Permit/Application with new SEMA personnel info
- 13:39, 1 September 2017 diff hist -16 m 751.1 Preliminary Design →751.1.2.19.2 Content: updated link
- 11:19, 1 September 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.7 Features Crossed
- 11:18, 1 September 2017 diff hist +55 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.7 Features Crossed
- 11:17, 1 September 2017 diff hist -2 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.7 Features Crossed
- 11:15, 1 September 2017 diff hist +4 m 751.5 Structural Detailing Guidelines →751.5.2.1 Plan and General Elevation (Front Sheet)
- 11:14, 1 September 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.2.1.1 Substructure Elements
- 11:07, 1 September 2017 diff hist -188 m Main Page EPG 236.16, EPG 236.4
- 10:46, 1 September 2017 diff hist +265 m LPA:136.13 LPA Policy Changes EPG 136.8.5.2
- 10:41, 1 September 2017 diff hist +152 m LPA:136.8 Local Public Agency Land Acquisition →136.8.5.2 Title Information: Per RW, added a link to a checklist of items to determine property ownership for ADA projects.
- 10:37, 1 September 2017 diff hist -2 m 236.4 Description Writing and Titles →236.4.4.1 Purpose: Per RW, added a checklist of items to determine property ownership for ADA projects.
- 10:31, 1 September 2017 diff hist 0 N File:236.4.4.1.docx current
- 10:30, 1 September 2017 diff hist +1,310 m 236.4 Description Writing and Titles →236.4.4.1 Purpose: Per RW, added a checklist of items to determine property ownership for ADA projects.
- 10:22, 1 September 2017 diff hist +109 m 236.16 Outdoor Advertising →236.16.11 Cutout and Extension Process: Per RW, updated the cutout and extension process to reflect current statutes.
- 08:35, 31 August 2017 diff hist +598 m Main Page EPG 751
- 08:19, 31 August 2017 diff hist +91 m 751.50 Standard Detailing Notes inserted links
- 13:38, 30 August 2017 diff hist +1 m 751.50 Standard Detailing Notes →E3. Miscellaneous
- 13:35, 30 August 2017 diff hist -4 m Category:941 Permits and Access Requests →941.2.2 Evaluation Guidelines and Considerations: minor correction
- 13:33, 30 August 2017 diff hist +298 m 751.50 Standard Detailing Notes Per BR, clarified guidance for bridge clearances.
- 13:16, 30 August 2017 diff hist 0 N File:751.5.2.1.2.7 construction.jpg current
- 13:16, 30 August 2017 diff hist 0 N File:751.5.2.1.2.7 min clearance.jpg current
- 13:15, 30 August 2017 diff hist 0 N File:751.5.2.1.1.5 min vert clearance.jpg current
- 13:14, 30 August 2017 diff hist -663 m 751.5 Structural Detailing Guidelines Per BR, clarified guidance for bridge clearances.
- 11:21, 30 August 2017 diff hist 0 m 751.40 LFD Widening and Repair updated link
- 11:19, 30 August 2017 diff hist +2 m 750.7 Non-Hydraulic Considerations updated links
- 11:17, 30 August 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.9 Slope Protection: updated links
- 11:15, 30 August 2017 diff hist -58 m Category:747 Bridge Reports and Layouts →747.1.3.2.3 Additional Information for Grade Separations: updated link
- 11:07, 30 August 2017 diff hist 0 N File:751.1.2.19.2 Retaining Wall.pdf current
- 11:06, 30 August 2017 diff hist 0 N File:751.1.2.19.2 Stream Crossing Culvert.pdf current
- 11:06, 30 August 2017 diff hist 0 N File:751.1.2.19.2 Stream Crossing Bridge.pdf current
- 11:06, 30 August 2017 diff hist 0 N File:751.1.2.19.2 Railroad Grade Separation.pdf current
- 11:06, 30 August 2017 diff hist -4 m 751.1 Preliminary Design →751.1.2.19.2 Content
- 11:05, 30 August 2017 diff hist 0 N File:751.1.2.19.2 Highway Grade Separation.pdf current
- 11:03, 30 August 2017 diff hist +2,052 m 751.1 Preliminary Design Per BR, clarified guidance for bridge clearances.
- 11:09, 29 August 2017 diff hist -9 m Main Page EPG 643.4
- 10:36, 29 August 2017 diff hist +5 Main Page
- 09:03, 29 August 2017 diff hist 0 N File:643.4.1.14.pdf current
- 09:02, 29 August 2017 diff hist 0 N File:643.4.1.14.jpg current
- 09:01, 29 August 2017 diff hist +691 643.4 Railroads →643.4.1.14 Railroad Crossing Median Islands: Per DE, policy for raised islands at railroad crossings now consistent w/ fed regulations by reducing the speed limit threshold from 45 to 40 mph
- 08:49, 29 August 2017 diff hist -1,404 616.23 Traffic Control for Field Operations →616.23.2.4 Flagger Control: Per TS, info moved to EPG 616.5
- 08:45, 29 August 2017 diff hist -22,546 616.20 Flagger Training Per TS, info moved to EPG 616.5 current
- 08:36, 29 August 2017 diff hist +115 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.81 Lighting Devices (MUTCD 6F.81): Per TS, due to flagger fatalities, MoDOT has implemented the National Safety Council’s 3-2-1 Cone Procedure into the MoDOT Maintenance operations.
- 08:32, 29 August 2017 diff hist 0 N File:616.5.8 nighttime.jpg current
- 08:30, 29 August 2017 diff hist 0 N File:616.5.7.1.jpg current
- 08:29, 29 August 2017 diff hist +1,433 616.5 Flagger Control (MUTCD Chapter 6E) Per TS, Nat'l Safety Council’s 3-2-1 Cone Procedure implemented for internal ops. Flagger lighting requirements for contract and MoDOT operations increased to 5.0 ft-candles to meet OSHA requirements
- 08:23, 29 August 2017 diff hist +118 616.4 Pedestrian and Worker Safety (MUTCD Chapter 6D) Per TS, due to flagger fatalities, MoDOT has implemented the National Safety Council’s 3-2-1 Cone Procedure into the MoDOT Maintenance operations.
- 12:31, 25 August 2017 diff hist 0 N File:751.9.3.1.7.6 Aug 2017.jpg current
- 12:31, 25 August 2017 diff hist 0 N File:751.9.3.1.7.4 Aug 2017.jpg current
- 12:30, 25 August 2017 diff hist +8 m 751.9 LFD Seismic →751.9.3.1.7 T- Joint Connections: Per BR, revised two figures about the splice stagger requirement for seismic column detail
- 10:44, 24 August 2017 diff hist +4 m Main Page
- 10:43, 24 August 2017 diff hist 0 N File:Main Page Aug 24, 2017.jpg current
- 10:43, 24 August 2017 diff hist -557 m Main Page EPG 751.20.3.1
- 07:16, 24 August 2017 diff hist +18 751.17 Concrete Slab Bridges →751.20.3.1 Solid Slabs
- 07:15, 24 August 2017 diff hist 0 N File:751.20.3.1 end span.jpg current
- 07:14, 24 August 2017 diff hist -38 m 751.17 Concrete Slab Bridges →751.20.3.1 Solid Slabs: Per BR, revised the intermediate bent beam cap height for solid slab end span to accommodate commercially available forming systems
- 13:07, 23 August 2017 diff hist +364 m Category:641 Bicycle Facilities added link to FHWA resources
- 13:05, 23 August 2017 diff hist +366 m LPA:136.7 Design added link to FHWA sources
- 12:59, 23 August 2017 diff hist -21 m Category:641 Bicycle Facilities →641.1 Types of Facilities: updated link
- 13:32, 22 August 2017 diff hist 0 N File:902.5.23 Left 2017.xls
- 13:32, 22 August 2017 diff hist +10 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) Per TS, corrected a formula in Left Turn Phasing Warrants spreadsheet
- 15:01, 18 August 2017 diff hist 0 m Main Page
- 13:05, 18 August 2017 diff hist -24 m 236.7 Negotiation Per RW, updated form link
- 13:02, 18 August 2017 diff hist -354 m 236.6 Appraisal and Appraisal Review Per RW, updated form link
- 12:58, 18 August 2017 diff hist -898 m 236.5 Property Management Per RW, updated form links
- 07:13, 17 August 2017 diff hist +184 m Category:903 Highway Signing updated several links
- 13:55, 16 August 2017 diff hist 0 m Main Page
- 14:53, 15 August 2017 diff hist 0 m Main Page
- 12:20, 14 August 2017 diff hist +2 m 751.36 Driven Piles →751.36.2 Steel Pile
- 11:12, 14 August 2017 diff hist -2 m Category:Safe and Sound →General: Per TS, updated "Type III" barricade to "Type 3"
- 11:10, 14 August 2017 diff hist -6 m 616.18 Construction Inspection Guidelines for Sec 616 →For Sec. 616.3.2: Per TS, updated "Type III" barricade to "Type 3"
- 11:09, 14 August 2017 diff hist -6 m 616.10 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation Per TS, updated "Type III" barricade to "Type 3"
- 11:08, 14 August 2017 diff hist +34 m Where to Find PDM Information in the EPG →Chapter VIII, Traffic Control Devices
- 11:01, 14 August 2017 diff hist -6 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Per TS, updated "Type III" barricade to "Type 3"
- 10:37, 14 August 2017 diff hist +153 m Main Page EPG 751.36.2
- 10:20, 14 August 2017 diff hist +2 751.50 Standard Detailing Notes →G7. HP Pile