User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:39, 14 April 2022 diff hist -19,511 m Category:113 Construction Inspection Guidance for Contractor's Claims Per CM, moved contents to EPG 105.16 current Tag: Replaced
- 11:23, 14 April 2022 diff hist +19,826 m Category:105 Control of Work →105.16 Controversies and Claims for Adjustment (Sec 105.16): Per CM, moved content of EPG 113 Construction Inspection Guidance for Contractor's Claims to EPG 105.16
- 10:29, 14 April 2022 diff hist -11 m 903.5 Regulatory Signs →903.5.20 DO NOT ENTER Sign (R5-1) (MUTCD Section 2B.37): minor correction
- 09:23, 13 April 2022 diff hist 0 N File:905.2.14.2.5.jpg current
- 09:22, 13 April 2022 diff hist -45 m 905.2 Traffic Studies Per TS, updated text to current verbiage by changing "accidents" to "crashes", "SWAR" changed to "SWCR" and "AR" to "CR". current
- 10:44, 12 April 2022 diff hist +1 m Category:403 Asphaltic Concrete Pavement →403.1.19 Acceptance of Material (Sec 403.19)
- 10:26, 12 April 2022 diff hist +8 m Category:126 Location Study and Alternatives Analysis Per Env'l, replaced CE2 Form with existing example version of CE3 Form. Also, updated archaic dot file to dotx
- 07:22, 12 April 2022 diff hist +27 m 751.22 Prestressed Concrete I Girders →751.22.2.5 Pretensioned Anchorage Zones: minor cosmetic revisions
- 14:45, 11 April 2022 diff hist -30 m Category:1011 Geotextile Per MT, updated link current
- 14:30, 11 April 2022 diff hist -246 m Recent Policy Changes in the EPG EPG 751.22
- 13:59, 11 April 2022 diff hist 0 N File:751.22.3.2.6 2022.jpg current
- 13:57, 11 April 2022 diff hist 0 N File:751.22.3.2.5 2022.jpg current
- 13:53, 11 April 2022 diff hist 0 N File:751.22.3.2.4 2022.jpg current
- 13:51, 11 April 2022 diff hist 0 N File:751.22.3.2.3 2022.jpg current
- 13:49, 11 April 2022 diff hist 0 N File:751.22.3.2.2 2022.jpg current
- 13:44, 11 April 2022 diff hist 0 N File:751.22.3.2.1 2022.jpg current
- 13:40, 11 April 2022 diff hist 0 N File:751.22.2.5 2022.jpg current
- 13:34, 11 April 2022 diff hist +1,487 m 751.22 Prestressed Concrete I Girders Per BR, revision allows a larger number of bonded strands for many of these girders, effectively increasing the span limits for these girders. Expanded guidance in EPG 751.22.3.2 to eliminate or reduce conflict between lowest middle two strands and the B bars.
- 10:31, 11 April 2022 diff hist 0 m 642.8 Sidewalk Design Criteria minor update to ADA Checklist links
- 10:30, 11 April 2022 diff hist -1 m Category:150 Quality Management minor update to ADA Checklist links
- 10:29, 11 April 2022 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: minor update to ADA Checklist links
- 10:28, 11 April 2022 diff hist 0 m LPA:136.11 Local Public Agency Construction minor update to ADA Checklist links
- 10:27, 11 April 2022 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) minor update to ADA Checklist links
- 10:25, 11 April 2022 diff hist 0 m Category:101 Standard Forms →Construction and Materials: minor update to ADA Checklist link
- 07:10, 11 April 2022 diff hist -157 m 171.4 Shoulders and Approaches →S&A(C2) Culvert Ends: updated broken std plan links
- 15:19, 6 April 2022 diff hist +2 m 153.20 Right of Way Per RW and CCO, minor updates to RW51 contract requirements. This agreement should include the approval as to form and attestation signature.
- 12:40, 6 April 2022 diff hist +6 m Category:101 Standard Forms →Bridge
- 12:39, 6 April 2022 diff hist +79 m Category:101 Standard Forms →Bridge: Per BR, updated link to Culvert Hydraulics Report
- 15:16, 5 April 2022 diff hist +24 m Recent Policy Changes in the EPG EPG 127.2.5
- 15:11, 5 April 2022 diff hist +386 m 127.2 Historic Preservation and Cultural Resources →127.2.5 Approximate Timelines for Section 106 Compliance: Per Env'l, Clarifying the timelines for completing the Section 106 of the National Historic Preservation Act review process
- 14:38, 5 April 2022 diff hist -46 m 642.8 Sidewalk Design Criteria Per CM, updated links to ADA Checklist
- 14:37, 5 April 2022 diff hist -46 m Category:150 Quality Management Per CM, updated links to ADA Checklist
- 14:36, 5 April 2022 diff hist -46 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per CM, updated links to ADA Checklist
- 14:35, 5 April 2022 diff hist -92 m LPA:136.11 Local Public Agency Construction Per CM, updated links to ADA Checklist
- 14:33, 5 April 2022 diff hist -92 m LPA:136.9 Plans, Specs and Estimates (PSE) Per CM, updated links to ADA Checklist
- 14:31, 5 April 2022 diff hist -46 m Category:101 Standard Forms →Construction and Materials: Per CM, updated ADA Checklist links
- 12:17, 5 April 2022 diff hist +95 m Category:940 Access Management Per TS, updated link to "Managing Access to Missouri's Highways" brochure current
- 11:30, 5 April 2022 diff hist -28 m 642.8 Sidewalk Design Criteria
- 10:52, 5 April 2022 diff hist +191 m 642.8 Sidewalk Design Criteria Per CM, minor revisions to the ADA Checklist
- 10:51, 5 April 2022 diff hist +152 m Category:150 Quality Management Per CM, minor revisions to the ADA Checklist
- 10:48, 5 April 2022 diff hist +198 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per CM, minor revisions to ADA Checklist
- 10:45, 5 April 2022 diff hist +11 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.2.10 ADA Checklist
- 10:44, 5 April 2022 diff hist +401 m LPA:136.11 Local Public Agency Construction Per CM, minor revisions to the ADA Checklist
- 10:36, 5 April 2022 diff hist +347 m LPA:136.9 Plans, Specs and Estimates (PSE) Per CM, minor revisions to the ADA Checklist
- 10:21, 5 April 2022 diff hist +149 m Category:101 Standard Forms →Construction and Materials: Per CM, minor revisions to ADA Checklist
- 12:16, 4 April 2022 diff hist +208 m Category:105 Control of Work →105.16 Controversies and Claims for Adjustment (Sec 105.16): Per CM, minor clarification
- 11:13, 1 April 2022 diff hist -17 m Help Article →Division Contacts
- 14:30, 31 March 2022 diff hist 0 N File:202.1 detonation.docx current
- 14:30, 31 March 2022 diff hist +244 m Category:202 Removal of Buildings and Structures added "Detonating an I-35 ramp bridge" current
- 13:21, 29 March 2022 diff hist 0 N File:127.13 Soundwall brochure.pdf current
- 13:20, 29 March 2022 diff hist +64 m 127.13 Noise Per Env'l, added Sound Wall brochure for general information
- 07:14, 29 March 2022 diff hist 0 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.5 Camber, Haunching and Girder Steps: updated link
- 15:21, 28 March 2022 diff hist +23 m Recent Policy Changes in the EPG
- 15:20, 28 March 2022 diff hist +33 m Recent Policy Changes in the EPG EPG 751.50
- 15:15, 28 March 2022 diff hist -373 m 751.50 Standard Detailing Notes Per BR, removed references to web coil ties in bulb-tee and NU girders
- 13:30, 28 March 2022 diff hist +1 m Category:101 Standard Forms →Materials Related: Per CM, updated broken link
- 13:27, 21 March 2022 diff hist -38 m 616.18 Construction Inspection Guidelines for Sec 616 →Safety Requirements (for Sec 616.3): deleted outdated photo of PPE
- 11:04, 18 March 2022 diff hist +5 m Help Article →EPG Ballot Cycles
- 11:03, 18 March 2022 diff hist +3 m Help Article →EPG Ballot Cycles
- 11:02, 18 March 2022 diff hist -21 m Help Article →EPG Ballot Cycles
- 11:01, 18 March 2022 diff hist +19 m Help Article →EPG Ballot Cycles
- 11:01, 18 March 2022 diff hist -19 m Help Article →EPG Ballot Cycles: updated schedule
- 08:25, 17 March 2022 diff hist -190 m 643.2 Local Utility Adjustments - Public and Private updated broken links
- 08:17, 17 March 2022 diff hist -36 643.4 Railroads updated broken links
- 15:19, 16 March 2022 diff hist -9 m Recent Policy Changes in the EPG
- 15:17, 16 March 2022 diff hist +75 m Recent Policy Changes in the EPG EPG 109.11
- 15:08, 16 March 2022 diff hist +4,839 m Category:109 Measurement and Payment →109.11 Compensation for Project Delays (for Sec 109.11): Per CM, expanded guidance to produce more uniform administration of delay claims
- 12:59, 16 March 2022 diff hist -969 m 106.17 New Product Evaluation Per CM, deleted archaic info in "How MoDOT Employees Report Product Tests" and updated the location of the New Products Coordinator from Organizational Results to Construction and Materials.
- 11:22, 14 March 2022 diff hist -14 m 1045.5 Policy on Color of Structural Steel Paint updated link current
- 10:15, 14 March 2022 diff hist +13 m Category:1029 Fabricating Prestressed Concrete Members for Bridges updated broken link
- 14:37, 11 March 2022 diff hist +275 m LPA:136.13 LPA Policy Changes EPG 136.9.4.1.1.16
- 14:35, 11 March 2022 diff hist 0 N File:136.9.4.1.1.16 Training.docx current
- 14:34, 11 March 2022 diff hist -35 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.16 On the Job Training (OJT) (23 CFR Section 230): Per LPA, updated training provision link with the current training provision.
- 08:43, 11 March 2022 diff hist -100 m Help Article updated link
- 08:38, 11 March 2022 diff hist +100 m Where to Find PDM Information in the EPG →Chapter IV, Detail Design: updated link current
- 08:25, 11 March 2022 diff hist +8 m Where to Find PDM Information in the EPG →Chapter VIII, Traffic Control Devices: updated links
- 08:21, 11 March 2022 diff hist +11 m Where to Find PDM Information in the EPG →Chapter VIII, Traffic Control Devices: updated links
- 08:14, 11 March 2022 diff hist +44 m Where to Find PDM Information in the EPG →Chapter VIII, Traffic Control Devices: updated links
- 15:55, 10 March 2022 diff hist -242 m Category:1180 Bituminous Stockpile Patching Material current
- 14:37, 10 March 2022 diff hist 0 N File:Table 805.2.4a.docx current
- 14:37, 10 March 2022 diff hist +242 m Category:1180 Bituminous Stockpile Patching Material
- 16:19, 9 March 2022 diff hist -241 m Category:1180 Bituminous Stockpile Patching Material
- 16:18, 9 March 2022 diff hist 0 N File:Table 805.2.4.docx current
- 16:18, 9 March 2022 diff hist +241 m Category:1180 Bituminous Stockpile Patching Material
- 15:51, 9 March 2022 diff hist +268 m LPA:136.13 LPA Policy Changes EPG 136.2
- 15:45, 9 March 2022 diff hist +10 m LPA:136.2 Certification and Training Per LPA, updated LPA training requirements to current practice current
- 15:32, 9 March 2022 diff hist +158 m LPA:136.1 Introduction →136.1.2.1.1 Requirements: Per LPA, updated LPA training requirements
- 15:30, 8 March 2022 diff hist +186 m LPA:136.13 LPA Policy Changes EPG 136.3.13
- 15:27, 8 March 2022 diff hist +97 m LPA:136.3 Federal Aid Basics →136.3.13 Agreements: Per LPA, removed archaic requirment to submit 7 copies of the program agreement
- 12:04, 8 March 2022 diff hist +13 m 905.2 Traffic Studies updated broken link
- 08:55, 8 March 2022 diff hist +11 m 901.16 Construction Inspection Guidelines for Sec 901 updated archaic link current
- 14:22, 3 March 2022 diff hist +41 m 903.3 Ground-Mounted Sign Supports clarification
- 13:40, 3 March 2022 diff hist 0 m 320.1 Preliminary Geotechnical Report →320.1.4.2 Example for the Summary for Preliminary Geotechnical Report - Form M-41
- 13:39, 3 March 2022 diff hist 0 N File:320.1.4.2 M-41 Example.jpg current
- 13:39, 3 March 2022 diff hist 0 N File:320.1 M-41.docx current
- 13:38, 3 March 2022 diff hist +136 m 320.1 Preliminary Geotechnical Report Per CM, provided updated Summary for Preliminary Geotechnical Report (Form M-41) and example of M-41
- 08:55, 3 March 2022 diff hist -10 m 236.8 Relocation Assistance Program updated links
- 08:36, 3 March 2022 diff hist 0 m 236.7 Negotiation updated links
- 16:25, 2 March 2022 diff hist +106 m 903.3 Ground-Mounted Sign Supports updated links
- 15:42, 1 March 2022 diff hist +17 Category:129 Public Involvement updated broken link
- 15:41, 1 March 2022 diff hist +68 m 236.7 Negotiation updated broken links
- 15:32, 1 March 2022 diff hist -12 m Category:132 Safety updated broken link
- 15:27, 1 March 2022 diff hist -70 m Category:132 Safety updated broken links
- 13:37, 1 March 2022 diff hist +13 m Category:107 Legal Relations and Responsibility to the Public updated broken link
- 13:30, 1 March 2022 diff hist +13 m 106.19 Materials Acceptance updated broken link current
- 15:30, 28 February 2022 diff hist -2 m Category:150 Quality Management Per EPS, replaced old ADA Checklist with current version
- 15:28, 28 February 2022 diff hist +5 m LPA:136.11 Local Public Agency Construction →136.11.13.5 American’s with Disabilities Act (ADA) Check List: Per EPS, replaced old ADA Checklist with current version
- 15:27, 28 February 2022 diff hist +5 m LPA:136.11 Local Public Agency Construction →136.11.4 Preconstruction Conference: Per EPS, replaced old ADA Checklist with current version
- 13:58, 28 February 2022 diff hist -869 m Category:105 Control of Work →105.9 Authority and Duties of Resident Engineer (Sec 105.9): Per CM, deleted archaic time and personnel reports guidance
- 15:53, 25 February 2022 diff hist -373 m 106.1 Source of Supply and Quality Requirements deleted archaic info
- 15:52, 25 February 2022 diff hist -2 m 106.1 Source of Supply and Quality Requirements updated broken link
- 14:55, 25 February 2022 diff hist +31 m Category:105 Control of Work updated broken link
- 14:42, 25 February 2022 diff hist +13 m 104.13 Construction Inspection Guidance for Sec 104 updated broken link current
- 14:15, 25 February 2022 diff hist -11 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) →104.12.2 Significant Scope Changes
- 14:09, 25 February 2022 diff hist 0 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) →104.12.2 Significant Scope Changes: updated link
- 14:08, 25 February 2022 diff hist +13 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) updated broken link
- 13:30, 25 February 2022 diff hist -57 m Category:134 Engineering Professional Services updated broken link
- 13:06, 25 February 2022 diff hist -165 m 238.2 Land Surveying Per CC and RW, deleted archaic RW11, Crop Damage Compensation Agreement and Release
- 11:51, 25 February 2022 diff hist +44 m 238.2 Land Surveying updated broken link
- 11:42, 25 February 2022 diff hist +11 m 238.1 Aerial Mapping and LiDAR Surveys updated broken link
- 09:41, 25 February 2022 diff hist -100 m 616.19 Quality Standards for Temporary Traffic Control Devices Per TS, deleted archaic "Work Zone Inspection Sheet"
- 13:22, 24 February 2022 diff hist 0 N File:127.14.3.5 secure 2022.pdf current
- 13:16, 24 February 2022 diff hist +5 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents →127.14.3.5 FHWA/MoDOT Environmental Partnering Agreement: Per Env'l, replaced older document with the 2022 FHWA/MoDOT Environmental Partnering Agreement
- 15:31, 23 February 2022 diff hist 0 N File:101 Bridge Hydraulics Report Feb 2022.dotx current
- 15:31, 23 February 2022 diff hist +4 m Category:101 Standard Forms →Bridge: Per BR, minor revision to Bridge Hydraulics Report
- 14:48, 23 February 2022 diff hist +100 m 616.19 Quality Standards for Temporary Traffic Control Devices Per TS, moved "Work Zone Inspection Sheet" from EPG Work Zone Safety and Mobility Policy Resources
- 13:55, 23 February 2022 diff hist +12 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per LPA, minor update for Fig. 136.4.10 LPA Consultant Services Invoice
- 08:53, 23 February 2022 diff hist -72 m 902.12 Flashing Beacons (MUTCD Chapter 4L) updated broken links current
- 08:43, 23 February 2022 diff hist -52 m 821.9 Labels and Safety Data Sheets (SDS) Per SM, deleted archaic SDS Chemicals link current
- 16:11, 22 February 2022 diff hist +16 m Category:821 Herbicides and Roadsides updated broken link current
- 16:07, 22 February 2022 diff hist +16 m Category:808 Planting Trees, Shrubs, and Other Plants updated broken link current
- 14:40, 22 February 2022 diff hist -39 m 751.5 Structural Detailing Guidelines →751.5.1.7 Contract Addendums and Construction Changes: updated broken link
- 13:53, 22 February 2022 diff hist -41 m 643.3 Policy, Standards and Regulations updated broken link
- 11:03, 22 February 2022 diff hist -27 m Category:101 Standard Forms →Bridge: uploaded structural rehabilitation checklist file to replace broken link
- 11:01, 22 February 2022 diff hist -54 m Category:747 Bridge Reports and Layouts uploaded structural rehabilitation checklist file to replace broken link
- 10:56, 22 February 2022 diff hist -27 m 751.1 Preliminary Design uploaded structural rehabilitation checklist file to replace broken link
- 10:54, 22 February 2022 diff hist 0 N File:751.1.3.2 Structural Rehabilitation Checklist.xlsm current
- 10:53, 22 February 2022 diff hist -27 m 751.1 Preliminary Design →751.1.3.2 Documentation: uploaded structural rehabilitation checklist file to replace broken link
- 08:46, 22 February 2022 diff hist +6 m Category:133 Snow and Ice Control →Winter Operations Communication Plan
- 08:43, 22 February 2022 diff hist +185 m Category:133 Snow and Ice Control →Winter Operations Communication Plan: updating broken links
- 16:09, 18 February 2022 diff hist +13 m Category:612 Impact Attenuators updated broken link
- 16:06, 18 February 2022 diff hist +8 m Category:612 Impact Attenuators updated broken link
- 15:23, 18 February 2022 diff hist -8 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: updated broken link
- 14:52, 18 February 2022 diff hist +92 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: updated broken links
- 14:37, 18 February 2022 diff hist +18 m Category:133 Snow and Ice Control →Winter Operations Communication Plan: update broken link
- 14:04, 18 February 2022 diff hist +13 m 616.13 Work Zone Capacity, Queue and Travel Delay updated broken link
- 13:57, 18 February 2022 diff hist +32 m 238.3 Route Surveying updated broken link current
- 13:18, 18 February 2022 diff hist +51 m 141.3 Local Funding Options updated broken links current
- 13:11, 18 February 2022 diff hist +24 m Category:202 Removal of Buildings and Structures updated broken links
- 13:04, 18 February 2022 diff hist +11 m Demolition and Removal of Improvements updated broken link current
- 12:25, 18 February 2022 diff hist +61 m Category:127 MoDOT and the Environment updated broken link current
- 12:22, 18 February 2022 diff hist +11 m 607.2 Plans updated broken link current
- 12:18, 18 February 2022 diff hist +11 m 237.12 Communication with the Public updated broken link current
- 12:14, 18 February 2022 diff hist +11 m 643.1 Utilities - Status Letter updated broken link
- 12:04, 18 February 2022 diff hist +16 m 106.11 Metric Implementation updated broken link current
- 12:00, 18 February 2022 diff hist +16 m Category:1015 Bituminous Material updated broken link current
- 11:55, 18 February 2022 diff hist +16 m 320.6 Slide Investigations updated broken link current
- 11:51, 18 February 2022 diff hist +16 m Category:904 Construction Inspection Guidance - Certification Requirements and Procedure for Lighting, Traffic Signals, Signs and Cathodic Protection updated broken link current
- 11:44, 18 February 2022 diff hist +16 m 127.20 Stream Stewardship Trust Fund in-Lieu Fee Mitigation Program updated broken link current
- 11:23, 18 February 2022 diff hist +10 m Category:1038 Bearing Pads for Structures updated broken links current
- 11:17, 18 February 2022 diff hist +5 m Category:1037 Shear Connectors updated broken link current
- 10:58, 18 February 2022 diff hist +42 m 171.5 Drainage updated broken links current
- 10:50, 18 February 2022 diff hist +58 m Category:139 Design - Build updated broken links
- 09:46, 18 February 2022 diff hist +33 m Category:235 Preliminary Plans updated broken links
- 09:35, 18 February 2022 diff hist +13 m 147.3 Job Order Contracting (JOC) updated broken link
- 09:20, 18 February 2022 diff hist +74 m Category:126 Location Study and Alternatives Analysis updated broken links
- 09:01, 18 February 2022 diff hist +13 m 144.5 Pavement Maintenance updated broken link
- 16:18, 17 February 2022 diff hist +18 m 643.4 Railroads updated broken links
- 16:04, 17 February 2022 diff hist +13 m 320.3 Drilling Operations updated broken link
- 15:51, 17 February 2022 diff hist +21 m Category:122 Aviation updated broken links current
- 13:13, 17 February 2022 diff hist +65 m Category:109 Measurement and Payment updated several broken links
- 12:27, 17 February 2022 diff hist +13 m Category:613 Pavement Repair updated broken link
- 12:19, 17 February 2022 diff hist +13 m Category:619 Pavement Edge Treatment updated broken link current
- 12:13, 17 February 2022 diff hist +13 m Category:206 Excavation for Structures updated broken link
- 12:02, 17 February 2022 diff hist +13 m 131.2 Proprietary Items and Public Interest Findings updated broken link
- 11:59, 17 February 2022 diff hist +13 m 106.1 Source of Supply and Quality Requirements updated several broken links
- 11:46, 17 February 2022 diff hist +38 m Category:108 Prosecution and Progress updated several broken links
- 11:37, 17 February 2022 diff hist +88 m Category:105 Control of Work updated several broken links
- 15:18, 16 February 2022 diff hist -176 m Category:101 Standard Forms →Contracts: deleted archaic links to DE contract
- 14:11, 16 February 2022 diff hist +163 m Category:101 Standard Forms →Construction and Contractor Related: Per CM, "Contractor's Affidavit Regarding Settlement of Claims (C-242) with Exceptions" now available
- 12:17, 16 February 2022 diff hist +64 m Recent Policy Changes in the EPG EPG 902.4
- 12:05, 16 February 2022 diff hist -2 m 902.4 Signal Installations and Equipment →902.4.2.1 Controller and Cabinet Replacement Program: Per TS, updated signal cabinet recommended replacement age to 25 years from 20 years
- 09:33, 16 February 2022 diff hist -31 m Category:109 Measurement and Payment →Contractor's Affidavit Regarding Settlement of Claims (C-242): updated C-242 link
- 16:14, 15 February 2022 diff hist +43 m 751.50 Standard Detailing Notes →J1. General: Per BR, Note J1.13 clarified
- 15:35, 15 February 2022 diff hist +88 m Recent Policy Changes in the EPG EPG 236.7.2.18 and EPG 236.11.1.3
- 15:27, 15 February 2022 diff hist +2 m 236.11 Mediation →236.11.1.3 Purpose
- 15:27, 15 February 2022 diff hist +274 m 236.7 Negotiation →236.7.2.19 Acquisition by Mediation: Per RW, updated mediation guidance to reflect current process and procedures, including the MoDOT Impasse Letter
- 14:57, 15 February 2022 diff hist 0 N File:236.11.1.3 Impasse.docx current
- 14:57, 15 February 2022 diff hist +272 m 236.11 Mediation →236.11.1.3 Purpose: Per RW, updated mediation guidance to reflect current process and procedures, including the MoDOT Impasse Letter
- 14:52, 15 February 2022 diff hist 0 m 236.11 Mediation →236.11.1.1 Authority
- 13:44, 15 February 2022 diff hist -112 m 616.14 Work Zone Safety and Mobility Policy →616.14.10 Work Zone Transportation Management Plan: updated links
- 13:11, 15 February 2022 diff hist +10 m 751.22 Prestressed Concrete I Girders →751.22.1.2 Geometric Properties
- 13:08, 15 February 2022 diff hist 0 N File:751.22.1.2 NU 63 70 78 2022.jpg current
- 13:04, 15 February 2022 diff hist 0 N File:751.22.1.2 NU 35 43 53 2022.jpg current
- 13:01, 15 February 2022 diff hist 0 N File:751.22.1.2 type 7 2022.jpg current
- 12:15, 15 February 2022 diff hist 0 N File:751.22.1.2 type 6 2022.jpg current
- 12:14, 15 February 2022 diff hist 0 N File:751.22.1.2 type 4 2022.jpg current
- 12:12, 15 February 2022 diff hist 0 N File:751.22.1.2 type 3 2022.jpg current
- 12:11, 15 February 2022 diff hist 0 N File:751.22.1.2 type 2 2022.jpg current
- 12:10, 15 February 2022 diff hist -4 m 751.22 Prestressed Concrete I Girders →751.22.1.2 Geometric Properties: Per BR, minor clarification involving rounding and a minor correction for Type 8
- 14:17, 14 February 2022 diff hist +14 m Recent Policy Changes in the EPG EPG 751.1.3.4, EPG 751.12.1.3, EPG 751.12.2
- 14:08, 14 February 2022 diff hist +213 m 751.12 Barriers, Railings, Curbs and Fences Per BR, aligned bridge barrier and railing guidance between EPG 751.1 and 751.12.
- 13:56, 14 February 2022 diff hist +1,093 m 751.1 Preliminary Design →751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts: Per BR, aligned bridge barrier and railing guidance between EPG 751.1 and 751.12.
- 09:48, 14 February 2022 diff hist -77 m 751.22 Prestressed Concrete I Girders →751.22.1.2 Geometric Properties: Per BR, minor deletion associated with previous revision
- 09:21, 10 February 2022 diff hist +19 m Recent Policy Changes in the EPG EPG 616.13.2
- 08:37, 10 February 2022 diff hist -37 m 147.3 Job Order Contracting (JOC) →147.3.11 Request to Subcontract Work (Form C-220): Per CM, updated guidance to reflect that as of Jan 3, 2022, MoDOT no longer monitors subcontractor insurance
- 15:52, 9 February 2022 diff hist 0 N File:616.13.2 Directions 2021.pdf current
- 15:51, 9 February 2022 diff hist 0 N File:616.13 WZ Impact 2022.xlsm current
- 15:51, 9 February 2022 diff hist +530 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.2 Interstate, Freeways and Multi-lane Roadways: Per TS, new version of the Work Zone Impact Analysis Spreadsheet and spreadsheet directions as well as adding in the smart work zone information.
- 14:38, 9 February 2022 diff hist +59 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.2 Interstate, Freeways and Multi-lane Roadways: inserted link
- 14:00, 9 February 2022 diff hist +2 m 237.8 Contract Time
- 13:51, 9 February 2022 diff hist +2 m 237.9 Submission of Plans and Supporting Documents updated Word Day Study to a dotx file
- 13:50, 9 February 2022 diff hist -445 m Category:124 Quality Control / Quality Assurance (QC/QA) Per DE, deleted references to archaic Project Estimate Quality Assurance Report; also updated Work Day Study to a .dotx file
- 13:46, 9 February 2022 diff hist -6 m Category:101 Standard Forms →Design Forms
- 13:45, 9 February 2022 diff hist 0 N File:124 Work Day Study a.dotx current
- 13:45, 9 February 2022 diff hist +2 m Category:101 Standard Forms →Design Forms
- 13:43, 9 February 2022 diff hist 0 m Category:101 Standard Forms →Design Forms
- 13:41, 9 February 2022 diff hist 0 N File:124 Work Day Study.dotx current
- 13:41, 9 February 2022 diff hist -43 m 237.8 Contract Time updated archaic dot form to dotx
- 09:33, 9 February 2022 diff hist -280 m Recent Policy Changes in the EPG EPG 242.2
- 09:23, 9 February 2022 diff hist +88 m Category:242 Optional and Alternate Pavement Designs →242.2 Life Cycle Cost Adjustment (LCCA) Factor: Per Bidding, the calculation of the LCCA was clarified
- 16:27, 8 February 2022 diff hist +1 m Category:910 Intelligent Transportation Systems →910.2 How ITS Works
- 13:45, 8 February 2022 diff hist -412 m Category:910 Intelligent Transportation Systems Per TS, moved Transportation Systems Management and Operations (TSM&O) Program and Action Plan link to EPG 909
- 12:06, 8 February 2022 diff hist +289 m Category:909 Transportation Systems Management and Operations (TSMO) Per TS, moved Transportation Systems Management and Operations (TSM&O) Program and Action Plan link to EPG 909 from EPG 910
- 09:23, 8 February 2022 diff hist +12 m Recent Policy Changes in the EPG EPG 238.2
- 09:14, 8 February 2022 diff hist 0 N File:238.2 Exhibit A.docx current
- 09:14, 8 February 2022 diff hist -59 m 238.2 Land Surveying Per CADD Survey, minor update of Legal Description - Exhibit A to replace the term “Legal” with “Property” to comply with Code State Regulation for surveying.
- 16:01, 7 February 2022 diff hist -30 m 237.9 Submission of Plans and Supporting Documents updated archaic dot file form link to pdf file
- 15:37, 7 February 2022 diff hist 0 N File:101 Utilities Checklist.dotx current
- 15:37, 7 February 2022 diff hist 0 N File:101 Traffic Checklist.dotx current
- 15:36, 7 February 2022 diff hist 0 N File:101 Right of Way Checklist.dotx current
- 15:36, 7 February 2022 diff hist 0 N File:101 Railroad Checklist.dotx current
- 15:36, 7 February 2022 diff hist 0 N File:101 Public Information and Outreach Checklist.dotx current
- 15:36, 7 February 2022 diff hist 0 N File:101 Planning Checklist.dotx current
- 15:35, 7 February 2022 diff hist 0 N File:101 Maintenance Checklist.dotx current
- 15:35, 7 February 2022 diff hist 0 N File:101 FHWA Checklist.dotx current
- 15:35, 7 February 2022 diff hist 0 N File:101 Construction and Materials Checklist.dotx current
- 15:34, 7 February 2022 diff hist 0 N File:101 Bridge Checklist.dotx current
- 15:34, 7 February 2022 diff hist -447 m Category:101 Standard Forms →Scoping: updated archaic .dot files to .dotx
- 13:41, 7 February 2022 diff hist 0 N File:101 Public Hearing Statement Form.dotx current
- 13:40, 7 February 2022 diff hist -49 m Category:101 Standard Forms →Public Involvement: updated archaic .dot file to .dotx
- 13:24, 7 February 2022 diff hist 0 N File:101 Turning Movement Traffic Count Request.dotx current
- 13:24, 7 February 2022 diff hist 0 N File:101 Fis Formc.dotx current
- 13:23, 7 February 2022 diff hist 0 N File:101 Conceptual Study Traffic Count Request.dotx current
- 13:23, 7 February 2022 diff hist 0 N File:101 ARAN Report Request.dotx current
- 13:23, 7 February 2022 diff hist +16 m Category:101 Standard Forms →Planning: updated archaic .dot files to .dotx
- 12:25, 7 February 2022 diff hist 0 N File:101 Soil Survey Request.dotx current
- 12:24, 7 February 2022 diff hist 0 N File:101 Soil Info Request.dotx current
- 12:24, 7 February 2022 diff hist 0 N File:101 Request for Asphalt Cement % Grade.dotx current
- 12:23, 7 February 2022 diff hist +10 m Category:101 Standard Forms →Materials: updated archaic .dot files to .dotx
- 12:16, 7 February 2022 diff hist 0 m Category:101 Standard Forms →Scoping
- 11:31, 7 February 2022 diff hist 0 N File:101 Bridge Hydraulics Report 2022.dotx current
- 11:25, 7 February 2022 diff hist -1 m Category:101 Standard Forms →Bridge
- 11:25, 7 February 2022 diff hist +5 m Category:101 Standard Forms →Bridge: Per BR, clarified Bridge Hydraulics Report form
- 16:02, 4 February 2022 diff hist 0 N File:Fig. 903.16.1 2022.pdf current
- 16:01, 4 February 2022 diff hist +5 m 903.16 Typical Signing Applications Per TS, minor update to Fig. 903.16.1 showing that city limit signs will no longer include the population, per already updated guidance current
- 15:34, 4 February 2022 diff hist 0 N File:Utility Print Submittal Letter Revised Plans.dotx current
- 15:34, 4 February 2022 diff hist 0 N File:Utility Print Submittal Letter.dotx current
- 15:34, 4 February 2022 diff hist 0 N File:Traffic Signal Warrants, Form D22.dotx current
- 15:34, 4 February 2022 diff hist 0 N File:Test-Cultural Resource Assessment Letter.dotx current
- 15:33, 4 February 2022 diff hist 0 N File:Suggested Revision to a CADD Standard.dotx current
- 15:33, 4 February 2022 diff hist 0 N File:Project Initialization Estimate Form.dotx current
- 15:33, 4 February 2022 diff hist 0 N File:Project Data for BAMS.dotx current
- 15:19, 4 February 2022 diff hist 0 N File:Preliminary Plans Proposal Review.dotx current
- 15:18, 4 February 2022 diff hist 0 N File:Pavement Repair Log.dotx current
- 15:17, 4 February 2022 diff hist 0 N File:Pavement Distress Log Form - Concrete 11x17.dotx current
- 15:17, 4 February 2022 diff hist 0 N File:Pavement Distress Log Form - Asphalt - 11x17.dotx current
- 15:04, 4 February 2022 diff hist 0 m Category:101 Standard Forms →Design Forms: updated forms to dotx
- 14:47, 4 February 2022 diff hist -76 m Category:129 Public Involvement updated Commission Backup Form Blank link
- 14:39, 4 February 2022 diff hist 0 N File:Equipment and Materials List.dotx current
- 14:39, 4 February 2022 diff hist 0 N File:Commission Backup Form Instructions.dotx current
- 14:38, 4 February 2022 diff hist 0 N File:Commission Backup Form Blank.dotx current
- 14:38, 4 February 2022 diff hist 0 N File:Sample Scope of Services Design.dotx current
- 14:38, 4 February 2022 diff hist 0 N File:Sample Scope of Services - Location and Environment.dotx current
- 14:37, 4 February 2022 diff hist 0 N File:District Award.dotx current
- 14:37, 4 February 2022 diff hist 0 m Category:101 Standard Forms →Design: dotx files for District Award, Sample Scope of Services - Location and Environment, Sample Scope of Services Design, Commission Backup Form Blank, Commission Backup Form Instructions and Equipment and Materials List
- 14:15, 4 February 2022 diff hist -808 m Category:128 Conceptual Studies updated Conceptual Study Report, 3R Report, 4R Report and Location Study Report files from archaic .dot files to .dotx files
- 14:04, 4 February 2022 diff hist 0 N File:Conceptual Study Report.dotx current
- 14:03, 4 February 2022 diff hist 0 N File:4R Conceptual Study Report.dotx current
- 14:03, 4 February 2022 diff hist 0 N File:3R Conceptual Study Report.dotx current
- 14:03, 4 February 2022 diff hist 0 m Category:101 Standard Forms →Design Forms: dotx files for 3R Conceptual Study Report, 4R Pavement Rehabilitation Analysis Data and Conceptual Study Report and Conceptual Study Report
- 13:35, 4 February 2022 diff hist 0 N File:Location Study Report.dotx current
- 13:34, 4 February 2022 diff hist 0 m Category:101 Standard Forms →Design Forms: Location Study Report.dotx
- 13:27, 3 February 2022 diff hist -44 m Category:1092 Signal Equipment current
- 12:20, 3 February 2022 diff hist 0 N File:Turning Movement Traffic Count Request.docx current
- 12:20, 3 February 2022 diff hist 0 m Category:101 Standard Forms →Planning
- 12:12, 3 February 2022 diff hist 0 N File:Fis Formc.docx current
- 12:12, 3 February 2022 diff hist 0 N File:Conceptual Study Traffic Count Request.docx current
- 12:12, 3 February 2022 diff hist 0 m Category:101 Standard Forms →Planning
- 12:11, 3 February 2022 diff hist 0 N File:ARAN Report Request.docx current
- 12:11, 3 February 2022 diff hist +1 m Category:101 Standard Forms →Planning
- 12:10, 3 February 2022 diff hist -195 m Category:101 Standard Forms →Planning: updated archaic .dot files to .docx or dotx
- 11:08, 3 February 2022 diff hist 0 N File:Soil Survey Request.docx current
- 11:08, 3 February 2022 diff hist 0 N File:Soil Info Request.docx current
- 11:08, 3 February 2022 diff hist 0 N File:Request for Asphalt Cement % Grade.docx current
- 11:06, 3 February 2022 diff hist -129 m Category:101 Standard Forms →Materials: updated archaic .dot files to .docx
- 10:14, 3 February 2022 diff hist +1 m Category:101 Standard Forms →Design Forms
- 10:14, 3 February 2022 diff hist 0 N File:Utility Print Submittal Letter Revised Plans.docx current
- 10:13, 3 February 2022 diff hist 0 N File:Utility Print Submittal Letter.docx current
- 10:13, 3 February 2022 diff hist 0 N File:Traffic Signal Warrants, Form D22.docx current
- 10:12, 3 February 2022 diff hist 0 N File:Test-Cultural Resource Assessment Letter.docx current
- 10:12, 3 February 2022 diff hist 0 N File:Suggested Revision to a CADD Standard.docx current
- 10:12, 3 February 2022 diff hist 0 N File:Project Initialization Estimate Form.docx current
- 10:11, 3 February 2022 diff hist 0 N File:Project Data for BAMS.docx current
- 10:11, 3 February 2022 diff hist 0 N File:Preliminary Plans Proposal Review.docx current
- 10:10, 3 February 2022 diff hist 0 N File:Pavement Repair Log.docx current
- 10:09, 3 February 2022 diff hist 0 N File:Pavement Distress Log Form - Concrete 11x17.docx current
- 10:09, 3 February 2022 diff hist 0 N File:Pavement Distress Log Form - Asphalt - 11x17.docx current
- 10:08, 3 February 2022 diff hist 0 N File:Location Study Report.docx current
- 10:07, 3 February 2022 diff hist 0 N File:Equipment and Materials List.docx current
- 10:07, 3 February 2022 diff hist 0 N File:Conceptual Study Report.docx
- 10:06, 3 February 2022 diff hist 0 N File:Commission Backup Form Instructions.docx current
- 10:05, 3 February 2022 diff hist 0 N File:Commission Backup Form Blank.docx current
- 10:05, 3 February 2022 diff hist 0 N File:4R Conceptual Study Report.docx current
- 10:04, 3 February 2022 diff hist -37 m Category:101 Standard Forms →Design Forms
- 09:59, 3 February 2022 diff hist 0 N File:4R Pavement Rehabilitation Analysis Data and Conceptual Study Report.docx current
- 09:58, 3 February 2022 diff hist 0 N File:3R Conceptual Study Report.docx current
- 09:55, 3 February 2022 diff hist -798 m Category:101 Standard Forms →Design Forms: updated archaic .dot files to .docx
- 08:57, 3 February 2022 diff hist 0 N File:Sample Scope of Services Design.docx current
- 08:57, 3 February 2022 diff hist 0 N File:Sample Scope of Services - Location and Environment.docx current
- 08:56, 3 February 2022 diff hist 0 N File:District Award.docx current
- 08:56, 3 February 2022 diff hist -172 m Category:101 Standard Forms →Contracts: updated archaic .dot files to .docx
- 15:47, 2 February 2022 diff hist +1 m Category:101 Standard Forms →Design: saved "District Award" as a docx file
- 14:38, 2 February 2022 diff hist -967 m Category:101 Standard Forms →Design: Per DE, deleted archaic .dot forms Inquiry Report, Preliminary Signal Plan Submittal, Project Assignments and Completion Dates, Major Project Scope or Estimate Change, Non-Major Project Scope or Estimate Change, Project Estimate Quality Assurance Report, Project Scoping Memorandum
- 12:02, 2 February 2022 diff hist -6 m Category:134 Engineering Professional Services →134.3.4 Basis of Payment: updated federal link
- 11:58, 2 February 2022 diff hist -18 m Category:134 Engineering Professional Services →134.3.4 Basis of Payment: updated federal link
- 11:56, 2 February 2022 diff hist -16 m Category:134 Engineering Professional Services →134.3.5.1 Subconsultant Cost Exceeding $25,000: updated federal link
- 14:09, 1 February 2022 diff hist +22 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, minor corrections and clarification
- 12:18, 1 February 2022 diff hist -211 m 750.7 Non-Hydraulic Considerations updated several broken links
- 12:13, 1 February 2022 diff hist +15 m 750.7 Non-Hydraulic Considerations →750.7.2.2 Roadways with ADT ≤ 3500
- 12:10, 1 February 2022 diff hist -1 m 750.7 Non-Hydraulic Considerations →750.7.3 Environmental Requirements
- 11:38, 31 January 2022 diff hist +515 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, additional updated guidance to reflect new CADD Package (Open Roads Designer) now in use.
- 09:30, 31 January 2022 diff hist 0 m 903.9 General Information Signs →903.9.5.1 Corridor Designations
- 09:29, 31 January 2022 diff hist 0 N File:M17-12.jpg current
- 09:28, 31 January 2022 diff hist -33 m 903.9 General Information Signs →903.9.5 Auto Tour Route Signs (M17 series) (MUTCD Section 2H.07): Per TS, minor relocation of route sign images to better coordinate with guidance
- 15:53, 28 January 2022 diff hist -881 m Recent Policy Changes in the EPG EPG 701
- 15:51, 28 January 2022 diff hist +1,359 m Category:701 Drilled Shafts Per CM, new guidance for the proper steps to be made to remediate a defect in a drilled shaft current
- 15:00, 28 January 2022 diff hist 0 N File:905.3.7.4 TS&O Report 2022.docx current
- 15:00, 28 January 2022 diff hist +5 m 905.3 Transportation Impact Analysis Per TS, replaced "marked-up" version of template with a "clean" version
- 14:33, 28 January 2022 diff hist +5 m 237.14 Electronic Design Data Delivery (BIM Deliverables)
- 13:54, 28 January 2022 diff hist -599 m Recent Policy Changes in the EPG EPG 237.14
- 13:49, 28 January 2022 diff hist -33 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal: updated links
- 13:45, 28 January 2022 diff hist +14 m Category:134 Engineering Professional Services →134.3.1 Engineering Services Contract (ESC)
- 13:43, 28 January 2022 diff hist -9 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification
- 13:43, 28 January 2022 diff hist +23 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: updated link
- 13:41, 28 January 2022 diff hist +38 m Category:134 Engineering Professional Services updated links
- 13:39, 28 January 2022 diff hist +38 m 237.9 Submission of Plans and Supporting Documents updated links
- 13:38, 28 January 2022 diff hist +19 m Category:237 Contract Plans updated link current
- 13:37, 28 January 2022 diff hist 0 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Smithk moved page 237.14 Electronic Design Data Delivery to 237.14 Electronic Design Data Delivery (BIM Deliverables): Per CADD
- 13:37, 28 January 2022 diff hist +71 N 237.14 Electronic Design Data Delivery Smithk moved page 237.14 Electronic Design Data Delivery to 237.14 Electronic Design Data Delivery (BIM Deliverables): Per CADD current Tag: New redirect
- 13:36, 28 January 2022 diff hist +164 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, updated guidance to reflect new CADD Package (Open Roads Designer) now in use.
- 09:06, 28 January 2022 diff hist +1 m Recent Policy Changes in the EPG
- 09:05, 28 January 2022 diff hist +1 m Recent Policy Changes in the EPG
- 09:03, 28 January 2022 diff hist +159 m Recent Policy Changes in the EPG EPG 237.9.3.2 and EPG 1081
- 08:56, 28 January 2022 diff hist -2 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal: Per Env'l, updated the Bridge Blasting and Painting Packet.
- 08:53, 28 January 2022 diff hist 0 N File:1081 Bridge Packet 2022.pdf
- 08:53, 28 January 2022 diff hist -2 m Category:1081 Coating of Structural Steel Per Env'l, updated the Bridge Blasting and Painting Packet. The Bridge Packet Memo and the Blast Label ordering instructions were updated. The 2022-01-67853 Completed 1-25-2022 was added.
- 15:47, 27 January 2022 diff hist +44 Category:1092 Signal Equipment
- 15:35, 27 January 2022 diff hist -21 m Category:1092 Signal Equipment
- 15:34, 27 January 2022 diff hist +21 m Category:1092 Signal Equipment
- 10:52, 27 January 2022 diff hist -4 m Category:101 Standard Forms →Construction and Materials
- 10:52, 27 January 2022 diff hist 0 m Category:101 Standard Forms →Construction and Materials: Per CM, correction of link
- 10:50, 27 January 2022 diff hist -4 m Category:105 Control of Work →105.9.4 Documentation Records
- 10:50, 27 January 2022 diff hist 0 m Category:105 Control of Work Per CM, corrected link
- 10:17, 27 January 2022 diff hist +310 m 153.11 Financial Services Per FS, added F36 info
- 09:21, 27 January 2022 diff hist -138 m Category:150 Quality Management Updated broken links
- 13:59, 26 January 2022 diff hist -214 m Recent Policy Changes in the EPG EPG 613.1.1
- 13:48, 26 January 2022 diff hist +2,710 Category:613 Pavement Repair →Basis of Payment: Per CM, revision expands Basis of Payment guidance for Resident Engineers about compensating contractors for concrete costs in full depth repairs that significantly exceed typical section plan depths.
- 13:24, 26 January 2022 diff hist +85 m Recent Policy Changes in the EPG EPG 104.2
- 13:10, 26 January 2022 diff hist +7,159 104.2 Project Scoping Per DE, new guidance for how and when to apply for a 5% increase of the federal cost share of innovative projects (that is, 15% state matching vs. 20% state matching).
- 12:18, 26 January 2022 diff hist +342 m Recent Policy Changes in the EPG EPG 139, EPG 149
- 12:08, 26 January 2022 diff hist +4,001 Category:149 Project Delivery Determination and Initial Risk Assessment Per DE, EPG 149's title was slightly modified and its guidance was also brought up to current practices for project delivery method determination and initial risks. Since design-build is only one method of project delivery, EPG 149 also reflects the concurrent revisions in EPG 139. current
- 11:55, 26 January 2022 diff hist 0 N File:Form 139.8.2.5a.docx current
- 11:54, 26 January 2022 diff hist +2 m Category:139 Design - Build
- 11:27, 26 January 2022 diff hist 0 N File:139.4 2021.docx current
- 11:26, 26 January 2022 diff hist 0 N File:139.2.pdf current
- 11:24, 26 January 2022 diff hist 0 N File:Form 139.8.2.5.docx current
- 11:23, 26 January 2022 diff hist +13 m Category:139 Design - Build
- 11:19, 26 January 2022 diff hist 0 N File:139.8 Design Build Process Checklist.docx current
- 11:18, 26 January 2022 diff hist +23,246 Category:139 Design - Build Per DE, the new design-build guidance in EPG 139 has been brought up to current practices, including updated forms and checklists.
- 10:54, 26 January 2022 diff hist +1 m Category:100 GENERAL
- 10:53, 26 January 2022 diff hist +17 m Category:130 Value Engineering updated link
- 10:52, 26 January 2022 diff hist 0 m Category:149 Project Delivery Determination and Initial Risk Assessment Smithk moved page Category:149 Project Delivery Method Determination and Risk Assessment to Category:149 Project Delivery Determination and Initial Risk Assessment: Per DE
- 10:52, 26 January 2022 diff hist +86 N Category:149 Project Delivery Method Determination and Risk Assessment Smithk moved page Category:149 Project Delivery Method Determination and Risk Assessment to Category:149 Project Delivery Determination and Initial Risk Assessment: Per DE current Tag: New redirect
- 09:51, 26 January 2022 diff hist -155 m Category:403 Asphaltic Concrete Pavement minor clarification
- 11:35, 21 January 2022 diff hist -375 m Recent Policy Changes in the EPG EPG 105.9.4
- 11:28, 21 January 2022 diff hist +104 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, QRG AWP CO Documentation Records
- 11:17, 21 January 2022 diff hist +687 m Category:105 Control of Work →105.9.4 Documentation Record: Per CM, updated to reflect current methods of documentation.
- 11:04, 21 January 2022 diff hist +19 m 135.2 Public Contacts current
- 11:36, 19 January 2022 diff hist +11 m 237.9 Submission of Plans and Supporting Documents →237.9.8 Pre-Bid Conferences: updated link
- 11:34, 19 January 2022 diff hist -3 m 238.1 Aerial Mapping and LiDAR Surveys updated link
- 11:33, 19 January 2022 diff hist -3 m 910.5 ITS Improvements Procurement updated link
- 11:31, 19 January 2022 diff hist +16 m 237.7 Equipment and Materials List updated link current
- 11:29, 19 January 2022 diff hist +11 m 147.1 Alternative Technical Concepts updated link current
- 14:17, 18 January 2022 diff hist +2 m Category:106 Control of Material →Abbreviations and definitions: minor correction current
- 15:47, 14 January 2022 diff hist +60 m Category:101 Standard Forms →Right of Way: Per RW, deleted archaic .dot form with updated Word files
- 14:57, 14 January 2022 diff hist -114 m Category:101 Standard Forms →Scoping: Per Env'l, deleted archaic .dot file, "Environmental Checklist"
- 13:33, 14 January 2022 diff hist +77 m Recent Policy Changes in the EPG EPG 102, EPG 108
- 13:23, 14 January 2022 diff hist -420 m Category:108 Prosecution and Progress →108.1.1 Review and Approval of a Subcontract Request: Per CM, updated guidance to reflect that, as of Jan 3, 2022, MoDOT no longer monitors subcontractor insurance
- 12:27, 14 January 2022 diff hist +453 m Category:102 Bidding Requirements and Conditions Per CM, updated guidance to reflect that, as of Jan 3, 2022, MoDOT no longer monitors subcontractor insurance current
- 11:53, 13 January 2022 diff hist +168 m Category:101 Standard Forms →Survey: Per CADD, archaic .dot files replaced with Sample Letter Notifying Property Owner of Survey
- 11:37, 13 January 2022 diff hist -1,916 m Category:101 Standard Forms →Design: Per CADD, deleted 15 archaic forms
- 09:58, 13 January 2022 diff hist +65 m Recent Policy Changes in the EPG EPG 1036.2.1.1
- 09:46, 13 January 2022 diff hist +22 m Category:1036 Reinforcing Steel for Concrete →1036.2.1.1 Reinforcing Steel, Dowel Bars, Mechanical Bar Splices and Cold Drawn Wire: Per CM, to decrease the risk of fracture in the jaws, a 30” min. length for the #14 and #18 tension test bars is required current
- 11:33, 12 January 2022 diff hist 0 N File:134.4.1 2022.docx current
- 11:32, 12 January 2022 diff hist -10 m Category:134 Engineering Professional Services Per DE, minor update to Fig. 134.4.1, PSC Approval to Execute Contract
- 09:08, 12 January 2022 diff hist -48 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.4.2 File Naming Conventions
- 15:00, 11 January 2022 diff hist -91 m 751.50 Standard Detailing Notes Per BR, updated broken links and other minor clarifications
- 14:28, 11 January 2022 diff hist +36 m 751.40 LFD Widening and Repair Per BR, updated broken links
- 14:01, 11 January 2022 diff hist -250 m 751.36 Driven Piles Per BR, updated broken link and other minor clarification
- 13:57, 11 January 2022 diff hist -51 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4.3 Wing Reinforcement: Per BR, updated link
- 13:48, 11 January 2022 diff hist +88 m 751.35 Concrete Pile Cap Integral End Bents Per BR, updated broken links
- 13:43, 11 January 2022 diff hist +6 m 751.33 Concrete Semi Deep Abutments →751.33.4.1 Front Elevation: Per BR, updated link current
- 13:33, 11 January 2022 diff hist -28 m 751.24 LFD Retaining Walls Per BR, updated links, other minor clarifications
- 13:19, 11 January 2022 diff hist 0 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3 Details: Per BR, updated broken links
- 13:10, 11 January 2022 diff hist +18 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.3.1 Spread Box Beams: Per BR, updated link
- 13:07, 11 January 2022 diff hist +149 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.1 Standard Drawings: Per BR, minor clarification
- 12:29, 11 January 2022 diff hist -1 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.2 Design
- 12:27, 11 January 2022 diff hist +4 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.1.4 Span and Structure Lengths: Per BR, updated link
- 12:11, 11 January 2022 diff hist +161 m 751.14 Steel Superstructure Per BR, updated broken links and other clarifications
- 11:46, 11 January 2022 diff hist -160 m 751.13 Expansion Joint Systems Per BR, deleted broken links, updated broken links and other clarifications current
- 11:33, 11 January 2022 diff hist +21 m 751.10 General Superstructure Per BR, updated broken links
- 11:08, 11 January 2022 diff hist -197 m 751.9 LFD Seismic Per BR, updated several links
- 10:22, 11 January 2022 diff hist +81 751.8 LRFD Concrete Box Culverts Per BR, updated broken links
- 10:15, 11 January 2022 diff hist +33 m 751.6 General Quantities →751.6.2.11 Structural Steel Protective Coatings (Nonweathering Steel): Per BR, updated broken links
- 09:21, 11 January 2022 diff hist -287 m 751.5 Structural Detailing Guidelines Per BR, deleted broken links, updated broken links and other clarifications
- 09:00, 11 January 2022 diff hist -668 m 751.1 Preliminary Design Per BR, updated broken links and revised EPG 751.1.3.9 asbestos and lead guidance to current practice (no longer in SharePoint)
- 08:25, 11 January 2022 diff hist -107 m Category:751 LRFD Bridge Design Guidelines Per BR, deleted broken link
- 14:39, 10 January 2022 diff hist +1 m Recent Policy Changes in the EPG
- 14:39, 10 January 2022 diff hist +1 m Recent Policy Changes in the EPG EPG 173.1.6
- 14:11, 10 January 2022 diff hist +11,406 m Category:173 Erosion Control for Maintenance Operations →173.1.6 Regulatory Conditions for Working in Streams/Wetlands: NWP, Section 401 Water Quality Certification General Conditions: Per Env'l, guidance expanded to align with the updated MoDOT/MDNR Memorandum of Understanding (MOU)
- 09:50, 10 January 2022 diff hist +37 m 102.2 Contractor Performance Rating System Per CM, updated link for Contractor Performance Evaluation System
- 15:34, 7 January 2022 diff hist +1 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1)
- 15:28, 7 January 2022 diff hist -1 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per CM, updated broken payroll training link
- 10:23, 7 January 2022 diff hist +549 m Category:101 Standard Forms →Construction and Materials: Per CM, added updated JOCs for 2022
- 13:28, 6 January 2022 diff hist -254 m Category:101 Standard Forms →Public Involvement: Per Env'l, removed archaic "Notice of Formal Public Hearing", "Open House Public Hearing" and "Public Hearing Statement Form" .dot files
- 08:20, 4 January 2022 diff hist -66 m Category:101 Standard Forms →Environmental and Cultural: Per Env'l, removed archaic STRUCT form
- 14:57, 3 January 2022 diff hist 0 N File:101 Contractor Payment Schedule 2022.pdf current
- 14:57, 3 January 2022 diff hist -21 m Category:101 Standard Forms →Construction and Materials: Per CM, uploaded Contractor Payment Schedule for 2022
- 14:49, 3 January 2022 diff hist +2 m Category:101 Standard Forms →Construction and Materials: Per CM, updated Contractor Payment Schedule link for 2022
- 14:21, 3 January 2022 diff hist 0 N File:110.3 On Site Bulleting Board Inspection.pdf current
- 14:20, 3 January 2022 diff hist -10 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per EPS, updated link for the checklist of the jobsite posters
- 14:10, 3 January 2022 diff hist -63 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters
- 14:09, 3 January 2022 diff hist +46 m Category:110 State and Federal Wage Rates and Other Requirements →110.2 Federal-Aid Projects (Guidance for Sec 110.2): Per EPS, updated link for the checklist of the jobsite posters
- 13:23, 3 January 2022 diff hist +5 m Category:1035 Reinforced Concrete Arch Culvert →1035.3 Report: Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info current
- 13:22, 3 January 2022 diff hist -11 m Category:137 Construction Inspection Guidance for Records to be Maintained Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 16:23, 30 December 2021 diff hist -517 m Category:109 Measurement and Payment Per CM, minor updates to Force Account Spreadsheet (which also replaced the archaic "one day" and "multiple days" versions of the form)
- 13:51, 30 December 2021 diff hist +1 m Category:101 Standard Forms →Construction and Materials
- 10:05, 30 December 2021 diff hist +273 m Recent Policy Changes in the EPG EPG 903.9
- 10:00, 30 December 2021 diff hist 0 N File:I6-1a 2021.jpg current
- 10:00, 30 December 2021 diff hist 0 N File:I4-1a 2021.jpg current
- 09:59, 30 December 2021 diff hist 0 N File:I6-1 2021.jpg current
- 09:59, 30 December 2021 diff hist 0 N File:I5-1 2021.jpg current
- 09:59, 30 December 2021 diff hist 0 N File:I4-1 2021.jpg current
- 09:58, 30 December 2021 diff hist -6 m 903.15 Signing Agreements →903.15.3 TR15 Sign Program Participation Paid by Others: updated link
- 09:58, 30 December 2021 diff hist +1,261 m 903.9 General Information Signs Per TS, removed populations from city limit signs. City limit and county line sign designs will be modified to match the MUTCD standard layout of jurisdictional boundary signs.
- 09:15, 29 December 2021 diff hist -55 m 617.2 Construction Inspection Guidelines for Sec 617
- 08:56, 29 December 2021 diff hist -4 m Category:1001 General Requirements for Material →1001.5.2.4 Report current
- 08:54, 29 December 2021 diff hist +1 m Category:1001 General Requirements for Material →1001.4.1.12 Initial Evaluation of Material
- 08:52, 29 December 2021 diff hist 0 N File:1001.4.1.9 AS3900.pdf current
- 08:51, 29 December 2021 diff hist -42 m Category:1001 General Requirements for Material →1001.4.1 Initial Evaluation: Per CM, updated AS 3900
- 14:14, 28 December 2021 diff hist +30 m Recent Policy Changes in the EPG EPG 127.1
- 14:13, 28 December 2021 diff hist +43 m 147.3 Job Order Contracting (JOC)
- 14:06, 28 December 2021 diff hist 0 m 127.1 Request for Environmental Services →127.1.1.2 Process
- 14:04, 28 December 2021 diff hist -1 m Category:235 Preliminary Plans →235.6 Approval of Preliminary Plan: updated link
- 14:04, 28 December 2021 diff hist -321 m 127.1 Request for Environmental Services Per Env'l, clarified the process of RES submittals and emphasized the electronic process. Added email group information.
- 13:09, 28 December 2021 diff hist +190 m 147.3 Job Order Contracting (JOC) Per Env'l, clarified the process of RES submittals and emphasized the electronic process.
- 12:17, 28 December 2021 diff hist +135 m 642.8 Sidewalk Design Criteria updating broken link
- 12:13, 28 December 2021 diff hist -33 m 642.8 Sidewalk Design Criteria updating several broken links
- 15:28, 23 December 2021 diff hist +27 m Category:1001 General Requirements for Material Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 10:27, 22 December 2021 diff hist -62 m 751.50 Standard Detailing Notes →J1. General: minor clarifications
- 08:39, 22 December 2021 diff hist -27 m Recent Policy Changes in the EPG EPG 109.14
- 08:36, 22 December 2021 diff hist -12 m Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14): Per CM, guidance now explicitly excludes pay items in Job Order Contracts from qualifying for Fuel Adjustment, per Sec. 109.14.
- 16:17, 17 December 2021 diff hist +3 m 903.2 Extent of Signing →903.2.25.2 Plan Development Procedure: updated broken BR division link
- 16:10, 17 December 2021 diff hist +3 m 751.1 Preliminary Design →751.1.2.9.2 Steel Girder Options: updated broken BR division link
- 16:07, 17 December 2021 diff hist +10 m Category:1029 Fabricating Prestressed Concrete Members for Bridges updating broken BR division links
- 16:03, 17 December 2021 diff hist +3 m Category:134 Engineering Professional Services →134.5.1 Invoicing: updated broken BR division link
- 15:56, 17 December 2021 diff hist +20 m 750.7 Non-Hydraulic Considerations updating broken BR division links
- 15:50, 17 December 2021 diff hist -14 m 121.5 Asset Management →121.5.2.3 Bridges: updated broken BR division link
- 15:49, 17 December 2021 diff hist +5 m Category:206 Excavation for Structures →206.4 Construction Inspection Guidelines for Sec 206: updated broken BR division link
- 15:46, 17 December 2021 diff hist +5 m 127.9 Floodplain Management →127.9.3.3 Responsibilities: updating broken BR division link
- 15:44, 17 December 2021 diff hist -14 m 131.1 Design Exception Process →131.1.4 The Design Exception Process: updating broken BR division link
- 15:42, 17 December 2021 diff hist +3 m 616.11 Traffic Control for Waterways →616.11.1 Guidelines for Determining the Need for Work Zone Control: updating broken BR division link current
- 15:41, 17 December 2021 diff hist +6 m 903.22 Material Inspection for Sec 903 updating BR division links current
- 15:39, 17 December 2021 diff hist +3 m 903.4 Overhead Sign Mounting →903.4.1 Overhead Sign Installations (MUTCD Section 2A.17): Updating broken BR division link current
- 14:55, 17 December 2021 diff hist -9 m Category:110 State and Federal Wage Rates and Other Requirements →110.2 Federal-Aid Projects (Guidance for Sec 110.2)
- 14:27, 17 December 2021 diff hist -4,193 m Category:110 State and Federal Wage Rates and Other Requirements Per CM and ECR, deleted listing of required posters and packets to be displayed at project site. Reader is directed to MoDOT's contractor resources website.
- 13:19, 17 December 2021 diff hist +54 m Recent Policy Changes in the EPG EPG 751.24.2.1, EPG 751.50
- 11:55, 17 December 2021 diff hist +2,079 m 751.50 Standard Detailing Notes Per BR, numerous notes updated to reflect that, in lieu of using pipe pile spacers, the contractor will have the option to use pile jackets for bridges up to 200 feet long.
- 11:47, 17 December 2021 diff hist +1,450 m 751.24 LFD Retaining Walls →751.24.2.1 Design: Per BR, in lieu of using pipe pile spacers, the contractor will have the option to use pile jackets for bridges up to 200 feet long.
- 13:50, 16 December 2021 diff hist -42 m 103.1 Bid Opening and Award Process Per Bidding and Estimates, updated links to PS&E chart and calendar.
- 13:46, 16 December 2021 diff hist 0 N File:237.9.3 Due Date Calendar.pdf current
- 13:45, 16 December 2021 diff hist +19 m 237.6 Project Estimates Per Bidding and Estimates, updated links to PS&E chart and calendar.
- 13:39, 16 December 2021 diff hist 0 N File:237.9.3 PS&E Due Date Chart.pdf current
- 13:38, 16 December 2021 diff hist -267 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Estimates, updated links to PS&E chart and calendar. Deleted reference to consultants' version of this information
- 14:19, 15 December 2021 diff hist +1 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.5.2.1 Sponsor Responsibilities
- 14:14, 15 December 2021 diff hist +17 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.5.2.1 Sponsor Responsibilities
- 08:30, 15 December 2021 diff hist +963 m 751.40 LFD Widening and Repair →751.40.2.3.2 Bent Cap Shear Strengthening using FRP Wrap
- 15:49, 14 December 2021 diff hist -54 m Recent Policy Changes in the EPG EPG 909
- 15:38, 14 December 2021 diff hist +230 m 616.14 Work Zone Safety and Mobility Policy →616.14.10 Work Zone Transportation Management Plan: Per TS, added info associated with the WZ Management Guidebook