All pages
Jump to navigation
Jump to search
- 234.1 Access to Interstate Highways
- 234.1 Interchange Justification for Interstate Highways
- 234.2 Diamond Interchanges
- 234.3 Directional Interchanges
- 234.4 Single Point Urban Interchanges (SPUIs)
- 234.5 Cloverleaf Interchanges
- 234.6 Diverging Diamond Interchanges
- 236.10 Right Of Way Condemnation
- 236.11 Mediation
- 236.12 Quality Assurance Reviews
- 236.13 Designing Right of Way Plans
- 236.14 Change in Route Status Report
- 236.15 Requests from Cities for Annexations
- 236.16 Outdoor Advertising
- 236.17 Junkyards
- 236.18 Local Public Agency Land Acquisition
- 236.18 Scenic Byways
- 236.1 General Information
- 236.2 Right of Way Organization and Personnel
- 236.3 Administration
- 236.4 Description Writing and Titles
- 236.5 Property Management
- 236.6 Appraisal and Appraisal Review
- 236.7 Negotiation
- 236.8 Relocation Assistance Program
- 236.9 Asbestos Abatement-Removal of Building Improvement
- 237.10 Distribution of Contract Plans
- 237.11 Signing and Sealing
- 237.12 Communication with the Public
- 237.13 Contract Plan File Name Convention
- 237.13 File Naming Convention
- 237.14 Electronic Design Data Delivery
- 237.14 Electronic Design Data Delivery (BIM Deliverables)
- 237.1 Plan Details
- 237.2 Title Sheet
- 237.3 Summary and Tabulation of Quantities
- 237.4 Plan-Profile Sheets
- 237.5 Special Provisions
- 237.6 Estimates
- 237.6 Project Estimates
- 237.7 Equipment and Materials List
- 237.8 Contract Time
- 237.9 Submission of Plans and Supporting Documents
- 238.1 Aerial Mapping and LiDAR Surveys
- 238.1 Photogrammetric Surveying
- 238.2 Land Surveying
- 238.3 Route Surveying
- 238.4 Construction Surveying
- 320.1 Preliminary Geotechnical Report
- 320.1 Preliminary Geotechnical Report (PGR)
- 320.2 Release of Subsurface Information
- 320.3 Drilling Operations
- 320.4 Procedure for Final Sounding
- 320.5 Foundation Investigations
- 320.6 Slide Investigations
- 320.7 Quarantine Regulations
- 321.1 Design of Earth Slopes
- 321.2 Geotechnical Guidelines
- 321.3 Procedures for Estimation of Geotechnical Parameter Values and Coefficients of Variation
- 413.10 Undersealing
- 413.1 Micro-Surfacing
- 413.2 Scrub Seal
- 413.3 Ultrathin Bonded Asphalt Wearing Surface
- 413.4 Bituminous Fog Sealing
- 413.5 Crack Treatment in Bituminous Pavements
- 413.6 Scrub Seal Treatment
- 413.7 Thin Hot Mix Asphalt Overlay
- 413.8 Spot Seal Coating
- 413.9 Fly Coating
- 460.1 Quality Control/Quality Assurance
- 460.2 Pre-Pavement Meeting
- 460.3 Plant Inspection
- 460.4 Paving Equipment
- 460.5 Roadway Inspection
- 460.6 Paving Operations
- 460.7 Mat Problems
- 570.1 Repair of Concrete Surface Failures
- 570.2 Joint and Crack Maintenance
- 570.3 Repair of Buckled Pavement
- 570.4 Repair of Settlements with Bituminous Patches
- 570.5 Mudjacking (Slab Jacking) by MoDOT Maintenance
- 570.6 Preparation of Portland Cement Concrete Surfaces Prior to Resurfacing
- 606.1 Guardrail
- 606.2 Guard Cable
- 606.3 One-Strand Cable - Access Restraint
- 607.1 Applications
- 607.2 Plans
- 607.3 One-Strand Cable - Access Restraint
- 607.4 Maintenance Planning Guidelines for Fences
- 609.3 Material Inspection for Sec 609
- 609.4 Maintenance Planning Guidelines for Cleaning and Reshaping Paved Ditches
- 609.5 Maintenance Planning Guidelines for Repairing Paved Ditches and Slopes
- 609.6 Maintenance Planning Guidelines for Repairing Curbs
- 611.1 Rock Blanket
- 611.2 Revetment
- 611.3 Concrete Slope Protection
- 611.4 Gabions
- 612.5 Maintenance Planning Guidelines for Impact Attenuators
- 614.2 Material Inspection for Sec 614
- 614.3 Laboratory Testing Guidelines for Sec 614
- 614.4 Maintenance Planning Guidelines for Drop Inlets and Storm Sewers
- 614.5 Maintenance of Floodgates
- 616.10 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation
- 616.11 Traffic Control for Waterways
- 616.12 Work Zone Speed Limits
- 616.13 Work Zone Capacity, Queue and Travel Delay
- 616.14 Work Zone Safety and Mobility Policy
- 616.15 Transit Considerations
- 616.16 Law Enforcement Services
- 616.17 Pavement Edge Treatment
- 616.18 Construction Inspection Guidelines for Sec 616
- 616.19 Quality Standards for Temporary Traffic Control Devices
- 616.1 General (MUTCD Chapter 6A)
- 616.20 Flagger Training
- 616.21 Work Zone Technician Training
- 616.22 Advanced Work Zone Training
- 616.23 Traffic Control for Field Operations
- 616.24 Traffic Control for Non-Motorized Traffic
- 616.25.MoDOT Work Zone Guidelines
- 616.25 MoDOT Work Zone Guidelines
- 616.26 Work Zone User Training
- 616.27 Fleet Lighting
- 616.27 MoDOT Fleet Lighting
- 616.27 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation
- 616.28 Traffic Control for Waterways
- 616.29 Work Zone Speed Limits
- 616.2 Fundamental Principles (MUTCD Chapter 6B)
- 616.30 Work Zone Capacity, Queue and Travel Delay
- 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C)
- 616.4 Pedestrian and Worker Safety (MUTCD Chapter 6D)
- 616.5 Flagger Control (MUTCD Chapter 6E)
- 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)
- 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G)
- 616.8 Typical Applications (MUTCD 6H)
- 616.9 Control of Traffic Through Traffic Incident Management Areas (MUTCD 6I)
- 616.x Typical Applications January 2023
- 617.1 Temporary Traffic Barriers
- 617.2 Construction Inspection Guidelines for Sec 617
- 617.3 Material Inspection for Sec 617
- 617.4 Laboratory Testing Guidelines for Sec 617
- 617.5 Maintenance Planning Guidelines for Concrete Traffic Barriers
- 620.10 Construction Inspection for Sec 620
- 620.10 Operational Procedures and Safety
- 620.11 Guidelines for Using Water-Borne Traffic Paint
- 620.11 Measurement of Retroreflectivity by Handheld Retroreflectometers
- 620.12 3M Tape
- 620.12 Construction Inspection for Sec 620
- 620.13 Measurement of Retroreflectivity by Handheld Retroreflectometers
- 620.14 3M Installation Contract
- 620.14 3M Tape Installation Contract
- 620.1 General (MUTCD Chapter 3A)
- 620.2 Pavement and Curb Markings (MUTCD Chapter 3B)
- 620.3 Roundabout Markings (MUTCD Chapter 3C)
- 620.4 Delineators (MUTCD Chapter 3D)
- 620.4 Markings for Preferential Lanes (MUTCD Chapter 3D)
- 620.5 Colored Pavements (MUTCD Chapter 3E)
- 620.5 Delineators (MUTCD Chapter 3F)
- 620.6 Colored Pavements
- 620.7 Channelizing Devices Used for Emphasis or Pavement Marking Patterns
- 620.7 Islands (MUTCD Chapter 3G)
- 620.8 Islands
- 620.8 Operational Procedures and Safety
- 620.9 Guidelines for Using Water-Borne Traffic Paint
- 620.9 Rumble Strip Markings
- 626.1 Edgeline Rumble Strips
- 626.2 Centerline Rumble Strips
- 626.3 Construction Inspection Guidelines for Sec 626
- 626.4 Transverse Rumble Strips
- 626.5 Modified Rumble Strips
- 640.1 Pavement Drainage
- 640.2 Median Drainage
- 641.1 Bicycle Facilities
- 642.10 Curb Ramp Applications
- 642.11 Pedestrian Grade Separations
- 642.12 Pedestrians and Roundabouts
- 642.13 ADA Self-Evaluation
- 642.14 ADA Transition Plan
- 642.14 Pedestrians and Roundabouts
- 642.1 Integrating Non-Motorized Facilities
- 642.1 Sidewalk Design Criteria
- 642.2 Consideration of Pedestrian Facilites on Projects
- 642.2 Sidewalk Ramp and Curb Ramp Design Criteria
- 642.3 Americans with Disabilities Act of 1990
- 642.3 Curb Ramp Applications
- 642.4 Impact of the Project Category on ADA
- 642.4 Pedestrian Grade Separations
- 642.5 Maximum Extent Feasible
- 642.5 Pedestrians and Roundabouts
- 642.6 Local Projects and ADA Considerations
- 642.7 Maintenance Responsibility
- 642.8 Sidewalk Design Criteria
- 642.9 Sidewalk Ramp and Curb Ramp Design Criteria
- 643.1 Utilities - Status and Liability Acceptance
- 643.1 Utilities - Status Letter
- 643.2 Local Utility Adjustments - Public and Private
- 643.3 Policy, Standards and Regulations
- 643.4 Railroads
- 646.1 Manholes
- 646.2 Pipelines
- 646.3 Private Underpasses
- 646.4 Work Funded by Maintenance
- 733 Precast Concrete Box Culverts
- 748.10 Legal Aspects of Hydraulic Design
- 748.1 Evaluation of Project Impacts
- 748.2 Roadway Design Criteria
- 748.2 Roadway Overtopping
- 748.3 Bridge Freeboard
- 748.3 Freeboard
- 748.4 Headwater and Backwater
- 748.5 Matching Existing Structures
- 748.6 Design High Water
- 748.6 High Water Surface Elevation
- 748.7 Bridge Deck and Bridge End Drainage
- 748.7 Bridge Deck Drainage
- 748.7 Bridge Reports and Layouts
- 748.8 Bridge Drainage
- 748.8 Development in Floodplains
- 748.8 National Flood Insurance Program (NFIP)
- 748.9 Legal Aspects of Hydraulic Design
- 748.9 National Flood Insurance Program (NFIP)
- 750.1 Open Channels
- 750.2 Culverts
- 750.3 Bridges
- 750.4 Storm Sewers
- 750.5 Sanitary Sewers
- 750.6 Erosion Control and Energy Dissipation
- 750.7 Non-Hydraulic Considerations
- 751.0 State Map
- 751.10 General Superstructure
- 751.11 Bearings
- 751.12 Barriers, Curbs and Fences
- 751.12 Barriers, Railings, Curbs and Fences
- 751.12 Protective Barricades
- 751.12 Protective Barriers
- 751.13 Expansion Devices
- 751.13 Expansion Joint Systems
- 751.14 Steel Superstructure
- 751.17 Concrete Slab Bridges
- 751.18 Concrete Multicell Box Girder Bridges
- 751.1 Preliminary Design
- 751.20 Continuous Concrete Slab Bridges
- 751.21 Concrete Box Girder
- 751.21 Prestressed Concrete Slab and Box Beams
- 751.22 P/S Concrete I Girders
- 751.22 Prestressed Concrete I Girders
- 751.23 P/S Concrete Double Tee
- 751.23 Prestressed Concrete Double Tee Girders
- 751.24 LFD Retaining Walls
- 751.24 Retaining Walls
- 751.2 Loads
- 751.30 Open Concrete End Bents
- 751.31 Open Concrete Intermediate Bents
- 751.32 Concrete Pile Cap Intermediate Bents
- 751.33 Concrete Semi Deep Abutments
- 751.34 Concrete Pile Cap Non-Integral End Bents
- 751.35 Concrete Pile Cap Integral End Bents
- 751.36 Driven Piles
- 751.37 Drilled Shafts
- 751.38 Spread Footings
- 751.39 Pile Footings
- 751.39 Seal Course
- 751.3 Structural Steel Design Properties
- 751.40 LFD Widening and Repair
- 751.40 Widening and Repair
- 751.40 Widening and Repair (LFD and Not Updated)
- 751.40 Widening and Repair (Non-LFD)
- 751.40 Widening and Repair (Non-LRFD)
- 751.4 Reinforced Concrete Design Properties
- 751.50 Standard Detailing Notes
- 751.5 Standard Details
- 751.5 Structural Detailing Guidelines
- 751.6 General Quantities
- 751.7 General Design Data
- 751.8 Concrete Box Culverts
- 751.8 LFD Culverts
- 751.8 LRFD Concrete Box Culverts
- 751.9 Bridge Seismic Design
- 751.9 LFD Seismic
- 770.10 Linseed Oil Treatment
- 770.1 District Routine Maintenance and Special Crew Responsibilities
- 770.2 Regional and Central Office Bridge Maintenance Crew Responsibilities
- 770.3 Cathodic Protection
- 770.4 Navigation Lights/Light Tenders
- 770.5 Posting of Bridge Limits
- 770.6 Bridge Approach Maintenance
- 770.6 Mat Gutter Maintenance
- 770.7 Channel Work - Gabion Installation
- 770.7 Maintenance of Bridge Superstructure
- 770.8 Channel Work - Rock Blanket
- 770.8 Maintenance of Bridge Substructure
- 770.9 Miscellaneous Bridge Maintenance
- 771.10 Bridge Joint Sealing - Hot Pour
- 771.11 Bridge Joint Sealing - Silicone
- 771.12 Bridge Joint Sealing - Polytite
- 771.13 Sealing Abutment and Pier Caps
- 771.14 Spot Painting of Bearings and Piling
- 771.15 Chip Seal to Entire Deck
- 771.15 Concrete Bridge Deck Sealer Selection Matrix
- 771.16 Bridge Deck Crack Pouring
- 771.16 Penetrating Concrete Sealer - Silane
- 771.17 Bridge Deck Total Surface Treatment - In Deck
- 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP)
- 771.17 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler
- 771.18 In-Deck Bridge Deck Crack Filler
- 771.18 Linseed Oil Treatment to Entire Deck
- 771.18 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler
- 771.19 Chip Seal to Entire Deck
- 771.19 Cut and Spray Brush and Vines
- 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking)
- 771.1 Mud Jacking Bridge Approach
- 771.20 Cut and Spray Brush and Vines
- 771.20 Rainy Day Bridge Activities
- 771.21 Rainy Day Bridge Activities
- 771.2 Bridge Cleaning and Flushing
- 771.3 Shaving Shoulder and Around Guardrail
- 771.4 Drain Basin Maintenance
- 771.5 Mat Gutter Maintenance
- 771.6 Channel Work - Gabion Installation
- 771.7 Channel Work - Rock Blanket
- 771.8 Remove Drift
- 771.9 Temporary Bridge Deck Repair
- 801.2 Laboratory Testing Guidelines for Sec 801
- 806.1 Erosion Control Measures
- 806.2 Sediment Control Measures
- 806.3 Additional Temporary Erosion and Sediment Controls
- 806.4 Preactivity Meeting
- 806.5 Site Inspections and BMP Repair
- 806.6 Proper Operation and Maintenance
- 806.7 Other Divisions' Activities
- 806.8 Storm Water Pollution Prevention Plan (SWPPP)
- 821.10 Equipment and Application Methods
- 821.11 Calibration
- 821.12 Mixing and Handling Guidelines
- 821.13 Traffic Control for Spraying Operations
- 821.14 Herbicide Spills Incident Reporting
- 821.15 Forms and Conversions
- 821.16 Total Vegetation Control Treatment
- 821.17 Plant Growth Regulators (PGRs)
- 821.18 Noxious Weeds
- 821.19 Problem Weeds
- 821.20 Woody Plant Control
- 821.21 Aquatic Areas
- 821.22 Weed Control in Landscaped Areas
- 821.23 Additives and Adjuvants
- 821.24 Glossary