Pages without language links

Jump to navigation Jump to search

The following pages do not link to other language versions.

Showing below up to 500 results in range #41 to #540.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. 1048.3 Laboratory Testing Guidelines for Sec 1048
  2. 1049.4 Laboratory Testing Guidelines for Sec 1049
  3. 1050.5 Laboratory Testing Guidelines for Sec 1050
  4. 1054.3 Laboratory Testing Guidelines for Sec 1054
  5. 1055.4 Laboratory Testing Guidelines for Sec 1055
  6. 1057.4 Laboratory Testing for Sec 1057
  7. 1059.4 Laboratory Testing Guidelines for Sec 1059
  8. 106.10 Missouri Domestic Products Requirement
  9. 106.11 Metric Implementation
  10. 106.12 Pre-Acceptance Lists (PAL)
  11. 106.13 Quality Control/Quality Assurance
  12. 106.14 Proprietary Items
  13. 106.15 Pipe Shipping Report Form
  14. 106.16 Special Designs and Shop Drawings
  15. 106.17 New Product Evaluation
  16. 106.18 Technician Certification Program
  17. 106.19 Materials Acceptance
  18. 106.1 Source of Supply and Quality Requirements
  19. 106.20 Reporting
  20. 106.21 Summary of Materials Inspected
  21. 106.22 Material Inspection Revisions
  22. 106.23 Online Research Publications (Research Publications)
  23. 106.24 Purchase Order Items
  24. 106.2 Local Materials Sources
  25. 106.3.2.10 TM-10, Specific Gravity Coarse Aggregate for Bituminous Mixtures
  26. 106.3.2.11 TM-11, Static Immersion Stripping Test
  27. 106.3.2.12 TM-12, Stripping of Bituminous-Aggregate Mixtures, Boil Method for Seal Coats
  28. 106.3.2.13 TM-13
  29. 106.3.2.14 TM-14, Soundness Test of Coarse Aggregate - Water-Alcohol Freeze Method
  30. 106.3.2.15 TM-15
  31. 106.3.2.16 TM-16
  32. 106.3.2.17 TM-17
  33. 106.3.2.18 TM-18, Smolder Resistance of Jute Netting
  34. 106.3.2.19 TM-19, Measurement of Pavement Surface Texture Depth by the Sand-Patch Method
  35. 106.3.2.1 TM-1, Alkalinity of Glass Fiber Mat Materials
  36. 106.3.2.20 TM-20, Measurement of Air, Surface or Bituminous Mixture Temperature
  37. 106.3.2.21 TM-21, Determination of Cobalt in Tungsten Carbide Inserts
  38. 106.3.2.22 TM-22, Determination of Percent Open Area of Plastic Filter Cloth
  39. 106.3.2.23 TM-23, Determination of Equivalent Opening Size of Plastic Filter Cloth
  40. 106.3.2.24 TM-24
  41. 106.3.2.25 TM-25, Determination of Chlorine in Chlorinated Rubber and Chlorinated Paraffin
  42. 106.3.2.26 TM-26, Determination of Calcium Carbonate and Magnesium Carbonate in Lime and Pigment Materials
  43. 106.3.2.27 TM-27, Determination of Calcium Oxide and Magnesium Oxide in Hydrated Lime
  44. 106.3.2.28 TM-28
  45. 106.3.2.29 TM-29, Determination of Nitrogen in Liquid Fertilizers
  46. 106.3.2.2 TM-2
  47. 106.3.2.30 TM-30
  48. 106.3.2.31 TM-31
  49. 106.3.2.32 TM-32, Determination of Purity of Sodium Chloride
  50. 106.3.2.33 TM-33
  51. 106.3.2.34 TM-34, Determination of Phosphorus in Lubricants
  52. 106.3.2.35 TM-35, Moisture Offset Factor for a Nuclear Gauge
  53. 106.3.2.36 TM-36, Density of Plastic Portland Cement Concrete by Nuclear Gauge
  54. 106.3.2.37 TM-37, Apparent Specific Gravity of Fine Aggregate for Bituminous Mixtures
  55. 106.3.2.38 TM-38, Determination of Dew Point for Structural Steel Painting
  56. 106.3.2.39 TM-39, Pull-Out Tests on Expansive Mortars
  57. 106.3.2.3 TM-3
  58. 106.3.2.40 TM-40, A One-Point Moisture-Density Relations Test for Soils
  59. 106.3.2.41 TM-41, Density Testing of Bituminous Mixtures with Nuclear Gauges
  60. 106.3.2.45 TM-45, Determination of Dry Film Coating Thickness Using Magnetic Gauges
  61. 106.3.2.46 TM-46, Analysis of Cement, Ground Granulated Blast Furnace Slag and Fly Ash
  62. 106.3.2.46 TM-46, Analysis of Cements and Fly Ashes
  63. 106.3.2.47 TM-47
  64. 106.3.2.48 TM-48, Determination of the Purity of Calcium Chloride
  65. 106.3.2.49 TM-49, Pull-Out Tests on Chemical Bonding Agents
  66. 106.3.2.4 TM-4
  67. 106.3.2.50 TM-50, Mechanical Analysis of Extracted Aggregate (Rapid Method)
  68. 106.3.2.51 TM-51, Determination of Bitumen in Bituminous Paving Mixtures
  69. 106.3.2.52 TM-52, Determination of Magnesium Chloride in Magnesium Chloride Brine
  70. 106.3.2.53 TM-53, Determination of Moisture Content of Bituminous Mixtures
  71. 106.3.2.54 TM-54, Asphalt Cement Content of Bituminous Mixtures by the Nuclear Method
  72. 106.3.2.55 TM-55, Determination of Calcium, Magnesium and Potassium in Soils
  73. 106.3.2.56 TM-56, Determination of Sodium Metasilicate (Na2SiO3)
  74. 106.3.2.57 TM-57, Determination of Manganese and/or Copper in Steel
  75. 106.3.2.58 TM-58, Determination of Phosphoric Acid (P2O5) in Commercial Fertilizers
  76. 106.3.2.59 TM-59, Determination of the International Roughness Index
  77. 106.3.2.5 TM-5
  78. 106.3.2.60 TM-60, Test of Cellulose and Mineral Fibers for SMA Mixtures
  79. 106.3.2.61 TM-61, Asphalt Draindown Test Procedure for Stone Mastic Asphalt Mixtures
  80. 106.3.2.62 TM-62, Prequalification of Dust Suppressants
  81. 106.3.2.63 TM-63, Determination of Compatibility of Asphalt Release Agents with Hot Asphaltic Concrete
  82. 106.3.2.64 TM-64, Void Detection and Undersealing Verification Testing of Concrete Pavement with a Falling Weight Deflectometer
  83. 106.3.2.66 TM-66, Aggregate Sample Reduction
  84. 106.3.2.67 TM-67, Preparation of Concrete for Use in AASHTO T161 Freeze and Thaw
  85. 106.3.2.68 TM-68
  86. 106.3.2.6 TM-6
  87. 106.3.2.70 TM-70, Glass Bead Tests
  88. 106.3.2.71 TM-71, Deleterious Content of Aggregate
  89. 106.3.2.72 TM-72, Sweep Test of Bituminous Surface Treatment Samples
  90. 106.3.2.73 TM-73, Volume of Voids in Compacted Filler or Fines
  91. 106.3.2.74 TM-74, Pullout Tests on Epoxy Bonding Agents for Resin Anchor Systems
  92. 106.3.2.75 TM-75, Determining Segregation Using the Nuclear Density Gauge
  93. 106.3.2.76 TM-76, Acid Insoluble Residue
  94. 106.3.2.77 TM-77, Determining the Binder Ignition Aggregate Correction Factor for Mixtures Containing Rap
  95. 106.3.2.78 TM-78, Los Angeles Abrasion for Lightweight Aggregate
  96. 106.3.2.79 TM-79, Procedure to Prepare Aggregate to Determine the Plasticity Index
  97. 106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs
  98. 106.3.2.80 TM-80, Measurement of Retroreflectivity by Handheld Retroreflectometers
  99. 106.3.2.81 TM-81, Specific Gravity and Absorption of Aggregate Using Automatic Vacuum Sealing Method
  100. 106.3.2.82 TM-82, Concrete Uniformity
  101. 106.3.2.83 TM-83, Field Estimation of Water Permeability of Compacted Asphalt Paving Mixtures
  102. 106.3.2.84 TM-84, Pipe Laser Profile Calibration
  103. 106.3.2.85 TM-85 Determination of Polyphosphoric Acid (PPA) in Performance Graded (PG) Asphalt Binders
  104. 106.3.2.86 TM-86 Preparation of Samples for Surface Sealer Wet Track Abrasion
  105. 106.3.2.87 TM-87 No-Pick-Up Time for Tack Coats
  106. 106.3.2.88 TM-88 Bond Strength Test for Tack Coat
  107. 106.3.2.89 TM-89 Determination of Aluminum Oxide in High Friction Surface Treatments (HFST)
  108. 106.3.2.8 TM-8, Photometric Test for Measuring the Brightness of Reflective Sheeting
  109. 106.3.2.90, Determination of Chemical Components in Asphalt and Non-Asphalt Rejuvenators
  110. 106.3.2.91 TM-91, Determination of Total Sulfur in Fly Ash by Sodium Carbonate fusion
  111. 106.3.2.92 TM-92, Determination of Sulfide sulfur by oxidation of blended slag cements
  112. 106.3.2.94 TM-94 Identification of Penetrating Emulsified Asphalts
  113. 106.3.2.95 TM-95 Mass Retention of Emulsified Asphalts Subjected to Water Droplets
  114. 106.3.2.9 TM-9, Resilience of Hot-Poured Elastic Type Joint Sealer
  115. 106.3 Samples, Tests and Cited Specifications
  116. 106.4 Plant Inspections
  117. 106.5 Storage of Materials
  118. 106.6 Handling Material
  119. 106.7 Unacceptable Material
  120. 106.8 Material Furnished by the Commission
  121. 106.9 Buy America Requirement
  122. 1060.4 Laboratory Testing Guidelines for Sec 1060
  123. 1066.4 Laboratory Testing Guidelines for Sec 1066
  124. 1070.3 Laboratory Testing Guidelines for Sec 1070
  125. 120.1 Pavements
  126. 120.2 Shoulders
  127. 120.3 Bridges
  128. 120.4 Traffic Control
  129. 120.5 Roadside Features
  130. 120.6 Roadsides
  131. 120.7 Drainage
  132. 120.8 Welcome Centers
  133. 120.9 Uninterrupted Traffic Flow
  134. 121.1 Public Involvement and Decision-Making
  135. 121.2 The Planning Framework for Transportation Decision-Making
  136. 121.3 The Statewide Transportation Improvement Program (STIP)
  137. 121.4 Quality Assurance / Quality Control for Project Prioritization
  138. 121.5 Asset Management
  139. 121.6 STIP Amendments
  140. 121.7 Program Estimates
  141. 127.10 Section 4(f) Public Lands
  142. 127.11 Farmland Conversion
  143. 127.12 Air Quality
  144. 127.13 Noise
  145. 127.14 National Environmental Policy Act (NEPA) Classification and Documents
  146. 127.15 Reevaluation of National Environmental Policy Act (NEPA) Documents
  147. 127.16 Wetland and Stream Mitigation
  148. 127.17 Wetland and Stream Mitigation Banking
  149. 127.18 Job Special Provisions (JSP) and Contract Documents
  150. 127.19 Section 404 Clean Water Act for Bridge Demolitions
  151. 127.1 Request for Environmental Services
  152. 127.20 Stream Stewardship Trust Fund in-Lieu Fee Mitigation Program
  153. 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties
  154. 127.22 Off-Site Borrow, Spoil, and Staging Areas
  155. 127.23 Negotiated Commitments and Mitigation in the National Environmental Policy Act (NEPA) Process
  156. 127.24 Speleological Findings
  157. 127.25 Maintenance Environmental Policies
  158. 127.26 Environmental Classification
  159. 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities
  160. 127.28 Planning and Environmental Linkages (PEL) and the National Environmental Policy Act (NEPA)
  161. 127.29 Stormwater
  162. 127.2 Historic Preservation and Cultural Resources
  163. 127.3 Community Impact Assessment
  164. 127.4 Wetlands and Streams
  165. 127.7 Threatened and Endangered Species
  166. 127.8 Hazardous and Solid Waste
  167. 127.9 Floodplain Management
  168. 130.6 Project Manager’s Guide
  169. 130.7 Value Engineering Team Leader Guide
  170. 131.1 Design Exception Process
  171. 131.2 Proprietary Items and Public Interest Findings
  172. 131.4 Design Exception Process
  173. 131.5 Proprietary Items and Public Interest Findings
  174. 132.1 Material Inspection for Safety
  175. 132.2 Construction Inspection Guidelines for Safety Precautions
  176. 132.2 Missouri's Blueprint - A Partnership Toward Zero Deaths
  177. 132.4 Highway Safety Plan and Performance Plan
  178. 133.1 Materials for Snow and Ice Control
  179. 133.2 Equipment for Snow and Ice Control
  180. 133.3 Snow and Ice Control Personnel
  181. 133.4 Snow and Ice Control Operations
  182. 133.5 Operator’s Guide for Anti-Icing
  183. 135.1 Guidelines for Good Contractor Relationships
  184. 135.2 Public Contacts
  185. 135.3 Inter-Departmental Relations
  186. 135.4 Required Notices and Posters
  187. 135.5 Labor Compliance
  188. 135.6 Equal Employment Opportunity
  189. 136.10 Construction Authorization and Letting
  190. 136.12 Reimbursement and Auditing
  191. 136.13 Glossary
  192. 136.2 Bridge Soft Match Credit Program
  193. 136.3 Project Selection and Programming
  194. 136.5 Agreements
  195. 136.7 Right of Way and Public Hearings
  196. 136.8 Preliminary Design
  197. 141.1 Cost Share Program
  198. 141.2 Missouri Transportation Finance Corporation (MTFC) Loans
  199. 141.3 Local Funding Options
  200. 141.4 Partnership Development Process
  201. 141.4 Transportation Improvement Program Amendments
  202. 141.5 Dispute Resolution Process
  203. 141.6 Acronyms and Definitions
  204. 141.7 Transportation Improvement Program Approval
  205. 141.8 Sponsorship Programs
  206. 144.5 Pavement Maintenance
  207. 147.1 Alternative Technical Concepts
  208. 147.2 Add Alternate Bidding
  209. 147.3 Job Order Contracting (JOC)
  210. 147.4 Fixed Price Variable Scope (FPVS) Contracting
  211. 153.10 Design – Escrow
  212. 153.11 Financial Services
  213. 153.12 General Services
  214. 153.13 Highway Safety
  215. 153.14 Human Resources
  216. 153.15 Information Systems
  217. 153.16 Maintenance
  218. 153.17 Medical Board Employee Benefits
  219. 153.18 Motor Carrier Services
  220. 153.19 Multimodal
  221. 153.20 Right of Way
  222. 153.21 Traffic
  223. 153.22 Transportation Planning
  224. 153.23 Utility
  225. 153.4 Administrative
  226. 153.5 Bridge
  227. 153.6 Chief Counsel's Office
  228. 153.7 Construction and Materials
  229. 153.8 Customer Relations
  230. 153.9 Design
  231. 171.10 Traffic Control
  232. 171.11 Roadside Appurtenances
  233. 171.12 Maintenance Policy History
  234. 171.1 Administration
  235. 171.2 Buildings and Grounds
  236. 171.3 Roadway Maintenance
  237. 171.4 Shoulders and Approaches
  238. 171.5 Drainage
  239. 171.6 Roadsides
  240. 171.7 Bridge Maintenance
  241. 171.8 Snow and Ice Control
  242. 171.9 Environmental
  243. 230.1 Horizontal Alignment
  244. 230.2 Vertical Alignment
  245. 231.1 Median Width
  246. 231.2 Clear Zones
  247. 231.3 Lane Width
  248. 231.4 Shoulder Width
  249. 231.5 Inslope Grade
  250. 231.6 Roadside Ditches
  251. 231.7 Backslope Grade
  252. 231.8 Bridge Width
  253. 232.1 Climbing Lanes
  254. 232.2 Passing Lanes
  255. 232.3 Two - Way Left - Turn Lanes
  256. 232.4 Expressways
  257. 232.5 Freeways
  258. 233.1 At-Grade Intersections - Driveways and Entrances
  259. 233.2 At-Grade Intersections with Stop and Yield Control
  260. 233.3 Roundabouts
  261. 233.4 At-Grade Intersections with Signal Control
  262. 234.1 Access to Interstate Highways
  263. 234.1 Interchange Justification for Interstate Highways
  264. 234.2 Diamond Interchanges
  265. 234.3 Directional Interchanges
  266. 234.4 Single Point Urban Interchanges (SPUIs)
  267. 234.5 Cloverleaf Interchanges
  268. 234.6 Diverging Diamond Interchanges
  269. 236.10 Right Of Way Condemnation
  270. 236.11 Mediation
  271. 236.12 Quality Assurance Reviews
  272. 236.13 Designing Right of Way Plans
  273. 236.14 Change in Route Status Report
  274. 236.15 Requests from Cities for Annexations
  275. 236.16 Outdoor Advertising
  276. 236.17 Junkyards
  277. 236.18 Scenic Byways
  278. 236.1 General Information
  279. 236.2 Right of Way Organization and Personnel
  280. 236.3 Administration
  281. 236.4 Description Writing and Titles
  282. 236.5 Property Management
  283. 236.6 Appraisal and Appraisal Review
  284. 236.7 Negotiation
  285. 236.8 Relocation Assistance Program
  286. 236.9 Asbestos Abatement-Removal of Building Improvement
  287. 237.10 Distribution of Contract Plans
  288. 237.11 Signing and Sealing
  289. 237.12 Communication with the Public
  290. 237.13 Contract Plan File Name Convention
  291. 237.14 Electronic Design Data Delivery (BIM Deliverables)
  292. 237.1 Plan Details
  293. 237.2 Title Sheet
  294. 237.3 Summary and Tabulation of Quantities
  295. 237.4 Plan-Profile Sheets
  296. 237.5 Special Provisions
  297. 237.6 Project Estimates
  298. 237.7 Equipment and Materials List
  299. 237.8 Contract Time
  300. 237.9 Submission of Plans and Supporting Documents
  301. 238.1 Aerial Mapping and LiDAR Surveys
  302. 238.2 Land Surveying
  303. 238.3 Route Surveying
  304. 238.4 Construction Surveying
  305. 320.1 Preliminary Geotechnical Report
  306. 320.2 Release of Subsurface Information
  307. 320.3 Drilling Operations
  308. 320.4 Procedure for Final Sounding
  309. 320.5 Foundation Investigations
  310. 320.6 Slide Investigations
  311. 320.7 Quarantine Regulations
  312. 321.1 Design of Earth Slopes
  313. 321.2 Geotechnical Guidelines
  314. 321.3 Procedures for Estimation of Geotechnical Parameter Values and Coefficients of Variation
  315. 413.10 Undersealing
  316. 413.1 Micro-Surfacing
  317. 413.2 Scrub Seal
  318. 413.3 Ultrathin Bonded Asphalt Wearing Surface
  319. 413.4 Bituminous Fog Sealing
  320. 413.5 Crack Treatment in Bituminous Pavements
  321. 413.6 Scrub Seal Treatment
  322. 413.7 Thin Hot Mix Asphalt Overlay
  323. 413.8 Spot Seal Coating
  324. 413.9 Fly Coating
  325. 460.1 Quality Control/Quality Assurance
  326. 460.2 Pre-Pavement Meeting
  327. 460.3 Plant Inspection
  328. 460.4 Paving Equipment
  329. 460.5 Roadway Inspection
  330. 460.6 Paving Operations
  331. 460.7 Mat Problems
  332. 570.1 Repair of Concrete Surface Failures
  333. 570.2 Joint and Crack Maintenance
  334. 570.3 Repair of Buckled Pavement
  335. 570.4 Repair of Settlements with Bituminous Patches
  336. 570.5 Mudjacking (Slab Jacking) by MoDOT Maintenance
  337. 570.6 Preparation of Portland Cement Concrete Surfaces Prior to Resurfacing
  338. 606.1 Guardrail
  339. 606.2 Guard Cable
  340. 606.3 One-Strand Cable - Access Restraint
  341. 607.1 Applications
  342. 607.2 Plans
  343. 607.3 One-Strand Cable - Access Restraint
  344. 607.4 Maintenance Planning Guidelines for Fences
  345. 609.3 Material Inspection for Sec 609
  346. 609.4 Maintenance Planning Guidelines for Cleaning and Reshaping Paved Ditches
  347. 609.5 Maintenance Planning Guidelines for Repairing Paved Ditches and Slopes
  348. 609.6 Maintenance Planning Guidelines for Repairing Curbs
  349. 611.1 Rock Blanket
  350. 611.2 Revetment
  351. 611.3 Concrete Slope Protection
  352. 611.4 Gabions
  353. 614.2 Material Inspection for Sec 614
  354. 614.3 Laboratory Testing Guidelines for Sec 614
  355. 614.4 Maintenance Planning Guidelines for Drop Inlets and Storm Sewers
  356. 614.5 Maintenance of Floodgates
  357. 616.10 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation
  358. 616.11 Traffic Control for Waterways
  359. 616.12 Work Zone Speed Limits
  360. 616.13 Work Zone Capacity, Queue and Travel Delay
  361. 616.14 Work Zone Safety and Mobility Policy
  362. 616.15 Transit Considerations
  363. 616.16 Law Enforcement Services
  364. 616.17 Pavement Edge Treatment
  365. 616.18 Construction Inspection Guidelines for Sec 616
  366. 616.19 Quality Standards for Temporary Traffic Control Devices
  367. 616.1 General (MUTCD Chapter 6A)
  368. 616.20 Flagger Training
  369. 616.21 Work Zone Technician Training
  370. 616.22 Advanced Work Zone Training
  371. 616.23 Traffic Control for Field Operations
  372. 616.24 Traffic Control for Non-Motorized Traffic
  373. 616.25 MoDOT Work Zone Guidelines
  374. 616.26 Work Zone User Training
  375. 616.27 MoDOT Fleet Lighting
  376. 616.2 Fundamental Principles (MUTCD Chapter 6B)
  377. 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C)
  378. 616.4 Pedestrian and Worker Safety (MUTCD Chapter 6D)
  379. 616.5 Flagger Control (MUTCD Chapter 6E)
  380. 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)
  381. 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G)
  382. 616.8 Typical Applications (MUTCD 6H)
  383. 616.9 Control of Traffic Through Traffic Incident Management Areas (MUTCD 6I)
  384. 616.x Typical Applications January 2023
  385. 617.1 Temporary Traffic Barriers
  386. 617.2 Construction Inspection Guidelines for Sec 617
  387. 617.3 Material Inspection for Sec 617
  388. 617.4 Laboratory Testing Guidelines for Sec 617
  389. 617.5 Maintenance Planning Guidelines for Concrete Traffic Barriers
  390. 620.10 Operational Procedures and Safety
  391. 620.11 Guidelines for Using Water-Borne Traffic Paint
  392. 620.12 Construction Inspection for Sec 620
  393. 620.13 Measurement of Retroreflectivity by Handheld Retroreflectometers
  394. 620.14 3M Installation Contract
  395. 620.1 General (MUTCD Chapter 3A)
  396. 620.2 Pavement and Curb Markings (MUTCD Chapter 3B)
  397. 620.3 Roundabout Markings (MUTCD Chapter 3C)
  398. 620.4 Markings for Preferential Lanes (MUTCD Chapter 3D)
  399. 620.5 Delineators (MUTCD Chapter 3F)
  400. 620.6 Colored Pavements
  401. 620.7 Channelizing Devices Used for Emphasis or Pavement Marking Patterns
  402. 620.8 Islands
  403. 620.9 Rumble Strip Markings
  404. 626.1 Edgeline Rumble Strips
  405. 626.2 Centerline Rumble Strips
  406. 626.3 Construction Inspection Guidelines for Sec 626
  407. 626.4 Transverse Rumble Strips
  408. 626.5 Modified Rumble Strips
  409. 640.1 Pavement Drainage
  410. 640.2 Median Drainage
  411. 641.1 Bicycle Facilities
  412. 642.10 Curb Ramp Applications
  413. 642.11 Pedestrian Grade Separations
  414. 642.12 Pedestrians and Roundabouts
  415. 642.13 ADA Self-Evaluation
  416. 642.14 ADA Transition Plan
  417. 642.1 Integrating Non-Motorized Facilities
  418. 642.2 Consideration of Pedestrian Facilites on Projects
  419. 642.3 Americans with Disabilities Act of 1990
  420. 642.4 Impact of the Project Category on ADA
  421. 642.5 Maximum Extent Feasible
  422. 642.6 Local Projects and ADA Considerations
  423. 642.7 Maintenance Responsibility
  424. 642.8 Sidewalk Design Criteria
  425. 642.9 Sidewalk Ramp and Curb Ramp Design Criteria
  426. 643.1 Utilities - Status and Liability Acceptance
  427. 643.1 Utilities - Status Letter
  428. 643.2 Local Utility Adjustments - Public and Private
  429. 643.3 Policy, Standards and Regulations
  430. 643.4 Railroads
  431. 646.1 Manholes
  432. 646.2 Pipelines
  433. 646.3 Private Underpasses
  434. 646.4 Work Funded by Maintenance
  435. 733 Precast Concrete Box Culverts
  436. 748.1 Evaluation of Project Impacts
  437. 748.2 Roadway Design Criteria
  438. 748.3 Freeboard
  439. 748.4 Headwater and Backwater
  440. 748.5 Matching Existing Structures
  441. 748.6 High Water Surface Elevation
  442. 748.7 Bridge Deck and Bridge End Drainage
  443. 748.7 Bridge Reports and Layouts
  444. 748.8 Development in Floodplains
  445. 748.9 Legal Aspects of Hydraulic Design
  446. 750.1 Open Channels
  447. 750.2 Culverts
  448. 750.3 Bridges
  449. 750.4 Storm Sewers
  450. 750.5 Sanitary Sewers
  451. 750.6 Erosion Control and Energy Dissipation
  452. 750.7 Non-Hydraulic Considerations
  453. 751.0 State Map
  454. 751.10 General Superstructure
  455. 751.11 Bearings
  456. 751.12 Barriers, Railings, Curbs and Fences
  457. 751.13 Expansion Joint Systems
  458. 751.14 Steel Superstructure
  459. 751.17 Concrete Slab Bridges
  460. 751.18 Concrete Multicell Box Girder Bridges
  461. 751.1 Preliminary Design
  462. 751.21 Prestressed Concrete Slab and Box Beams
  463. 751.22 Prestressed Concrete I Girders
  464. 751.23 Prestressed Concrete Double Tee Girders
  465. 751.24 LFD Retaining Walls
  466. 751.2 Loads
  467. 751.30 Open Concrete End Bents
  468. 751.31 Open Concrete Intermediate Bents
  469. 751.32 Concrete Pile Cap Intermediate Bents
  470. 751.33 Concrete Semi Deep Abutments
  471. 751.34 Concrete Pile Cap Non-Integral End Bents
  472. 751.35 Concrete Pile Cap Integral End Bents
  473. 751.36 Driven Piles
  474. 751.37 Drilled Shafts
  475. 751.38 Spread Footings
  476. 751.39 Pile Footings
  477. 751.39 Seal Course
  478. 751.3 Structural Steel Design Properties
  479. 751.40 LFD Widening and Repair
  480. 751.4 Reinforced Concrete Design Properties
  481. 751.50 Standard Detailing Notes
  482. 751.5 Structural Detailing Guidelines
  483. 751.6 General Quantities
  484. 751.7 General Design Data
  485. 751.8 LFD Culverts
  486. 751.8 LRFD Concrete Box Culverts
  487. 751.9 LFD Seismic
  488. 770.10 Linseed Oil Treatment
  489. 770.1 District Routine Maintenance and Special Crew Responsibilities
  490. 770.2 Regional and Central Office Bridge Maintenance Crew Responsibilities
  491. 770.3 Cathodic Protection
  492. 770.4 Navigation Lights/Light Tenders
  493. 770.5 Posting of Bridge Limits
  494. 770.6 Bridge Approach Maintenance
  495. 770.6 Mat Gutter Maintenance
  496. 770.7 Channel Work - Gabion Installation
  497. 770.7 Maintenance of Bridge Superstructure
  498. 770.8 Channel Work - Rock Blanket
  499. 770.8 Maintenance of Bridge Substructure
  500. 770.9 Miscellaneous Bridge Maintenance

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)