Pages without language links

Jump to navigation Jump to search

The following pages do not link to other language versions.

Showing below up to 500 results in range #51 to #550.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. 106.13 Quality Control/Quality Assurance
  2. 106.14 Proprietary Items
  3. 106.15 Pipe Shipping Report Form
  4. 106.16 Special Designs and Shop Drawings
  5. 106.17 New Product Evaluation
  6. 106.18 Technician Certification Program
  7. 106.19 Materials Acceptance
  8. 106.1 Source of Supply and Quality Requirements
  9. 106.20 Reporting
  10. 106.21 Summary of Materials Inspected
  11. 106.22 Material Inspection Revisions
  12. 106.23 Online Research Publications (Research Publications)
  13. 106.24 Purchase Order Items
  14. 106.2 Local Materials Sources
  15. 106.3.2.10 TM-10, Specific Gravity Coarse Aggregate for Bituminous Mixtures
  16. 106.3.2.11 TM-11, Static Immersion Stripping Test
  17. 106.3.2.12 TM-12, Stripping of Bituminous-Aggregate Mixtures, Boil Method for Seal Coats
  18. 106.3.2.13 TM-13
  19. 106.3.2.14 TM-14, Soundness Test of Coarse Aggregate - Water-Alcohol Freeze Method
  20. 106.3.2.15 TM-15
  21. 106.3.2.16 TM-16
  22. 106.3.2.17 TM-17
  23. 106.3.2.18 TM-18, Smolder Resistance of Jute Netting
  24. 106.3.2.19 TM-19, Measurement of Pavement Surface Texture Depth by the Sand-Patch Method
  25. 106.3.2.1 TM-1, Alkalinity of Glass Fiber Mat Materials
  26. 106.3.2.20 TM-20, Measurement of Air, Surface or Bituminous Mixture Temperature
  27. 106.3.2.21 TM-21, Determination of Cobalt in Tungsten Carbide Inserts
  28. 106.3.2.22 TM-22, Determination of Percent Open Area of Plastic Filter Cloth
  29. 106.3.2.23 TM-23, Determination of Equivalent Opening Size of Plastic Filter Cloth
  30. 106.3.2.24 TM-24
  31. 106.3.2.25 TM-25, Determination of Chlorine in Chlorinated Rubber and Chlorinated Paraffin
  32. 106.3.2.26 TM-26, Determination of Calcium Carbonate and Magnesium Carbonate in Lime and Pigment Materials
  33. 106.3.2.27 TM-27, Determination of Calcium Oxide and Magnesium Oxide in Hydrated Lime
  34. 106.3.2.28 TM-28
  35. 106.3.2.29 TM-29, Determination of Nitrogen in Liquid Fertilizers
  36. 106.3.2.2 TM-2
  37. 106.3.2.30 TM-30
  38. 106.3.2.31 TM-31
  39. 106.3.2.32 TM-32, Determination of Purity of Sodium Chloride
  40. 106.3.2.33 TM-33
  41. 106.3.2.34 TM-34, Determination of Phosphorus in Lubricants
  42. 106.3.2.35 TM-35, Moisture Offset Factor for a Nuclear Gauge
  43. 106.3.2.36 TM-36, Density of Plastic Portland Cement Concrete by Nuclear Gauge
  44. 106.3.2.37 TM-37, Apparent Specific Gravity of Fine Aggregate for Bituminous Mixtures
  45. 106.3.2.38 TM-38, Determination of Dew Point for Structural Steel Painting
  46. 106.3.2.39 TM-39, Pull-Out Tests on Expansive Mortars
  47. 106.3.2.3 TM-3
  48. 106.3.2.40 TM-40, A One-Point Moisture-Density Relations Test for Soils
  49. 106.3.2.41 TM-41, Density Testing of Bituminous Mixtures with Nuclear Gauges
  50. 106.3.2.45 TM-45, Determination of Dry Film Coating Thickness Using Magnetic Gauges
  51. 106.3.2.46 TM-46, Analysis of Cement, Ground Granulated Blast Furnace Slag and Fly Ash
  52. 106.3.2.46 TM-46, Analysis of Cements and Fly Ashes
  53. 106.3.2.47 TM-47
  54. 106.3.2.48 TM-48, Determination of the Purity of Calcium Chloride
  55. 106.3.2.49 TM-49, Pull-Out Tests on Chemical Bonding Agents
  56. 106.3.2.4 TM-4
  57. 106.3.2.50 TM-50, Mechanical Analysis of Extracted Aggregate (Rapid Method)
  58. 106.3.2.51 TM-51, Determination of Bitumen in Bituminous Paving Mixtures
  59. 106.3.2.52 TM-52, Determination of Magnesium Chloride in Magnesium Chloride Brine
  60. 106.3.2.53 TM-53, Determination of Moisture Content of Bituminous Mixtures
  61. 106.3.2.54 TM-54, Asphalt Cement Content of Bituminous Mixtures by the Nuclear Method
  62. 106.3.2.55 TM-55, Determination of Calcium, Magnesium and Potassium in Soils
  63. 106.3.2.56 TM-56, Determination of Sodium Metasilicate (Na2SiO3)
  64. 106.3.2.57 TM-57, Determination of Manganese and/or Copper in Steel
  65. 106.3.2.58 TM-58, Determination of Phosphoric Acid (P2O5) in Commercial Fertilizers
  66. 106.3.2.59 TM-59, Determination of the International Roughness Index
  67. 106.3.2.5 TM-5
  68. 106.3.2.60 TM-60, Test of Cellulose and Mineral Fibers for SMA Mixtures
  69. 106.3.2.61 TM-61, Asphalt Draindown Test Procedure for Stone Mastic Asphalt Mixtures
  70. 106.3.2.62 TM-62, Prequalification of Dust Suppressants
  71. 106.3.2.63 TM-63, Determination of Compatibility of Asphalt Release Agents with Hot Asphaltic Concrete
  72. 106.3.2.64 TM-64, Void Detection and Undersealing Verification Testing of Concrete Pavement with a Falling Weight Deflectometer
  73. 106.3.2.66 TM-66, Aggregate Sample Reduction
  74. 106.3.2.67 TM-67, Preparation of Concrete for Use in AASHTO T161 Freeze and Thaw
  75. 106.3.2.68 TM-68
  76. 106.3.2.6 TM-6
  77. 106.3.2.70 TM-70, Glass Bead Tests
  78. 106.3.2.71 TM-71, Deleterious Content of Aggregate
  79. 106.3.2.72 TM-72, Sweep Test of Bituminous Surface Treatment Samples
  80. 106.3.2.73 TM-73, Volume of Voids in Compacted Filler or Fines
  81. 106.3.2.74 TM-74, Pullout Tests on Epoxy Bonding Agents for Resin Anchor Systems
  82. 106.3.2.75 TM-75, Determining Segregation Using the Nuclear Density Gauge
  83. 106.3.2.76 TM-76, Acid Insoluble Residue
  84. 106.3.2.77 TM-77, Determining the Binder Ignition Aggregate Correction Factor for Mixtures Containing Rap
  85. 106.3.2.78 TM-78, Los Angeles Abrasion for Lightweight Aggregate
  86. 106.3.2.79 TM-79, Procedure to Prepare Aggregate to Determine the Plasticity Index
  87. 106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs
  88. 106.3.2.80 TM-80, Measurement of Retroreflectivity by Handheld Retroreflectometers
  89. 106.3.2.81 TM-81, Specific Gravity and Absorption of Aggregate Using Automatic Vacuum Sealing Method
  90. 106.3.2.82 TM-82, Concrete Uniformity
  91. 106.3.2.83 TM-83, Field Estimation of Water Permeability of Compacted Asphalt Paving Mixtures
  92. 106.3.2.84 TM-84, Pipe Laser Profile Calibration
  93. 106.3.2.85 TM-85 Determination of Polyphosphoric Acid (PPA) in Performance Graded (PG) Asphalt Binders
  94. 106.3.2.86 TM-86 Preparation of Samples for Surface Sealer Wet Track Abrasion
  95. 106.3.2.87 TM-87 No-Pick-Up Time for Tack Coats
  96. 106.3.2.88 TM-88 Bond Strength Test for Tack Coat
  97. 106.3.2.89 TM-89 Determination of Aluminum Oxide in High Friction Surface Treatments (HFST)
  98. 106.3.2.8 TM-8, Photometric Test for Measuring the Brightness of Reflective Sheeting
  99. 106.3.2.90, Determination of Chemical Components in Asphalt and Non-Asphalt Rejuvenators
  100. 106.3.2.91 TM-91, Determination of Total Sulfur in Fly Ash by Sodium Carbonate fusion
  101. 106.3.2.92 TM-92, Determination of Sulfide sulfur by oxidation of blended slag cements
  102. 106.3.2.94 TM-94 Identification of Penetrating Emulsified Asphalts
  103. 106.3.2.95 TM-95 Mass Retention of Emulsified Asphalts Subjected to Water Droplets
  104. 106.3.2.9 TM-9, Resilience of Hot-Poured Elastic Type Joint Sealer
  105. 106.3 Samples, Tests and Cited Specifications
  106. 106.4 Plant Inspections
  107. 106.5 Storage of Materials
  108. 106.6 Handling Material
  109. 106.7 Unacceptable Material
  110. 106.8 Material Furnished by the Commission
  111. 106.9 Buy America Requirement
  112. 1060.4 Laboratory Testing Guidelines for Sec 1060
  113. 1066.4 Laboratory Testing Guidelines for Sec 1066
  114. 1070.3 Laboratory Testing Guidelines for Sec 1070
  115. 120.1 Pavements
  116. 120.2 Shoulders
  117. 120.3 Bridges
  118. 120.4 Traffic Control
  119. 120.5 Roadside Features
  120. 120.6 Roadsides
  121. 120.7 Drainage
  122. 120.8 Welcome Centers
  123. 120.9 Uninterrupted Traffic Flow
  124. 121.1 Public Involvement and Decision-Making
  125. 121.2 The Planning Framework for Transportation Decision-Making
  126. 121.3 The Statewide Transportation Improvement Program (STIP)
  127. 121.4 Quality Assurance / Quality Control for Project Prioritization
  128. 121.5 Asset Management
  129. 121.6 STIP Amendments
  130. 121.7 Program Estimates
  131. 127.10 Section 4(f) Public Lands
  132. 127.11 Farmland Conversion
  133. 127.12 Air Quality
  134. 127.13 Noise
  135. 127.14 National Environmental Policy Act (NEPA) Classification and Documents
  136. 127.15 Reevaluation of National Environmental Policy Act (NEPA) Documents
  137. 127.16 Wetland and Stream Mitigation
  138. 127.17 Wetland and Stream Mitigation Banking
  139. 127.18 Job Special Provisions (JSP) and Contract Documents
  140. 127.19 Section 404 Clean Water Act for Bridge Demolitions
  141. 127.1 Request for Environmental Services
  142. 127.20 Stream Stewardship Trust Fund in-Lieu Fee Mitigation Program
  143. 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties
  144. 127.22 Off-Site Borrow, Spoil, and Staging Areas
  145. 127.23 Negotiated Commitments and Mitigation in the National Environmental Policy Act (NEPA) Process
  146. 127.24 Speleological Findings
  147. 127.25 Maintenance Environmental Policies
  148. 127.26 Environmental Classification
  149. 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities
  150. 127.28 Planning and Environmental Linkages (PEL) and the National Environmental Policy Act (NEPA)
  151. 127.29 Stormwater
  152. 127.2 Historic Preservation and Cultural Resources
  153. 127.3 Community Impact Assessment
  154. 127.4 Wetlands and Streams
  155. 127.7 Threatened and Endangered Species
  156. 127.8 Hazardous and Solid Waste
  157. 127.9 Floodplain Management
  158. 130.6 Project Manager’s Guide
  159. 130.7 Value Engineering Team Leader Guide
  160. 131.1 Design Exception Process
  161. 131.2 Proprietary Items and Public Interest Findings
  162. 131.4 Design Exception Process
  163. 131.5 Proprietary Items and Public Interest Findings
  164. 132.1 Material Inspection for Safety
  165. 132.2 Construction Inspection Guidelines for Safety Precautions
  166. 132.2 Missouri's Blueprint - A Partnership Toward Zero Deaths
  167. 132.4 Highway Safety Plan and Performance Plan
  168. 133.1 Materials for Snow and Ice Control
  169. 133.2 Equipment for Snow and Ice Control
  170. 133.3 Snow and Ice Control Personnel
  171. 133.4 Snow and Ice Control Operations
  172. 133.5 Operator’s Guide for Anti-Icing
  173. 135.1 Guidelines for Good Contractor Relationships
  174. 135.2 Public Contacts
  175. 135.3 Inter-Departmental Relations
  176. 135.4 Required Notices and Posters
  177. 135.5 Labor Compliance
  178. 135.6 Equal Employment Opportunity
  179. 136.10 Construction Authorization and Letting
  180. 136.12 Reimbursement and Auditing
  181. 136.13 Glossary
  182. 136.2 Bridge Soft Match Credit Program
  183. 136.3 Project Selection and Programming
  184. 136.5 Agreements
  185. 136.7 Right of Way and Public Hearings
  186. 136.8 Preliminary Design
  187. 141.1 Cost Share Program
  188. 141.2 Missouri Transportation Finance Corporation (MTFC) Loans
  189. 141.3 Local Funding Options
  190. 141.4 Partnership Development Process
  191. 141.4 Transportation Improvement Program Amendments
  192. 141.5 Dispute Resolution Process
  193. 141.6 Acronyms and Definitions
  194. 141.7 Transportation Improvement Program Approval
  195. 141.8 Sponsorship Programs
  196. 144.5 Pavement Maintenance
  197. 147.1 Alternative Technical Concepts
  198. 147.2 Add Alternate Bidding
  199. 147.3 Job Order Contracting (JOC)
  200. 147.4 Fixed Price Variable Scope (FPVS) Contracting
  201. 153.10 Design – Escrow
  202. 153.11 Financial Services
  203. 153.12 General Services
  204. 153.13 Highway Safety
  205. 153.14 Human Resources
  206. 153.15 Information Systems
  207. 153.16 Maintenance
  208. 153.17 Medical Board Employee Benefits
  209. 153.18 Motor Carrier Services
  210. 153.19 Multimodal
  211. 153.20 Right of Way
  212. 153.21 Traffic
  213. 153.22 Transportation Planning
  214. 153.23 Utility
  215. 153.4 Administrative
  216. 153.5 Bridge
  217. 153.6 Chief Counsel's Office
  218. 153.7 Construction and Materials
  219. 153.8 Customer Relations
  220. 153.9 Design
  221. 171.10 Traffic Control
  222. 171.11 Roadside Appurtenances
  223. 171.12 Maintenance Policy History
  224. 171.1 Administration
  225. 171.2 Buildings and Grounds
  226. 171.3 Roadway Maintenance
  227. 171.4 Shoulders and Approaches
  228. 171.5 Drainage
  229. 171.6 Roadsides
  230. 171.7 Bridge Maintenance
  231. 171.8 Snow and Ice Control
  232. 171.9 Environmental
  233. 230.1 Horizontal Alignment
  234. 230.2 Vertical Alignment
  235. 231.1 Median Width
  236. 231.2 Clear Zones
  237. 231.3 Lane Width
  238. 231.4 Shoulder Width
  239. 231.5 Inslope Grade
  240. 231.6 Roadside Ditches
  241. 231.7 Backslope Grade
  242. 231.8 Bridge Width
  243. 232.1 Climbing Lanes
  244. 232.2 Passing Lanes
  245. 232.3 Two - Way Left - Turn Lanes
  246. 232.4 Expressways
  247. 232.5 Freeways
  248. 233.1 At-Grade Intersections - Driveways and Entrances
  249. 233.2 At-Grade Intersections with Stop and Yield Control
  250. 233.3 Roundabouts
  251. 233.4 At-Grade Intersections with Signal Control
  252. 234.1 Access to Interstate Highways
  253. 234.1 Interchange Justification for Interstate Highways
  254. 234.2 Diamond Interchanges
  255. 234.3 Directional Interchanges
  256. 234.4 Single Point Urban Interchanges (SPUIs)
  257. 234.5 Cloverleaf Interchanges
  258. 234.6 Diverging Diamond Interchanges
  259. 236.10 Right Of Way Condemnation
  260. 236.11 Mediation
  261. 236.12 Quality Assurance Reviews
  262. 236.13 Designing Right of Way Plans
  263. 236.14 Change in Route Status Report
  264. 236.15 Requests from Cities for Annexations
  265. 236.16 Outdoor Advertising
  266. 236.17 Junkyards
  267. 236.18 Scenic Byways
  268. 236.1 General Information
  269. 236.2 Right of Way Organization and Personnel
  270. 236.3 Administration
  271. 236.4 Description Writing and Titles
  272. 236.5 Property Management
  273. 236.6 Appraisal and Appraisal Review
  274. 236.7 Negotiation
  275. 236.8 Relocation Assistance Program
  276. 236.9 Asbestos Abatement-Removal of Building Improvement
  277. 237.10 Distribution of Contract Plans
  278. 237.11 Signing and Sealing
  279. 237.12 Communication with the Public
  280. 237.13 Contract Plan File Name Convention
  281. 237.14 Electronic Design Data Delivery (BIM Deliverables)
  282. 237.1 Plan Details
  283. 237.2 Title Sheet
  284. 237.3 Summary and Tabulation of Quantities
  285. 237.4 Plan-Profile Sheets
  286. 237.5 Special Provisions
  287. 237.6 Project Estimates
  288. 237.7 Equipment and Materials List
  289. 237.8 Contract Time
  290. 237.9 Submission of Plans and Supporting Documents
  291. 238.1 Aerial Mapping and LiDAR Surveys
  292. 238.2 Land Surveying
  293. 238.3 Route Surveying
  294. 238.4 Construction Surveying
  295. 320.1 Preliminary Geotechnical Report
  296. 320.2 Release of Subsurface Information
  297. 320.3 Drilling Operations
  298. 320.4 Procedure for Final Sounding
  299. 320.5 Foundation Investigations
  300. 320.6 Slide Investigations
  301. 320.7 Quarantine Regulations
  302. 321.1 Design of Earth Slopes
  303. 321.2 Geotechnical Guidelines
  304. 321.3 Procedures for Estimation of Geotechnical Parameter Values and Coefficients of Variation
  305. 413.10 Undersealing
  306. 413.1 Micro-Surfacing
  307. 413.2 Scrub Seal
  308. 413.3 Ultrathin Bonded Asphalt Wearing Surface
  309. 413.4 Bituminous Fog Sealing
  310. 413.5 Crack Treatment in Bituminous Pavements
  311. 413.6 Scrub Seal Treatment
  312. 413.7 Thin Hot Mix Asphalt Overlay
  313. 413.8 Spot Seal Coating
  314. 413.9 Fly Coating
  315. 460.1 Quality Control/Quality Assurance
  316. 460.2 Pre-Pavement Meeting
  317. 460.3 Plant Inspection
  318. 460.4 Paving Equipment
  319. 460.5 Roadway Inspection
  320. 460.6 Paving Operations
  321. 460.7 Mat Problems
  322. 570.1 Repair of Concrete Surface Failures
  323. 570.2 Joint and Crack Maintenance
  324. 570.3 Repair of Buckled Pavement
  325. 570.4 Repair of Settlements with Bituminous Patches
  326. 570.5 Mudjacking (Slab Jacking) by MoDOT Maintenance
  327. 570.6 Preparation of Portland Cement Concrete Surfaces Prior to Resurfacing
  328. 606.1 Guardrail
  329. 606.2 Guard Cable
  330. 606.3 One-Strand Cable - Access Restraint
  331. 607.1 Applications
  332. 607.2 Plans
  333. 607.3 One-Strand Cable - Access Restraint
  334. 607.4 Maintenance Planning Guidelines for Fences
  335. 609.3 Material Inspection for Sec 609
  336. 609.4 Maintenance Planning Guidelines for Cleaning and Reshaping Paved Ditches
  337. 609.5 Maintenance Planning Guidelines for Repairing Paved Ditches and Slopes
  338. 609.6 Maintenance Planning Guidelines for Repairing Curbs
  339. 611.1 Rock Blanket
  340. 611.2 Revetment
  341. 611.3 Concrete Slope Protection
  342. 611.4 Gabions
  343. 612.4 Maintenance Planning Guidelines for Impact Attenuators
  344. 614.2 Material Inspection for Sec 614
  345. 614.3 Laboratory Testing Guidelines for Sec 614
  346. 614.4 Maintenance Planning Guidelines for Drop Inlets and Storm Sewers
  347. 614.5 Maintenance of Floodgates
  348. 616.10 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation
  349. 616.11 Traffic Control for Waterways
  350. 616.12 Work Zone Speed Limits
  351. 616.13 Work Zone Capacity, Queue and Travel Delay
  352. 616.14 Work Zone Safety and Mobility Policy
  353. 616.15 Transit Considerations
  354. 616.16 Law Enforcement Services
  355. 616.17 Pavement Edge Treatment
  356. 616.18 Construction Inspection Guidelines for Sec 616
  357. 616.19 Quality Standards for Temporary Traffic Control Devices
  358. 616.1 General (MUTCD Chapter 6A)
  359. 616.20 Flagger Training
  360. 616.21 Work Zone Technician Training
  361. 616.22 Advanced Work Zone Training
  362. 616.23 Traffic Control for Field Operations
  363. 616.24 Traffic Control for Non-Motorized Traffic
  364. 616.25 MoDOT Work Zone Guidelines
  365. 616.26 Work Zone User Training
  366. 616.27 MoDOT Fleet Lighting
  367. 616.2 Fundamental Principles (MUTCD Chapter 6B)
  368. 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C)
  369. 616.4 Pedestrian and Worker Safety (MUTCD Chapter 6D)
  370. 616.5 Flagger Control (MUTCD Chapter 6E)
  371. 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)
  372. 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G)
  373. 616.8 Typical Applications (MUTCD 6H)
  374. 616.9 Control of Traffic Through Traffic Incident Management Areas (MUTCD 6I)
  375. 616.x Typical Applications January 2023
  376. 617.1 Temporary Traffic Barriers
  377. 617.2 Construction Inspection Guidelines for Sec 617
  378. 617.3 Material Inspection for Sec 617
  379. 617.4 Laboratory Testing Guidelines for Sec 617
  380. 617.5 Maintenance Planning Guidelines for Concrete Traffic Barriers
  381. 620.10 Operational Procedures and Safety
  382. 620.11 Guidelines for Using Water-Borne Traffic Paint
  383. 620.12 Construction Inspection for Sec 620
  384. 620.13 Measurement of Retroreflectivity by Handheld Retroreflectometers
  385. 620.14 3M Installation Contract
  386. 620.1 General (MUTCD Chapter 3A)
  387. 620.2 Pavement and Curb Markings (MUTCD Chapter 3B)
  388. 620.3 Roundabout Markings (MUTCD Chapter 3C)
  389. 620.4 Markings for Preferential Lanes (MUTCD Chapter 3D)
  390. 620.5 Delineators (MUTCD Chapter 3F)
  391. 620.6 Colored Pavements
  392. 620.7 Channelizing Devices Used for Emphasis or Pavement Marking Patterns
  393. 620.8 Islands
  394. 620.9 Rumble Strip Markings
  395. 626.1 Edgeline Rumble Strips
  396. 626.2 Centerline Rumble Strips
  397. 626.3 Construction Inspection Guidelines for Sec 626
  398. 626.4 Transverse Rumble Strips
  399. 626.5 Modified Rumble Strips
  400. 640.1 Pavement Drainage
  401. 640.2 Median Drainage
  402. 641.1 Bicycle Facilities
  403. 642.10 Curb Ramp Applications
  404. 642.11 Pedestrian Grade Separations
  405. 642.12 Pedestrians and Roundabouts
  406. 642.13 ADA Self-Evaluation
  407. 642.14 ADA Transition Plan
  408. 642.1 Integrating Non-Motorized Facilities
  409. 642.2 Consideration of Pedestrian Facilites on Projects
  410. 642.3 Americans with Disabilities Act of 1990
  411. 642.4 Impact of the Project Category on ADA
  412. 642.5 Maximum Extent Feasible
  413. 642.6 Local Projects and ADA Considerations
  414. 642.7 Maintenance Responsibility
  415. 642.8 Sidewalk Design Criteria
  416. 642.9 Sidewalk Ramp and Curb Ramp Design Criteria
  417. 643.1 Utilities - Status and Liability Acceptance
  418. 643.1 Utilities - Status Letter
  419. 643.2 Local Utility Adjustments - Public and Private
  420. 643.3 Policy, Standards and Regulations
  421. 643.4 Railroads
  422. 646.1 Manholes
  423. 646.2 Pipelines
  424. 646.3 Private Underpasses
  425. 646.4 Work Funded by Maintenance
  426. 733 Precast Concrete Box Culverts
  427. 748.1 Evaluation of Project Impacts
  428. 748.2 Roadway Design Criteria
  429. 748.3 Freeboard
  430. 748.4 Headwater and Backwater
  431. 748.5 Matching Existing Structures
  432. 748.6 High Water Surface Elevation
  433. 748.7 Bridge Deck and Bridge End Drainage
  434. 748.7 Bridge Reports and Layouts
  435. 748.8 Development in Floodplains
  436. 748.9 Legal Aspects of Hydraulic Design
  437. 750.1 Open Channels
  438. 750.2 Culverts
  439. 750.3 Bridges
  440. 750.4 Storm Sewers
  441. 750.5 Sanitary Sewers
  442. 750.6 Erosion Control and Energy Dissipation
  443. 750.7 Non-Hydraulic Considerations
  444. 751.0 State Map
  445. 751.10 General Superstructure
  446. 751.11 Bearings
  447. 751.12 Barriers, Railings, Curbs and Fences
  448. 751.13 Expansion Joint Systems
  449. 751.14 Steel Superstructure
  450. 751.17 Concrete Slab Bridges
  451. 751.18 Concrete Multicell Box Girder Bridges
  452. 751.1 Preliminary Design
  453. 751.21 Prestressed Concrete Slab and Box Beams
  454. 751.22 Prestressed Concrete I Girders
  455. 751.23 Prestressed Concrete Double Tee Girders
  456. 751.24 LFD Retaining Walls
  457. 751.2 Loads
  458. 751.30 Open Concrete End Bents
  459. 751.31 Open Concrete Intermediate Bents
  460. 751.32 Concrete Pile Cap Intermediate Bents
  461. 751.33 Concrete Semi Deep Abutments
  462. 751.34 Concrete Pile Cap Non-Integral End Bents
  463. 751.35 Concrete Pile Cap Integral End Bents
  464. 751.36 Driven Piles
  465. 751.37 Drilled Shafts
  466. 751.38 Spread Footings
  467. 751.39 Pile Footings
  468. 751.39 Seal Course
  469. 751.3 Structural Steel Design Properties
  470. 751.40 LFD Widening and Repair
  471. 751.4 Reinforced Concrete Design Properties
  472. 751.50 Standard Detailing Notes
  473. 751.5 Structural Detailing Guidelines
  474. 751.6 General Quantities
  475. 751.7 General Design Data
  476. 751.8 LFD Culverts
  477. 751.8 LRFD Concrete Box Culverts
  478. 751.9 LFD Seismic
  479. 770.10 Linseed Oil Treatment
  480. 770.1 District Routine Maintenance and Special Crew Responsibilities
  481. 770.2 Regional and Central Office Bridge Maintenance Crew Responsibilities
  482. 770.3 Cathodic Protection
  483. 770.4 Navigation Lights/Light Tenders
  484. 770.5 Posting of Bridge Limits
  485. 770.6 Bridge Approach Maintenance
  486. 770.6 Mat Gutter Maintenance
  487. 770.7 Channel Work - Gabion Installation
  488. 770.7 Maintenance of Bridge Superstructure
  489. 770.8 Channel Work - Rock Blanket
  490. 770.8 Maintenance of Bridge Substructure
  491. 770.9 Miscellaneous Bridge Maintenance
  492. 771.10 Bridge Joint Sealing - Hot Pour
  493. 771.11 Bridge Joint Sealing - Silicone
  494. 771.12 Bridge Joint Sealing - Polytite
  495. 771.13 Sealing Abutment and Pier Caps
  496. 771.14 Spot Painting of Bearings and Piling
  497. 771.15 Concrete Bridge Deck Sealer Selection Matrix
  498. 771.16 Penetrating Concrete Sealer - Silane
  499. 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP)
  500. 771.18 In-Deck Bridge Deck Crack Filler

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)