Difference between revisions of "Category:101 Standard Forms"
Jump to navigation
Jump to search
m (→AASHTOWare Project Quick Reference Guides (QRGs): Per CM, new QRG Checking For Unauthorized Sample Records) |
m (→Checklist: Per Bidding and Contracts, updated D-12 links) |
||
Line 546: | Line 546: | ||
*[[media:124.2.4 Design Progress Check list.docx|Design Progress Check List]] | *[[media:124.2.4 Design Progress Check list.docx|Design Progress Check List]] | ||
− | *[[media:D- | + | *[[media:D-12_2022.pdf|District Final Design Checklist - D-12]] |
*[[media:124.2.4 Check List for Preliminary Plans.docx|Preliminary Plans Check List]] | *[[media:124.2.4 Check List for Preliminary Plans.docx|Preliminary Plans Check List]] |
Revision as of 12:46, 18 May 2022
EPG articles are not referenced as "sections" but as EPG XXX.X (example: EPG 401.3) to avoid confusion with MoDOT specs (which are contractually binding). |
Contents
- 1
- 2 Bridge
- 3 Construction and Materials
- 4 Design
- 5 External Civil Rights
- 6 Financial Services
- 7 Highway Safety/Traffic
- 8 Maintenance
- 9 Motor Carrier Services
- 10 Planning
- 11 Right of Way
- 11.1 General Information
- 11.2 Right of Way Organization and Personnel
- 11.3 Administration
- 11.4 Description Writing and Titles
- 11.5 Property Management
- 11.6 Appraisal and Appraisal Review
- 11.7 Negotiation
- 11.8 Relocation Assistance Program
- 11.9 Asbestos Abatement-Removal of Building Improvement
- 11.10 Right Of Way Condemnation
- 11.11 Mediation
- 11.12 Quality Assurance Reviews
- 11.13 Designing Right of Way Plans
- 11.14 Change in Route Status Report
- 11.15 Requests from Cities for Annexations
- 11.16 Outdoor Advertising
- 11.17 Junkyards
- 11.18 Local Public Agency Land Acquisition
Standard forms organized by functional unit are accessible from this page. The files accessible by the links below are identical to those accessed through Word, Excel or other software application by MoDOT employees. Many of these file links are also contained in Engineering Policy Guide articles that refer to the forms.
Bridge
Construction and Materials
Forms for Contractor Use
Construction and Contractor Related
- Contractor Questionnaire (to bid contracts less than $2,000,000)
- Prequalification Contractor Questionnaire (to bid a contract of any size)
Materials Related
Posters, Federal Aid
Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.
Posters, State Aid
Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.
Utility or Right of Way Related
Quick Reference Guides (QRGs)
AASHTOWare Project Quick Reference Guides (QRGs)
Storm Water Database Quick Reference Guides (QRGs)
Design
Microstation D-Sheets |
Signing |
D-28, D-29 through D-34 |
Signals |
D-37A through D-37d, D-38 through D-38e |
Typical Sections |
D-49 through D-70 |
Miscellaneous |
D-71 |
Bridge
Checklist
Contracts
Design Forms
Engineering Professional Services
Environmental and Cultural
Materials
Planning
Public Involvement
- Public Hearing Statement Form
- Sample Letter Advertising a Public Hearing
- Sample Notice 4F
- Sample Notice of Public Hearing
- Sample Opportunity for a Public Hearing/Meeting Notice
- Sample Public Involvement Plan or Communication Plan
- Sample Request for Approval of Location and/or Design of Highways to State Design Engineer
- Sample Request for Approval of Location to the Commission
- Sample Transcript
Right of Way
Scoping
Survey
External Civil Rights
DBE
OJT
Workforce Diversity JSP
Financial Services
Highway Safety/Traffic
Maintenance
Chip Seal Forms
- Application Adjustment Factor Form
- Traffic Evaluation Factor (TEF) for Asphalt Application Adjustment
Bridge Maintenance
- Blank Inspection Report
- Bridge Maintenance Repair Report (Excel)
- Cathodic System Evaluation
- CIF (Critical Inspection Finding)
- FAR (Follow-Up Action Required)
- Maintenance Material Usage (Excel)
- Maintenance Recommendation Report
- Paint Data Report (Excel)
- Photo Log Sheet (Excel)
Snow & Ice Control
Rest Areas
Commuter Lots
Disasters
Performance Indicators
Pavement Management
Motor Carrier Services
Planning
Right of Way
General Information
Right of Way Organization and Personnel
Administration
Description Writing and Titles
Property Management
Appraisal and Appraisal Review
Negotiation
Relocation Assistance Program
Asbestos Abatement-Removal of Building Improvement
Right Of Way Condemnation
Mediation
Quality Assurance Reviews
Designing Right of Way Plans
Change in Route Status Report
Requests from Cities for Annexations
Outdoor Advertising
Junkyards
Local Public Agency Land Acquisition